Bar Bending Schedule for Pile Foundation with


Calculations

To clearly understand the bar bending schedule of a pile foundation, it is necessary to be familiar
about the typical reinforcement details of a pile foundation. Pile foundation is a common type of deep
foundation, used for supporting heavy loaded structures when the site under consideration have a
very weak soil that is compressible in nature.

Layout of a Typical Pile Foundation


A typical pile foundation arrangement have the load structure supported by a pile cap, which is in
turn supported by several piles as shown in the plan and front view arrangement in the below figures.

Fig.1: Pile Foundation Arrangement – Superstructure, Pile Cap and Piles

https://theconstructor.org/structural-engg/pile-foundation-bar-bending-schedule-calculations/20989/ 1/5
8/3/2018 Bar Bending Schedule for Pile Foundation with Calculations

Structural Speci cation and Reinforcement Details of a Pile


Foundation
The figure-2 shows the typical reinforcement details and drawing of a pile foundation. The details of
pile cap are not explained in this article.

Fig.2: Pile Foundation Details

The whole arrangement is clearly understood from the figure-2. The pile cage has vertical
reinforcement held together by outer and inner rings. The Reinforcement in pile construction include:

1. Vertical Reinforcement
2. Outer Ring Reinforcement
3. Inner Ring Reinforcement

The above details are mentioned in the figure-3 below. The Outer rings are provided as helical rings
and the inner is circular or spiral ties.

https://theconstructor.org/structural-engg/pile-foundation-bar-bending-schedule-calculations/20989/ 2/5
8/3/2018 Bar Bending Schedule for Pile Foundation with Calculations

Fig.3: Cross-section details in section A-A of figure-2

The development length ‘Ld’ is provided outside of the column piercing into the pile cap. The
anchorage length to the recommended amount is provided to the bottom of the column as shown in
figure-2.

From the Figure:

1. Length of Pile = 20m


2. Diameter of Pile = 0.6m
3. Diameter of:
a. Vertical Reinforcement = 20mm – 12nos
b. Outer Helical Ring = 8mm @ 200mm c/c
c. Inner spiral ties = 16mm @ 2000mm c/c

4. Bottom Length of Anchorage = 300mm


5. Development Length = 40d
6. Clear Cover = 75mm

Calculation for Bar Bending Schedule of Pile Foundation

Step 1: Length of Vertical Reinforcement


In the case of bar bending schedule of a column or a pile, there comes need for lapping the rods so
that the length of pile (20m) is attained. Hence, a lapping length equal to 5Dd is provided in extra.
Therefore,

https://theconstructor.org/structural-engg/pile-foundation-bar-bending-schedule-calculations/20989/ 3/5
8/3/2018 Bar Bending Schedule for Pile Foundation with Calculations

Total Cutting Length for Vertical Reinforcement = Anchorage Length at the bottom of the
pile + the height of the pile + development length (40d) + Lap length (50d) – clear cover
provided at the bottom.

i.e. Lv = 300 + 20000 + 40d +50d -75 = 300 + 20000+ (40 x 12) + (50 x 12) – 75

Total length of vertical reinforcement, Lv = 21.3m

Note: During tying the bar, it is recommended to tie at the middle, as tying at the ends of the bars
will be subjected to higher stress values.

Step 2: Inner Spacing Ring – Number and Length of each Ring


Here, we have to determine the length of each inner ring along with their numbers arranged.

The number of rings (Nr) = [Length of the Pile / Spacing] + 1

= [20000/2000] +1 = 11 No’s

The circumference of the ring gives the length of each ring. For this the radius of the ring has to be
determined. Given the radius of the pile, the clear cover, outer ring radius:

The radius of the ring = [Radius of the pile – clear cover – diameter: of outer ring –
diameter: of vertical reinforcement:]/2

= [600 – 75 – 8 – 12]/2= 252.5mm

Hence, Length of ring = 2xpixr

= 2 x 3.147 x 252.3 = 1584.4mm = 1.58m

Step 3: Outer Helical Ring – Number and Length of each ring


For every specification of outer helical ring, the radius of the same have to be determined.

Radius of Helical Ring Outer = [Diameter of Pile – Clear Cover]/2

= [600 -75]/2 = 262.5mm

Length of ring = 2xpixr

https://theconstructor.org/structural-engg/pile-foundation-bar-bending-schedule-calculations/20989/ 4/5
8/3/2018 Bar Bending Schedule for Pile Foundation with Calculations

= 2 x 3.147 x 262.5 = 1648.5mm = 1.65m

The number of rings (Nr) = [Length of the Pile / Spacing] + 1

= [20000/200] +1 = 101 No’s

Step 4: Bar Bending Schedule

Diameter of Bars No. of Bars Length of rods Total Length


Specification
(m) (m) (m) (m)
Vertical Bar 12 12 21.3 255.6
Inner Ring
16 11 1.58 17.4
bar
Outer ring bar 8 101 1.65 166.65

Neenu Arjun
Neenu is a Civil and Structural Engineer and has experience in Design of Concrete and Steel Structures. She is an
Author, Editor and Partner at theconstructor.org.

https://theconstructor.org/structural-engg/pile-foundation-bar-bending-schedule-calculations/20989/ 5/5