Академический Документы
Профессиональный Документы
Культура Документы
17
A ADJUST PILE GROUP AT GRID 2/D & 2/E AP 24.11.17
PROPOSED LAYOUT
B FOOTING AT GRID 2/E, 4/C(CONFIRMED) & 5/C AP 30.11.17
C 6BPa @ GRID 3/D REVISED AP 05.01.18
D 6BPb @ GRID 9/C & 4BPa @ GRID 9/D REVISED AP 18.01.18
E STUMP ENLARGEMENT FOR FT9 @ GRID 4/C AP 30.01.18
E.4 15.03.18
1089
5
4400
4400
108
95
108
95
11400
11400
EL
:3
5.1
39200
5
39200
EL: 35.35
0
790
11500
11500
EL: 36.65
00
114
8400
00
8400
308
EL: 34.85 Geotechnical, Civil & Structural Engineering Consultancy
F-5-7, Block F, Neo Damansara, No. 1, Jalan PJU 8/1,
Damansara Perdana, 47820 Petaling Jaya, Selangor.
Tel: 03-7732 8970 Fax: 03-7732 9870
00
115
9500 9500 9900 9900
9500 9500
FOR CONSTRUCTION
REV.:
C/AP/J006/S/OR/PL/LP/003 E.4