Вы находитесь на странице: 1из 10

iAes

ELECTRICAL DEPARTMENT
LEVEL 2 TITLE REV: 1
CODE: A3L2 PRELIMINARY DESIGN CHECK LIST DATE:06-04-06

PROJECT NAME:………………………….

PROJECT NUMBER: ……………………. DATE: ……………..

SL
DESCRIPTION YES/NO REMARKS
NO
1 PRELIMINARY DRAWINGS
CHECKED?

2 DRAWINGS ARE ACCORDING TO


REQUIREMENT?

3 PRELIMINARY HEAT LOAD SHEET


CHECKED? (PLS ATTACH SUMMERY
SHEET)

4 ELECTRICAL LOAD REQUIREMENT


SHEET CHECKED? (ATTACH
SUMMERY SHEET)

5 EQUIPMENT SELECTION BOTH HIGH


SIDE AND LOW SIDE SHEET
CHECKED?(ATTCH SUMMARY
SHEET ALONG WITH LOCATIONS)

6 EXCEPTED TIME SHEET FOR STAGE 2


ATTACHED?

ISSUED BY CHECKED/APPROVED BY

DEPT: DEPT:
NAME: NAME:
SIGN: SIGN:

DATE: DATE:
iAes
ELECTRICAL DEPARTMENT
LEVEL: 2 TITLE REV: R1
CODE: A4L2 DESIGN CHECK LIST DATE:06-04-06

PROJECT NAME:………………………….

PROJECT NUMBER: ……………………. DATE: …………….

SL NO DESCRIPTION YES/NO Sign DATE

1 HEAT LOAD CALCULATION.

2 VENTILATION CALCULATION.

3 AHU STATIC PRESSURE CALCULATION.

4 CHILLER SIZING AND CONFIGURATION

5
KITCHEN VENTILATION CALCULATION

6
TOILET EXTRACT CALCULATION.

7 PUMP HEAD CALCULATION.

8 ELECTRICAL REQUIREMENT FOR EQUIPMENTS


CALCULATION

9 PLANT ROOM SIZE SIZING

ISSUED BY RECEVIDE BY

DEPT: DEPT:
NAME: NAME:
SIGN: SIGN:

DATE : DATE :
iAes
ELECTRICAL DEPARTMENT
LEVEL: 3 TITLE REV: R1
CODE: A5L3 DRAFTING CHECK LIST DATE:06-04-06

PROJECT NAME:………………………….

PROJECT NUMBER :……………………. DATE ……………..

DUCT CHECK LIST:


SL
DESCRIPTION YES/NO Sign DATE

1 THE CFM OF INDIVIDUAL DUCT


MENTIONED IN DWGS?

2 THE DUCT SIZES, TEXT HEIGHTS,


AND TEXT STYLES. ARE CHECKED?

3 ASPECT RATIO!!! CHECKED??

4 REDUCERS & ELBOWS CHECKED?

5 GAUGES IN INDIVIDUAL DUCTS


ARE SHOWN IN DWGS?
6 THE FRICTION RATIO & VELOCITY
AT THE INITIAL STAGE OF THE
DUCT (NEAR EQUIPMENT)
ARE SHOWN?
7 THERMAL &ACOUSTIC
INSULATION
THICKNESS
AREA/LENGTH
MAENTIONED?
8 SIZES OF FALLOWING SHOWN IN
DWGS
1 VCD
2 SUPPLY AIR GRILL
3 RETURN AIR GRILLS
4 DIFFUSERS
5 FIRE CONTROL DAMPERS
9 DUCT SUPPORTING DETAILS.ARE
GIVEN?
10 DUCT NUMBERING DONE? SHOWN
IN DRAWINGS?
11 VANES, SPLITTER IS SHOWN?
12 VCD ACCESSING GRILLS SHOWN
WITH SIZES?
13 HAVE FRESH AIR DAMPERS SIZES
ARE SHOWN IN THE DWGS

14 HAVE SHOWN THE BOTTOM OF


DUCT, PIPE, FALSE CEILING IN
SECTIONS
EQUIPMENTS CHECK LIST

SL
DESCRIPTION YES/NO Sign DATE

1 AHU’S / CSU’S /FCU’S DUCTABLE


SPLIT / HIGH WALL SPLIT UNITS
SIZES ARE MENTIONED IN DWGS?
2 THE TONNAGE OF EQUIPMENT IS
SHOWN?
3 CFM OF THE EQUIPMENT IS
SHOWN?
4 EQUIPMENT SCHEDULE IS SHOWN?
5 TRAP DOOR SIZES, PLS MENTION
6 ELECTRICAL REQUIREMENT /
LOCATION SHOWN I DRAWINGS?
7 DRAIN POINT LOCATIONS

8 HAVE SHOWN THE BOTTOM OF


THE EQUIPMENT IN THE SECTIONS
9 THE EQUIPMENT FIXING DETAILS
SHOWN IN DRAWINGS

PIPING CHECK LIST


SL DESCRIPTION YES/NO SIGN DATE
NO
1 THE PIPE SIZES & SUPPORTING
DETAILS. ARE SHOWN?
2 THE USGPM OF EACH AND EVERY
PIPE ARE MENTIONED IN DWGS?
3 ALL PIPES IN DOUBLE LINE?
CHECKED?
4 THE INSULATION OF PIPES. ARE
MENTIONED? WITH YHICKNESS!
5 THE U TURN, SHORT RETURNS,
EXPANSION JOINTS, TAPPING. IN
PIPING IS CHECKED?
6 THE DRAIN PIPES SIZES. ARE
SHOWN?
7 THE CONDENSATE WATER PIPE
SIZES IN THE DWGS SHOWN IN
DRAWINGS?
8 CHECK THE VALVES AND VALVE
SIZES

9 AIR VENTS ARE PROVIDED FOR


WHERE EVER NECESSAR

ISSUED BY RECEVIDE BY

DEPT: DEPT:
NAME: NAME:
SIGN: SIGN:

DATE: DATE:
ELECTRICAL DEPARTMENT
iAes
LEVEL II TITLE REV: R1
CODE A5L6 PRE TENDERING CHECK LIST DATE:06-04-06

PROJECT NAME: ………………………….

PROJECT NUMBER: ……………………. DATE: …………….

SL NO DESCRIPTION YES/NO Sign DATE

1 Tender boq is checked its specification and


quantities
2 Budgeratory cost check

3 Tender document verified, for both commercial and


technical specification.
4 Tender drawing are made

ISSUED BY RECEVIDE BY

DEPT : DEPT :

NAME: NAME:

SIGN: SIGN:

DATE : DATE :
iAes
ELECTRICAL DEPARTMENT
LEVEL 2 TITLE REV: R1
CODE: A7L2 POST TENDER CHECK LIST DATE:06-04-06

PROJECT NAME: ………………………….

PROJECT NUMBER: ……………………. DATE: ……………..

SL NO DESCRIPTION YES/NO Sign DATE

1 Tender finalizing
2 Tender comparison
3 Issuing of work contract
4 Issuing of work contract
5 Issuing of P.O
6 Technical specification submission
7 Hand over to Execution.

ISSUED BY RECEVIDE BY

DEPT: DEPT:
NAME: NAME:
SIGN: SIGN:

DATE: DATE:
iAes
ELECTRICAL DEPARTMENT
LEVEL: 2 TITLE REV: R1
CODE: A8L2 PROJECT TEAM DETAIL DATE:06-04-06

PROJECT NAME: ………………………….

PROJECT NUMBER: ……………………. DATE: ……………..

JOB NO: Project Name

Location of work

Clint’s particulars

Organization Clint’s consultant (if any)

Clint Representative Contact person

Name: Name:

Designation: Designation:

Address: Address:

Tel: Tel:
Fax: Fax:
E-mail: E-mail
Clint’s Brief:

Scope of Service:

Contractor’s Particulars:

PHE Contractor HVAC Contractor

Contact Person: Contact Person:

Name: Name:

Designation: Designation:

Address: Address:

Tel: Tel:
Fax: Fax:
E-mail: E-mail:
Other consultant

Electrical consultant : Architects:

Contact Person: Contact Person:

Name: Name:

Designation: Designation:

Address: Address:

Tel: Tel:
Fax: Fax:
E-mail: E-mail:
Structural consultant: HVAC Consultant:

Contact Person: Contact Person:

Name: Name:

Designation: Designation:

Address: Address:

Tel: Tel:
Fax: Fax:
E-mail: E-mail:

PHE CONSULTANT :

Contact Person:

Name:

Designation:

Address:

Tel:
Fax:
E-mail:

ISSUED BY RECEVIDE BY

DEPT: DEPT:
NAME: NAME:
SIGN: SIGN:

DATE: DATE:
iAes
ELECTRICAL DEPARTMENT

LEVEL: 2 TITLE REV: R1


CODE: A9L2 HAND OVER SHEET TO EXECUTION DATE:06-04-06

PROJECT NAME:………………………….

PROJECT NUMBER: ……………………. DATE: ……………..

SL DESCRIPTION YES/NO SIGN DATE


NO

1 TENDER DOCUMENTS

2 CONTRACTORS DETAILS

3 CLIENT DETAILS

4 ARCHITECT DETAILS

5 STRUCTURAL CONSULTANT

6 PROJECT NMANAGEMENT
CONSULTANT

7 P.O. + FINALIZED BOQ

8 APPROVED SHOP DRAWINGS

9 OTHERS

ISSUED BY CHECKED/APPROVED BY

DEPT: DEPT:
NAME: NAME:
SIGN: SIGN:
DATE: DATE:

Вам также может понравиться