Академический Документы
Профессиональный Документы
Культура Документы
For heating steam boilers from 50 to 600 BHp or 10,000 to 70,000 Steam Lbs/Hr
Make entries in yellow boxes to calculate fuel usage and potential savings
Units:
Boiler Maximum Load 200 BHp
Annual Fuel Requirement 27,518 MM Btu/Yr Based on load profile as shown in graph below
100%
80%
60% % Load
40%
20%
0%
L G P T V C N B R R AY UN
JU AU SE OC NO DE JA FE MA AP M J
MicroMod Fuel Savings Estimator
For process steam boilers from 50 to 600 BHp or 10,000 to 70,000 Steam Lbs/Hr
Units:
Boiler Maximum Load 100 Bhp
Efficiency 80.0%
Hrs/day in use 16
Days/Yr in use 200
Enter Data in shaded boxes only. All other values are calculated. Accuracy: Within Tolerance of Fuel Analysis & Data
Assumptions: (1) Standard Fuel Analysis
(2) Boiler Properly Maintained
Boiler Data:
Units:
Boiler Rating 75 1000 lbs/hr Percent Load
Average Load 60 1000 lbs/hr 80.0%
Fuel Type: No. 6 Oil
Coal % H2O 5 If coal or solid is selected as fuel type, enter % moisture as fired.
Efficiency Check:
Payback Analysis:
Enter Project Cost, $: $12,000 Note: the average installed cost of a TrimPAK system, including VFD, is $12,000
This calculation does not take into account savings from reduced maintance and failure avoidance, or reduction
in electricity consumption when installing a Variable Speed Drive.