Perhitungan Balok Anak

Desain Balok Anak

Frame 218

Tumpuan kiri = -8.847 kN-m


Tumpuan Kanan = -8.6853 kN-m

Rencana Balok Anak


L = 3000 mm
b = 200 mm
h = 300 mm
ts = 30 mm
Tulangan Lentur = D 16
Tulangan Geser = Ø 10
fc' = 30 MPa
fyl = 320 MPa
fyt = 240 MPa
φ = 0.8

Perhitungan Tulangan Lentur

Perhitungan Tulangan Tumpuan


β1 = 0.85 - 0.05 fc' -
7
= 0.8357143

d = tinggi balok (h) - selimut beton (ts) - diameter tulangan geser - (1/2.diameter tu
= 300 - 30 - 10
= 252 mm
m = fy = 12.54902
0.85 fc'
ρb = 0.85 β1 fc' 600
fy 600 +
ρmax = 0.75 ρb = 0.032574
ρmin = 1.4 = 0.004375
fy
Mu = 8.847 kN-m = 8847000 N-mm
Mn = Mu = 11058750 N-mm
φ
Rn = Mn = 0.870713 N/mm2
bd 2

ρ = 1 1 - 1 -
m
= 0.0027691
ρ Pakai = 0.004375
As perlu = ρ Pakai b d
= 220.5 mm2
As pakai = 402.12386 mm2

Dipasang 2 D 16

Perhitungan Tulangan Lapangan


β1 = 0.85 - 0.05 fc' -
7
= 0.8357143

d = tinggi balok (h) - selimut beton (ts) - diameter tulangan geser - (1/2.diameter tu
= 300 - 30 - 10
= 252 mm
m = fy = 12.54902
0.85 fc'
ρb = 0.85 β1 fc' 600
fy 600 +
ρmax = 0.75 ρb = 0.032574
ρmin = 1.4 = 0.004375
fy
Mu = 9.7432 kN-m = 9743200 N-mm
Mn = Mu = 12179000 N-mm
φ
Rn = Mn = 0.958916 N/mm2
bd 2

ρ = 1 1 - 1 -
m
= 0.0030552
ρ Pakai = 0.004375
As perlu = ρ Pakai b d
= 220.5 mm2
As pakai = 402.12386 mm2

Dipasang 2 D 16

Perhitungan Tulangan Geser dan Torsi

Gaya geser yang dipakai dalam perhitungan adalah gaya geser terfaktor, Vu sejarak d dari muka tumpuan sesuai

fc' = 30 MPa
fyt = 240 MPa
Vu = 23.298 kN
L = 3000 mm
d = 252 mm
φ = 0.75
λ = 1 Untuk Beton Normal SNI 03-2847-2013 Pasal 8.6.1

Vu' = Vu L - d
L/2 2
= 19.383936 kN

Vc = 0.17 λ √ fc' bw d
= 0.17 1 5.477226 200 252
= 46928.869 N = 46.92887 kN
φVc = 35.196652 kN
0.5 φVc = 17.598326 kN

Periksa Nilai Vu
Vu' = 19.383936 kN
φVc = 35.196652 kN
0.5 φVc = 17.598326 kN

Vu' < 0.5 φVc Kondisi 1


0.5 φVc < Vu' ≤ φVc Kondisi 2
Vu' > φVc Kondisi 3

Kondisi 2 Dibutuhkan tulangan geser minimum

Vu = φVc + φVs
Vs = Vu - φVc
φ
Vs = 0

Tulangan Geser Minimum


Dapat dipasang tulangan sengkang vertikal berdiameter 10 mm dengan jarak maksimum ditentukan
digunakan = Ø 10 mm 2 kaki
Av = 157.07963 mm2

Hitung nilai Vc1 dan Vc2


Vc1 = 0.33 √ fc' bw d
= 0.33 5.477226 200 252
= 91097.2158 N = 91.0972158
Vc2 = 0.66 √ fc' bw d
= 0.66 5.477226 200 252
= 182194.432 N = 182.194432

Tentukan jarak maksimum tulangan sengkang sesuai dengan persyaratan dalam SNI 2847:2013
jarak maksimum tersebut diambil dari nilai terkecil antara s2 dan s3

s2 = d = 126 mm
2
s3 = Av fyt = 538.5587 mm
0.35 bw

Dipasang smaks = 126 mm

Dipasang Sengkang Ø 10 - 120 mm

Desain untuk Torsi

Periksa kecukupan penampang menahan momen torsi terfaktor berdasarkan SNI 03-2847-2013 pasal 11.5.3.1

Vu 2 Tu Ph
+
bw d 1.7 Aoh2
Vc 0.66 √ fc'
φ +
bw d

xo Lebar as ke as tulangan sengkang = b -


= 200 -
= 130 mm
yo tinggi as ke as tulangan sengkang = h -
= 300 -
= 230 mm
Aoh = xo yo
Ao = 0.85 Aoh
Ph = 2 ( xo + yo )
Vu = 19.383936 kN = 19383.94 N
Vc = 46.928869 kN = 46928.87 N
Tu = 1.3791 kN-m = 1379100 N-mm

19383.936 2 1379100 720


+
200 252 1.7 894010000

0.1479186251 + 0.4268486515 0.5

0.7581341 MPa

46928.8687270426 0.66 5.47722558


0.75 +
200 252

0.75 0.9311283478 + 3.6149688795

3.4095729 MPa

0.7581341 ≤ 3.40957292 OK Dimensi Penampang Mencukupi U

Periksa persyaratan pengaruh berdasarkan SNI 03-2847-2013 Pasal 11.5.1, yaitu pengaruh puntir dapat diabaika

Tu ≤ φ 0.083 λ √ fc'

Acp = b h
= 60000 mm2
Pcp = 2 (b+h)
= 1000 mm
Tu ≤ 0.75 0.083 1 5.47722558

1379100 ≤ 1227446.25 N-mm PERLU Tulangan Torsi

Tulangan Sengkang Tertutup, At dihitung berdasarkan SNI 2847:2013 Pasal 11.5.3.6


At = Tn
s 2 Ao fyt cot Ѳ

Tn = Tu
φ
= 1838800 N-mm
At = Luas satu buah kaki tulangan sengkang
fyt = 240 MPa
s = Jarak antar tulangan sengkang
Ao = 25415 mm2
Ѳ = 45 Untuk balok beton non-prategang
cot Ѳ = 1

At = 1838800
s 2 25415 240 1
At = 0.1507312 mm2/mm (satu kaki)
s

Tulangan Memanjang, Al dihitung berdasarkan SNI 2847:2013 Pasal 11.5.3.7

Al = At Ph fyt cot2 Ѳ
s fy

At = 0.1507312 mm2/mm
s
Ph = 720 mm
fyt = fy = 240 MPa
cot Ѳ = 1

Al = 0.1507312 720 1 1
= 108.526461 mm2

Cek Terhadap Al min untuk torsi berdasarkan SNI 2847:2013 Pasal 11.5.5.3

Al min = 0.42 √ fc' Acp


-
fyt
= 0.42 5.477226 60000
-
240
= 575.108685 - 108.5265
= 466.582225 mm2

Sehingga Al Diambil Sebesar Al = 466.5822 mm2

Tulangan Lentur
Tumpuan
2 D 16
As' = 402.12386 mm2
Lapangan
2 D 16
As' = 402.12386 mm2

Tulangan Geser
Ø 10 - 120 mm

Tulangan Torsi
Al = 466.582225 mm2
Tulangan Memanjang didistribusikan pada keliling penampang
Gunakan 1/3 luasnya
155.52741 mm2

Tumpuan

Distribusi tulangan memanjang Torsi di tumpuan


As'
Atas = 557.651268 mm2 Dipasang 3
Tengah = 155.527408 mm2 Dipasang 2
Bawah = 557.651268 mm2 Dipasang 3

Distribusi tulangan memanjang Torsi di lapangan


As'
Atas = 402.12386 mm2 Dipasang 3
Tengah = 155.527408 mm2 Dipasang 2
Bawah = 402.12386 mm2 Dipasang 3

Tumpuan
28
7

tulangan geser - (1/2.diameter tulangan lentur)


- 8

600 = 0.0434321623
fy

2 m Rn 0.5
fy

28
7

tulangan geser - (1/2.diameter tulangan lentur)


- 8

600 = 0.0434321623
fy

2 m Rn 0.5
fy
rak d dari muka tumpuan sesuai SNI 03-2847-2013 Pasal 11.1.3.1.

2013 Pasal 8.6.1


Tidak dibutuhkan tulangan geser
Dibutuhkan tulangan geser minimum
Tulangan geser harus disediakan

aksimum ditentukan

kN

kN

SNI 2847:2013

( Vs ≤ Vc1 )

NI 03-2847-2013 pasal 11.5.3.1

0.5
2

2ts - Ø sengkang
60 - 10

2ts - Ø sengkang
60 - 10

= 29900 mm2
= 25415 mm2
= 720 mm

0.5
2

Dimensi Penampang Mencukupi Untuk Menahan Torsi

u pengaruh puntir dapat diabaikan jika:

Acp2
Pcp

3600000000
1000

ulangan Torsi
n-prategang

At Ph fyt
s fy
0.150731195 720 240
240
Lapangan

D 16 603.18578949
D 13 265.46457923
D 16 603.18578949

D 16 603.18578949
D 13 265.46457923
D 16 603.18578949

Lapangan
Frame 13

Tumpuan Kiri = -9.8389 kN-m


Tumpuan Kanan = -8.9838 kN-m
Balok Anak
Penyaluran Tulangan Tarik

D = 16 mm Ld = 578.673 ≥ 300 mm
fyl = 320 MPa OK
fc' = 30 MPa Ambil Ld = 600 mm
ψt = 1.30 = 60 cm
ψe = 1.00
λ = 1.00

Penyaluran Tulangan Tekan

D = 16 mm Ldc = 224.347 ≥ 220.16 ≥


fy = 320 MPa
fc' = 30 MPa Ambil Ldc = 250 mm
λ = 1.00 = 25 cm
F.Mod = 1.00
200 mm
Tulangan tarik pada ujung tumpuan harus dibengkokan dengan kait standar 90 atau 180

Panjang Penyaluran Kait

D = 16 mm Ldh = 179.478 ≥ 128 ≥ 150


fy = 320 MPa
fc' = 30 MPa Ambil Ldh = 200 mm
ψe = 1.00 = 20 cm
λ = 1.00 Ujung balok diperpanjang dengan 200 + 30
F.Mod = 0.80 230 mm
23 cm
mm