PRODUCT COSTING CONFIGURATION

Title Tr Code Menu path Configuration Rationale


Maintain Overhead Cost Element KA06 IMG -> Controlling -> PCC -> Overhead Cost Overhead Cost Element is the secondary cost element,
PCP -> Basic Settings for Element is used to a cost carrier which carries the cost from Cost centre’s to
Material Costing -> Overhead -> carry overhead cost Production Order and are used in Cost Component
Maintain Overhead Cost Element from Cost Center to Structure and costing Sheet.
Production Order

Maintain Calculation Base SPRO IMG -> Controlling -> PCC -> Material Calculation base helps in determining to which cost
PCP -> Basic Settings for elements overhead is applied together.
Material Costing -> Overhead -> Production
Costing Sheet: Components ->
Define Calculation Base
Define Percentage Overhead SPRO IMG -> Controlling -> PCC -> Plan -> Overhead Type The planned overhead calculation works out to be 18%
PCP -> Basic Settings for 1 of the total raw material consumption. Here we calculate
Material Costing -> Overhead -> and assign plan and actual overhead and attach it to a
Costing Sheet: Components -> Actual -> Overhead dependency.
Define Overhead Percentage Type 2
Define Credits SPRO IMG -> Controlling -> PCC -> E01, PUN, CHN, DUR, Credit key helps in attaching the cost center that needs
PCP -> Basic Settings for GUR, HOS, NAS, RAN to be credited when a production order is debited with
Material Costing -> Overhead -> the earlier created overhead cost.
Costing Sheet: Components ->
Define Credits
Define Costing Sheet SPRO IMG -> Controlling -> PCC -> We create separate Costing sheet integrates all elements of overhead
PCP -> Basic Settings for costing sheet for each costing defined earlier such as calculation base,
Material Costing -> Overhead -> of the manufacturing overhead rate and credit key. Since each credit key has
Define Costing Sheets plants – PUNCS, a plant specific cost centre to be credited we have
CHNCS, DURCS, separate costing sheet for each plant.
GURCS, HOSCS,
NASCS and RANCS
Define Cost Component Structure OKTZ IMG -> Controlling -> PCC -> Material The cost component structure breaks down the results of
PCP -> Basic Settings for Raw Material the standard cost estimate into factors such as raw
Material Costing -> Define Cost Consumption materials, production and overhead.
Component Structure SFG Consumption
Production
Power
Labor
Machine
________________________________________________________________________________________________________________________________________________
Page 1 of 6 Price Waterhouse Associates
Title Tr Code Menu path Configuration Rationale
Overhead
Production
Overhead
Define Costing Type OKKI IMG -> Controlling -> PCC -> In the costing type we define which field in the material
PCP -> Material Cost Estimate Standard Price master record the costing result can be transferred to:
With Quantity Structure -> Update Std Price or the commercial price.
Costing Variant: Components ->
Define Costing Types Valuation View: Legal
Define Valuation Variant OKK4 IMG -> Controlling -> PCC -> 001 Planned Valuation Valuation variant contain parameters required for
PCP -> Material Cost Estimate Variant valuation of a cost estimate which include – Material
With Quantity Structure -> Valuation, Int Activity Types and Processes,
Costing Variant: Components -> 002 Current Valuation Subcontracting, Ext. Processing and Overhead.
Define Valuation Variant Variant

006 Production order


planned

007 Production Order


Actual

Create a Valuation
variant for each of
these plants
Define Quantity Structure Control OKK5 IMG -> Controlling -> PCC -> Quantity Structure control is used in cost estimates with
PCP -> Material Cost Estimate SPEL Std Qty Struct quantity structure to specify for each plant how the
With Quantity Structure -> PEL system searches for valid alternative BOM and routing.
Costing Variant: Components ->
Define Quantity Structure Control SPIL Std Qty Struct PIL
Define Date Control OKK6 IMG -> Controlling -> PCC -> Date control, controls the dates on which the quantity
PCP -> Material Cost Estimate SPEL Std Cost Est PEL structure and the value structure are created.
With Quantity Structure ->
Costing Variant: Components -> SPIL Std Cost Est PIL
Define Date Control
Define Transfer Strategy OKKM IMG -> Controlling -> PCC -> Transfer control prevents system from creating a new
PCP -> Material Cost Estimate PC01 Transfer w/ Plant cost estimate for a material when costing data already
With Quantity Structure -> Change exists. Instead existing costing data is simply transferred

________________________________________________________________________________________________________________________________________________
Page 2 of 6 Price Waterhouse Associates
Title Tr Code Menu path Configuration Rationale
Costing Variant: Components -> into the new cost estimate.
Define Transfer Control

Define Costing Variant OKKN IMG -> Controlling -> PCC -> Costing variant contains all the control parameters for
PCP -> Material Cost Estimate SPIL Std Cost costing which include valuation variant, costing type,
With Quantity Structure -> Estimate PIL date control, qty structure control and transfer control
Define Costing Variant SPEL Std Cost Also we can mention whether we want to pass on the lot
Estimate PEL size maintained for the FG in material master during
costing run
Production Order Also if we want to include the additive cost – like cost
Planned incurred with special procurement
Production Order
Actual
Define Order Types KOT2 IMG -> Controlling -> PCC -> The most important thing we need to check here is
Cost Object Controlling -> PP01 Standard settlement profile maintained for each of the production
Product Cost by Order -> Production Order order.
Manufacturing Orders -> Check
Order Types A copy of production
order for each of the
plant
Define Result Analysis Key OKG1 IMG -> Controlling -> PCC -> Result analysis key is required for calculating the WIP
Cost Object Controlling -> related to that order. During period end closing we need
Product Cost by Order -> Period RA Key – 0002 to define a Result Analysis Key. We use WIP calculation
End Closing -> Work in Process at Actual Costs.
-> Define Results Analysis Key
Define Cost Element for WIP KA06 IMG -> Controlling -> PCC -> 931000 WIP All Costs In this step we create cost element under which WIP and
Calculation Cost Object Controlling -> 931001 WIP Material reserves are updated on an order.
Product Cost by Order -> Period Cost Order is not settled when WIP is settled.
End Closing -> Work in Process 931002 WIP Secondary
-> Define Cost Element For WIP Cost
Calculation
Define Result Analysis Version OKG9 IMG -> Controlling -> PCC -> Used the standard one We maintain the Result analysis Version and calculate
Cost Object Controlling -> the WIP depending on the planned version.
Product Cost by Order -> Period
End Closing -> Work in Process Here we also specify the cost element that is going to
-> Define Result Analysis carry the WIP all cost created earlier

________________________________________________________________________________________________________________________________________________
Page 3 of 6 Price Waterhouse Associates
Title Tr Code Menu path Configuration Rationale
Versions

Define Valuation Method OKGC IMG -> Controlling -> PCC -> Use the standard one This creates a link between the Controlling area, the
Cost Object Controlling -> result analysis key, the result analysis version and the
Product Cost by Order -> Period system status.
End Closing -> Work in Process In product cost by order the WIP is normally calculated
-> Define Valuation Method at Actual costs.
(Actual Costs)
Define Line Id SPRO IMG -> Controlling -> PCC -> PMA Material Cost The WIP for each order are calculated and apportioned
Cost Object Controlling -> PSC Secondary Cost to the Line Id’s. For WIP that needs to be capitalized can
Product Cost by Order -> Period PAL Settlement Cost be mentioned for each line id.
End Closing -> Work in Process
-> Define Line IDs
Define Assignment OKGB IMG -> Controlling -> PCC -> We define the cost elements to the line id’s under which
Cost Object Controlling -> an order is debited or credited. WIPR – WIP with
Product Cost by Order -> Period requirement to capitalize.
End Closing -> Work in Process ++99+++++
-> Define Line IDs + PSC
++98+++++
+ PSC
++9021+++
+ PMA
++80020002 PCE
Define Update OKGA IMG -> Controlling -> PCC -> PAL A 000002 All material withdrawals, internal activities, external
++80020003 PCE
Cost Object Controlling -> PCE N 000002 activities and overhead assigned to line ID of K category
Product Cost by Order -> Period PMA K 000002 and for material issue and settlement to line ID’s of
End Closing -> Work in Process PSC K 000002 category A and not to be used in WIP to category N.
-> Define Update
Define Posting Rules for Settling WIP OKG8 IMG -> Controlling -> PCC -> Change in WIP Here we specify the GL accounts to which the WIP is
Cost Object Controlling -> 90020001 settled during the period end closing for all open orders
Product Cost by Order -> Period and reverse entry is passed once the order is settled.
End Closing -> Work in Process WIP 70160000
-> Define Posting Rules for
Settling Work In Process

________________________________________________________________________________________________________________________________________________
Page 4 of 6 Price Waterhouse Associates
Title Tr Code Menu path Configuration Rationale
Define Number Ranges OKG6 IMG -> Controlling -> PCC -> KABG Automatic CO documents are created when these transactions are
Cost Object Controlling -> Result Analysis carried out. We must maintain number ranges to restrict
Product Cost by Order -> Period the areas for the numbers assigned.
End Closing -> Work in Process KSWP Calc. Primary
-> Define Number Ranges Target Costs (WIP)

KSWS Calc. secondary


target costs (WIP)
Define Variance Key OKV1 IMG -> Controlling -> PCC -> Used the standard Production order can only be selected for variance
Cost Object Controlling -> calculation if a variance key is entered in the order.
Product Cost by Order -> Period 00001 Variance Variance calculation requires that order have the status
End Closing -> Variance Calculation for Orders DLV or TECO.
Calculation -> Define Variance
Keys
Define Default Variance Keys for Plants OKVW IMG -> Controlling -> PCC -> Assign Variance Key to Variance is calculated on the basis of the variance key
Cost Object Controlling -> each Plants shown in the order master record. The variance key
Product Cost by Order -> Period flows from the material master to the production order
End Closing -> Variance when the material is being produced.
Calculation -> Define Variance
Keys For Plants
Check Variance Variant OKVG IMG -> Controlling -> PCC -> Set as default. Variance variant determines the variances to be
Cost Object Controlling -> calculated which may include- scrap variance, input
Product Cost by Order -> Period price variance, input quantity variance, resource usage
End Closing -> Variance variance, remaining input variance, lot size variance,
Calculation -> Define Variance output price variance, mixed price variance and
Variant remaining variance.
Define order type dependent parameter OPL8 IMG -> Production -> Shop Floor Here we assign each Here we define the parameters relevant to controlling
Control -> Master Data -> Order plant with the such as costing variant for planned and actual costs and
-> Define order type - dependent corresponding Order a result analysis key.
parameter type since we want to
maintain a different
document number
range for production
order in each plant.

________________________________________________________________________________________________________________________________________________
Page 5 of 6 Price Waterhouse Associates
Title Tr Code Menu path Configuration Rationale
Define Target Cost Version OKV6 IMG -> Controlling -> PCC -> We use the Standard Target cost means the cost expected to be incurred in
Cost Object Controlling -> Target Cost Version 0 producing a specified quantity of goods. Target cost can
Product Cost by Order -> Period be used to determine variance, WIP and scrap. For
End Closing -> Variance settlement only target cost version 0 is relevant.
Calculation -> Define Target Cost
Versions
Define Number Ranges for Variance KANK IMG -> Controlling -> PCC -> We assign Variance Documents are created when variance are calculated for
Document Cost Object Controlling -> Calculation related – target costs, variances, scrap, and distributed actual
Product Cost by Order -> Period transaction to number costs. Numbers assigned to these documents are
End Closing -> Variance ranges. maintained here.
Calculation -> Define Number
Ranges for Variance Documents
Create Settlement Profile SPRO IMG -> Controlling -> PCC -> We don’t set the Settlement profile contains a range of control
Cost Object Controlling -> settlement indicator for parameters. We must define a settlement rule before we
Product Cost by Order -> Period Profitability analysis define settlement profile.
End Closing -> Settlement -> and only specify the If we want variance settlement to Profitability Analysis
Create Settlement Profile Allocation structure as we must also set the variance indicator and allow
CO object. settlement to a profitability segment.
Define Number Ranges SNUM IMG -> Controlling -> PCC -> Assigning of Controlling We define the document numbers or ranges for the
Cost Object Controlling -> to appropriate group of controlling area OSCR.
Product Cost by Order -> Period number ranges.
End Closing -> Settlement -> System generates documents while settling a object.
Define Number Ranges for
Variance Documents

________________________________________________________________________________________________________________________________________________
Page 6 of 6 Price Waterhouse Associates

Вам также может понравиться