G COLD WELL PUMP HOUSE TO SURFACE CONDENSER, TURBINE OIL COOLER &
GENERATOR COOLER
PIPE, DN900, 12 mm THK, IS 3589, GR FE410, ERW/ SWP, BE
PIPE, DN150, IS 1239 PART-I, HEAVY, ERW, BW
300 MM CONCRETE ENCASEMENT FOR DN900 PIPE
IV FITTINGS
PIPE FITTINGS, CS EQUIVALENT MATERIAL IS 2062 GR E250 BR
V PIPE SUPPORT
1 PIPE SUPPORTING STRUCTURE
2 U-BOLT
VI PAINTING
NOTES
1 PIPELINE ROUTED ON PIPE RACK/ BUILDING WALL
2 INSIDE PUMP, COMPRESSOR HOUSE, DM WATER PLANT AND BOILER HOUSE PIPING TO BE CONSIDERED BY RESP
ENGINEER/ VENDOR
3 QUANTITY OF DUCT TO BE CONSIDERED BY RESPECTIVE PACKAGE ENGINEER
4 ALL FLANGE END VALVE SHALL BE SUPPLIED ALONG WITH COMPANION FLANGE, NUTS, BOLTS & GASKET
5 10% CUTTING ALLOWANCE SHALL BE CONSIDERED
6 ASSUME PLANT LAYOUT DRAWING DOC NO. K1-A-TP-BD-0003, REV-M ARE IN TURE SCALE AND LATEST
ptive Power Plant darba - Rajstan
TIES (BOQ)
350 m
350 m
250 m
200
200 nos
80 nos
150
80 no
80
250
400
350
1800
150
1800
1700
250
50
50
50
80
50
150
100
80
50
80
100
50
300 m
450 m
250 m
2
nos
10
nos
3 nos
50 m
4 nos
15 m
2
nos
500 m
5 nos
15 m
2
nos
50 m
50 m
400 m
10 nos
500 m
150 m
200 m
150 m
50 m
50 m
100 m
50 m
350 m
1500 m
450 m
50 m
200 m
250 m
300 m
200 m
100 m
10 MT
20 MT
3 MT
1 Lot
LE AND LATEST