Академический Документы
Профессиональный Документы
Культура Документы
PROJECT: CONSTRUCTION OF ROADBED, MAJOR & MINOR BRIDGES, TRACK LINKING (EXCLUDING SUPPLY OF
RAILS AND MAIN LINE PSC SLEEPERS), S&T, OHE, TSS & GENERAL ELECTRICAL WORKS IN CONNECTION WITH
DOUBLING BETWEEN KOTA AND BINA (282.576 KMS IN THREE PACKAGES) EXCLUDING RUTHIYAI-GUNA SECTION ON
KOTA AND BHOPAL DIVISIONS OF WEST CENTRAL RAILWAY IN THE STATE OF RAJASTHAN AND MADHYA
PRADESH.PKG III
Report On
METHOD STATEMENT FOR MINOR BRIDGE.
Client:
Contractor:
SIMPLEX. QA/QC
Certified that Report is in Conformity to Contractual and Codal Provisions.
Project Manager
SIMPLEX INFRASTRUCTURES LIMITED.
No Objection By
PMC RVNL
1
SIMPLEX – BCPL – PERFECTO (JV)
CONTENTS
Sl.No. Content
1 Scope
2 References
3 Responsibilities
4 Materials and Equipments
5 Procedure
6 Health ,Safety and Environment
2
SIMPLEX – BCPL – PERFECTO (JV)
1. Scope :
This work shall consists construction of cast in situ minor bridges with approved drawings ,which
includes excavation, foundation ,raft, wall and slab constructions for the Doubling between
Raebareli and Amethi Stations.
2. References:
RESPONSIBILITIES:
Sr. Bridge Engineer / Site In charge is responsible for entire activity for construction of
Minor bridge works.
4. MATERIALS & EQUIPMENTS:
MATERIALS:
Grade of concrete as per approved drawings and approved design mix
Fe500 reinforcements
Form Work and scaffoldings materials arrangements as per RVNL Specifications.
Materials shall be approved before starting the works.
3
SIMPLEX – BCPL – PERFECTO (JV)
EQUIPMENTS:
Mixer machine with weigh batcher / Batch Mix Plant
Transit Mixer
Vibrator and Needles
Water Tanker
Excavator
DG for power supply
Lifting Sling
D shackle
4
5
SIMPLEX – BCPL – PERFECTO (JV)
d) Removal of props under slabs:
1) Spanning up to 6 m 14 days