Group 2
Afiq Hidayatullah
Meirani Khairunnisa
William Surjana
Albertus Diantoro
The Øresund Bridge is a 16-kilometer (10 mile) joined rail and street connect
burrow spreading over the Øresund strait. It is connecting the urban communities
of Copenhagen, Denmark to Malmo in Sweden. The Øresund Link crosses the
Baltic Sea and is made up of an artificial island stretching 4 km, a 4 km
underwater tunnel and a bridge spanning 8 km.
The opening of the Øresund Bridge has allowed 17,000 people to commute
across the bridge every day, which has reduced the issue of labour shortages in
Denmark and improved the housing market in Sweden. The bridge has also
improved trade, tourism and relations between the two countries and has allowed
Sweden to be connected to mainland Europe.
2. Background
A. Concept
First concept was build the tunnel for 16 km long, but it will be pricely
and high risk for the aircraft, because it is very near with Kopenham
International Airport and will disturb the air traffic for landing and take off it will
be very risky for safety. Then it result, build lower bridge will be safer for the
aircraft. Then, suddenly it comes build road inside the water, half tunnel for
the safer aircraft traffic and with half bridge to reduce the cost. Then, the
problem is to build the tunnel to the sea, it need dry land to enter & exit road.
Finally the final discussion result final mapping concept is to build 4 km
Tunnel, 4 km dry land, 8 km bridge.
C. Production
The first step is to make the perimeter, large carried stone bring from
sweden, billion kilograms of them. To stay on schedule, material was
constantly being brought here. To make the precise location on where they
put the material, they use the GPS to make 12 km perimeters. The Denmark
and Sweden usually get the material from the bottom of the sea.
There are several major issue that were considered under the
design-build contract, which are about the general identification and
assessment of construction risks, ship collision in connection with realignment
of navigation channel, and risks in connection with 5-year bridge operation by
contractor.
The replacement of the cable that was used for suspension is a crucial
problem, because it’s affect the safety requirement for the bridge users. The
bridge wasn’t in a good static condition, meaning there is some force acting
down (pressing down) from the bridge and cause some noise. The bridge is
not 100% in a good static condition when there are cars and train passing on
the bridge. on the production process of installation the cable, the engineers
need to calculate the tension of the cable and putting the cable accurately and
precise to the specification that the engineers design. This is complicated by
pre-stressing requirements and traffic flow across the bridge, but is still far
simpler than cable replacement on a suspension bridge.
D. Utilization
After the bridge have been raised, in 5 first five years, there are more
than 40.000 cars across this bridge with their different needs; businesses,
tourism, and finding job. However, in the first year, the engineers face several
problems especially in the maintenance of the bridge. The bold and nuts are
rusting, its not only but over 16.000 bolt to make sure the bridge stand strong.
Therefore, the engineers are trying to fixed the problem by cleaning and
giving moisture to the bolt and nuts. Morever, the suspension cable also need
to be maintain. The cable dumper will napless by time than it need to be
replace and checked.
There is also another surprised fact that this brick become the artificial
coral reefs. There are an increasing number of reef which become the home
of many fish. Furthermore, this bridge are connecting the two countries, two
continent in the europe so that it theri transportation for any kind of needs.
4. Conclusion
Based on the analysis, the Øresund Bridge is a really fine concept of system
engineering. As it was explained, the project went through a solid and efficient life
cycle stages with strong concept. The whole development of concept cause the
efficiency in budgets and time both for the process and the result of the
construction of the bridge.
The construction of the bridge answered the basic issues mentioned in the
background. As the first issues is about to connect the locations and the second
is about the community and project context. The construction is succeed in
connecting two nations which are Denmark and Sweden through the Øresund
Bridge. By having the bridge, the connection and transportation for the two
countries is more eased. The usual two hours duration of the transportation
between Denmark and Sweden through ferry now is reduced to 10 minutes. The
usual cost of ferry now can be reduced to very minimum moreover for self-owned
transportation citizen for the both nations. As about the community and project
context issues, both nations has their own issues about economy, while
Copenhagen have problems with high cost and tight labor for the business,
Malmo also has problem with unemployment. The connection between two
countries would give them both the solutions with efficiency of costs and times for
both nations through the bridge. Malmo could integrate its economies and reduce
its unemployment by having their labors work in Copenhagen, while Copenhagen
is also able to solve its lack of labors.
According to the analysis of the system and life cycle stages, it is concluded
that the approach for this system is sequential as the methods are predictable,
stable, repeatable, and high assurance. Process improvement focuses on
increasing process capability through standardization, measurement, and control.
It is known that this project has strong concept. The concept has 4000 drawing
design from start to delivery of final documentation which was evolved for seven
years. The project develop its concept with good-composed of budget, time, and,
quality constraints. The initial planning is carried throughout the whole process
including the risk analysis. The Øresund Bridge is a success project of system
engineering using sequential approach.
References:
https://www.youtube.com/watch?time_continue=539&v=X8_VQbOh7go
https://www.bing.com/videos/search?q=story+of+oresund+bridge+consturction&view
=detail&mid=1E954CB1E369417280D91E954CB1E369417280D9&FORM=VIRE
https://www.youtube.com/watch?v=lm9XB9D3nzs
http://www.bath.ac.uk/ace/uploads/StudentProjects/Bridgeconference2011/papers/S
aleema%20Hughes.pdf
https://www.oresundsbron.com/en/node/6738