GREENHOUSE PROJECT

8 8 8 9
Objectives 201 201 201 201

1 CANVASSING AND FULL EXPENSES LIST APR MAY JUN JUL AUG SEPT OCT NOV DEC JAN FEB MAR
1.1 SOLAR PANEL
1.2 WIND TURBINE
1.3 WATER PUMP AND CONTROLS
1.3 EXHAUST FANS
1.4 MISTING CONTROLS
1.5 BATTERY SOURCE
1.6 LIGHTING
1.7 PLANT BASES
1.8 INVERTER
1.9 CHARGING CONTROLS

2 PLANT BASES CONSTRUCTION


2.1 PLANT BASE WELDING
2.2 MOUNTING OF PLANT BASE
2.3 POLIISHING OF THE BASE

3 POWER SOURCES INSTALLATION


3.1 SOLAR PANEL INSTALLATION
3.2 WIND TURBINE INSTALLATION
3.3 BATTERY AND CHARGING CONTROLS CONSTRUCTION
3.4 TESTING OF POWER OUTPUT FROM MINIMUM TO MAXIMUM

4 DRIFT IRRIGATION CONSTRUCTION


4.1 WATER PUMP INSTALLATION
4.2 WATER PIPE INSTALLATION
4.3 WATER STORAGE CONSTRUCTION
4.4 TESTING OF WATER ING SYSTEM

5 COOLING SYSTEM INSTALLATION


5.1 EXHAUST FANS INSTALLATION