SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-1
NOTATION:
d/h = Effective/Total Depth of Slab (d=h-conc.cover)
g/q = Dead/Live Load (not factored)
L1 = Width of the Slab Along the Strip Direction
L2 = Width of the Slab Perpendicular to the Strip Direction
C = Moment Coefficient M=C p / L^2
M-spn = Ultimate Design Span Moment
M-sup = Ultimate Design Support Moment
Mc = Balanced Support Moment
As = Steel Area (Required/Supplied)
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday - Proposed Hotel
YADDAH
Development
ENG. SERVICES
for Mr Nwachokor
(*1B7-S36T-BYQY-2MEF)
O.S
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-2
Support Mc = 0.0
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday - Proposed Hotel
YADDAH
Development
ENG. SERVICES
for Mr Nwachokor
(*1B7-S36T-BYQY-2MEF)
O.S
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-3
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday - Proposed Hotel
YADDAH
Development
ENG. SERVICES
for Mr Nwachokor
(*1B7-S36T-BYQY-2MEF)
O.S
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-4
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday - Proposed Hotel
YADDAH
Development
ENG. SERVICES
for Mr Nwachokor
(*1B7-S36T-BYQY-2MEF)
O.S
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-5
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday - Proposed Hotel
YADDAH
Development
ENG. SERVICES
for Mr Nwachokor
(*1B7-S36T-BYQY-2MEF)
O.S
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-6
Support Mc = 0.0
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday - Proposed Hotel
YADDAH
Development
ENG. SERVICES
for Mr Nwachokor
(*1B7-S36T-BYQY-2MEF)
O.S
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-7
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday - Proposed Hotel
YADDAH
Development
ENG. SERVICES
for Mr Nwachokor
(*1B7-S36T-BYQY-2MEF)
O.S
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-8
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday - Proposed Hotel
YADDAH
Development
ENG. SERVICES
for Mr Nwachokor
(*1B7-S36T-BYQY-2MEF)
O.S
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-9
Support Mc = 0.0
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday - Proposed Hotel
YADDAH
Development
ENG. SERVICES
for Mr Nwachokor
(*1B7-S36T-BYQY-2MEF)
O.S
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-10
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday - Proposed Hotel
YADDAH
Development
ENG. SERVICES
for Mr Nwachokor
(*1B7-S36T-BYQY-2MEF)
O.S
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-11
Support Mc = 0.0
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday - Proposed Hotel
YADDAH
Development
ENG. SERVICES
for Mr Nwachokor
(*1B7-S36T-BYQY-2MEF)
O.S
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-12
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday - Proposed Hotel
YADDAH
Development
ENG. SERVICES
for Mr Nwachokor
(*1B7-S36T-BYQY-2MEF)
O.S
SLAB ANALYSIS AND DESIGN REPORT Orion Building Design System 18.0 (04.2012) / Page: DSM-13
Support Mc = 0.0
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-1
Axis: 1 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B54 L=2827.5mm B53 L=4297.5mm B52 L=5000mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 0 x 0 - 260 x 150 0 x 0 - 410 x 150 0 x 0 - 490 x 150
Shear
Force
(Env.) -24.215
-75.609 -70.447
65.112 66.099
42.191 47.436 39.915
Moment
(Env.)
-16.038
-32.07
-46.901
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-2
Axis: 1 Storey: 1 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B51 L=4500mm B50 L=3600mm B49 L=1425mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf --- --- 0 x 0 - 110 x 150
2.97
1.2
34.492
18.666 19.502 21.166
12.882 12.36
Moment 7.383
(Env.) -6.543 -7.551 -0.388
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-3
Axis: 1 Storey: 1 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B48 L=3225mm B47 L=2150.6mm B46 L=3225mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 0 x 0 - 300 x 150 0 x 0 - 190 x 150 0 x 0 - 300 x 150
G=7.43 8.35
Q=3 4.77 3.37
1.93 1.29
0.52
Loads 0.11 1.61 3.11 0.11 1.08 2.04 0.11 1.8 3.23
UDL G=11.53 Q=0 kN/m UDL G=11.53 Q=0 kN/m UDL G=11.53 Q=0 kN/m
36.907 45.799
25.239
Shear
Force
(Env.) -38.694
-24.909
-38.20
33.773
23.893 20.473 18.881 18.742 21.272
Moment
(Env.) -0.0392.392
-15.323 -16.788
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-4
Axis: 1 Storey: 1 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B45 L=374mm
HxBw (mm) 450 x 225
Flange BfxHf 0 x 0 - 20 x 150
G=1.29
Q=0.52
Loads 0.26
UDL G=11.53 Q=0 kN/m
Shear
Force
(Env.)
-51.462
18.159
Moment
(Env.)
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-5
Axis: 1 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B49 L=1425mm B48 L=3225mm B47 L=2150.6mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 0 x 0 - 110 x 150 0 x 0 - 300 x 150 0 x 0 - 190 x 150
7.43
3 4.77
G=2.97 1.93
Q=1.2
Loads 0.11 0.71 1.31 0.11 1.61 3.11 0.11 1.08 2.04
UDL G=11.53 Q=0 kN/m UDL G=11.53 Q=0 kN/m UDL G=11.53 Q=0 kN/m
34.83 36.106
24.407
Shear
Force
(Env.) -13.716
-22.204
-36.585
Moment 9.912
(Env.) 1.271 -0.946
-12.338 -14.919
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-6
Axis: 1 Storey: 2 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B46 L=3225mm B45 L=374mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 0 x 0 - 300 x 150 0 x 0 - 20 x 150
G=8.35
Q=3.37
1.29
0.52
Shear
Force
(Env.)
-33.26
-51.462
35.457
16.255 18.161
Moment
(Env.)
-13.465
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-7
Axis: 1 Storey: 2 (/ 2) Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B54 L=2827.5mm B53 L=4297.5mm B52 L=5000mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 0 x 0 - 260 x 150 0 x 0 - 410 x 150 0 x 0 - 490 x 150
Shear
Force
-21.79
(Env.)
-63.79 -70.461
84.937
57.999 58.949
33.35 37.823
Moment
(Env.) -13.703
-28.385
-48.104
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-8
Axis: 1 Storey: 2 (/ 2) ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B51 L=4500mm B50 L=3600mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 0 x 0 - 440 x 150 ---
G=9.37 9.37
Q=7.58 7.58
-98.216
79.211
55.806
43.043
22.399
Moment
(Env.) -11.265
-41.162
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-9
Axis: 1 Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B125 L=875.4mm B54 L=2827.5mm B53 L=4297.5mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 0 x 0 - 80 x 150 0 x 0 - 270 x 150 420 x 150 - 420 x 150
Loads 0.11 0.44 0.76 0.11 2.03 2.83 1.25 3.16 4.3
UDL G=11.53 Q=0 kN/m UDL G=11.53 Q=0 kN/m UDL G=11.53 Q=0 kN/m
109.597
48.007 40.487
Shear
Force
(Env.) -33.733
-68.904
72.893
Moment 9.196
(Env.)
-38.875
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-10
Axis: 1 Storey: 3 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B52 L=5000mm B51 L=4500mm B50 L=3600mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 500 x 150 - 500 x 150 440 x 150 - 440 x 150 350 x 150 - 350 x 150
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-11
Axis: 1 Storey: 3 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B49 L=1425mm B48 L=3225mm B47 L=2150.6mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 0 x 0 - 120 x 150 310 x 150 - 310 x 150 0 x 0 - 200 x 150
13.92 13.92
10.95 5.62 5.62 10.27
4.42
G=6.5 4.15
5.82 4.77
Q=2.63 2.35 1.93
Loads 0.11 1.43 0.6 1.2 1.94 3.11 0.11 1.08 2.04
UDL G=11.53 Q=0 kN/m UDL G=2.8 Q=0.45 kN/m UDL G=2.8 Q=0.45 kN/m
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-12
Axis: 1 Storey: 3 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B46 L=3225mm B45 L=374mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 0 x 0 - 310 x 150 0 x 0 - 20 x 150
G=8.35
Q=3.37
1.29
0.52
40.801
Shear
Force
(Env.) -33.366
-51.462
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-13
Axis: 10 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B63 L=4650mm
HxBw (mm) 450 x 225
Flange BfxHf 660 x 150 - 660 x 150
G=14.42 14.42
Q=5.83 5.83
Shear
Force
(Env.)
-49.43
Moment
(Env.)
-71.793
Bending (Top Edge) ...
M (kN.m) 17.9 17.9
d (mm) 407.0 407.0
K/K' 0.09 0.09
x (mm) 50.88 50.88
Asm (mm2) 130.20 130.20
Asv (mm2) 0.00 0.00
As (mm2) 130.20 130.20
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 36.0 71.8 36.0
d (mm) 390.0 407.0 390.0
K/K' 0.03 0.05 0.03
x (mm) 48.75 50.88 48.75
Asm (mm2) 272.82 520.81 272.82
Asv (mm2) 0.00 115.45 0.00
As (mm2) 272.82 520.81 272.82
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 45.4 45.4
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-14
Axis: 10 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B63 L=4650mm
HxBw (mm) 450 x 225
Flange BfxHf 660 x 150 - 660 x 150
G=14.42 14.42
Q=5.83 5.83
Shear
Force
(Env.)
-49.43
Moment
(Env.)
-71.793
Bending (Top Edge) ...
M (kN.m) 17.9 17.9
d (mm) 407.0 407.0
K/K' 0.09 0.09
x (mm) 50.88 50.88
Asm (mm2) 130.20 130.20
Asv (mm2) 0.00 0.00
As (mm2) 130.20 130.20
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 36.0 71.8 36.0
d (mm) 390.0 407.0 390.0
K/K' 0.03 0.05 0.03
x (mm) 48.75 50.88 48.75
Asm (mm2) 272.82 520.81 272.82
Asv (mm2) 0.00 115.45 0.00
As (mm2) 272.82 520.81 272.82
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 45.4 45.4
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-15
Axis: 12 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B64 L=651.5mm
HxBw (mm) 450 x 225
Flange BfxHf 50 x 150 - 50 x 150
G=5.34
Q=2.16
Loads 0.54
UDL G=2.8 Q=0.45 kN/m
2.097
Shear
Force
(Env.)
-3.294
Moment
(Env.)
-0.438
Bending (Top Edge) ...
M (kN.m) 0.1 0.1
d (mm) 407.0 407.0
K/K' 0.00 0.00
x (mm) 50.88 50.88
Asm (mm2) 0.79 0.79
Asv (mm2) 0.00 0.00
As (mm2) 0.79 0.79
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 0.4 0.4 0.3
d (mm) 390.0 407.0 390.0
K/K' 0.00 0.00 0.00
x (mm) 48.75 50.88 48.75
Asm (mm2) 3.30 3.18 2.16
Asv (mm2) 0.00 4.21 0.00
As (mm2) 3.30 3.30 2.16
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 1.9 2.1
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.4
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-16
Axis: 12 Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B129 L=7125mm
HxBw (mm) 450 x 225
Flange BfxHf 1030 x 150 - 1030 x 150
11.42
G=9.95 11.42
9.95
4.61
Q=4.02 4.61
4.02
Shear
Force
(Env.)
-75.584
Moment
(Env.)
-154.558
Bending (Top Edge) ...
M (kN.m) 38.6 38.6
d (mm) 407.0 407.0
K/K' 0.20 0.20
x (mm) 50.88 50.88
Asm (mm2) 280.30 280.30
Asv (mm2) 0.00 0.00
As (mm2) 280.30 280.30
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 79.8 154.6 79.8
d (mm) 389.0 389.0 389.0
K/K' 0.04 0.09 0.04
x (mm) 48.63 48.63 48.63
Asm (mm2) 605.81 1173.09 605.80
Asv (mm2) 0.00 153.45 0.00
As (mm2) 605.81 1173.09 605.80
As' (mm2) 0.00 0.00 0.00
As-min 142.36 142.36 142.36
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 71.5 71.5
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.1 196.1
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 1206.37 1206.37 1206.37
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-17
Axis: 13 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B68 L=4650mm B67 L=2150.6mm B66 L=3225mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 460 x 150 - 460 x 150 200 x 150 - 200 x 150 310 x 150 - 310 x 150
16.7
13.36 13.37 6.75
G=7.42 7.42
7.217.21 5.4 5.410.64
10.09
9.53 9.53
4.3
4.08
3.85 3.85
Q=3 3 2.91
2.91 2.59
1.05
Loads 0.11 0.86 1.57 3.08 4.26 1.08 2.04 0.11 1.8 3.23
UDL G=2.8 Q=0.45 kN/m UDL G=2.8 Q=0.45 kN/m UDL G=2.8 Q=0.45 kN/m
98.464
63.468
Shear
Force -11.192
(Env.) -63.588 -69.464
79.766 79.127
66.421
Moment
(Env.)
-24.724 -24.813
-92.592
Bending (Top Edge) ...
M (kN.m) 23.1 0.9 79.8 79.1 41.8 2.1 6.0 16.1 66.4
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.12 0.00 0.41 0.41 0.22 0.01 0.03 0.08 0.34
x (mm) 50.88 50.88 83.75 83.01 50.88 50.88 50.88 50.88 68.63
Asm (mm2) 167.92 6.48 599.02 593.76 303.13 15.56 43.86 116.65 490.85
Asv (mm2) 0.00 226.02 0.00 0.00 197.82 0.00 0.00 168.84 0.00
As (mm2) 167.92 232.49 599.02 593.76 500.96 15.56 43.86 285.49 490.85
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 47.0 92.6 2.9 8.6 24.7 24.6 24.2 0.0
d (mm) 390.0 389.0 390.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.05 0.10 0.00 0.02 0.05 0.04 0.03 0.00
x (mm) 48.75 48.63 48.75 50.88 48.75 48.75 50.88 48.75
Asm (mm2) 356.02 702.77 22.30 62.22 187.17 186.60 175.46 0.27
Asv (mm2) 0.00 226.02 0.00 197.82 0.00 0.00 168.84 0.00
As (mm2) 356.02 702.77 22.30 187.17 187.17 186.60 186.60 0.27
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 142.73 142.36 142.73 142.73 148.95 142.73 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 59.9 85.2 58.0 41.3 13.0 55.5
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 196.6 196.6 196.6 196.6 196.6 196.6
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.1 0.2 0.2
T-min (kN.m) 3.6 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19
Bottom Edge 603.19 1005.31 603.19 603.19 603.19 603.19 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 3Y16 3Y16 3Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-18
Axis: 13 Storey: 1 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B65 L=374mm
HxBw (mm) 450 x 225
Flange BfxHf 10 x 150 - 10 x 150
G=2.59
Q=1.05
Loads 0.26
UDL G=12.53 Q=0 kN/m
Shear
Force
(Env.)
-155.652
56.898
Moment
(Env.)
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-19
Axis: 13 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B68 L=4650mm B67 L=2150.6mm B66 L=3225mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 460 x 150 - 460 x 150 200 x 150 - 200 x 150 310 x 150 - 310 x 150
16.7
13.36 13.37 6.75
G=7.42 7.42
7.217.21 5.4 5.410.64
10.09
9.53 9.53
4.3
4.08
3.85 3.85
Q=3 3 2.91
2.91 2.59
1.05
Loads 0.11 0.86 1.57 3.08 4.26 1.08 2.04 0.11 1.8 3.23
UDL G=2.8 Q=0.45 kN/m UDL G=2.8 Q=0.45 kN/m UDL G=11.53 Q=0 kN/m
86.881 77.037
Shear
Force -27.683
(Env.) -52.199 -59.567
Moment
(Env.)
-20.513
-31.393
-72.95
Bending (Top Edge) ...
M (kN.m) 18.2 0.7 66.1 62.5 32.0 2.3 7.8 7.1 63.8
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.09 0.00 0.34 0.32 0.17 0.01 0.04 0.04 0.33
x (mm) 50.88 50.88 68.32 64.33 50.88 50.88 50.88 50.88 65.69
Asm (mm2) 132.30 5.01 488.66 460.12 232.16 16.41 56.93 51.28 469.81
Asv (mm2) 0.00 185.40 0.00 0.00 163.12 0.00 0.00 184.45 0.00
As (mm2) 132.30 190.41 488.66 460.12 395.28 16.41 56.93 235.73 469.81
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 38.2 73.0 0.8 9.0 20.5 27.6 31.4 0.0
d (mm) 390.0 407.0 390.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.04 0.07 0.00 0.02 0.04 0.04 0.04 0.00
x (mm) 48.75 50.88 48.75 50.88 48.75 48.75 50.88 48.75
Asm (mm2) 289.09 529.20 6.04 65.64 155.29 208.78 227.73 0.28
Asv (mm2) 0.00 185.40 0.00 163.12 0.00 0.00 184.45 0.00
As (mm2) 289.09 529.20 6.04 155.29 155.29 208.78 227.73 0.28
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 142.73 148.95 142.73 142.73 148.95 142.73 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 48.2 73.1 48.1 32.8 18.5 63.4
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 196.6 196.6 196.6 196.6 196.6 196.6
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.1 0.1 0.1
T-min (kN.m) 3.6 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19
Bottom Edge 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 3Y16 3Y16 3Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-20
Axis: 13 Storey: 2 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B65 L=374mm
HxBw (mm) 450 x 225
Flange BfxHf 10 x 150 - 10 x 150
G=2.59
Q=1.05
Loads 0.26
UDL G=11.53 Q=0 kN/m
Shear
Force
(Env.)
-148.012
54.143
Moment
(Env.)
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-21
Axis: 13 Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B68 L=4650mm B67 L=2150.6mm B66 L=3225mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 460 x 150 - 460 x 150 200 x 150 - 200 x 150 310 x 150 - 310 x 150
G=21.9
Q=8.85 16.7
9.53 6.75
3.85 2.59
1.05
94.279
74.488
Shear
Force -28.918
(Env.) -64.584 -66.198
73.435 70.552
58.11
Moment
(Env.)
-20.165
-30.809
-79.838
Bending (Top Edge) ...
M (kN.m) 20.0 0.0 73.4 70.6 34.1 2.3 7.7 8.3 58.1
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.10 0.00 0.38 0.37 0.18 0.01 0.04 0.04 0.30
x (mm) 50.88 50.88 76.51 73.25 50.88 50.88 50.88 50.88 59.47
Asm (mm2) 144.79 0.07 547.23 523.94 247.65 16.51 55.87 60.47 425.33
Asv (mm2) 0.00 228.96 0.00 0.00 194.59 0.00 0.00 178.94 0.00
As (mm2) 144.79 229.03 547.23 523.94 442.23 16.51 55.87 239.41 425.33
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 44.6 79.8 4.8 9.1 20.2 27.1 30.8
d (mm) 390.0 407.0 390.0 407.0 390.0 390.0 407.0
K/K' 0.05 0.08 0.01 0.02 0.04 0.04 0.04
x (mm) 48.75 50.88 48.75 50.88 48.75 48.75 50.88
Asm (mm2) 337.57 579.17 36.68 66.03 152.66 205.13 223.50
Asv (mm2) 0.00 228.96 0.00 194.59 0.00 0.00 178.94
As (mm2) 337.57 579.17 36.68 152.66 152.66 205.13 223.50
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 142.73 148.95 142.73 142.73 148.95 142.73 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 55.3 85.0 57.1 32.7 19.8 61.9
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 196.6 196.6 196.6 196.6 196.6 196.6
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.1 0.0
T-min (kN.m) 3.6 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19
Bottom Edge 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 3Y16 3Y16 3Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-22
Axis: 13 Storey: 3 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B65 L=374mm
HxBw (mm) 450 x 225
Flange BfxHf 10 x 150 - 10 x 150
G=2.59
Q=1.05
Loads 0.26
UDL G=11.53 Q=0 kN/m
Shear
Force
(Env.)
-148.012
54.151
Moment
(Env.)
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-23
Axis: 15a Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B70 L=7125mm B69 L=2382.5mm
HxBw (mm) 600 x 300 600 x 300
Flange BfxHf 720 x 150 - 720 x 150 210 x 150 - 210 x 150
17.1
G=15.79 17.1
15.79
13.82
Q=12.76 13.82
12.76 10.68
8.63
Shear
Force
(Env.)
-115.28 -126.033
242.357 244.126
Moment
(Env.)
-219.474
Bending (Top Edge) ...
M (kN.m) 54.9 17.1 242.4 244.1 141.7 41.7
d (mm) 557.0 557.0 539.0 539.0 557.0 557.0
K/K' 0.11 0.04 0.54 0.54 0.29 0.09
x (mm) 69.63 69.63 148.65 149.88 79.32 69.63
Asm (mm2) 290.84 90.44 1417.57 1429.39 756.42 221.13
Asv (mm2) 0.00 419.37 0.00 0.00 395.16 0.00
As (mm2) 290.84 509.80 1417.57 1429.39 1151.58 221.13
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 271.80 271.80 263.02 263.02 271.80 0.00
Bending (Bottom Edge) ...
M (kN.m) 121.5 219.5 27.0 0.1
d (mm) 539.0 539.0 540.0 557.0
K/K' 0.05 0.08 0.01 0.00
x (mm) 67.38 67.38 67.50 69.63
Asm (mm2) 665.42 1202.22 147.68 0.50
Asv (mm2) 0.00 419.37 0.00 0.00
As (mm2) 665.42 1202.22 147.68 0.50
As' (mm2) 0.00 0.00 0.00 0.00
As-min 263.02 263.02 263.50 263.50 271.80 0.00
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0
Vd @d(kN) 106.6 162.1 111.5 86.9
v (N/mm2) 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05
V-Rd (kN) 271.7 272.2 272.2 280.8
Vnom (kN) 0.0 0.0
Td (kN.m) 0.1 0.0
T-min (kN.m) 8.4 8.4
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- ---
Provided Steel Areas (mm2)
Top Edge 804.25 804.25 1608.50 1608.50 X 804.25 804.25
Bottom Edge 1206.37 1206.37 804.25 804.25 804.25 804.25
Steel Bars ...
Hanger Bars 4Y16 4Y16
Top Bar
Top SupBar 4Y16 4Y16
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-24
Axis: 15a Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B70 L=7125mm B111 L=9500mm
HxBw (mm) 600 x 300 600 x 300
Flange BfxHf 720 x 150 - 720 x 150 960 x 150 - 960 x 150
17.1
G=15.79 17.1
15.79 17.1
15.79 17.1
15.79
6.91
Q=6.38 6.91
6.38 13.82
12.76 13.82
12.76
147.373 153.276
Shear
Force
(Env.) -80.435
-241.921
439.769
289.23
Moment
(Env.)
-141.003
-356.655
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-25
Axis: 15a Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B70 L=7125mm B111 L=9500mm B130 L=3600mm
HxBw (mm) 600 x 225 750 x 225 600 x 225
Flange BfxHf 720 x 150 - 720 x 150 930 x 150 - 930 x 150 340 x 150 - 340 x 150
20.8
17.58
15.9815.98 15.98 8.4 15.98 16.34
15.98
15.98
12.96 12.96 7.1
6.46 6.46 6.46 6.46 6.6
6.46
6.46
G=9.945.24 5.24 9.95
Q=4.02 4.02
Shear
Force
(Env.) -84.242
-132.846
-278.173
417.944
292.46 331.635 283.912
Moment
(Env.)
-125.612
-461.675
Bending (Top Edge) ...
M (kN.m) 31.4 49.0 292.5 417.9 331.6 283.9 159.3 36.9
d (mm) 555.0 555.0 535.0 685.0 685.0 535.0 536.0 555.0
K/K' 0.09 0.14 0.88 0.77 0.61 0.85 0.48 0.10
x (mm) 69.38 69.38 268.12 287.55 217.48 257.80 128.97 69.38
Asm (mm2) 167.06 260.74 1917.74 2056.71 1555.48 1843.88 922.42 196.18
Asv (mm2) 0.00 382.53 0.00 0.00 0.00 0.00 381.10 0.00
As (mm2) 167.06 643.27 1917.74 2056.71 1555.48 1843.88 1303.52 196.18
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 203.12 203.12 195.80 250.69 258.01 250.69 195.80 196.16 203.12
Bending (Bottom Edge) ...
M (kN.m) 81.9 125.6 44.1 461.7 41.3 0.0
d (mm) 540.0 555.0 705.0 685.0 705.0 540.0
K/K' 0.03 0.05 0.01 0.09 0.01 0.00
x (mm) 67.50 69.38 88.13 85.63 88.13 67.50
Asm (mm2) 447.79 668.24 184.75 1989.92 172.86 0.00
Asv (mm2) 0.00 382.53 0.00 652.70 0.00 0.00
As (mm2) 447.80 668.24 184.75 1989.92 172.86 0.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 197.63 203.12 203.12 258.01 250.69 258.01 197.63 203.12 197.63
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 71.0 149.3 252.6 227.2 116.5 54.2
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 272.2 279.8 355.4 355.4 272.2 272.2
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.0 0.1
T-min (kN.m) 5.0 6.4 5.0
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 1256.64 1256.64 2199.12 2199.12 1256.64 2199.12 2199.12 1658.76 1256.64
Bottom Edge 1256.64 1256.64 1256.64 1256.64 2199.12 1256.64 1256.64 1256.64 1256.64
Steel Bars ...
Hanger Bars 4Y20 4Y20 4Y20
Top Bar 2Y16
Top SupBar 3Y20 3Y20 3Y20 3Y20
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-26
Axis: 18 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B75 L=2827.5mm B74 L=4297.5mm B73 L=5000mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 260 x 150 - 0 x 0 410 x 150 - 410 x 150 490 x 150 - 490 x 150
11.48
11.32
11.14
G=7.9 7.9 7.9 9.41 9.41 8.7
7.598.6
8.43
Q=6.38 6.38 6.386.99 5.7
5.81
6.29
4.5
6.29 5.14
6.296.29
4.5 4.5
3.68
Shear
Force
-21.62
(Env.)
-83.476 -92.518
87.641 88.948
59.421
46.377 54.439
Moment
(Env.) -13.092
-52.504 -58.22
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-27
Axis: 18 Storey: 1 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B72 L=4500mm B71 L=3600mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 0 x 0 - 440 x 150 0 x 0 - 350 x 150
8.35
G=5.75 5.75 3.38
Q=2.33 2.33
47.989
30.208
Shear
Force
(Env.)
-55.414 -50.31
57.798
41.829 40.619
Moment
(Env.) -19.788 -25.007
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-28
Axis: 18 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B112 L=875.4mm B75 L=2827.5mm B74 L=4297.5mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 80 x 150 - 0 x 0 260 x 150 - 0 x 0 410 x 150 - 410 x 150
Loads 0.11 0.44 0.76 0.11 1.71 2.83 2.29 3.24 4.19
UDL G=11.53 Q=0 kN/m UDL G=11.53 Q=0 kN/m UDL G=11.53 Q=0 kN/m
81.104
39.40 41.385
Shear
Force
(Env.) -33.257
-75.486
69.743
Moment 10.235
(Env.)
-53.058
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-29
Axis: 18 Storey: 2 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B73 L=5000mm B72 L=4500mm B71 L=3600mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 490 x 150 - 490 x 150 440 x 150 - 440 x 150 0 x 0 - 350 x 150
13.24
12.91 13.65 13.65
7.7 7.9
7.43
G=8.22 8.71 8.71 11.51 8.35
7.9
7.9
7.9 6.98
5.82 6.38
Q=4.98 6.38
6.38
6.38 3.38
4.7
27.436
Shear
Force
(Env.)
-53.983
-77.463
-94.103
71.618 72.366 71.435 67.143
53.841
Moment
(Env.)
-20.959
-41.247 -45.756
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-30
Axis: 18 Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B75 L=2827.5mm B74 L=4297.5mm B73 L=5000mm
HxBw (mm) 600 x 225 600 x 225 600 x 225
Flange BfxHf 270 x 150 - 0 x 0 420 x 150 - 0 x 0 500 x 150 - 500 x 150
15.42 15.42
14.85 14.85
G=7.99 7.99 7.99 6.23
6 6.23
6 7.8
Q=3.23 3.23 3.23 3.15
49.00 63.824
Shear
Force -24.347
(Env.) -60.993
-94.162
86.733
70.023 74.215
25.311 29.541
Moment
(Env.) -16.111 -24.597
-78.196
Bending (Top Edge) ...
M (kN.m) 4.0 0.2 25.3 29.5 12.8 70.0 74.2 0.1 86.7
d (mm) 557.0 557.0 557.0 557.0 557.0 557.0 557.0 557.0 539.0
K/K' 0.01 0.00 0.07 0.08 0.04 0.19 0.21 0.00 0.26
x (mm) 69.63 69.63 69.63 69.63 69.63 69.63 69.63 69.63 67.38
Asm (mm2) 21.35 1.02 134.17 156.59 68.02 371.17 393.39 0.65 475.10
Asv (mm2) 0.00 90.74 0.00 0.00 145.54 0.00 0.00 212.67 0.00
As (mm2) 21.35 91.75 134.17 156.59 213.56 371.17 393.39 213.32 475.10
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 203.85 203.85 203.85 203.85 203.85 203.85 203.85 203.85 197.26
Bending (Bottom Edge) ...
M (kN.m) 10.2 16.1 0.4 8.0 24.6 9.5 78.2 42.0
d (mm) 540.0 557.0 540.0 540.0 557.0 540.0 557.0 540.0
K/K' 0.01 0.02 0.00 0.01 0.02 0.01 0.04 0.02
x (mm) 67.50 69.63 67.50 67.50 69.63 67.50 69.63 67.50
Asm (mm2) 55.61 85.40 2.38 43.67 130.38 52.16 414.49 229.82
Asv (mm2) 0.00 90.74 0.00 0.00 145.54 0.00 212.67 0.00
As (mm2) 55.61 85.40 2.38 43.67 130.38 52.16 414.49 229.82
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 197.63 203.85 197.63 197.63 203.85 197.63 197.63 203.85 197.63
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 12.5 28.7 35.6 51.9 80.5 135.3
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 272.2 272.2 272.2 272.2 272.2 272.2
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.0 0.0
T-min (kN.m) 5.0 5.0 5.0
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19 1005.31
Bottom Edge 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 3Y16 3Y16 3Y16
Top Bar
Top SupBar 2Y16
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-31
Axis: 18 Storey: 3 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B72 L=4500mm B71 L=3600mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 440 x 150 - 440 x 150 350 x 150 - 350 x 150
95.745
39.79
Shear
Force
(Env.)
-98.322 -90.004
83.864
72.26 69.842
Moment
(Env.)
-42.055 -35.291
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-32
Axis: 19 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B78 L=5075.8mm B77 L=3225mm B76 L=374mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 710 x 150 - 710 x 150 310 x 150 - 310 x 150 10 x 150 - 10 x 150
17.91
G=11.82 7.24 11.82 11.82 14.26 11.82
Q=4.77 4.77 4.77 5.76 4.77
2.59
1.05
Shear
Force
(Env.) -32.987
-83.658
-97.601
59.638
35.424
Moment
(Env.) -25.481
-125.063
Bending (Top Edge) ...
M (kN.m) 31.3 31.3 6.4 8.3 59.6 35.4 15.7 5.3
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.16 0.16 0.03 0.04 0.31 0.18 0.08 0.03
x (mm) 50.88 50.88 50.88 50.88 61.14 50.88 50.88 50.88
Asm (mm2) 226.81 226.81 46.21 60.13 437.28 256.98 113.89 38.18
Asv (mm2) 0.00 0.00 0.00 156.38 0.00 0.00 329.71 0.00
As (mm2) 226.81 226.81 46.21 216.51 437.28 256.98 256.98 38.18
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95 0.00
Bending (Bottom Edge) ...
M (kN.m) 68.1 125.1 62.8 15.8 25.5 0.1
d (mm) 389.0 389.0 389.0 407.0 407.0 390.0
K/K' 0.05 0.10 0.05 0.02 0.04 0.00
x (mm) 48.63 48.63 48.63 50.88 50.88 48.75
Asm (mm2) 516.87 949.23 476.78 114.50 184.85 1.00
Asv (mm2) 0.00 180.50 0.00 0.00 156.38 0.00
As (mm2) 516.87 949.23 476.78 114.50 184.85 1.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 142.36 142.36 142.36 148.95 148.95 142.73 142.73 148.95 0.00
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 73.0 74.9 23.8 55.4 0.0 0.0
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 196.1 196.1 205.2 196.6 196.6 205.2
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.2 0.0
T-min (kN.m) 3.6 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19
Bottom Edge 1005.31 1005.31 1005.31 603.19 603.19 603.19 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 3Y16 3Y16 3Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-33
Axis: 19 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B78 L=5075.8mm B77 L=3225mm B76 L=374mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 500 x 150 - 500 x 150 310 x 150 - 310 x 150 10 x 150 - 10 x 150
18.69
G=13.37 7.55 13.37 11.82 14.26 11.82
Q=5.4 5.4 4.77 5.76 4.77
2.59
1.05
Shear
Force
-21.591
(Env.)
-63.424
-94.351
65.726
34.179
Moment
(Env.)
-37.699
-105.911
Bending (Top Edge) ...
M (kN.m) 26.5 26.5 9.4 8.3 65.7 34.2 15.1 5.1
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.14 0.14 0.05 0.04 0.34 0.18 0.08 0.03
x (mm) 50.88 50.88 50.88 50.88 67.85 50.88 50.88 50.88
Asm (mm2) 192.08 192.08 68.37 60.06 485.32 247.94 109.72 36.65
Asv (mm2) 0.00 0.00 0.00 188.66 0.00 0.00 318.32 0.00
As (mm2) 192.08 192.08 68.37 248.73 485.32 247.94 247.94 36.65
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95 0.00
Bending (Bottom Edge) ...
M (kN.m) 54.0 105.9 63.7 36.4 37.7 0.1
d (mm) 407.0 407.0 407.0 407.0 407.0 390.0
K/K' 0.05 0.10 0.06 0.05 0.05 0.00
x (mm) 50.88 50.88 50.88 50.88 50.88 48.75
Asm (mm2) 391.99 768.31 462.27 263.79 273.48 0.50
Asv (mm2) 0.00 150.24 0.00 0.00 188.66 0.00
As (mm2) 391.99 768.31 462.27 263.79 273.48 0.50
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 148.95 148.95 148.95 148.95 148.95 142.73 142.73 148.95 0.00
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 58.4 51.6 12.4 64.6 0.0 0.0
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 205.2 205.2 205.2 196.6 196.6 205.2
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.1 0.0
T-min (kN.m) 3.6 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19
Bottom Edge 804.25 804.25 804.25 603.19 603.19 603.19 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 3Y16 3Y16 3Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-34
Axis: 19 Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B77 L=3225mm B76 L=374mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 310 x 150 - 310 x 150 10 x 150 - 10 x 150
14.26
G=11.82 5.76 11.82
Q=4.77 4.77
2.59
1.05
50.148
Shear
Force -14.313
(Env.)
-90.522
52.007
33.426
Moment
(Env.) -10.263
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-35
Axis: 20 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B79 L=4500mm
HxBw (mm) 450 x 225
Flange BfxHf 640 x 150 - 640 x 150
10.58 10.58
9.65
7.05
6.68 4.28 4.28
3.9
2.85
2.7
G=2.23
Q=0.9
Shear
Force
(Env.)
-59.234
Moment
(Env.)
-77.488
Bending (Top Edge) ...
M (kN.m) 19.4 19.4
d (mm) 407.0 407.0
K/K' 0.10 0.10
x (mm) 50.88 50.88
Asm (mm2) 140.53 140.53
Asv (mm2) 0.00 0.00
As (mm2) 140.53 140.53
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 39.6 77.5 41.7
d (mm) 390.0 407.0 390.0
K/K' 0.03 0.06 0.04
x (mm) 48.75 50.88 48.75
Asm (mm2) 299.92 562.12 315.94
Asv (mm2) 0.00 122.40 0.00
As (mm2) 299.92 562.12 315.94
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 50.2 52.9
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-36
Axis: 20 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B79 L=4500mm
HxBw (mm) 450 x 225
Flange BfxHf 640 x 150 - 640 x 150
10.58 10.58
9.65
7.05
6.68 4.28 4.28
3.9
2.85
2.7
G=2.23
Q=0.9
Shear
Force
(Env.)
-36.20
Moment
(Env.)
-51.592
Bending (Top Edge) ...
M (kN.m) 12.9 12.9
d (mm) 407.0 407.0
K/K' 0.07 0.07
x (mm) 50.88 50.88
Asm (mm2) 93.57 93.57
Asv (mm2) 0.00 0.00
As (mm2) 93.57 93.57
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 25.3 51.6 27.4
d (mm) 390.0 407.0 390.0
K/K' 0.02 0.04 0.02
x (mm) 48.75 50.88 48.75
Asm (mm2) 191.36 374.26 207.38
Asv (mm2) 0.00 84.03 0.00
As (mm2) 191.36 374.26 207.38
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 32.5 35.2
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-37
Axis: 21 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B83 L=898.5mm B82 L=3025mm B81 L=5000mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf --- 280 x 150 - 280 x 150 480 x 150 - 480 x 150
12.02
4.86 9.74
8.93 9.44
9.44 9.44 8.29
9.449.44
3.94
3.61 6.64
5.83 5.78
5.78 5.785.78
5.78 4.95
3.1 3.77
3.19 3.16
1.25 1.28
-65.485
Bending (Top Edge) ...
M (kN.m) 2.4 8.9 15.5 31.1 13.6 52.7 58.5 37.8
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.01 0.05 0.08 0.16 0.07 0.27 0.30 0.20
x (mm) 50.88 50.88 50.88 50.88 50.88 53.55 59.92 50.88
Asm (mm2) 17.46 64.21 112.27 225.74 98.69 383.01 428.61 274.13
Asv (mm2) 0.00 67.46 0.00 0.00 139.64 0.00 0.00 0.00
As (mm2) 17.46 112.27 112.27 225.74 238.33 383.01 428.61 274.13
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 0.00 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 8.9 16.2 11.1 65.5 32.5
d (mm) 390.0 407.0 390.0 407.0 390.0
K/K' 0.01 0.02 0.01 0.06 0.03
x (mm) 48.75 50.88 48.75 50.88 48.75
Asm (mm2) 67.37 117.41 84.03 475.05 245.71
Asv (mm2) 0.00 139.64 0.00 172.40 0.00
As (mm2) 67.37 117.41 84.03 475.05 245.71
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 0.00 148.95 142.73 142.73 148.95 142.73 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 15.3 17.3 38.1 46.4 71.1 59.6
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 205.2 196.6 196.6 196.6 196.6 196.6
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.1 0.1
T-min (kN.m) 3.6 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19
Bottom Edge 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 3Y16 3Y16 3Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-38
Axis: 21 Storey: 1 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B80 L=900mm
HxBw (mm) 450 x 225
Flange BfxHf 80 x 150 - 80 x 150
3.48
3.29
G=3.16 3.16 3.48
1.41
1.33
Q=1.28 1.28 1.4 1.25 1.25
0.51 0.51
Shear
Force
-18.031
(Env.)
12.417
Moment
(Env.)
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-39
Axis: 21 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B83 L=898.5mm B82 L=3025mm B81 L=5000mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 0 x 0 - 80 x 150 280 x 150 - 280 x 150 480 x 150 - 480 x 150
12.02 10.58
10.58
4.86 9.74
8.93 7.274.28
4.28
3.94
3.61 6.31
3.1 2.943.16
2.55 3.16
G=1.67
Q=0.67 1.25 1.28 1.28
-42.187
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-40
Axis: 21 Storey: 2 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B80 L=900mm
HxBw (mm) 450 x 225
Flange BfxHf 80 x 150 - 80 x 150
3.48
3.29
G=3.16 3.16 3.48
1.41
1.33
Q=1.28 1.28 1.4 1.25 1.25
0.51 0.51
Shear
Force
(Env.) -18.031
12.386
Moment
(Env.)
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-41
Axis: 21 Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B131 L=1272.5mm B82 L=3025mm B81 L=5000mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 0 x 0 - 120 x 150 0 x 0 - 290 x 150 500 x 150 - 500 x 150
14.66
14.48 14.66
14.48
5.93
5.85 5.93
5.85 9.1
6.93 8.54 8.54
8.35
6.31 3.45 3.68
3.38 3.45
G=2.59 2.8 2.55 3.16
3.16
Q=1.05 1.28
1.28
Loads 0.11 0.64 1.16 0.11 1.51 2.910.11 1.58 2.49 3.35 3.99 4.89
UDL G=11.53 Q=0 kN/m UDL G=11.53 Q=0 kN/m UDL G=11.53 Q=0 kN/m
101.879
37.814 34.285
Shear
Force
(Env.) -30.985
-95.16
55.593
32.924 34.118 41.241
Moment 12.927
(Env.)
-100.785
Bending (Top Edge) ...
M (kN.m) 4.1 18.9 32.9 34.1 19.5 41.2 55.6 25.2
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.02 0.10 0.17 0.18 0.10 0.21 0.29 0.13
x (mm) 50.88 50.88 50.88 50.88 50.88 50.88 56.73 50.88
Asm (mm2) 29.69 137.37 238.84 247.51 141.20 299.17 405.74 182.78
Asv (mm2) 0.00 110.84 0.00 0.00 71.21 0.00 0.00 0.00
As (mm2) 29.69 238.84 238.84 247.51 212.41 299.17 405.74 182.78
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 0.00 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 0.0 18.9 100.8 73.8
d (mm) 407.0 390.0 407.0 407.0
K/K' 0.00 0.02 0.10 0.07
x (mm) 50.88 48.75 50.88 50.88
Asm (mm2) 0.06 143.44 731.13 535.69
Asv (mm2) 0.00 0.00 221.00 0.00
As (mm2) 0.06 143.44 731.13 535.69
As' (mm2) 0.00 0.00 0.00 0.00
As-min 0.00 148.95 142.73 142.73 148.95 142.73 142.73 148.95 148.95
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 17.8 29.6 22.7 26.0 85.9 86.3
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 205.2 196.6 196.6 196.6 196.6 205.2
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.1 0.0
T-min (kN.m) 3.6 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19
Bottom Edge 603.19 603.19 603.19 603.19 603.19 603.19 804.25 804.25 804.25
Steel Bars ...
Hanger Bars 3Y16 3Y16 3Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-42
Axis: 22 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B86 L=4175.6mm B85 L=3225mm B84 L=374mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 420 x 150 - 420 x 150 300 x 150 - 300 x 150 10 x 150 - 10 x 150
14.08 14.26
5.69 11.82 11.82 5.76 11.82
7.36 4.78 4.77 4.77
1.5 2.97
G=0.77
0.77
3.34
1.79 2.59
1.35
0.6 0.72 1.05
Q=0.31
0.31
Loads 2.09 2.87 4.060.11 1.31 1.8 2.29 3.23 0.26
UDL G=2.8 Q=0.45 kN/m UDL G=2.8 Q=0.45 kN/m UDL G=2.8 Q=0.45 kN/m
41.387 49.834
Shear
Force
-23.897
(Env.) -37.82
-95.57
47.425
35.223
9.524 11.099
Moment
(Env.)
-14.992
-48.572
Bending (Top Edge) ...
M (kN.m) 12.1 12.1 11.1 9.8 47.4 35.2 15.7 5.2
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.06 0.06 0.06 0.05 0.25 0.18 0.08 0.03
x (mm) 50.88 50.88 50.88 50.88 50.88 50.88 50.88 50.88
Asm (mm2) 88.09 88.09 80.51 71.22 344.03 255.52 113.89 37.64
Asv (mm2) 0.00 0.00 0.00 121.96 0.00 0.00 329.98 0.00
As (mm2) 88.09 88.09 80.51 193.17 344.03 255.52 255.52 37.64
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95 0.00
Bending (Bottom Edge) ...
M (kN.m) 23.9 48.6 24.6 10.8 15.0 0.0 0.1
d (mm) 390.0 407.0 390.0 390.0 407.0 390.0 407.0
K/K' 0.03 0.05 0.03 0.02 0.02 0.00 0.00
x (mm) 48.75 50.88 48.75 48.75 50.88 48.75 50.88
Asm (mm2) 181.19 352.36 186.09 81.53 108.76 0.12 0.48
Asv (mm2) 0.00 95.23 0.00 0.00 121.96 0.00 0.00
As (mm2) 181.19 352.36 186.09 81.53 108.76 0.12 0.48
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 142.73 148.95 142.73 142.73 148.95 142.73 142.73 148.95 0.00
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 32.4 36.9 19.7 41.9 0.0 0.0
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 196.6 196.6 196.6 196.6 196.6 205.2
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.1 0.2 0.0
T-min (kN.m) 3.6 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-43
Axis: 22 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B85 L=3225mm B84 L=374mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 300 x 150 - 300 x 150 10 x 150 - 10 x 150
14.26
G=11.82 5.76 11.82
Q=4.77 4.77
2.59
1.05
49.729
Shear
Force -15.943
(Env.)
-99.399
50.655
35.964
Moment
(Env.)
-12.175
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-44
Axis: 22 Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B85 L=3225mm B84 L=374mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 310 x 150 - 310 x 150 10 x 150 - 10 x 150
14.26
G=11.82 5.76 11.82
Q=4.77 4.77
2.59
1.05
48.958
Shear
Force -15.828
(Env.)
-95.57
48.169
35.271
Moment
(Env.)
-12.04
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-45
Axis: 23 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B87 L=2625mm
HxBw (mm) 450 x 225
Flange BfxHf 340 x 150 - 340 x 150
G=7.42 7.42
Q=3 3 4.46
1.8 3.34 3.34
1.35 1.35 0.87
0.77
0.77
0.35
0.31
0.31
Shear
Force
(Env.)
-31.208
Moment
(Env.)
-23.542
Bending (Top Edge) ...
M (kN.m) 5.9 5.9
d (mm) 407.0 407.0
K/K' 0.03 0.03
x (mm) 50.88 50.88
Asm (mm2) 42.69 42.69
Asv (mm2) 0.00 0.00
As (mm2) 42.69 42.69
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 12.7 23.5 14.7
d (mm) 390.0 407.0 390.0
K/K' 0.02 0.03 0.02
x (mm) 48.75 50.88 48.75
Asm (mm2) 96.12 170.78 111.57
Asv (mm2) 0.00 63.32 0.00
As (mm2) 96.12 170.78 111.57
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 22.1 21.4
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.1
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-46
Axis: 23 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B87 L=2625mm B113 L=4175.6mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 240 x 150 - 240 x 150 410 x 150 - 410 x 150
16.46
6.65 13.37
G=7.42 7.42 8.91 5.4
Q=3 3 4.46 3.34 34.46
3.9
3.34.9 3.6
1.8 1.35 1.8
1.58
1.35
Loads 0.11 0.86 1.31 1.61 2.51 0.56 2.09 2.71 4.06
UDL G=11.53 Q=0 kN/m UDL G=11.53 Q=0 kN/m
53.55 52.98
Shear
Force -7.311
(Env.)
-85.094
62.606 57.271
Moment
(Env.) -1.699
-57.359
Bending (Top Edge) ...
M (kN.m) 3.0 30.3 62.6 57.3 0.2 14.3
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.02 0.16 0.33 0.30 0.00 0.07
x (mm) 50.88 50.88 64.40 58.55 50.88 50.88
Asm (mm2) 21.48 219.97 460.61 418.78 1.25 104.02
Asv (mm2) 0.00 131.93 0.00 0.00 184.09 0.00
As (mm2) 21.48 351.90 460.61 418.78 185.34 104.02
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 148.95 148.95 148.95 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 1.7 1.0 4.8 57.4 32.9
d (mm) 390.0 407.0 390.0 407.0 390.0
K/K' 0.00 0.00 0.01 0.06 0.04
x (mm) 48.75 50.88 48.75 50.88 48.75
Asm (mm2) 12.65 7.10 36.35 416.10 249.28
Asv (mm2) 0.00 131.93 0.00 184.09 0.00
As (mm2) 12.65 12.65 36.35 416.10 249.28
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 142.73 148.95 142.73 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0
Vd @d(kN) 14.0 41.2 71.6 43.7
v (N/mm2) 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05
V-Rd (kN) 196.6 196.6 196.6 196.6
Vnom (kN) 0.0 0.0
Td (kN.m) 0.1 0.0
T-min (kN.m) 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- ---
Provided Steel Areas (mm2)
Top Edge 603.19 603.19 603.19 603.19 603.19 603.19
Bottom Edge 603.19 603.19 603.19 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 3Y16 3Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-47
Axis: 23 Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B87 L=2625mm B113 L=4175.6mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 250 x 150 - 250 x 150 410 x 150 - 410 x 150
G=11.88 11.88
Q=4.8 4.810.03
9.47
8.91 9.78
9.54
8.91 9.53
4.05
3.82
3.6 3.95
3.85
3.6 3.85
62.709 78.712
Shear
Force
(Env.)
-134.395
97.839
83.11
Moment
(Env.)
-113.839
Bending (Top Edge) ...
M (kN.m) 12.4 47.6 83.1 97.8 0.8 28.5
d (mm) 407.0 407.0 389.0 389.0 407.0 407.0
K/K' 0.06 0.25 0.47 0.56 0.00 0.15
x (mm) 50.88 50.88 92.60 111.39 50.88 50.88
Asm (mm2) 89.65 345.15 662.33 796.73 5.57 206.46
Asv (mm2) 0.00 157.05 0.00 0.00 351.64 0.00
As (mm2) 89.65 502.20 662.33 796.73 357.20 206.46
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 148.95 148.95 142.36 142.36 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 6.8 113.8 51.1
d (mm) 363.5 389.0 389.0
K/K' 0.01 0.14 0.06
x (mm) 45.44 48.63 48.63
Asm (mm2) 55.02 864.04 387.63
Asv (mm2) 0.00 351.64 0.00
As (mm2) 55.02 864.04 387.63
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73 133.03 142.36 142.36
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0
Vd @d(kN) 21.7 49.9 118.8 69.8
v (N/mm2) 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05
V-Rd (kN) 196.6 196.6 183.2 196.1
Vnom (kN) 0.0 0.0
Td (kN.m) 0.0 0.0
T-min (kN.m) 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- ---
Provided Steel Areas (mm2)
Top Edge 603.19 603.19 1005.31 804.25 402.12 402.12
Bottom Edge 603.19 603.19 603.19 1005.31 1005.31 1005.31
Steel Bars ...
Hanger Bars 3Y16 2Y16
Top Bar
Top SupBar 2Y16 2Y16
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-48
Axis: 24 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B90 L=4100mm B89 L=5400mm B88 L=3600mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 400 x 150 - 400 x 150 530 x 150 - 530 x 150 350 x 150 - 350 x 150
17.26 16.71
6.98
6.97 13.18 6.75
10.21 10.21
10.2 9.65 5.33 9.65
G=6.31 4.13 4.13
4.12 7.05
6.31 3.9 3.9
Q=2.55 3.16
3.16
3.16 2.85
2.55
1.28
1.28
1.28
Loads 0.11 0.75 1.54 2.56 3.99 0.9 1.69 2.89 3.6 4.31 5.29
0.11 1.8 3.49
UDL G=2.8 Q=0.45 kN/m UDL G=11.53 Q=0 kN/m UDL G=11.53 Q=0 kN/m
94.514
61.024
34.187
Shear
Force -13.15
(Env.)
-73.704
-127.734
119.28
100.755
83.528 77.744
Moment
(Env.) -9.055
-27.192
-81.008
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-49
Axis: 24 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B90 L=4100mm B89 L=5400mm B88 L=3600mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 400 x 150 - 400 x 150 530 x 150 - 530 x 150 350 x 150 - 350 x 150
17.26 16.71
6.98
6.97 13.18 6.75
10.21 10.21
10.2 9.65 5.33 9.65
G=6.31 4.13 4.13
4.12 7.05
6.31 3.9 3.9
Q=2.55 3.16
3.16
3.16 2.85
2.55
1.28
1.28
1.28
Loads 0.11 0.75 1.54 2.56 3.99 0.9 1.69 2.89 3.6 4.31 5.29
0.11 1.8 3.49
UDL G=2.8 Q=0.45 kN/m UDL G=11.53 Q=0 kN/m UDL G=2.8 Q=0.45 kN/m
89.646
60.271
20.844
Shear
Force -13.534
(Env.) -49.402
-129.321
124.189
97.665
68.373 56.595
Moment
(Env.) -9.484 -18.471
-79.872
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-50
Axis: 24 Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B89 L=5400mm B88 L=3600mm
HxBw (mm) 600 x 225 450 x 225
Flange BfxHf 540 x 150 - 540 x 150 350 x 150 - 350 x 150
38.997
Shear
Force
(Env.)
-109.69 -113.844
99.233 88.905
Moment
(Env.)
-34.098
-148.19
Bending (Top Edge) ...
M (kN.m) 37.0 99.2 88.9 13.7 8.5
d (mm) 557.0 539.0 389.0 407.0 407.0
K/K' 0.10 0.29 0.51 0.07 0.04
x (mm) 69.63 76.55 99.89 50.88 50.88
Asm (mm2) 196.38 547.49 714.43 99.58 61.84
Asv (mm2) 0.00 0.00 0.00 212.22 0.00
As (mm2) 196.38 547.49 714.43 311.80 61.84
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 203.85 203.85 197.26 142.36 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 93.9 148.2 29.0 34.1 20.9
d (mm) 539.0 539.0 539.0 407.0 390.0
K/K' 0.05 0.08 0.01 0.04 0.03
x (mm) 67.38 67.38 67.38 50.88 48.75
Asm (mm2) 514.33 811.75 158.74 247.36 157.90
Asv (mm2) 0.00 292.25 0.00 212.22 0.00
As (mm2) 514.33 811.75 158.74 247.36 157.90
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 197.26 197.26 197.26 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0
Vd @d(kN) 94.3 126.0 84.9 29.7
v (N/mm2) 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05
V-Rd (kN) 271.7 271.7 196.6 196.6
Vnom (kN) 0.0 0.0
Td (kN.m) 0.0 0.0
T-min (kN.m) 5.0 3.6
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 804.25 804.25 402.12 402.12
Bottom Edge 1005.31 1005.31 1005.31 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16 2Y16
Top Bar
Top SupBar 2Y16 2Y16
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-51
Axis: 25 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B91 L=436mm
HxBw (mm) 450 x 225
Flange BfxHf ---
Loads
UDL G=2.53 Q=0 kN/m
0.69
Shear
Force
(Env.)
-0.69
Moment
(Env.)
-0.075
Bending (Top Edge) ...
M (kN.m) 0.0 0.0
d (mm) 407.0 407.0
K/K' 0.00 0.00
x (mm) 50.88 50.88
Asm (mm2) 0.14 0.14
Asv (mm2) 0.00 0.00
As (mm2) 0.14 0.14
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 0.1 0.1 0.1
d (mm) 390.0 407.0 390.0
K/K' 0.00 0.00 0.00
x (mm) 48.75 50.88 48.75
Asm (mm2) 0.47 0.54 0.57
Asv (mm2) 0.00 0.83 0.00
As (mm2) 0.47 0.57 0.57
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 0.0 0.0
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.8
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-52
Axis: 26 Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B133 L=1272.5mm B132 L=3025mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 120 x 150 - 0 x 0 290 x 150 - 290 x 150
13.86
5.6
G=2.59
Q=1.05
16.317
Shear
Force
(Env.)
-33.695
28.351 28.346
Moment
(Env.)
-12.473
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-53
Axis: 28 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B92 L=436mm
HxBw (mm) 450 x 225
Flange BfxHf ---
Loads
UDL G=2.53 Q=0 kN/m
0.69
Shear
Force
(Env.)
-0.69
Moment
(Env.)
-0.075
Bending (Top Edge) ...
M (kN.m) 0.0 0.0
d (mm) 407.0 407.0
K/K' 0.00 0.00
x (mm) 50.88 50.88
Asm (mm2) 0.14 0.14
Asv (mm2) 0.00 0.00
As (mm2) 0.14 0.14
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 0.1 0.1 0.1
d (mm) 390.0 407.0 390.0
K/K' 0.00 0.00 0.00
x (mm) 48.75 50.88 48.75
Asm (mm2) 0.47 0.54 0.57
Asv (mm2) 0.00 0.83 0.00
As (mm2) 0.47 0.57 0.57
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 0.0 0.0
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.8
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-54
Axis: 30 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B93 L=1800mm
HxBw (mm) 450 x 225
Flange BfxHf 230 x 150 - 0 x 0
G=3.9
Q=1.58
Shear
Force
(Env.)
-15.822
Moment
(Env.)
-7.654
Bending (Top Edge) ...
M (kN.m) 1.9 1.9
d (mm) 407.0 407.0
K/K' 0.01 0.01
x (mm) 50.88 50.88
Asm (mm2) 13.88 13.88
Asv (mm2) 0.00 0.00
As (mm2) 13.88 13.88
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 4.6 7.7 4.6
d (mm) 390.0 407.0 390.0
K/K' 0.01 0.02 0.01
x (mm) 48.75 50.88 48.75
Asm (mm2) 34.79 55.52 34.79
Asv (mm2) 0.00 27.36 0.00
As (mm2) 34.79 55.52 34.79
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 7.6 7.6
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-55
Axis: 30 Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B93 L=1800mm
HxBw (mm) 450 x 225
Flange BfxHf 230 x 150 - 230 x 150
G=7.8
Q=3.15
Shear
Force
(Env.)
-9.457
Moment
(Env.)
-5.324
Bending (Top Edge) ...
M (kN.m) 1.3 1.3
d (mm) 407.0 407.0
K/K' 0.01 0.01
x (mm) 50.88 50.88
Asm (mm2) 9.66 9.66
Asv (mm2) 0.00 0.00
As (mm2) 9.66 9.66
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 3.0 5.3 3.0
d (mm) 390.0 407.0 390.0
K/K' 0.01 0.01 0.01
x (mm) 48.75 50.88 48.75
Asm (mm2) 22.63 38.62 22.63
Asv (mm2) 0.00 20.68 0.00
As (mm2) 22.63 38.62 22.63
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 5.7 5.7
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-56
Axis: 31 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B99 L=3600mm B98 L=3600mm B97 L=2625mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 340 x 150 - 0 x 0 340 x 150 - 0 x 0 ---
G=8.35 8.35
Q=3.38 3.38
48.71
37.604
24.383
Shear
Force
(Env.) -20.704
-31.177
-47.157
34.859 38.672
20.522 19.018 24.322
Moment 4.616
(Env.)
-17.313
-26.468
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-57
Axis: 31 Storey: 1 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B96 L=4175.6mm B95 L=3225mm B94 L=374mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 400 x 150 - 0 x 0 300 x 150 - 0 x 0 20 x 150 - 0 x 0
G=9.78
Q=3.95 8.35
3.37
1.29
0.52
Shear
Force
(Env.) -39.775
-48.649
-73.71
34.086 34.854 37.926
28.643 26.464
Moment
(Env.) 0.011
-6.039
-30.824
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-58
Axis: 31 Storey: 1 (/ 2) Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B102 L=898.5mm B101 L=3025mm B100 L=4100mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf --- 280 x 150 - 0 x 0 390 x 150 - 0 x 0
14.11
14.1
8.93 5.7
3.61 7.05 7.05
4.46 2.85 2.85
1.8
36.683 38.208
23.697
Shear
Force
(Env.) -26.668
-54.156
35.698 35.132
27.055
15.466
Moment 3.701
(Env.) -0.423
-38.079
Bending (Top Edge) ...
M (kN.m) 2.4 8.8 15.5 27.1 11.0 35.7 35.1 9.5
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.01 0.05 0.08 0.14 0.06 0.19 0.18 0.05
x (mm) 50.88 50.88 50.88 50.88 50.88 50.88 50.88 50.88
Asm (mm2) 17.37 64.13 112.20 196.27 79.60 258.96 254.86 69.06
Asv (mm2) 0.00 67.47 0.00 0.00 78.97 0.00 0.00 0.00
As (mm2) 17.37 112.20 112.20 196.27 158.56 258.96 254.86 69.06
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 0.00 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 0.0 0.0 0.4 5.5 38.1 24.2
d (mm) 407.0 390.0 407.0 390.0 407.0 390.0
K/K' 0.00 0.00 0.00 0.01 0.07 0.05
x (mm) 50.88 48.75 50.88 48.75 50.88 48.75
Asm (mm2) 0.05 0.13 3.07 41.68 276.24 183.42
Asv (mm2) 0.00 0.00 78.97 0.00 119.20 0.00
As (mm2) 0.05 0.13 3.07 41.68 276.24 183.42
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 0.00 148.95 142.73 142.73 148.95 142.73 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 15.3 17.3 18.1 27.7 45.1 28.4
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 205.2 196.6 196.6 196.6 196.6 196.6
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.0 0.0
T-min (kN.m) 3.6 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-59
Axis: 31 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B102 L=898.5mm B101 L=3025mm B100 L=4100mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 80 x 150 - 0 x 0 280 x 150 - 0 x 0 390 x 150 - 0 x 0
14.11
14.1
8.93 5.7
3.61 7.05 7.05
4.46 2.85 2.85
G=1.67 1.8
Q=0.67
Loads 0.11 0.45 0.79 1.64 2.01 2.910.11 1.54 2.56 3.99
UDL G=11.53 Q=0 kN/m UDL G=11.53 Q=0 kN/m UDL G=11.53 Q=0 kN/m
67.617
49.107
14.42
Shear
Force
(Env.)
-41.344 -43.822
54.458 59.192
30.00
12.359 18.909
Moment 6.235
(Env.)
-30.149
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-60
Axis: 31 Storey: 2 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B114 L=1800mm B99 L=3600mm B98 L=3600mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 160 x 150 - 0 x 0 340 x 150 - 0 x 0 340 x 150 - 0 x 0
8.35 8.35
G=3.9 3.38 3.38
Q=1.58
38.002 39.26
22.001
Shear
Force -14.146
(Env.)
-42.147 -40.74
31.234
21.817 23.682 24.393 21.819
14.645
Moment 8.803
(Env.)
-14.979 -18.975
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-61
Axis: 31 Storey: 2 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B97 L=2625mm B96 L=4175.6mm B95 L=3225mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf --- 400 x 150 - 0 x 0 300 x 150 - 0 x 0
9.78 8.35
3.95 3.37
1.29
0.52
49.935 42.495
20.581
Shear
Force
(Env.) -20.502
-33.074
-47.645
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-62
Axis: 31 Storey: 2 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B94 L=374mm
HxBw (mm) 450 x 225
Flange BfxHf 20 x 150 - 0 x 0
G=1.29
Q=0.52
Loads 0.26
UDL G=11.53 Q=0 kN/m
Shear
Force
(Env.)
-73.71
26.459
Moment
(Env.)
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-63
Axis: 31 Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B99 L=3600mm B98 L=3600mm B97 L=2625mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 350 x 150 - 0 x 0 350 x 150 - 350 x 150 250 x 150 - 0 x 0
14.35
G=11.14 11.14 11.149.65
5.8
Q=4.5 4.5 4.5 3.9 5.94
4.7
4.7
1.9
1.9 2.4
-67.262
41.318 41.89
29.218 26.979 24.63
Moment 5.885
(Env.)
-28.982 -24.497
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-64
Axis: 31 Storey: 3 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B96 L=4175.6mm B95 L=3225mm B94 L=374mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 410 x 150 - 0 x 0 310 x 150 - 0 x 0 20 x 150 - 0 x 0
G=9.78 8.35
Q=3.95 3.37
1.29
0.52
50.124
40.053
Shear
Force
(Env.) -35.386
-48.892
-73.71
29.367 31.936 27.692 29.937 26.459
Moment
(Env.)
-9.382
-30.607
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-65
Axis: 31 Storey: 3 (/ 2) Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B101 L=3025mm B100 L=4100mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 290 x 150 - 0 x 0 400 x 150 - 0 x 0
22.46 22.46
9.08 18.759.08
15.22 7.58
G=6.93 6.15
Q=2.8 3.53
1.43
Shear
Force
(Env.) -22.546
-46.018
34.404
29.70
Moment
(Env.)
-14.687
-38.187
Bending (Top Edge) ...
M (kN.m) 3.7 2.0 29.7 34.4 0.4 9.5
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.02 0.01 0.15 0.18 0.00 0.05
x (mm) 50.88 50.88 50.88 50.88 50.88 50.88
Asm (mm2) 26.64 14.58 215.46 249.58 2.95 69.25
Asv (mm2) 0.00 93.43 0.00 0.00 106.71 0.00
As (mm2) 26.64 108.01 215.46 249.58 109.66 69.25
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 148.95 148.95 148.95 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 9.8 14.7 1.0 38.2 28.5
d (mm) 390.0 407.0 390.0 407.0 390.0
K/K' 0.02 0.03 0.00 0.07 0.06
x (mm) 48.75 50.88 48.75 50.88 48.75
Asm (mm2) 74.26 106.55 7.55 277.02 216.12
Asv (mm2) 0.00 93.43 0.00 106.71 0.00
As (mm2) 74.26 106.55 7.55 277.02 216.12
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 142.73 148.95 142.73 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0
Vd @d(kN) 14.3 32.3 38.5 35.1
v (N/mm2) 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05
V-Rd (kN) 196.6 196.6 196.6 196.6
Vnom (kN) 0.0 0.0
Td (kN.m) 0.1 0.0
T-min (kN.m) 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-66
Axis: 6 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B58 L=4650mm B57 L=2150.6mm B56 L=3225mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 460 x 150 - 460 x 150 200 x 150 - 200 x 150 310 x 150 - 310 x 150
14.63
14.42 16.7
5.91
5.83 6.75
7.36 9.53
7.05
G=5.94 5.94 3.85
2.97
Q=2.4 2.42.85 2.59
1.05
Loads 0.11 0.71 1.31 3.04 4.540.11 1.08 2.04 0.11 1.8 3.23
UDL G=11.53 Q=0 kN/m UDL G=11.53 Q=0 kN/m UDL G=11.53 Q=0 kN/m
100.759
69.633
Shear
Force
(Env.) -38.684
-57.918
-85.087
78.129 76.541
59.295
11.86
Moment
(Env.) -22.091
-100.791
Bending (Top Edge) ...
M (kN.m) 25.2 0.0 78.1 76.5 45.0 14.1 11.9 7.5 59.3
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.13 0.00 0.41 0.40 0.23 0.07 0.06 0.04 0.31
x (mm) 50.88 50.88 81.87 80.05 50.88 50.88 50.88 50.88 60.76
Asm (mm2) 182.79 0.14 585.54 572.53 326.77 102.62 86.04 54.35 434.59
Asv (mm2) 0.00 251.68 0.00 0.00 165.55 0.00 0.00 158.49 0.00
As (mm2) 182.79 251.82 585.54 572.53 492.32 102.62 86.04 212.84 434.59
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 60.5 100.8 4.6 11.6 22.1 0.0
d (mm) 407.0 407.0 390.0 390.0 407.0 390.0
K/K' 0.06 0.10 0.01 0.02 0.03 0.00
x (mm) 50.88 50.88 48.75 48.75 50.88 48.75
Asm (mm2) 438.98 731.17 34.96 87.81 160.25 0.30
Asv (mm2) 0.00 251.68 0.00 0.00 158.49 0.00
As (mm2) 438.98 731.17 34.96 87.81 160.25 0.30
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 148.95 148.95 142.73 142.73 148.95 142.73 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 75.8 91.5 48.8 23.7 29.5 56.0
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 205.2 196.6 196.6 196.6 196.6 196.6
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.0 0.1
T-min (kN.m) 3.6 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19
Bottom Edge 804.25 804.25 804.25 603.19 603.19 603.19 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 3Y16 3Y16 3Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-67
Axis: 6 Storey: 1 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B55 L=374mm
HxBw (mm) 450 x 225
Flange BfxHf 10 x 150 - 10 x 150
G=2.59
Q=1.05
Loads 0.26
UDL G=11.53 Q=0 kN/m
Shear
Force
(Env.)
-134.734
49.194
Moment
(Env.)
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-68
Axis: 6 Storey: 1 (/ 2) Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B60 L=7125mm B59 L=2382.5mm
HxBw (mm) 600 x 300 600 x 300
Flange BfxHf 720 x 150 - 720 x 150 200 x 150 - 200 x 150
15.51 15.51
G=12.27
12.53 12.5312.27 10.68
Q=9.91 9.92 8.63
Shear
Force
(Env.)
-106.708
-131.701
248.643 257.605
Moment
(Env.)
-198.147
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-69
Axis: 6 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B58 L=4650mm B57 L=2150.6mm B56 L=3225mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 460 x 150 - 460 x 150 200 x 150 - 200 x 150 310 x 150 - 310 x 150
14.63
14.42 16.7
5.91
5.83 6.75
7.36 9.53
7.05
G=5.94 5.94 3.85
2.97
Q=2.4 2.42.85 2.59
1.05
Loads 0.11 0.71 1.31 3.04 4.540.11 1.08 2.04 0.11 1.8 3.23
UDL G=2.8 Q=0.45 kN/m UDL G=2.8 Q=0.45 kN/m UDL G=2.8 Q=0.45 kN/m
64.869 52.125
Shear
Force -19.017
(Env.) -34.195
-52.367
5.465
Moment
(Env.) -2.565
-12.625
-64.636
Bending (Top Edge) ...
M (kN.m) 16.2 0.0 51.5 45.0 26.5 8.0 5.5 14.0 52.7
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.08 0.00 0.27 0.23 0.14 0.04 0.03 0.07 0.27
x (mm) 50.88 50.88 52.26 50.88 50.88 50.88 50.88 50.88 53.61
Asm (mm2) 117.22 0.30 373.82 326.17 192.29 58.08 39.64 101.41 383.41
Asv (mm2) 0.00 169.59 0.00 0.00 103.69 0.00 0.00 129.07 0.00
As (mm2) 117.22 169.89 373.82 326.17 295.98 58.08 39.64 230.48 383.41
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 38.3 64.6 0.8 2.6 8.0 12.6
d (mm) 390.0 407.0 390.0 390.0 390.0 407.0
K/K' 0.04 0.07 0.00 0.01 0.01 0.02
x (mm) 48.75 50.88 48.75 48.75 48.75 50.88
Asm (mm2) 290.13 468.89 5.81 19.42 60.90 91.59
Asv (mm2) 0.00 169.59 0.00 0.00 0.00 129.07
As (mm2) 290.13 468.89 5.81 19.42 60.90 91.59
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 142.73 148.95 142.73 142.73 148.95 142.73 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 48.4 60.9 30.4 16.2 15.2 44.2
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 196.6 196.6 196.6 196.6 196.6 196.6
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.0 0.0
T-min (kN.m) 3.6 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-70
Axis: 6 Storey: 2 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B55 L=374mm
HxBw (mm) 450 x 225
Flange BfxHf 10 x 150 - 10 x 150
G=2.59
Q=1.05
Loads 0.26
UDL G=11.53 Q=0 kN/m
Shear
Force
(Env.)
-130.812
47.721
Moment
(Env.)
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-71
Axis: 6 Storey: 2 (/ 2) Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B60 L=7125mm B108 L=9500mm
HxBw (mm) 600 x 300 600 x 300
Flange BfxHf 720 x 150 - 720 x 150 930 x 150 - 930 x 150
Shear
Force
(Env.) -107.90
-229.586
444.527
308.62
Moment
(Env.)
-180.748
-317.325
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-72
Axis: 6 Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B127 L=875.4mm B60 L=7125mm B108 L=9500mm
HxBw (mm) 450 x 225 600 x 225 750 x 225
Flange BfxHf 80 x 150 - 0 x 0 720 x 150 - 720 x 150 930 x 150 - 930 x 150
22.28
19.06
18.93 18.93 9 18.93
13.01 13.01 13.86 7.65
7.7 7.65 7.65
7.08 5.26 5.26
3.54
3.54 5.08 5.6
4.52
3.96 3.96
G=1.61 2.86 2.05
1.83
Q=0.65 1.431.6 1.6
1.43
Loads 0.11 0.44 0.76 0.11 0.83 2.03 4.08 5.99 7.01 1 2.05 3.99 6.13 6.8 9.39
UDL G=11.53 Q=0 kN/m UDL G=12.38 Q=0 kN/m UDL G=13.22 Q=0 kN/m
204.204 237.224
48.007
Shear
Force
(Env.) -86.568
-302.945
452.016
332.202
241.718
36.111 36.337
Moment
(Env.) -98.531
-479.522
Bending (Top Edge) ...
M (kN.m) 6.9 22.2 36.1 36.3 57.4 332.2 452.0 241.7
d (mm) 407.0 407.0 407.0 555.0 555.0 535.0 685.0 685.0
K/K' 0.04 0.12 0.19 0.10 0.16 1.00 0.83 0.44
x (mm) 50.88 50.88 50.88 69.38 69.38 320.13 317.72 151.85
Asm (mm2) 49.85 161.30 261.96 193.30 305.55 2289.69 2272.49 1086.07
Asv (mm2) 0.00 152.40 0.00 0.00 342.42 0.00 0.00 0.00
As (mm2) 49.85 261.96 261.96 193.30 647.96 2289.69 2272.49 1086.07
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 0.00 148.95 148.95 203.12 203.12 195.80 250.69 258.01 250.69
Bending (Bottom Edge) ...
M (kN.m) 49.3 98.5 65.7 479.5 107.7
d (mm) 540.0 535.0 685.0 685.0 685.0
K/K' 0.02 0.04 0.01 0.09 0.02
x (mm) 67.50 66.88 85.63 85.63 85.63
Asm (mm2) 269.42 543.77 283.25 2066.85 464.37
Asv (mm2) 0.00 342.42 0.00 686.59 0.00
As (mm2) 269.42 543.77 283.25 2066.85 464.37
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 0.00 148.95 142.73 197.63 195.80 203.12 250.69 250.69 250.69
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 39.0 40.8 73.9 189.4 268.3 216.0
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 205.2 196.6 272.2 279.8 345.3 345.3
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.0 0.0
T-min (kN.m) 3.6 5.0 6.4
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 603.19 603.19 603.19 1256.64 1256.64 2513.27 2513.27 1256.64 2199.12
Bottom Edge 603.19 603.19 603.19 1256.64 2199.12 1256.64 2199.12 2199.12 2199.12
Steel Bars ...
Hanger Bars 3Y16 4Y20 4Y20
Top Bar
Top SupBar 4Y20 4Y20 3Y20
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-73
Axis: 6 Storey: 3 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B126 L=3600mm B58 L=4650mm B57 L=2150.6mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 340 x 150 - 340 x 150 460 x 150 - 460 x 150 200 x 150 - 200 x 150
20.42
18.93 18.93
G=16.71
Q=6.75 7.658.257.65
9.53
3.85
84.231
16.497 5.497
Shear
Force -49.693
-73.521
(Env.) -96.591
177.821
29.274 36.501 61.673 54.263 6.961
Moment
(Env.) 25.008 6.951
-0.958
-64.458
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-74
Axis: 6 Storey: 3 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B56 L=3225mm B55 L=374mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 310 x 150 - 310 x 150 10 x 150 - 10 x 150
G=16.7
Q=6.75
2.59
1.05
64.987
Shear
Force -34.86
(Env.) -130.812
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-75
Axis: 7 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B61 L=651.5mm
HxBw (mm) 450 x 225
Flange BfxHf 50 x 150 - 50 x 150
G=5.34
Q=2.16
Loads 0.54
UDL G=2.8 Q=0.45 kN/m
2.097
Shear
Force
(Env.)
-3.294
Moment
(Env.)
-0.438
Bending (Top Edge) ...
M (kN.m) 0.1 0.1
d (mm) 407.0 407.0
K/K' 0.00 0.00
x (mm) 50.88 50.88
Asm (mm2) 0.79 0.79
Asv (mm2) 0.00 0.00
As (mm2) 0.79 0.79
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 0.4 0.4 0.3
d (mm) 390.0 407.0 390.0
K/K' 0.00 0.00 0.00
x (mm) 48.75 50.88 48.75
Asm (mm2) 3.30 3.18 2.16
Asv (mm2) 0.00 4.21 0.00
As (mm2) 3.30 3.30 2.16
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 1.9 2.1
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.4
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-76
Axis: 7 Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B128 L=7125mm
HxBw (mm) 450 x 225
Flange BfxHf 1030 x 150 - 1030 x 150
9.99 9.99
4.04
G=7.08 4.04 7.09
Q=2.86 2.86
Shear
Force
(Env.)
-68.712
Moment
(Env.)
-138.984
Bending (Top Edge) ...
M (kN.m) 34.7 34.7
d (mm) 407.0 407.0
K/K' 0.18 0.18
x (mm) 50.88 50.88
Asm (mm2) 252.06 252.06
Asv (mm2) 0.00 0.00
As (mm2) 252.06 252.06
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 72.0 139.0 72.0
d (mm) 407.0 389.0 407.0
K/K' 0.04 0.08 0.04
x (mm) 50.88 48.63 50.88
Asm (mm2) 522.63 1054.88 522.63
Asv (mm2) 0.00 137.40 0.00
As (mm2) 522.63 1054.88 522.63
As' (mm2) 0.00 0.00 0.00
As-min 148.95 142.36 148.95
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 64.6 64.6
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 205.2 205.2
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 804.25 1206.37 804.25
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-77
Axis: 9 Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B62 L=7125mm
HxBw (mm) 600 x 225
Flange BfxHf 1030 x 150 - 1030 x 150
15.34 15.34
G=12.26
12.39 12.3912.26
Q=9.91 9.91
Shear
Force
(Env.)
-120.893
Moment
(Env.)
-256.513
Bending (Top Edge) ...
M (kN.m) 64.1 64.1
d (mm) 557.0 557.0
K/K' 0.18 0.18
x (mm) 69.63 69.63
Asm (mm2) 339.93 339.93
Asv (mm2) 0.00 0.00
As (mm2) 339.93 339.93
As' (mm2) 0.00 0.00
As-min 203.85 203.85 203.85
Bending (Bottom Edge) ...
M (kN.m) 129.3 256.5 129.3
d (mm) 539.0 539.0 539.0
K/K' 0.04 0.07 0.04
x (mm) 67.38 67.38 67.38
Asm (mm2) 708.20 1405.11 708.20
Asv (mm2) 0.00 262.49 0.00
As (mm2) 708.20 1405.11 708.20
As' (mm2) 0.00 0.00 0.00
As-min 197.26 197.26 197.26
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 113.5 113.5
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 271.7 271.7
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 5.0
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 603.19 603.19 603.19
Bottom Edge 1407.43 1407.43 1407.43
Steel Bars ...
Hanger Bars 3Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-78
Axis: 9 Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B110 L=875.4mm B62 L=7125mm B109 L=9500mm
HxBw (mm) 450 x 225 600 x 225 600 x 225
Flange BfxHf 0 x 0 - 80 x 150 720 x 150 - 720 x 150 1390 x 150 - 1390 x 150
39.40
Shear
Force
(Env.)
-134.525
-172.747
28.599 29.53
Moment
(Env.)
-251.352
-476.772
Bending (Top Edge) ...
M (kN.m) 5.3 17.3 28.6 62.8 62.8 119.2 119.2
d (mm) 405.0 405.0 405.0 555.0 555.0 555.0 555.0
K/K' 0.03 0.09 0.15 0.18 0.18 0.33 0.33
x (mm) 50.63 50.63 50.63 69.38 69.38 90.07 90.07
Asm (mm2) 38.29 126.36 208.49 334.29 334.29 644.20 644.20
Asv (mm2) 0.00 122.22 0.00 0.00 0.00 0.00 0.00
As (mm2) 38.29 208.49 208.49 334.29 334.29 644.20 644.20
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 0.00 148.22 148.22 203.12 203.12 203.12 203.12 203.12 203.12
Bending (Bottom Edge) ...
M (kN.m) 114.6 251.4 131.0 239.8 476.8 253.9
d (mm) 555.0 555.0 555.0 535.0 535.0 535.0
K/K' 0.04 0.09 0.05 0.05 0.11 0.06
x (mm) 69.38 69.38 69.38 66.88 66.88 66.88
Asm (mm2) 609.69 1337.15 696.65 1323.41 2631.16 1401.05
Asv (mm2) 0.00 279.04 0.00 0.00 358.45 0.00
As (mm2) 609.69 1337.15 696.65 1323.41 2631.16 1401.05
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 0.00 148.22 142.73 203.12 203.12 203.12 195.80 195.80 195.80
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 30.5 32.5 121.3 113.7 163.9 162.5
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 204.1 196.6 279.8 279.8 269.7 269.7
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.0 0.0
T-min (kN.m) 3.6 5.0 5.0
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 942.48 942.48 942.48 942.48 942.48 942.48 942.48 942.48 942.48
Bottom Edge 1256.64 1256.64 1256.64 1256.64 X 1256.64 1256.64 2199.12 X 2199.12 2199.12
Steel Bars ...
Hanger Bars 3Y20 3Y20 3Y20
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-79
Axis: AA Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B24 L=4725mm B25 L=4725mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 470 x 150 - 470 x 150 470 x 150 - 470 x 150
16.71 16.71
G=11.5111.51 6.75 6.75
8.35 9.65
8.35 9.65
Q=4.65 4.65
3.383.9
3.38 3.9
57.288
Shear
Force
(Env.)
-79.786
-100.937
118.832 109.996
22.743
Moment
(Env.)
-65.315
-101.868
Bending (Top Edge) ...
M (kN.m) 25.5 2.1 118.8 110.0 7.3 16.3
d (mm) 407.0 407.0 389.0 389.0 407.0 407.0
K/K' 0.13 0.01 0.68 0.63 0.04 0.08
x (mm) 50.88 50.88 139.93 127.64 50.88 50.88
Asm (mm2) 184.75 14.96 1000.85 912.95 52.82 118.45
Asv (mm2) 0.00 338.42 0.00 0.00 249.98 0.00
As (mm2) 184.75 353.38 1000.85 912.95 302.80 118.45
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 148.95 148.95 142.36 142.36 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 56.6 101.9 1.0 65.3 39.4
d (mm) 407.0 407.0 390.0 407.0 390.0
K/K' 0.06 0.10 0.00 0.07 0.04
x (mm) 50.88 50.88 48.75 50.88 48.75
Asm (mm2) 410.33 738.98 7.69 473.82 298.14
Asv (mm2) 0.00 338.42 0.00 249.98 0.00
As (mm2) 410.33 738.98 7.69 473.82 298.14
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 148.95 148.95 142.73 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0
Vd @d(kN) 70.5 116.5 91.6 48.0
v (N/mm2) 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05
V-Rd (kN) 205.2 196.6 196.6 196.6
Vnom (kN) 0.0 0.0
Td (kN.m) 0.0 0.0
T-min (kN.m) 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- ---
Provided Steel Areas (mm2)
Top Edge 603.19 603.19 1005.31 1005.31 603.19 603.19
Bottom Edge 804.25 804.25 804.25 804.25 804.25 804.25
Steel Bars ...
Hanger Bars 3Y16 3Y16
Top Bar
Top SupBar 2Y16 2Y16
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-80
Axis: AA Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B24 L=4725mm B25 L=4725mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 470 x 150 - 470 x 150 470 x 150 - 470 x 150
16.71 16.71
G=11.5111.51 6.75 6.75
8.35 9.65
8.35 9.65
Q=4.65 4.65
3.383.9
3.38 3.9
Shear
Force
(Env.) -46.134
-94.928
81.321 81.60
Moment
(Env.)
-66.76
-77.754
Bending (Top Edge) ...
M (kN.m) 16.7 1.9 81.3 81.6 0.9 19.4
d (mm) 405.0 405.0 405.0 405.0 405.0 405.0
K/K' 0.09 0.01 0.43 0.43 0.00 0.10
x (mm) 50.63 50.63 86.06 86.38 50.63 50.63
Asm (mm2) 121.67 14.04 615.52 617.84 6.85 141.71
Asv (mm2) 0.00 222.50 0.00 0.00 228.91 0.00
As (mm2) 121.67 236.54 615.52 617.84 235.76 141.71
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 148.22 148.22 148.22 148.22 148.22 148.22
Bending (Bottom Edge) ...
M (kN.m) 37.5 66.8 0.3 77.8 44.3
d (mm) 390.0 405.0 390.0 405.0 390.0
K/K' 0.04 0.07 0.00 0.08 0.05
x (mm) 48.75 50.63 48.75 50.63 48.75
Asm (mm2) 283.68 486.69 2.16 566.84 335.45
Asv (mm2) 0.00 222.50 0.00 228.91 0.00
As (mm2) 283.68 486.69 2.16 566.84 335.45
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 142.73 148.22 142.73 142.73 148.22 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0
Vd @d(kN) 42.3 76.2 85.7 54.3
v (N/mm2) 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05
V-Rd (kN) 196.6 196.6 196.6 196.6
Vnom (kN) 0.0 0.0
Td (kN.m) 0.0 0.0
T-min (kN.m) 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- ---
Provided Steel Areas (mm2)
Top Edge 942.48 942.48 942.48 942.48 942.48 942.48
Bottom Edge 942.48 942.48 942.48 942.48 942.48 942.48
Steel Bars ...
Hanger Bars 3Y20 3Y20
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-81
Axis: AA Storey: 2 (/ 2) Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B103 L=4050mm B104 L=6721.5mm B105 L=3453.5mm
HxBw (mm) 600 x 225 600 x 225 600 x 225
Flange BfxHf 0 x 0 - 390 x 150 0 x 0 - 670 x 150 0 x 0 - 330 x 150
G=9.37 9.2
Q=7.58 7.44 7.9
6.13 6.38
4.96
Loads 0.11 2.01 3.90.15 1.39 2.63 4.71 6.570.15 1.75 3.34
UDL G=3.65 Q=0.9 kN/m UDL G=3.65 Q=0.9 kN/m UDL G=3.65 Q=0.9 kN/m
133.237
72.045
Shear 2.256
Force -13.006
(Env.) -68.243
-162.646
192.859 184.326
155.655 147.467
Moment
(Env.) -8.78 -0.401
-216.219
Bending (Top Edge) ...
M (kN.m) 15.2 81.9 155.7 192.9 3.6 184.3 147.5 86.5 20.0
d (mm) 555.0 555.0 555.0 555.0 555.0 555.0 555.0 555.0 555.0
K/K' 0.04 0.23 0.43 0.54 0.01 0.51 0.41 0.24 0.06
x (mm) 69.38 69.38 120.44 153.18 69.38 145.50 113.48 69.38 69.38
Asm (mm2) 81.03 435.85 861.43 1095.64 19.23 1040.68 811.66 460.11 106.49
Asv (mm2) 0.00 210.68 0.00 0.00 485.35 0.00 0.00 206.02 0.00
As (mm2) 81.03 646.54 861.43 1095.64 504.58 1040.68 811.66 666.13 106.49
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 203.12 203.12 203.12 203.12 203.12 203.12 203.12 203.12 203.12
Bending (Bottom Edge) ...
M (kN.m) 7.2 8.8 34.7 216.2 4.4 0.1
d (mm) 540.0 555.0 555.0 555.0 540.0 540.0
K/K' 0.01 0.01 0.02 0.15 0.00 0.00
x (mm) 67.50 69.38 69.38 69.38 67.50 67.50
Asm (mm2) 39.48 46.71 184.69 1150.25 23.79 0.42
Asv (mm2) 0.00 210.68 0.00 485.35 0.00 0.00
As (mm2) 39.48 46.71 184.69 1150.25 23.79 0.42
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 197.63 203.12 203.12 203.12 203.12 197.63 197.63 203.12 197.63
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 21.4 65.9 156.3 126.9 62.1 29.8
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 272.2 279.8 279.8 272.2 272.2 272.2
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.1 0.0 0.1
T-min (kN.m) 5.0 5.0 5.0
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 942.48 942.48 942.48 1256.64 1256.64 1256.64 942.48 942.48 942.48
Bottom Edge 942.48 942.48 942.48 1256.64 1256.64 1256.64 942.48 942.48 942.48
Steel Bars ...
Hanger Bars 3Y20 4Y20 3Y20
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-82
Axis: AA Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B103 L=4050mm B104 L=6721.5mm B105 L=3453.5mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 400 x 150 - 400 x 150 680 x 150 - 680 x 150 330 x 150 - 330 x 150
21.16 21.16
17.82
G=16.7116.71 16.71 8.55 8.55 16.71 15.98
7.26.75
Q=6.75 6.75 6.75 6.46
10.844
Shear
Force
(Env.) -41.968
-58.066
-100.254
107.435 116.902 104.67 92.943
Moment
(Env.) -6.614
-38.469
-100.493
Bending (Top Edge) ...
M (kN.m) 9.6 28.3 107.4 116.9 1.2 104.7 92.9 47.1 5.8
d (mm) 407.0 407.0 389.0 389.0 407.0 389.0 389.0 407.0 407.0
K/K' 0.05 0.15 0.61 0.66 0.01 0.59 0.53 0.24 0.03
x (mm) 50.88 50.88 124.16 137.21 50.88 120.43 105.04 50.88 50.88
Asm (mm2) 69.77 205.38 888.04 981.38 8.60 861.40 751.32 341.89 41.78
Asv (mm2) 0.00 228.52 0.00 0.00 239.53 0.00 0.00 168.94 0.00
As (mm2) 69.77 433.89 888.04 981.38 248.13 861.40 751.32 510.83 41.78
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 148.95 148.95 142.36 142.36 148.95 142.36 142.36 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 24.6 38.5 6.2 100.5 3.6 6.6 6.3
d (mm) 390.0 407.0 390.0 389.0 390.0 407.0 390.0
K/K' 0.03 0.04 0.00 0.08 0.00 0.01 0.01
x (mm) 48.75 50.88 48.75 48.63 48.75 50.88 48.75
Asm (mm2) 186.55 279.06 46.84 762.74 26.95 47.98 47.84
Asv (mm2) 0.00 228.52 0.00 239.53 0.00 168.94 0.00
As (mm2) 186.56 279.06 46.84 762.74 26.95 47.98 47.84
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 142.73 148.95 142.73 142.73 142.36 142.73 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 32.7 79.8 96.3 92.9 54.2 13.4
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 196.6 196.6 196.6 196.6 196.6 196.6
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.1 0.0 0.1
T-min (kN.m) 3.6 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 603.19 603.19 1005.31 1005.31 603.19 1005.31 1005.31 603.19 603.19
Bottom Edge 603.19 603.19 603.19 603.19 1005.31 603.19 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 3Y16 3Y16 3Y16
Top Bar
Top SupBar 2Y16 2Y16 2Y16 2Y16
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-83
Axis: AC Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B18 L=4050mm B19 L=3137.5mm B20 L=3137.5mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 390 x 150 - 0 x 0 290 x 150 - 0 x 0 290 x 150 - 0 x 0
7.21 7.21
G=2.97 2.97 2.91 2.91
Q=1.2 1.2
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-84
Axis: AC Storey: 1 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B21 L=3900mm B22 L=4225mm B23 L=5225mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 370 x 150 - 0 x 0 420 x 150 - 420 x 150 510 x 150 - 510 x 150
Loads 0.11 0.86 3.9 1.8 2.93 3.36 4.11 1.31 1.81 2.3 3.43 5.11
UDL G=11.53 Q=0 kN/m UDL G=2.8 Q=0.45 kN/m UDL G=11.53 Q=0 kN/m
Shear
Force
(Env.) -43.544 -39.696
-113.351
84.105 86.667
Moment
(Env.) -17.248 -12.87
-70.41
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-85
Axis: AC Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B18 L=4050mm B19 L=3137.5mm B20 L=3137.5mm
HxBw (mm) 1800 x 225 1800 x 225 1800 x 225
Flange BfxHf 390 x 150 - 0 x 0 290 x 150 - 0 x 0 290 x 150 - 0 x 0
7.21 7.21
G=2.97 2.97 2.91 2.91
Q=1.2 1.2
-170.282 -164.673
Bending (Top Edge) ...
M (kN.m) 41.8 41.8 38.4 38.4 15.5 27.1
d (mm) 1755.0 1755.0 1755.0 1755.0 1755.0 1755.0
K/K' 0.01 0.01 0.01 0.01 0.00 0.01
x (mm) 219.38 219.38 219.38 219.38 219.38 219.38
Asm (mm2) 70.38 70.38 64.53 64.53 26.10 45.66
Asv (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As (mm2) 70.38 70.38 64.53 64.53 26.10 45.66
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 642.29 635.34 642.29 642.29 635.34 642.29 642.29 635.34 642.29
Bending (Bottom Edge) ...
M (kN.m) 60.7 167.3 170.2 164.7 153.4 71.8 46.9 62.0 54.6
d (mm) 1755.0 1755.0 1755.0 1755.0 1755.0 1755.0 1755.0 1755.0 1755.0
K/K' 0.02 0.05 0.05 0.05 0.04 0.02 0.01 0.02 0.02
x (mm) 219.38 219.38 219.38 219.38 219.38 219.38 219.38 219.38 219.38
Asm (mm2) 102.04 281.51 286.40 277.04 258.13 120.87 78.89 104.38 91.83
Asv (mm2) 0.00 242.40 0.00 0.00 262.22 0.00 0.00 127.87 0.00
As (mm2) 102.04 286.40 286.40 277.04 277.04 120.88 78.89 104.38 91.83
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 642.29 642.29 642.29 642.29 642.29 642.29 642.29 642.29 642.29
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 45.4 24.5 31.1 38.9 40.2 38.1
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 884.6 884.6 884.6 884.6 884.6 884.6
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.0 0.0
T-min (kN.m) 16.4 16.4 16.4
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 942.48 942.48 942.48 942.48 942.48 942.48 942.48 942.48 942.48
Bottom Edge 942.48 942.48 942.48 942.48 942.48 942.48 942.48 942.48 942.48
Steel Bars ...
Hanger Bars 3Y20 3Y20 3Y20
Top Bar
Top SupBar
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-86
Axis: AC Storey: 2 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B21 L=3900mm B22 L=4225mm B23 L=5225mm
HxBw (mm) 1800 x 225 450 x 225 450 x 225
Flange BfxHf 370 x 150 - 0 x 0 420 x 150 - 420 x 150 510 x 150 - 510 x 150
Loads 0.11 0.86 3.9 1.8 2.93 3.36 4.11 1.31 1.81 2.3 3.43 5.11
UDL G=19.13 Q=0 kN/m UDL G=2.8 Q=0.45 kN/m UDL G=11.53 Q=0 kN/m
85.074
50.762 52.916
Shear
Force
(Env.) -41.926
-56.147
-100.366
101.603
41.806 59.255 77.839
24.988
Moment
(Env.) -12.085
-62.854 -67.76
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-87
Axis: AC Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B18 L=4050mm B19 L=3137.5mm B20 L=3137.5mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 400 x 150 - 400 x 150 300 x 150 - 300 x 150 300 x 150 - 300 x 150
17.82
G=16.7116.71 16.71 19.31 19.31 19.31
7.26.75 7.8 7.8 7.8 14.49
Q=6.75 6.75 5.86
2.21
1.65
0.89
0.67
Loads 0.11 1.8 3.940.11 1.8 2.33 3.14 0.81 1.78 3.03
UDL G=11.53 Q=0 kN/m UDL G=11.53 Q=0 kN/m UDL G=11.53 Q=0 kN/m
Shear
Force
(Env.) -52.114 -51.841
-73.257
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-88
Axis: AC Storey: 3 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B21 L=3900mm B22 L=4225mm B23 L=5225mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 380 x 150 - 380 x 150 420 x 150 - 420 x 150 520 x 150 - 520 x 150
18.19
18.19 19.8 19.8 17.08
7.35
7.35 8 8 6.9 11.88
10.95
10.95
10.95 9.41
4.43
4.43
4.43 3.8 4.8
G=1.65
1.09 2.21
1.09 2.48
1.92
1.36 2.48
1.36
Q=0.67
0.44 0.89
0.44 010.55
.780.551
0.78
Loads 2.17 3.79 1.9 2.36 4.11 1.31 2.86 3.91 5.11
UDL G=11.53 Q=0 kN/m UDL G=11.53 Q=0 kN/m UDL G=11.53 Q=0 kN/m
81.614 87.574
69.84
Shear
-35.467
Force
(Env.) -41.359
-49.122
-83.628
-134.751
93.156 100.206
58.69 58.174
33.388
Moment
(Env.)
-28.926 -32.121
-92.01
Bending (Top Edge) ...
M (kN.m) 33.4 1.4 58.7 58.2 17.7 93.2 100.2 0.1 23.0
d (mm) 407.0 407.0 389.0 389.0 407.0 389.0 389.0 407.0 407.0
K/K' 0.17 0.01 0.33 0.33 0.09 0.53 0.57 0.00 0.12
x (mm) 50.88 50.88 63.28 62.69 50.88 105.32 114.50 50.88 50.88
Asm (mm2) 242.21 10.02 452.64 448.36 128.69 753.28 818.95 1.06 166.87
Asv (mm2) 0.00 146.78 0.00 0.00 200.47 0.00 0.00 231.21 0.00
As (mm2) 242.21 156.80 452.64 448.36 329.16 753.28 818.95 232.27 166.87
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 148.95 148.95 142.36 142.36 148.95 142.36 142.36 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 28.9 4.3 32.1 5.5 92.0 53.1
d (mm) 407.0 390.0 407.0 363.5 389.0 389.0
K/K' 0.03 0.01 0.04 0.01 0.09 0.05
x (mm) 50.88 48.75 50.88 45.44 48.63 48.63
Asm (mm2) 209.84 32.57 233.01 44.54 698.35 403.31
Asv (mm2) 146.78 0.00 200.47 0.00 231.21 0.00
As (mm2) 209.84 32.57 233.01 44.54 698.35 403.31
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 142.73 148.95 142.73 142.73 148.95 142.73 133.03 142.36 142.36
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 47.7 62.7 64.7 75.9 87.6 61.1
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 196.6 196.6 196.6 196.6 183.2 196.1
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.0 0.0
T-min (kN.m) 3.6 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 804.25 804.25 402.12 1005.31 1005.31 402.12 402.12
Bottom Edge 603.19 603.19 603.19 603.19 603.19 603.19 1005.31 1005.31 1005.31
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar 2Y16 2Y16 3Y16 3Y16
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-89
Axis: AD Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B17 L=4050mm
HxBw (mm) 450 x 225
Flange BfxHf 570 x 150 - 570 x 150
10.4 10.4
4.2 4.2
G=5.94 5.94
Q=2.4 2.4
Shear
Force
(Env.)
-54.098
Moment
(Env.)
-62.142
Bending (Top Edge) ...
M (kN.m) 15.5 15.5
d (mm) 407.0 407.0
K/K' 0.08 0.08
x (mm) 50.88 50.88
Asm (mm2) 112.70 112.70
Asv (mm2) 0.00 0.00
As (mm2) 112.70 112.70
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 33.0 62.1 33.0
d (mm) 390.0 407.0 390.0
K/K' 0.03 0.05 0.03
x (mm) 48.75 50.88 48.75
Asm (mm2) 249.57 450.80 249.57
Asv (mm2) 0.00 108.07 0.00
As (mm2) 249.57 450.80 249.57
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 44.8 44.8
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-90
Axis: AD Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B17 L=4050mm
HxBw (mm) 450 x 225
Flange BfxHf 570 x 150 - 570 x 150
10.4 10.4
4.2 4.2
G=5.94 5.94
Q=2.4 2.4
Shear
Force
(Env.)
-33.367
Moment
(Env.)
-41.152
Bending (Top Edge) ...
M (kN.m) 10.3 10.3
d (mm) 407.0 407.0
K/K' 0.05 0.05
x (mm) 50.88 50.88
Asm (mm2) 74.63 74.63
Asv (mm2) 0.00 0.00
As (mm2) 74.63 74.63
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 21.2 41.2 21.2
d (mm) 390.0 407.0 390.0
K/K' 0.02 0.04 0.02
x (mm) 48.75 50.88 48.75
Asm (mm2) 160.74 298.53 160.74
Asv (mm2) 0.00 73.74 0.00
As (mm2) 160.74 298.53 160.74
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 29.4 29.4
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-91
Axis: AE Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B15 L=5200mm B16 L=2925mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 520 x 150 - 520 x 150 280 x 150 - 280 x 150
15.72
15.72
6.35
6.35 9.62
G=7.42 3.89 5.873.83
Q=3 3.71
3.71
3.71 2.371.553.19
1.5
1.51.5 1.29
5.798
Shear
Force
(Env.)
-62.317 -74.587
108.599 106.502
Moment
(Env.) -1.021
-78.026
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-92
Axis: AE Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B15 L=5200mm B16 L=2925mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 520 x 150 - 520 x 150 280 x 150 - 280 x 150
15.72
15.72
6.35
6.35 10.39
G=7.42 4.2 7.42
Q=3 3.71
3.71
3.71 3
1.5
1.51.5
Shear 0.177
Force
(Env.) -39.221
-51.744
83.171 80.503
Moment
(Env.)
-52.03
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-93
Axis: AF Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B13 L=312.5mm B14 L=5225mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 20 x 150 - 0 x 0 520 x 150 - 520 x 150
15.72
15.72
13.436.35
6.35
5.43 9.78 9.78
3.95 3.95
1.55
G=0.99
0.99
0.63
Q=0.4
0.4
Loads 0.11 0.31 1.31 3.14 5.11
UDL G=2.8 Q=0.45 kN/m UDL G=11.53 Q=0 kN/m
67.888
39.309
Shear
Force
(Env.)
-85.545
34.77
12.125
Moment
(Env.)
-104.578
Bending (Top Edge) ...
M (kN.m) 2.0 5.8 12.1 34.8 26.1
d (mm) 407.0 407.0 407.0 407.0 407.0
K/K' 0.01 0.03 0.06 0.18 0.14
x (mm) 50.88 50.88 50.88 50.88 50.88
Asm (mm2) 14.41 42.15 87.96 252.23 189.66
Asv (mm2) 0.00 134.83 0.00 0.00 0.00
As (mm2) 14.41 87.96 87.96 252.23 189.66
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 0.00 148.95 148.95 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 56.0 104.6 52.2
d (mm) 389.0 389.0 389.0
K/K' 0.06 0.11 0.05
x (mm) 48.63 48.63 48.63
Asm (mm2) 424.67 793.75 396.20
Asv (mm2) 0.00 166.59 0.00
As (mm2) 424.67 793.75 396.20
As' (mm2) 0.00 0.00 0.00
As-min 0.00 148.95 148.95 142.36 142.36 142.36
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0
Vd @d(kN) 0.0 0.0 75.4 59.9
v (N/mm2) 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05
V-Rd (kN) 205.2 205.2 196.1 196.1
Vnom (kN) 0.0 0.0
Td (kN.m) 0.0 0.0
T-min (kN.m) 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 603.19 603.19 603.19 1005.31 1005.31 1005.31
Steel Bars ...
Hanger Bars 2Y16 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-94
Axis: AF Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B14 L=5225mm
HxBw (mm) 450 x 225
Flange BfxHf 740 x 150 - 740 x 150
14.36
G=11.885.8
Q=4.88.429.78 9.78
3.43.95 3.95
Shear
Force
(Env.)
-74.43
Moment
(Env.)
-104.634
Bending (Top Edge) ...
M (kN.m) 26.2 26.2
d (mm) 407.0 407.0
K/K' 0.14 0.14
x (mm) 50.88 50.88
Asm (mm2) 189.76 189.76
Asv (mm2) 0.00 0.00
As (mm2) 189.76 189.76
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 57.1 104.6 52.2
d (mm) 407.0 407.0 407.0
K/K' 0.04 0.07 0.04
x (mm) 50.88 50.88 50.88
Asm (mm2) 414.19 759.05 378.81
Asv (mm2) 0.00 143.67 0.00
As (mm2) 414.19 759.05 378.81
As' (mm2) 0.00 0.00 0.00
As-min 148.95 148.95 148.95
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 65.2 59.6
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 205.2 205.2
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 804.25 804.25 804.25
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-95
Axis: AF Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B14 L=5225mm
HxBw (mm) 450 x 225
Flange BfxHf 740 x 150 - 740 x 150
15.72 15.72
G=11.88 6.35 6.35 11.88
Q=4.8 4.8
Shear
Force
(Env.)
-86.05
Moment
(Env.)
-131.351
Bending (Top Edge) ...
M (kN.m) 32.8 32.8
d (mm) 407.0 407.0
K/K' 0.17 0.17
x (mm) 50.88 50.88
Asm (mm2) 238.22 238.22
Asv (mm2) 0.00 0.00
As (mm2) 238.22 238.22
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 67.1 131.4 67.1
d (mm) 389.0 389.0 389.0
K/K' 0.05 0.10 0.05
x (mm) 48.63 48.63 48.63
Asm (mm2) 509.43 996.95 509.43
Asv (mm2) 0.00 181.87 0.00
As (mm2) 509.43 996.95 509.43
As' (mm2) 0.00 0.00 0.00
As-min 142.36 142.36 142.36
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 77.3 77.3
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.1 196.1
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 1005.31 1005.31 1005.31
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-96
Axis: AH Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B10 L=4050mm B11 L=3137.5mm B12 L=3137.5mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 390 x 150 - 390 x 150 290 x 150 - 290 x 150 290 x 150 - 290 x 150
Loads 0.11 1.08 1.61 2.44 2.98 3.940.11 1.08 1.57 3.03 1.57 2.06 3.03
UDL G=12.53 Q=0 kN/m UDL G=12.53 Q=0 kN/m UDL G=12.53 Q=0 kN/m
71.541 63.391
32.625
Shear
Force
(Env.)
-53.961 -51.85
-64.411
62.21
45.125 50.227 52.789
Moment
(Env.) 2.082
-6.227
-24.06
-57.692
Bending (Top Edge) ...
M (kN.m) 14.4 45.1 50.2 17.4 62.2 52.8 7.5 6.0
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.07 0.23 0.26 0.09 0.32 0.27 0.04 0.03
x (mm) 50.88 50.88 50.95 50.88 63.96 53.70 50.88 50.88
Asm (mm2) 104.63 327.35 364.39 126.50 457.48 384.07 54.65 43.63
Asv (mm2) 0.00 0.00 0.00 139.41 0.00 0.00 144.01 0.00
As (mm2) 104.63 327.35 364.39 265.92 457.48 384.07 198.66 43.63
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 32.3 57.7 19.3 0.7 6.2 0.0 24.1 16.4
d (mm) 390.0 407.0 390.0 390.0 407.0 390.0 407.0 390.0
K/K' 0.04 0.07 0.02 0.00 0.01 0.00 0.03 0.03
x (mm) 48.75 50.88 48.75 48.75 50.88 48.75 50.88 48.75
Asm (mm2) 244.71 418.51 146.12 5.54 45.17 0.01 174.54 124.44
Asv (mm2) 0.00 159.31 0.00 0.00 139.41 0.00 144.01 0.00
As (mm2) 244.71 418.51 146.12 5.54 45.17 0.01 174.54 124.44
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 142.73 148.95 142.73 142.73 148.95 142.73 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 44.0 60.7 41.3 48.8 49.8 21.1
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 196.6 196.6 196.6 196.6 196.6 196.6
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.1 0.1
T-min (kN.m) 3.6 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19
Bottom Edge 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 3Y16 3Y16 3Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-97
Axis: AH Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B10 L=4050mm B11 L=3137.5mm B12 L=3137.5mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 390 x 150 - 390 x 150 290 x 150 - 290 x 150 290 x 150 - 290 x 150
Loads 0.11 1.08 1.61 2.44 2.98 3.940.11 1.08 1.57 3.03 1.57 2.06 3.03
UDL G=11.53 Q=0 kN/m UDL G=11.53 Q=0 kN/m UDL G=11.53 Q=0 kN/m
66.158 60.837
26.706
Shear
Force
(Env.)
-36.678
-52.193
-64.029
60.048 57.745
33.574 28.665
Moment
(Env.) 1.814
-6.498
-17.762
-56.568
Bending (Top Edge) ...
M (kN.m) 14.1 33.6 28.7 17.0 60.0 57.7 12.4 4.4
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.07 0.17 0.15 0.09 0.31 0.30 0.06 0.02
x (mm) 50.88 50.88 50.88 50.88 61.59 59.07 50.88 50.88
Asm (mm2) 102.59 243.55 207.95 123.55 440.49 422.48 89.66 32.21
Asv (mm2) 0.00 0.00 0.00 134.23 0.00 0.00 146.40 0.00
As (mm2) 102.59 243.55 207.95 257.78 440.49 422.48 236.06 32.21
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 31.4 56.6 18.2 0.4 6.5 17.8 13.1
d (mm) 390.0 407.0 390.0 390.0 407.0 407.0 390.0
K/K' 0.04 0.07 0.02 0.00 0.01 0.03 0.02
x (mm) 48.75 50.88 48.75 48.75 50.88 50.88 48.75
Asm (mm2) 237.87 410.36 137.63 3.12 47.14 128.85 99.01
Asv (mm2) 0.00 145.24 0.00 0.00 134.23 146.40 0.00
As (mm2) 237.87 410.36 137.63 3.12 47.14 128.85 99.01
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 142.73 148.95 142.73 142.73 148.95 142.73 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 42.9 56.0 26.8 47.0 50.1 15.9
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 196.6 196.6 196.6 196.6 196.6 196.6
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.0 0.0
T-min (kN.m) 3.6 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19
Bottom Edge 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 3Y16 3Y16 3Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-98
Axis: AH Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B10 L=4050mm B11 L=3137.5mm B12 L=3137.5mm
HxBw (mm) 600 x 225 600 x 225 600 x 225
Flange BfxHf 400 x 150 - 400 x 150 300 x 150 - 300 x 150 300 x 150 - 300 x 150
Loads 0.11 1.08 2.03 2.98 3.940.11 1.08 2.33 3.14 0.81 2.06 3.03
UDL G=3.65 Q=0.45 kN/m UDL G=3.65 Q=0.45 kN/m UDL G=3.65 Q=0.45 kN/m
79.771
56.026
36.169
Shear
Force -2.374
(Env.) -46.083 -38.648
146.16
75.991 77.08
Moment 68.756
(Env.) -27.357
-63.064
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-99
Axis: AH Storey: 3 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B115 L=8125mm
HxBw (mm) 600 x 225
Flange BfxHf 820 x 150 - 820 x 150
15.72 15.72
G=9.53 6.35 6.35 9.53
Q=3.85 3.85
Shear
Force
(Env.)
-129.691
162.10
Moment
(Env.)
-190.053
Bending (Top Edge) ...
M (kN.m) 162.1 47.5
d (mm) 539.0 539.0
K/K' 0.48 0.14
x (mm) 130.59 67.38
Asm (mm2) 934.07 260.27
Asv (mm2) 0.00 0.00
As (mm2) 934.07 260.27
As' (mm2) 0.00 0.00
As-min 197.26 197.26 197.26
Bending (Bottom Edge) ...
M (kN.m) 6.0 190.1 106.8
d (mm) 513.5 539.0 539.0
K/K' 0.00 0.07 0.04
x (mm) 64.19 67.38 67.38
Asm (mm2) 34.65 1041.06 584.96
Asv (mm2) 0.00 306.03 0.00
As (mm2) 34.65 1041.06 584.96
As' (mm2) 0.00 0.00 0.00
As-min 187.93 197.26 197.26
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 123.1 83.9
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 258.8 271.7
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 5.0
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 1005.31 1005.31 1005.31
Bottom Edge 1206.37 1206.37 1206.37
Steel Bars ...
Hanger Bars 3Y16
Top Bar 2Y16
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-100
Axis: AJ Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B6 L=4050mm B7 L=6275mm B8 L=7812.5mm
HxBw (mm) 600 x 225 600 x 225 600 x 225
Flange BfxHf 390 x 150 - 390 x 150 620 x 150 - 620 x 150 790 x 150 - 790 x 150
20.36
20.36
16.7 8.22
8.22 16.7
13.12 13.12 13.12 13.12 6.75 6.75 11.82
G=9.53 5.3 5.3 9.53 9.53 5.3 5.3 9.53
Q=3.85 3.85 3.85 3.85 4.78
-186.329
250.461 255.551
191.203
75.879 80.293
Moment
(Env.) -48.158 -57.206
-235.828
Bending (Top Edge) ...
M (kN.m) 12.0 3.0 75.9 80.3 65.4 250.5 255.6 1.8 191.2
d (mm) 557.0 557.0 557.0 557.0 557.0 539.0 539.0 557.0 539.0
K/K' 0.03 0.01 0.21 0.22 0.18 0.74 0.76 0.00 0.57
x (mm) 69.63 69.63 69.63 69.63 69.63 217.25 222.75 69.63 157.53
Asm (mm2) 63.82 16.05 402.21 425.61 346.86 1553.89 1593.22 9.46 1126.71
Asv (mm2) 0.00 187.23 0.00 0.00 321.73 0.00 0.00 473.61 0.00
As (mm2) 63.82 203.27 402.21 425.61 668.59 1553.89 1593.22 483.07 1126.71
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 203.85 203.85 203.85 203.85 203.85 197.26 197.26 203.85 197.26
Bending (Bottom Edge) ...
M (kN.m) 28.7 48.2 0.8 20.5 57.2 18.4 235.8 58.7
d (mm) 540.0 557.0 540.0 540.0 557.0 513.5 539.0 513.5
K/K' 0.02 0.03 0.00 0.01 0.02 0.01 0.09 0.02
x (mm) 67.50 69.63 67.50 67.50 69.63 64.19 67.38 64.19
Asm (mm2) 156.81 255.27 4.18 112.32 303.23 105.98 1291.81 337.36
Asv (mm2) 0.00 187.23 0.00 0.00 321.73 0.00 473.61 0.00
As (mm2) 156.81 255.27 4.18 112.32 303.23 105.98 1291.81 337.36
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 197.63 203.85 197.63 197.63 203.85 197.63 187.93 197.26 187.93
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 35.1 65.0 69.6 122.7 172.5 176.1
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 272.2 272.2 272.2 272.2 258.8 258.8
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.0 0.0
T-min (kN.m) 5.0 5.0 5.0
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 603.19 603.19 603.19 804.25 804.25 1608.50 1608.50 804.25 1407.43
Bottom Edge 603.19 603.19 603.19 603.19 603.19 603.19 1407.43 1407.43 1407.43
Steel Bars ...
Hanger Bars 3Y16 4Y16 4Y16
Top Bar
Top SupBar 4Y16 4Y16 3Y16
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-101
Axis: AJ Storey: 1 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B9 L=5537.5mm
HxBw (mm) 450 x 225
Flange BfxHf 550 x 150 - 550 x 150
18.13
G=16.7 18.13
16.7
7.32
Q=6.75 7.32
6.75
42.564
Shear
Force
(Env.) -101.188
173.026
Moment
(Env.) -56.212
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-102
Axis: AJ Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B6 L=4050mm B7 L=6275mm B8 L=7812.5mm
HxBw (mm) 600 x 225 600 x 225 600 x 225
Flange BfxHf 390 x 150 - 390 x 150 620 x 150 - 620 x 150 790 x 150 - 790 x 150
20.36
20.36
16.7 8.22
8.22 16.7
13.12 13.12 13.12 13.12 6.75 6.75 11.81
11.81
G=9.53 5.3 5.3 9.53 9.53 5.3 5.3 9.53
Q=3.85 3.85 3.85 3.85 4.77
4.77
1.55
0.99
0.63
0.4
Loads 0.11 1.08 1.8 2.25 2.98 3.94
0.11 1.08 1.8 4.48 5.2 6.16
0.11 1.8 3.4 5.09 6.51 7.7
UDL G=12.38 Q=0 kN/m UDL G=12.38 Q=0 kN/m UDL G=12.38 Q=0 kN/m
172.38
127.901
78.973
Shear
Force
(Env.) -46.599
-90.029
-165.024
207.978 217.387 208.787
74.604 79.45
Moment
(Env.) -44.998 -66.07
-173.909
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-103
Axis: AJ Storey: 2 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B9 L=5537.5mm
HxBw (mm) 600 x 225
Flange BfxHf 550 x 150 - 550 x 150
18.13 18.13
16.7
15.15 7.32 7.32
6.12 6.75
1.55
G=0.99
0.43
0.43
Q=0.40.62
0.17
0.17
Loads 1.8 2.4 3.45 5.43
UDL G=12.38 Q=0 kN/m
73.171
Shear
Force
(Env.)
-181.798
196.062
Moment
(Env.)
-95.753
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-104
Axis: AJ Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B6 L=4050mm B7 L=6275mm B8 L=7812.5mm
HxBw (mm) 600 x 225 600 x 225 600 x 225
Flange BfxHf 400 x 150 - 400 x 150 630 x 150 - 630 x 150 790 x 150 - 790 x 150
119.366 128.117
79.333
Shear
Force
-45.015
(Env.) -94.494
-134.201
Moment
(Env.)
-42.38
-75.467
-121.712
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-105
Axis: AJ Storey: 3 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B9 L=5537.5mm
HxBw (mm) 600 x 225
Flange BfxHf 550 x 150 - 550 x 150
18.13 18.13
16.7
15.15 7.32 7.32
6.12 6.75
1.55
G=0.99
0.43
0.43
Q=0.40.62
0.17
0.17
Loads 1.8 2.4 3.45 5.43
UDL G=12.38 Q=0 kN/m
81.038
Shear
Force
(Env.)
-196.757
146.763
Moment
(Env.)
-113.702
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-106
Axis: AL Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B1 L=4050mm B2 L=6275mm B3 L=5200mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 0 x 0 - 600 x 150 0 x 0 - 940 x 150 0 x 0 - 780 x 150
Shear
Force
(Env.)
-45.757
-66.207
-82.958
Moment
(Env.)
-52.411
-96.412
-144.464
Bending (Top Edge) ...
M (kN.m) 13.1 13.1 36.1 36.1 24.1 24.1
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.07 0.07 0.19 0.19 0.13 0.13
x (mm) 50.88 50.88 50.88 50.88 50.88 50.88
Asm (mm2) 95.05 95.05 262.00 262.00 174.85 174.85
Asv (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As (mm2) 95.05 95.05 262.00 262.00 174.85 174.85
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 27.6 52.4 27.6 74.7 144.5 74.7 50.1 96.4 50.1
d (mm) 390.0 407.0 407.0 389.0 389.0 389.0 407.0 407.0 407.0
K/K' 0.04 0.07 0.04 0.08 0.16 0.08 0.06 0.11 0.06
x (mm) 48.75 50.88 50.88 48.63 48.63 48.63 50.88 50.88 50.88
Asm (mm2) 208.70 380.21 199.98 566.96 1096.48 566.96 363.31 699.40 363.31
Asv (mm2) 0.00 91.51 0.00 0.00 164.11 0.00 0.00 132.33 0.00
As (mm2) 208.70 380.21 199.98 566.96 1096.48 566.96 363.31 699.40 363.31
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 142.73 148.95 148.95 142.36 142.36 142.36 148.95 148.95 148.95
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 37.4 37.4 74.3 74.3 57.2 57.2
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 196.6 205.2 196.1 196.1 205.2 205.2
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.0 0.0
T-min (kN.m) 3.6 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 804.25 804.25 804.25 1206.37 1206.37 1206.37 804.25 804.25 804.25
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-107
Axis: AL Storey: 1 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B4 L=2612.5mm B5 L=5537.5mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 0 x 0 - 390 x 150 0 x 0 - 830 x 150
8.35 8.35
G=5.91 3.37 3.37
Q=2.39
25.375
Shear
Force
(Env.) -25.375
-68.005
Moment
(Env.) -18.243
-105.737
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-108
Axis: AL Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B1 L=4050mm B2 L=6275mm B3 L=5200mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 0 x 0 - 600 x 150 0 x 0 - 940 x 150 0 x 0 - 780 x 150
Shear
Force
(Env.)
-45.757
-62.957
-79.036
Moment
(Env.)
-52.411
-92.187
-138.312
Bending (Top Edge) ...
M (kN.m) 13.1 13.1 34.6 34.6 23.0 23.0
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.07 0.07 0.18 0.18 0.12 0.12
x (mm) 50.88 50.88 50.88 50.88 50.88 50.88
Asm (mm2) 95.05 95.05 250.84 250.84 167.19 167.19
Asv (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As (mm2) 95.05 95.05 250.84 250.84 167.19 167.19
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 27.6 52.4 27.6 71.4 138.3 71.4 47.8 92.2 47.8
d (mm) 390.0 407.0 407.0 407.0 389.0 407.0 407.0 407.0 390.0
K/K' 0.04 0.07 0.04 0.07 0.15 0.07 0.06 0.11 0.06
x (mm) 48.75 50.88 50.88 50.88 48.63 50.88 50.88 50.88 48.75
Asm (mm2) 208.70 380.21 199.98 517.83 1049.78 517.83 346.56 668.75 361.67
Asv (mm2) 0.00 91.51 0.00 0.00 157.48 0.00 0.00 126.88 0.00
As (mm2) 208.70 380.21 199.98 517.83 1049.78 517.83 346.56 668.75 361.67
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 142.73 148.95 148.95 148.95 142.36 148.95 148.95 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 37.4 37.4 71.0 71.0 54.6 54.6
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 196.6 205.2 205.2 205.2 205.2 196.6
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.0 0.0
T-min (kN.m) 3.6 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 603.19 603.19 603.19 804.25 1206.37 804.25 804.25 804.25 804.25
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-109
Axis: AL Storey: 2 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B4 L=2612.5mm B5 L=5537.5mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 0 x 0 - 390 x 150 0 x 0 - 830 x 150
8.35 8.35
G=5.91 3.37 3.37
Q=2.39
25.375
Shear
Force
(Env.) -25.375
-68.005
Moment
(Env.) -18.243
-105.737
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-110
Axis: AL Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B1 L=4050mm B2 L=6275mm B3 L=5200mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 0 x 0 - 600 x 150 0 x 0 - 940 x 150 0 x 0 - 780 x 150
Shear
Force
(Env.)
-45.757
-62.957
-79.036
Moment
(Env.)
-52.411
-92.187
-138.312
Bending (Top Edge) ...
M (kN.m) 13.1 13.1 34.6 34.6 23.0 23.0
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.07 0.07 0.18 0.18 0.12 0.12
x (mm) 50.88 50.88 50.88 50.88 50.88 50.88
Asm (mm2) 95.05 95.05 250.84 250.84 167.19 167.19
Asv (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As (mm2) 95.05 95.05 250.84 250.84 167.19 167.19
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 27.6 52.4 27.6 71.4 138.3 71.4 47.8 92.2 47.8
d (mm) 390.0 407.0 407.0 407.0 389.0 407.0 407.0 407.0 390.0
K/K' 0.04 0.07 0.04 0.07 0.15 0.07 0.06 0.11 0.06
x (mm) 48.75 50.88 50.88 50.88 48.63 50.88 50.88 50.88 48.75
Asm (mm2) 208.70 380.21 199.98 517.83 1049.78 517.83 346.56 668.75 361.67
Asv (mm2) 0.00 91.51 0.00 0.00 157.48 0.00 0.00 126.88 0.00
As (mm2) 208.70 380.21 199.98 517.83 1049.78 517.83 346.56 668.75 361.67
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 142.73 148.95 148.95 148.95 142.36 148.95 148.95 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 37.4 37.4 71.0 71.0 54.6 54.6
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 196.6 205.2 205.2 205.2 205.2 196.6
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.0 0.0
T-min (kN.m) 3.6 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 804.25 804.25 804.25 804.25 1206.37 804.25 804.25 804.25 804.25
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-111
Axis: AL Storey: 3 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B4 L=2612.5mm B5 L=5537.5mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 0 x 0 - 390 x 150 0 x 0 - 830 x 150
8.35 8.35
G=5.91 3.37 3.37
Q=2.39
25.375
Shear
Force
(Env.) -25.375
-68.005
Moment
(Env.) -18.243
-105.737
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-112
Axis: B Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B107 L=7434.5mm
HxBw (mm) 450 x 225
Flange BfxHf 1110 x 150 - 0 x 0
G=1.61 1.61
Q=0.65 0.65
Loads 0.11 7
UDL G=2.8 Q=0.45 kN/m
25.81
Shear
Force
(Env.)
-25.81
Moment
(Env.)
-49.201
Bending (Top Edge) ...
M (kN.m) 12.3 12.3
d (mm) 407.0 407.0
K/K' 0.06 0.06
x (mm) 50.88 50.88
Asm (mm2) 89.23 89.23
Asv (mm2) 0.00 0.00
As (mm2) 89.23 89.23
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 26.3 49.2 26.3
d (mm) 390.0 407.0 390.0
K/K' 0.03 0.04 0.03
x (mm) 48.75 50.88 48.75
Asm (mm2) 198.89 356.92 198.89
Asv (mm2) 0.00 45.28 0.00
As (mm2) 198.89 356.92 198.89
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 22.7 22.7
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.1
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-113
Axis: B Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B124 L=4050mm
HxBw (mm) 450 x 225
Flange BfxHf 600 x 150 - 0 x 0
G=1.61 1.61
Q=0.65 0.65
Shear
Force
(Env.)
-34.417
Moment
(Env.)
-35.553
Bending (Top Edge) ...
M (kN.m) 8.9 8.9
d (mm) 407.0 407.0
K/K' 0.05 0.05
x (mm) 50.88 50.88
Asm (mm2) 64.48 64.48
Asv (mm2) 0.00 0.00
As (mm2) 64.48 64.48
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 19.8 35.6 19.8
d (mm) 390.0 407.0 390.0
K/K' 0.03 0.05 0.03
x (mm) 48.75 50.88 48.75
Asm (mm2) 150.05 257.91 150.05
Asv (mm2) 0.00 58.35 0.00
As (mm2) 150.05 257.91 150.05
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 26.2 26.2
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-114
Axis: D Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B40 L=2737.5mm B41 L=2969.1mm B42 L=2830.6mm
HxBw (mm) 600 x 225 600 x 225 600 x 225
Flange BfxHf 250 x 150 - 0 x 0 280 x 150 - 280 x 150 260 x 150 - 260 x 150
G=9.37 9.53
Q=7.58 6.18 6.9 6.91 7.53 8.09
7.53
5.75 5.36
4.81 5.97 5.01 6.54
6.09
4.65 3.78 3.78 4.05 5.27 4.25 4.25 3.333.78 3.3
4.33
3.89
3.43 2.36 1.341.53
1.53 1.53
Loads 0.11 2.01 2.74 1.16 1.46 2.09 2.7 0.65 0.97 1.64 2.18 2.72
UDL G=3.65 Q=0.9 kN/m UDL G=3.65 Q=0.9 kN/m UDL G=3.65 Q=0.9 kN/m
81.885 84.039
43.263
Shear
Force -14.396
(Env.)
-88.955 -101.854
50.063 50.843 57.497
43.319
34.347
Moment
(Env.) -10.395
-61.405 -63.154
Bending (Top Edge) ...
M (kN.m) 2.6 8.3 34.3 43.3 50.1 50.8 0.6 57.5
d (mm) 557.0 557.0 557.0 557.0 557.0 557.0 557.0 557.0
K/K' 0.01 0.02 0.10 0.12 0.14 0.14 0.00 0.16
x (mm) 69.63 69.63 69.63 69.63 69.63 69.63 69.63 69.63
Asm (mm2) 13.78 43.98 182.07 229.62 265.37 269.50 2.95 304.78
Asv (mm2) 0.00 85.12 0.00 0.00 0.00 0.00 314.49 0.00
As (mm2) 13.78 129.11 182.07 229.62 265.37 269.50 304.78 304.78
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 203.85 203.85 203.85 203.85 203.85 203.85 203.85 203.85 203.85
Bending (Bottom Edge) ...
M (kN.m) 6.2 10.4 0.1 19.4 61.4 8.4 18.8 63.2 1.6
d (mm) 540.0 557.0 540.0 540.0 557.0 540.0 540.0 557.0 540.0
K/K' 0.01 0.01 0.00 0.02 0.05 0.01 0.02 0.05 0.00
x (mm) 67.50 69.63 67.50 67.50 69.63 67.50 67.50 69.63 67.50
Asm (mm2) 33.64 55.10 0.52 106.09 325.49 45.79 102.60 334.76 8.56
Asv (mm2) 0.00 85.12 0.00 0.00 248.61 0.00 0.00 314.49 0.00
As (mm2) 33.64 55.10 0.52 106.09 325.49 45.79 102.60 334.76 8.56
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 197.63 203.85 197.63 197.63 203.85 197.63 197.63 203.85 197.63
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 8.5 26.0 73.0 67.0 90.8 67.3
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 272.2 272.2 272.2 272.2 272.2 272.2
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.0 0.0
T-min (kN.m) 5.0 5.0 5.0
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-115
Axis: D Storey: 1 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B43 L=2950.3mm B44 L=2737.5mm
HxBw (mm) 600 x 225 600 x 225
Flange BfxHf 270 x 150 - 270 x 150 250 x 150 - 0 x 0
9.76
8.65 9.76
G=8.09
7.66 6.36 7.9
6.99
Q=6.54 6.58 6.38
3.78 3.78 3.79
2.8
1.53 1.53 2.26
13.731
Shear
Force
(Env.) -36.923
-76.658
57.264
38.057 31.668
Moment
(Env.) -9.586
-49.059
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-116
Axis: D Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B40 L=2737.5mm B41 L=2969.1mm B42 L=2830.6mm
HxBw (mm) 600 x 225 600 x 225 600 x 225
Flange BfxHf 250 x 150 - 0 x 0 280 x 150 - 0 x 0 260 x 150 - 260 x 150
G=9.37 9.7
Q=3.79 5.75 6.13 4.81 3.92
2.33 2.48 1.94 3.22
1.3
Loads 0.11 2.01 2.74 1.16 1.46 2.7 0.97 1.2 1.52 2.83
UDL G=12.38 Q=0 kN/m UDL G=12.38 Q=0 kN/m UDL G=12.38 Q=0 kN/m
107.002
84.276
48.804
Shear
Force -23.321
(Env.)
-86.814
-138.247
-60.822
-90.388
Bending (Top Edge) ...
M (kN.m) 3.7 1.7 28.9 38.1 48.3 52.1 56.2
d (mm) 557.0 557.0 557.0 557.0 557.0 557.0 557.0
K/K' 0.01 0.00 0.08 0.11 0.13 0.14 0.16
x (mm) 69.63 69.63 69.63 69.63 69.63 69.63 69.63
Asm (mm2) 19.71 9.26 153.38 202.04 255.96 276.24 298.02
Asv (mm2) 0.00 91.22 0.00 0.00 0.00 0.00 0.00
As (mm2) 19.71 100.48 153.38 202.04 255.96 276.24 298.02
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 203.85 203.85 203.85 203.85 203.85 203.85 203.85 203.85 203.85
Bending (Bottom Edge) ...
M (kN.m) 9.4 14.9 1.4 14.3 60.8 2.2 24.7 90.4 6.3
d (mm) 540.0 557.0 540.0 540.0 557.0 540.0 540.0 557.0 540.0
K/K' 0.01 0.02 0.00 0.02 0.08 0.00 0.02 0.08 0.01
x (mm) 67.50 69.63 67.50 67.50 69.63 67.50 67.50 69.63 67.50
Asm (mm2) 51.19 78.84 7.84 78.02 322.40 11.80 134.96 479.12 34.55
Asv (mm2) 0.00 91.22 0.00 0.00 240.26 0.00 0.00 427.71 0.00
As (mm2) 51.19 78.84 7.84 78.02 322.40 11.80 134.96 479.12 34.55
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 197.63 203.85 197.63 197.63 203.85 197.63 197.63 203.85 197.63
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 11.5 28.0 70.7 66.6 123.4 85.7
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 272.2 272.2 272.2 272.2 272.2 272.2
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.0 0.6
T-min (kN.m) 5.0 5.0 5.0
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-117
Axis: D Storey: 2 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B43 L=2950.3mm B44 L=2737.5mm
HxBw (mm) 600 x 225 600 x 225
Flange BfxHf 270 x 150 - 270 x 150 250 x 150 - 250 x 150
10.81
G=9.7 9.51
4.37
Q=3.92 3.84
4.41 3.22
1.61 1.61 1.78 1.3
0.65 0.65
68.094
17.285
Shear
Force -29.171
(Env.) -59.481
52.586
17.776 13.544
Moment
(Env.) -13.924
-32.463
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-118
Axis: D Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B40 L=2737.5mm B41 L=2969.1mm B42 L=2830.6mm
HxBw (mm) 600 x 225 600 x 225 600 x 225
Flange BfxHf 260 x 150 - 260 x 150 280 x 150 - 280 x 150 270 x 150 - 270 x 150
11.08
4.48 7.55 8.59 10.23
4.13
3.05 3.47
4.81 3.78
3.78
G=3.22 3.22 3.54
Q=1.3 1.3 1.43 1.94 1.53
1.53
Loads 0.11 0.44 2.03 2.74 0.88 1.2 2.14 2.860.11 1.08 1.42 2.72
UDL G=3.65 Q=0.45 kN/m UDL G=12.38 Q=0 kN/m UDL G=12.38 Q=0 kN/m
79.385
41.426 44.23
Shear
Force -9.628
(Env.) -31.636
-116.485
-90.878
Bending (Top Edge) ...
M (kN.m) 1.3 10.7 35.4 42.5 22.7 18.9 5.5 28.1
d (mm) 557.0 557.0 557.0 557.0 557.0 557.0 557.0 557.0
K/K' 0.00 0.03 0.10 0.12 0.06 0.05 0.02 0.08
x (mm) 69.63 69.63 69.63 69.63 69.63 69.63 69.63 69.63
Asm (mm2) 6.82 56.59 187.85 225.41 120.43 100.27 29.16 149.15
Asv (mm2) 0.00 86.46 0.00 0.00 0.00 0.00 88.01 0.00
As (mm2) 6.82 143.05 187.85 225.41 120.43 100.27 117.17 149.15
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 203.85 203.85 203.85 203.85 203.85 203.85 203.85 203.85 203.85
Bending (Bottom Edge) ...
M (kN.m) 3.9 5.1 19.2 90.9 29.0 3.2 12.1
d (mm) 540.0 557.0 540.0 557.0 540.0 540.0 557.0
K/K' 0.00 0.00 0.02 0.07 0.02 0.00 0.01
x (mm) 67.50 69.63 67.50 69.63 67.50 67.50 69.63
Asm (mm2) 21.38 27.30 104.77 481.72 158.58 17.27 64.19
Asv (mm2) 0.00 86.46 0.00 336.16 0.00 0.00 88.01
As (mm2) 21.38 27.30 104.77 481.72 158.58 17.27 64.19
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 197.63 203.85 197.63 197.63 203.85 197.63 197.63 203.85 197.63
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 4.2 26.4 98.9 67.5 19.8 27.7
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 272.2 272.2 272.2 272.2 272.2 272.2
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.1 0.0
T-min (kN.m) 5.0 5.0 5.0
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-119
Axis: D Storey: 3 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B43 L=2950.3mm B44 L=2737.5mm
HxBw (mm) 600 x 225 600 x 225
Flange BfxHf 280 x 150 - 280 x 150 260 x 150 - 260 x 150
11.77
8.75 4.75
3.54 6.76
G=3.78
3.78 3.783.78 2.73 3.78
3.78
Q=1.53
1.53 1.531.53 1.53
1.53
32.196
Shear
Force
(Env.) -60.33 -54.352
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-120
Axis: H Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B123 L=3037.5mm
HxBw (mm) 450 x 225
Flange BfxHf 450 x 150 - 0 x 0
G=2.59 2.59
Q=1.05 1.05
Shear
Force
(Env.)
-11.85
Moment
(Env.)
-9.974
Bending (Top Edge) ...
M (kN.m) 2.5 2.5
d (mm) 407.0 407.0
K/K' 0.01 0.01
x (mm) 50.88 50.88
Asm (mm2) 18.09 18.09
Asv (mm2) 0.00 0.00
As (mm2) 18.09 18.09
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 5.6 10.0 5.6
d (mm) 390.0 407.0 390.0
K/K' 0.01 0.02 0.01
x (mm) 48.75 50.88 48.75
Asm (mm2) 42.43 72.36 42.43
Asv (mm2) 0.00 22.16 0.00
As (mm2) 42.43 72.36 42.43
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 8.9 8.9
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-121
Axis: I Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B39 L=6225mm
HxBw (mm) 450 x 225
Flange BfxHf ---
Loads
UDL G=2.53 Q=0 kN/m
10.746
Shear
Force
(Env.)
-10.744
Moment
(Env.)
-16.451
Bending (Top Edge) ...
M (kN.m) 4.1 4.1
d (mm) 407.0 407.0
K/K' 0.02 0.02
x (mm) 50.88 50.88
Asm (mm2) 29.83 29.83
Asv (mm2) 0.00 0.00
As (mm2) 29.83 29.83
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 9.2 16.5 9.2
d (mm) 390.0 407.0 390.0
K/K' 0.05 0.09 0.05
x (mm) 48.75 50.88 48.75
Asm (mm2) 69.43 119.34 69.45
Asv (mm2) 0.00 19.79 0.00
As (mm2) 69.43 119.34 69.45
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 9.1 9.1
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-122
Axis: I Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B39 L=6225mm
HxBw (mm) 450 x 225
Flange BfxHf 930 x 150 - 0 x 0
G=1.67 1.67
Q=0.67 0.67
Shear
Force
(Env.)
-53.624
Moment
(Env.)
-84.669
Bending (Top Edge) ...
M (kN.m) 21.2 21.2
d (mm) 407.0 407.0
K/K' 0.11 0.11
x (mm) 50.88 50.88
Asm (mm2) 153.55 153.55
Asv (mm2) 0.00 0.00
As (mm2) 153.55 153.55
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 45.6 84.7 45.6
d (mm) 390.0 407.0 390.0
K/K' 0.05 0.09 0.05
x (mm) 48.75 50.88 48.75
Asm (mm2) 345.20 614.21 345.20
Asv (mm2) 0.00 92.08 0.00
As (mm2) 345.20 614.21 345.20
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 45.3 45.3
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 804.25 804.25 804.25
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-123
Axis: I Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B122 L=3225mm
HxBw (mm) 450 x 225
Flange BfxHf ---
Loads
UDL G=2.53 Q=0 kN/m
5.102
Shear
Force
(Env.)
-5.102
Moment
(Env.)
-4.114
Bending (Top Edge) ...
M (kN.m) 1.0 1.0
d (mm) 407.0 407.0
K/K' 0.01 0.01
x (mm) 50.88 50.88
Asm (mm2) 7.46 7.46
Asv (mm2) 0.00 0.00
As (mm2) 7.46 7.46
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 2.4 4.1 2.4
d (mm) 390.0 407.0 390.0
K/K' 0.01 0.02 0.01
x (mm) 48.75 50.88 48.75
Asm (mm2) 17.86 29.84 17.86
Asv (mm2) 0.00 8.32 0.00
As (mm2) 17.86 29.84 17.86
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 3.5 3.5
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-124
Axis: K Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B106 L=6225mm
HxBw (mm) 450 x 225
Flange BfxHf 0 x 0 - 890 x 150
G=1.67 1.67
Q=0.67 0.67
Shear
Force
(Env.)
-21.76
Moment
(Env.)
-35.08
Bending (Top Edge) ...
M (kN.m) 8.8 8.8
d (mm) 407.0 407.0
K/K' 0.05 0.05
x (mm) 50.88 50.88
Asm (mm2) 63.62 63.62
Asv (mm2) 0.00 0.00
As (mm2) 63.62 63.62
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 18.9 35.1 18.9
d (mm) 390.0 407.0 390.0
K/K' 0.02 0.04 0.02
x (mm) 48.75 50.88 48.75
Asm (mm2) 142.74 254.48 142.74
Asv (mm2) 0.00 38.24 0.00
As (mm2) 142.74 254.48 142.74
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 18.8 18.8
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-125
Axis: K Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B106 L=6225mm
HxBw (mm) 450 x 225
Flange BfxHf 620 x 150 - 620 x 150
9.52
3.85 6.93
6.93
G=5.18 5.19 2.8
2.8
Q=2.09 2.1
Shear
Force
(Env.)
-76.014
28.466 29.059
Moment
(Env.)
-138.971
Bending (Top Edge) ...
M (kN.m) 34.7 34.7
d (mm) 407.0 407.0
K/K' 0.18 0.18
x (mm) 50.88 50.88
Asm (mm2) 252.04 252.04
Asv (mm2) 0.00 0.00
As (mm2) 252.04 252.04
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 51.5 139.0 45.7
d (mm) 407.0 389.0 390.0
K/K' 0.04 0.12 0.04
x (mm) 50.88 48.63 48.75
Asm (mm2) 373.61 1054.79 345.99
Asv (mm2) 0.00 186.00 0.00
As (mm2) 373.61 1054.79 345.99
As' (mm2) 0.00 0.00 0.00
As-min 148.95 142.36 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 72.2 66.5
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 205.2 196.6
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 804.25 1206.37 804.25
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-126
Axis: L Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B38 L=3225mm
HxBw (mm) 450 x 225
Flange BfxHf 440 x 150 - 0 x 0
G=4.7 4.7
Q=1.9 1.9
Shear
Force
(Env.)
-32.189
Moment
(Env.)
-28.252
Bending (Top Edge) ...
M (kN.m) 7.1 7.1
d (mm) 407.0 407.0
K/K' 0.04 0.04
x (mm) 50.88 50.88
Asm (mm2) 51.24 51.24
Asv (mm2) 0.00 0.00
As (mm2) 51.24 51.24
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 15.6 28.3 15.6
d (mm) 390.0 407.0 390.0
K/K' 0.03 0.05 0.03
x (mm) 48.75 50.88 48.75
Asm (mm2) 118.32 204.95 118.32
Asv (mm2) 0.00 60.14 0.00
As (mm2) 118.32 204.95 118.32
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 23.9 23.9
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-127
Axis: L Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B38 L=3225mm
HxBw (mm) 450 x 225
Flange BfxHf 440 x 150 - 0 x 0
G=4.7 4.7
Q=1.9 1.9
Shear
Force
(Env.)
-32.189
Moment
(Env.)
-28.252
Bending (Top Edge) ...
M (kN.m) 7.1 7.1
d (mm) 407.0 407.0
K/K' 0.04 0.04
x (mm) 50.88 50.88
Asm (mm2) 51.24 51.24
Asv (mm2) 0.00 0.00
As (mm2) 51.24 51.24
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 15.6 28.3 15.6
d (mm) 390.0 407.0 390.0
K/K' 0.03 0.05 0.03
x (mm) 48.75 50.88 48.75
Asm (mm2) 118.32 204.95 118.32
Asv (mm2) 0.00 60.14 0.00
As (mm2) 118.32 204.95 118.32
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 23.9 23.9
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-128
Axis: M Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B121 L=4050mm
HxBw (mm) 450 x 225
Flange BfxHf 570 x 150 - 570 x 150
G=18.93
Q=7.65
Shear
Force
(Env.)
-62.793
Moment
(Env.)
-76.18
Bending (Top Edge) ...
M (kN.m) 19.0 19.0
d (mm) 407.0 407.0
K/K' 0.10 0.10
x (mm) 50.88 50.88
Asm (mm2) 138.16 138.16
Asv (mm2) 0.00 0.00
As (mm2) 138.16 138.16
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 38.9 76.2 38.9
d (mm) 390.0 407.0 390.0
K/K' 0.04 0.07 0.04
x (mm) 48.75 50.88 48.75
Asm (mm2) 294.75 552.63 294.75
Asv (mm2) 0.00 136.32 0.00
As (mm2) 294.75 552.63 294.75
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 53.5 53.5
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-129
Axis: N Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B33 L=4050mm B34 L=6721.5mm B35 L=3453.5mm
HxBw (mm) 600 x 225 600 x 225 600 x 225
Flange BfxHf 390 x 150 - 390 x 150 670 x 150 - 670 x 150 330 x 150 - 330 x 150
Loads 0.11 1.19 2.01 2.82 3.90.15 1.23 2.63 4.71 5.49 6.570.15 1.23 1.75 2.26 3.34
UDL G=3.65 Q=0.9 kN/m UDL G=3.65 Q=0.9 kN/m UDL G=3.65 Q=0.9 kN/m
136.822
92.411
5.885
Shear
Force -22.574
(Env.)
-93.284
-168.75
166.687 188.955 183.317
135.251
13.118
Moment
(Env.)
12.858 -17.378 -7.81
-207.706
Bending (Top Edge) ...
M (kN.m) 8.9 72.7 166.7 189.0 135.3 183.3 97.7 24.4
d (mm) 557.0 557.0 539.0 539.0 539.0 539.0 557.0 557.0
K/K' 0.02 0.20 0.49 0.56 0.40 0.54 0.27 0.07
x (mm) 69.63 69.63 134.75 155.40 106.88 150.09 72.54 69.63
Asm (mm2) 47.08 385.18 963.80 1111.47 764.46 1073.53 518.82 129.35
Asv (mm2) 0.00 262.88 0.00 0.00 0.00 0.00 277.32 0.00
As (mm2) 47.08 648.06 963.80 1111.47 764.46 1073.53 796.14 129.35
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 203.85 203.85 197.26 197.26 203.85 197.26 197.26 203.85 203.85
Bending (Bottom Edge) ...
M (kN.m) 13.1 17.4 38.4 207.7 39.5 0.0 7.8
d (mm) 540.0 557.0 539.0 539.0 539.0 557.0 540.0
K/K' 0.01 0.01 0.02 0.09 0.02 0.00 0.01
x (mm) 67.50 69.63 67.38 67.38 67.38 69.63 67.50
Asm (mm2) 71.61 92.12 210.30 1137.76 216.58 0.16 42.70
Asv (mm2) 0.00 262.88 0.00 455.92 0.00 277.32 0.00
As (mm2) 71.61 92.12 210.30 1137.76 216.58 42.70 42.70
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 197.63 203.85 203.85 197.26 197.26 197.26 203.85 203.85 197.63
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 19.3 84.3 161.0 129.6 84.3 34.8
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 272.2 280.8 271.7 271.7 280.8 272.2
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.1 0.0 0.1
T-min (kN.m) 5.0 5.0 5.0
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 804.25 804.25 1206.37 1206.37 804.25 1206.37 1206.37 804.25 804.25
Bottom Edge 603.19 603.19 603.19 1206.37 1206.37 1206.37 804.25 804.25 804.25
Steel Bars ...
Hanger Bars 4Y16 4Y16 4Y16
Top Bar
Top SupBar 2Y16 2Y16 2Y16 2Y16
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-130
Axis: N Storey: 1 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B36 L=3225mm B37 L=6225mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 310 x 150 - 310 x 150 620 x 150 - 620 x 150
13.37 12.59
8.39
G=7.59 9.35 8.39
7.59 7.81 5.4 5.09 8.92
4.54 5.22 4.54 6.31
6.315.23
5.69 6.31 6.315.54 3.61
Q=4.15 4.15 2.55
2.552.11 3.16 2.55 2.552.24
2.3
47.494 44.647
Shear
Force -14.649
(Env.) -70.586
69.634 67.863
9.481 -4.626
Moment
(Env.) -7.979 1.745
-5.988
-68.264
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-131
Axis: N Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B33 L=4050mm B34 L=6721.5mm B35 L=3453.5mm
HxBw (mm) 750 x 225 750 x 225 750 x 225
Flange BfxHf 390 x 150 - 390 x 150 670 x 150 - 670 x 150 330 x 150 - 330 x 150
G=18.75 18.41
Q=11.36 11.16 15.8
12.27 9.57
7.43
Loads 0.11 2.01 3.90.15 1.39 2.63 4.71 6.570.15 1.75 3.34
UDL G=13.22 Q=0 kN/m UDL G=13.22 Q=0 kN/m UDL G=13.22 Q=0 kN/m
230.192
132.05
35.093
Shear
Force -24.661
(Env.) -101.977
-296.358
-420.517
Bending (Top Edge) ...
M (kN.m) 12.4 119.5 245.5 287.5 226.5 186.8 102.8 49.3
d (mm) 705.0 705.0 686.0 686.0 686.0 686.0 705.0 705.0
K/K' 0.02 0.21 0.45 0.53 0.41 0.34 0.18 0.09
x (mm) 88.13 88.13 154.21 184.13 141.11 114.42 88.13 88.13
Asm (mm2) 52.09 500.25 1102.94 1316.96 1009.28 818.39 430.43 206.55
Asv (mm2) 0.00 365.76 0.00 0.00 0.00 0.00 281.85 0.00
As (mm2) 52.09 866.01 1102.95 1316.96 1009.28 818.39 712.28 206.55
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 258.01 258.01 251.06 251.06 258.01 251.06 251.06 258.01 258.01
Bending (Bottom Edge) ...
M (kN.m) 13.0 13.7 52.5 420.5 45.4
d (mm) 690.0 705.0 686.0 686.0 663.5
K/K' 0.01 0.01 0.01 0.11 0.01
x (mm) 86.25 88.13 85.75 85.75 82.94
Asm (mm2) 55.75 57.30 225.85 1809.88 202.00
Asv (mm2) 0.00 365.76 0.00 850.92 0.00
As (mm2) 55.75 57.30 225.85 1809.88 202.00
As' (mm2) 0.00 0.00 0.00 0.00 0.00
As-min 252.52 258.01 258.01 251.06 251.06 242.83 252.52 258.01 252.52
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 31.1 112.3 276.6 211.7 83.5 22.9
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 347.8 355.4 345.8 334.4 347.8 347.8
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.0 0.1
T-min (kN.m) 6.4 6.4 6.4
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 942.48 942.48 1344.60 1344.60 942.48 1344.60 1344.60 942.48 942.48
Bottom Edge 1256.64 1256.64 1256.64 1859.82 1859.82 1859.82 1256.64 1256.64 1256.64
Steel Bars ...
Hanger Bars 3Y20 3Y20 3Y20
Top Bar
Top SupBar 2Y16 2Y16 2Y16 2Y16
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-132
Axis: N Storey: 2 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B36 L=3225mm B37 L=6225mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 310 x 150 - 310 x 150 620 x 150 - 620 x 150
13.37 12.59
9.06
G=8.22 10.19 9.06
8.22 7.81 5.4 8.92
3.66 4.12 3.66 6.315.23
6.31 5.69 6.31 6.315.09
5.54
Q=3.32 3.32 2.55 2.33.16
2.552.11 2.55 2.552.24 3.61
29.795 45.619
Shear
Force -26.178
-70.181
(Env.)
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-133
Axis: N Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B34 L=6721.5mm B35 L=3453.5mm B36 L=3225mm
HxBw (mm) 600 x 225 600 x 225 450 x 225
Flange BfxHf 680 x 150 - 680 x 150 330 x 150 - 330 x 150 310 x 150 - 0 x 0
16.04 15.98
10.98 6.48 9.95
9.59
9.59 9.95 6.46
8.2
G=7.087.09 4.44 7.43
3.31 4.02
3.88
3.88 4.02 3
Q=2.862.86
34.129
13.846
Shear
Force -12.189
(Env.) -64.38
-127.714
159.336 141.342
-218.728
Bending (Top Edge) ...
M (kN.m) 54.7 159.3 141.3 89.1 39.2 29.9 40.9 65.5
d (mm) 557.0 539.0 539.0 557.0 557.0 407.0 407.0 389.0
K/K' 0.15 0.47 0.42 0.25 0.11 0.16 0.21 0.37
x (mm) 69.63 128.11 112.17 69.63 69.63 50.88 50.88 71.20
Asm (mm2) 289.85 916.27 802.31 472.41 207.83 217.19 297.00 509.23
Asv (mm2) 0.00 0.00 0.00 187.68 0.00 0.00 97.90 0.00
As (mm2) 289.85 916.27 802.31 660.09 207.83 217.19 394.90 509.23
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 203.85 203.85 197.26 197.26 203.85 203.85 148.95 148.95 142.36
Bending (Bottom Edge) ...
M (kN.m) 132.4 218.7 30.4
d (mm) 539.0 539.0 539.0
K/K' 0.06 0.09 0.01
x (mm) 67.38 67.38 67.38
Asm (mm2) 725.07 1198.14 166.44
Asv (mm2) 0.00 473.01 0.00
As (mm2) 725.07 1198.14 166.44
As' (mm2) 0.00 0.00 0.00
As-min 197.26 197.26 197.26 203.85 203.85 197.63 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 121.5 158.4 57.9 23.4 9.7 31.1
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 271.7 271.7 280.8 272.2 196.6 196.6
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.0 0.0
T-min (kN.m) 5.0 5.0 3.6
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 603.19 603.19 1005.31 1206.37 804.25 804.25 402.12 402.12 804.25
Bottom Edge 1206.37 1206.37 1206.37 804.25 804.25 804.25 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 3Y16 4Y16 2Y16
Top Bar
Top SupBar 2Y16 2Y16 2Y16
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-134
Axis: N Storey: 3 ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B37 L=6225mm
HxBw (mm) 450 x 225
Flange BfxHf 620 x 150 - 620 x 150
18.62 18.62
13.92
13.92
G=13.86
7.53 7.53 12.13
11.57 11.57
5.62
5.63
Q=5.6 10.89
4.9
4.68
5.81 6.93
6.93
4.68
4.4
3.96 2.8
2.8
2.35
1.6
56.293
Shear
Force
(Env.)
-91.68
82.19
Moment
(Env.)
-109.359
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-135
Axis: U Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B30 L=4050mm B31 L=6721.5mm B32 L=3453.5mm
HxBw (mm) 600 x 225 600 x 225 600 x 225
Flange BfxHf 0 x 0 - 590 x 150 0 x 0 - 1000 x 150 0 x 0 - 500 x 150
Loads 0.11 1.19 2.82 3.90.15 1.23 5.49 6.570.15 1.23 2.26 3.34
UDL G=3.65 Q=0.9 kN/m UDL G=3.65 Q=0.9 kN/m UDL G=3.65 Q=0.9 kN/m
54.971
29.602 24.235
Shear
Force
(Env.) -23.933
-29.931
-54.971
Moment
(Env.)
-35.47 -24.81
-103.841
Bending (Top Edge) ...
M (kN.m) 8.9 8.9 26.0 26.0 6.2 6.2
d (mm) 557.0 557.0 557.0 557.0 557.0 557.0
K/K' 0.02 0.02 0.07 0.07 0.02 0.02
x (mm) 69.63 69.63 69.63 69.63 69.63 69.63
Asm (mm2) 47.00 47.00 137.61 137.61 32.88 32.88
Asv (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As (mm2) 47.00 47.00 137.61 137.61 32.88 32.88
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 203.85 203.85 203.85 203.85 203.85 203.85 203.85 203.85 203.85
Bending (Bottom Edge) ...
M (kN.m) 18.5 35.5 19.3 55.3 103.8 55.3 13.7 24.8 13.0
d (mm) 540.0 557.0 540.0 540.0 557.0 540.0 540.0 557.0 540.0
K/K' 0.02 0.03 0.02 0.03 0.05 0.03 0.01 0.02 0.01
x (mm) 67.50 69.63 67.50 67.50 69.63 67.50 67.50 69.63 67.50
Asm (mm2) 101.31 188.02 105.67 302.26 550.43 302.26 74.66 131.51 71.17
Asv (mm2) 0.00 63.54 0.00 0.00 107.25 0.00 0.00 52.34 0.00
As (mm2) 101.31 188.02 105.67 302.26 550.43 302.26 74.66 131.51 71.17
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 197.63 203.85 197.63 197.63 203.85 197.63 197.63 203.85 197.63
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 24.0 23.5 48.6 48.6 17.8 18.3
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 272.2 272.2 272.2 272.2 272.2 272.2
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.1 0.0 0.1
T-min (kN.m) 5.0 5.0 5.0
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-136
Axis: W Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B29 L=4725mm
HxBw (mm) 450 x 225
Flange BfxHf 670 x 150 - 670 x 150
18.01
18
7.28
7.27
10.95 10.95
10.76
G=7.79 4.42
4.43 4.43
4.35
Q=3.15 2.97
1.2
Shear
Force
(Env.)
-68.889
Moment
(Env.)
-93.31
Bending (Top Edge) ...
M (kN.m) 23.3 23.3
d (mm) 407.0 407.0
K/K' 0.12 0.12
x (mm) 50.88 50.88
Asm (mm2) 169.23 169.23
Asv (mm2) 0.00 0.00
As (mm2) 169.23 169.23
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 48.5 93.3 53.3
d (mm) 407.0 407.0 407.0
K/K' 0.04 0.07 0.04
x (mm) 50.88 50.88 50.88
Asm (mm2) 351.96 676.90 386.46
Asv (mm2) 0.00 139.75 0.00
As (mm2) 351.96 676.90 386.46
As' (mm2) 0.00 0.00 0.00
As-min 148.95 148.95 148.95
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 59.6 69.5
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 205.2 205.2
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 603.19 603.19 603.19
Bottom Edge 804.25 804.25 804.25
Steel Bars ...
Hanger Bars 3Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-137
Axis: W Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B29 L=4725mm
HxBw (mm) 450 x 225
Flange BfxHf 670 x 150 - 670 x 150
18.01
18
7.28
7.27
10.95 10.95
G=7.79 4.42
4.43 4.43 7.79
Q=3.15 3.15
Shear
Force
(Env.)
-67.613
Moment
(Env.)
-90.276
Bending (Top Edge) ...
M (kN.m) 22.6 22.6
d (mm) 407.0 407.0
K/K' 0.12 0.12
x (mm) 50.88 50.88
Asm (mm2) 163.72 163.72
Asv (mm2) 0.00 0.00
As (mm2) 163.72 163.72
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 47.5 90.3 47.5
d (mm) 390.0 407.0 390.0
K/K' 0.04 0.07 0.04
x (mm) 48.75 50.88 48.75
Asm (mm2) 359.69 654.89 359.70
Asv (mm2) 0.00 135.28 0.00
As (mm2) 359.69 654.89 359.70
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 58.3 58.3
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 804.25 804.25 804.25
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-138
Axis: W Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B29 L=4725mm
HxBw (mm) 450 x 225
Flange BfxHf 670 x 150 - 670 x 150
7.67
7.48
G=7.29 7.85
7.48 7.85
3.1
3.02
Q=2.95 3.17
3.02 3.17
4.51
3.39
1.82 2.41
2.282.28
1.86
1.37 0.97
0.920.92
0.75
Shear
Force
(Env.)
-68.029
Moment
(Env.)
-80.962
Bending (Top Edge) ...
M (kN.m) 20.2 20.2
d (mm) 407.0 407.0
K/K' 0.11 0.11
x (mm) 50.88 50.88
Asm (mm2) 146.83 146.83
Asv (mm2) 0.00 0.00
As (mm2) 146.83 146.83
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 44.4 81.0 45.6
d (mm) 390.0 407.0 390.0
K/K' 0.04 0.06 0.04
x (mm) 48.75 50.88 48.75
Asm (mm2) 336.37 587.32 345.53
Asv (mm2) 0.00 114.82 0.00
As (mm2) 336.37 587.32 345.53
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 53.3 58.0
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-139
Axis: W Storey: 3 (/ 2) Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B117 L=4050mm B118 L=6721.5mm B119 L=3453.5mm
HxBw (mm) 450 x 225 450 x 225 450 x 225
Flange BfxHf 570 x 150 - 570 x 150 970 x 150 - 970 x 150 480 x 150 - 480 x 150
22.4 22.4
G=18.93 19.18 9.05 9.05 19.18
Q=7.65 7.75 7.75 15.98
6.46
42.062 48.83
Shear
Force
(Env.) -42.062 -48.83
-135.483
Moment
(Env.) -55.19 -49.947
-272.852
Bending (Top Edge) ...
M (kN.m) 13.8 13.8 68.2 68.2 12.5 12.5
d (mm) 407.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.07 0.07 0.35 0.35 0.06 0.06
x (mm) 50.88 50.88 70.63 70.63 50.88 50.88
Asm (mm2) 100.09 100.09 505.16 505.16 90.58 90.58
Asv (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As (mm2) 100.09 100.09 505.16 505.16 90.58 90.58
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 27.2 55.2 27.2 134.9 272.9 134.9 26.1 49.9 26.1
d (mm) 390.0 407.0 389.0 386.0 386.0 386.0 389.0 407.0 390.0
K/K' 0.03 0.05 0.03 0.08 0.16 0.08 0.03 0.05 0.03
x (mm) 48.75 50.88 48.63 48.25 48.25 48.25 48.63 50.88 48.75
Asm (mm2) 205.91 400.36 206.44 1032.19 2087.04 1032.19 198.33 362.33 197.82
Asv (mm2) 0.00 101.99 0.00 0.00 300.70 0.00 0.00 103.54 0.00
As (mm2) 205.91 400.36 206.44 1032.19 2087.04 1032.19 198.33 362.33 197.82
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
As-min 142.73 148.95 142.36 141.27 141.27 141.27 142.36 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0 0.0 0.0
Vd @d(kN) 38.1 38.1 126.4 126.4 39.6 39.6
v (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05 4.05 4.05
V-Rd (kN) 196.6 196.1 194.6 194.6 196.1 196.6
Vnom (kN) 0.0 0.0 0.0
Td (kN.m) 0.0 0.0 0.0
T-min (kN.m) 3.6 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- --- ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 X 402.12 402.12 X 402.12 402.12 402.12 402.12
Bottom Edge 603.19 603.19 1206.37 1545.66 X 1545.66 1545.66 1206.37 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16 2Y16 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-140
Axis: W Storey: 3 (/ 2) ... Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B120 L=3225mm
HxBw (mm) 450 x 225
Flange BfxHf 440 x 150 - 440 x 150
G=14.85
Q=6
43.915
Shear
Force
(Env.) -43.915
Moment
(Env.) -41.737
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-141
Axis: X Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B28 L=3225mm
HxBw (mm) 450 x 225
Flange BfxHf 440 x 150 - 440 x 150
G=10.63
10.589.69
5.88 5.67 7.86
Q=5.81
4.78
2.831.882.05
2.021.351.12
Shear
Force
(Env.)
-55.947
Moment
(Env.)
-60.936
Bending (Top Edge) ...
M (kN.m) 15.2 15.2
d (mm) 407.0 407.0
K/K' 0.08 0.08
x (mm) 50.88 50.88
Asm (mm2) 110.51 110.51
Asv (mm2) 0.00 0.00
As (mm2) 110.51 110.51
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 28.6 60.9 46.8
d (mm) 390.0 407.0 390.0
K/K' 0.03 0.06 0.05
x (mm) 48.75 50.88 48.75
Asm (mm2) 216.76 442.04 354.29
Asv (mm2) 0.00 129.98 0.00
As (mm2) 216.76 442.04 354.29
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 46.1 78.8
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-142
Axis: X Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B28 L=3225mm
HxBw (mm) 450 x 225
Flange BfxHf 440 x 150 - 0 x 0
G=5.75
Q=2.33
1.11
0.45
Shear
Force
(Env.)
-38.369
Moment
(Env.)
-38.856
Bending (Top Edge) ...
M (kN.m) 9.7 9.7
d (mm) 407.0 407.0
K/K' 0.05 0.05
x (mm) 50.88 50.88
Asm (mm2) 70.47 70.47
Asv (mm2) 0.00 0.00
As (mm2) 70.47 70.47
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 19.1 38.9 29.7
d (mm) 390.0 407.0 390.0
K/K' 0.04 0.07 0.06
x (mm) 48.75 50.88 48.75
Asm (mm2) 144.64 281.87 225.15
Asv (mm2) 0.00 81.81 0.00
As (mm2) 144.64 281.87 225.15
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 30.1 49.3
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-143
Axis: X Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B116 L=1500mm
HxBw (mm) 450 x 225
Flange BfxHf 190 x 150 - 190 x 150
G=12.44
11.88 11.88
Q=5.034.8 4.8
5.57
2.25
Shear
Force
(Env.)
-18.825
Moment
(Env.)
-6.701
Bending (Top Edge) ...
M (kN.m) 1.7 1.7
d (mm) 407.0 407.0
K/K' 0.01 0.01
x (mm) 50.88 50.88
Asm (mm2) 12.15 12.15
Asv (mm2) 0.00 0.00
As (mm2) 12.15 12.15
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 4.4 6.7 3.9
d (mm) 390.0 407.0 390.0
K/K' 0.01 0.01 0.01
x (mm) 48.75 50.88 48.75
Asm (mm2) 33.69 48.61 29.74
Asv (mm2) 0.00 29.13 0.00
As (mm2) 33.69 48.61 29.74
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 7.3 6.4
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.1
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 402.12 402.12 402.12
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-144
Axis: Y Storey: 1 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B26 L=1500mm B27 L=4725mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 200 x 150 - 200 x 150 670 x 150 - 670 x 150
12.25 12.25
10.77
7.79 4.95 4.954.35
6.48 6.48
3.51
G=2.95 2.62 2.62 3.15 2.97
1.42
Q=1.19 0.17 1.2
0.07
Loads 0.41 0.75 1.39 0.11 0.9 1.8 2.93 4.01 4.61
UDL G=2.8 Q=0.45 kN/m UDL G=11.53 Q=0 kN/m
79.508
7.782
Shear
Force -9.927
(Env.)
-70.548
Moment
(Env.) -3.817
-96.64
Bending (Top Edge) ...
M (kN.m) 1.0 1.0 24.2 24.2
d (mm) 407.0 407.0 407.0 407.0
K/K' 0.00 0.00 0.13 0.13
x (mm) 50.88 50.88 50.88 50.88
Asm (mm2) 6.92 6.92 175.26 175.26
Asv (mm2) 0.00 0.00 0.00 0.00
As (mm2) 6.92 6.92 175.26 175.26
As' (mm2) 0.00 0.00 0.00 0.00
As-min 148.95 148.95 148.95 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 2.5 3.8 2.1 49.8 96.6 54.5
d (mm) 390.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.01 0.01 0.00 0.04 0.07 0.04
x (mm) 48.75 50.88 50.88 50.88 50.88 50.88
Asm (mm2) 18.87 27.69 15.45 361.44 701.06 395.66
Asv (mm2) 0.00 17.27 0.00 0.00 145.57 0.00
As (mm2) 18.87 27.69 15.45 361.44 701.06 395.66
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 142.73 148.95 148.95 148.95 148.95 148.95
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0
Vd @d(kN) 4.4 3.9 61.3 71.2
v (N/mm2) 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05
V-Rd (kN) 196.6 205.2 205.2 205.2
Vnom (kN) 0.0 0.0
Td (kN.m) 0.2 0.1
T-min (kN.m) 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12 402.12 402.12 402.12
Bottom Edge 804.25 804.25 804.25 804.25 804.25 804.25
Steel Bars ...
Hanger Bars 2Y16 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-145
Axis: Y Storey: 2 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B26 L=1500mm B27 L=4725mm
HxBw (mm) 450 x 225 450 x 225
Flange BfxHf 200 x 150 - 200 x 150 670 x 150 - 670 x 150
12.25 12.25
7.79 4.95 4.95 7.8
6.48 6.48
3.51
G=2.95 2.62 2.62 3.15 3.15
1.42
Q=1.19 0.17
0.07
Loads 0.41 0.75 1.39 0.11 0.9 1.8 2.93 3.83 4.61
UDL G=2.8 Q=0.45 kN/m UDL G=11.53 Q=0 kN/m
69.286
7.782
Shear
Force -9.927
(Env.)
-69.286
Moment
(Env.) -3.817
-93.641
Bending (Top Edge) ...
M (kN.m) 1.0 1.0 23.4 23.4
d (mm) 407.0 407.0 407.0 407.0
K/K' 0.00 0.00 0.12 0.12
x (mm) 50.88 50.88 50.88 50.88
Asm (mm2) 6.92 6.92 169.83 169.83
Asv (mm2) 0.00 0.00 0.00 0.00
As (mm2) 6.92 6.92 169.83 169.83
As' (mm2) 0.00 0.00 0.00 0.00
As-min 148.95 148.95 148.95 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 2.5 3.8 2.1 48.8 93.6 48.8
d (mm) 390.0 407.0 407.0 407.0 407.0 407.0
K/K' 0.01 0.01 0.00 0.04 0.07 0.04
x (mm) 48.75 50.88 50.88 50.88 50.88 50.88
Asm (mm2) 18.87 27.69 15.45 354.23 679.30 354.23
Asv (mm2) 0.00 17.27 0.00 0.00 141.14 0.00
As (mm2) 18.87 27.69 15.45 354.23 679.30 354.23
As' (mm2) 0.00 0.00 0.00 0.00 0.00 0.00
As-min 142.73 148.95 148.95 148.95 148.95 148.95
Shear and Torsion Design ...
Vd (kN) 0.0 0.0 0.0 0.0
Vd @d(kN) 4.4 3.9 60.0 60.0
v (N/mm2) 0.00 0.00 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05 4.05 4.05
V-Rd (kN) 196.6 205.2 205.2 205.2
Vnom (kN) 0.0 0.0
Td (kN.m) 0.1 0.0
T-min (kN.m) 3.6 3.6
b-sup (mm) 0.0 0.0 0.0 0.0
Links Y10-250 Y10-250 Y10-250 Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d --- ---
Provided Steel Areas (mm2)
Top Edge 603.19 603.19 603.19 603.19 603.19 603.19
Bottom Edge 804.25 804.25 804.25 804.25 804.25 804.25
Steel Bars ...
Hanger Bars 3Y16 3Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-146
Axis: Y Storey: 3 Material: C25/30 / Grade 410 (Type 2) (Links: Grade 410 (Type 2))
B27 L=4725mm
HxBw (mm) 450 x 225
Flange BfxHf 670 x 150 - 670 x 150
15.04
6.08 10.77
G=7.79 4.35
Q=3.15 2.97 2.41
1.861.86
1.86
1.20.75 0.97
0.750.75
Shear
Force
(Env.)
-47.046
Moment
(Env.)
-69.401
Bending (Top Edge) ...
M (kN.m) 17.4 17.4
d (mm) 407.0 407.0
K/K' 0.09 0.09
x (mm) 50.88 50.88
Asm (mm2) 125.86 125.86
Asv (mm2) 0.00 0.00
As (mm2) 125.86 125.86
As' (mm2) 0.00 0.00
As-min 148.95 148.95 148.95
Bending (Bottom Edge) ...
M (kN.m) 34.6 69.4 36.9
d (mm) 390.0 407.0 390.0
K/K' 0.03 0.05 0.03
x (mm) 48.75 50.88 48.75
Asm (mm2) 262.11 503.45 278.99
Asv (mm2) 0.00 107.59 0.00
As (mm2) 262.11 503.45 278.99
As' (mm2) 0.00 0.00 0.00
As-min 142.73 148.95 142.73
Shear and Torsion Design ...
Vd (kN) 0.0 0.0
Vd @d(kN) 43.1 48.2
v (N/mm2) 0.00 0.00
v-Rdc (N/mm2) 0.00 0.00 0.00
v-Rdmax (N/mm2) 4.05 4.05
V-Rd (kN) 196.6 196.6
Vnom (kN) 0.0
Td (kN.m) 0.0
T-min (kN.m) 3.6
b-sup (mm) 0.0 0.0
Links Y10-250 Y10-250 Y10-250
Deflection Check ...
L/d ---
Provided Steel Areas (mm2)
Top Edge 402.12 402.12 402.12
Bottom Edge 603.19 603.19 603.19
Steel Bars ...
Hanger Bars 2Y16
Top Bar
Top SupBar
Side Bars
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
BEAM DESIGN RESULTS Orion Building Design System 18.0 (04.2012) / Page: BD-147
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-1
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-2
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-3
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-4
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-5
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Proposed Hotel Development for Mr Nwachokor O.S YADDAH ENG. SERVICES (*1B7-S36T-BYQY-2MEF)
COLUMN REINFORCEMENT DESIGN Orion Building Design System 18.0 (04.2012) / Page: CD-6
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday - Proposed Hotel
YADDAH
Development
ENG. SERVICES
for Mr Nwachokor
(*1B7-S36T-BYQY-2MEF)
O.S
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-1
BT1
--------------------------------------------------------------------------------
Columns: C1, C7, C12, C19, C20, C27, C34, C39, C49, C51, C50, C56, C45, C32, C33, C38, C44,
C46, C17, C26, C6, C11
bx = 225.0 mm by = 300.0 mm
Effects: Column = C39 - Critical Combination = 13 (G+Q-Wx-Nx)
N = -497.5 kN Mx = 0.0 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 1200.0 mm Ly = 1600.0 mm
h = 400.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 281.554 kN/m2 S-min = 281.554 kN/m2
Allowable Soil Stress will be amplified by the factor (x3.0) =
300.000 kN/m2
As-min (Both Dir's) = 688.00 mm2/m
Punching Check (At Column Face):
Vt = 521.6 kN V-eff = 521.6 kN
v = 1.44 N/mm2 < v-Rdmax = 4.05 N/mm2
Punching Check (At 'd'):
Vt = 349.0 kN V-eff = 349.0 kN
v = 0.34 N/mm2 < v-Rdc = 0.41 N/mm2
X Dir: Footing Design: M = 33.5 kN.m/m
K/K' = 0.06 < 1.0
As = 688.00 mm2/m Y16-250
Shear Check (At Column Face):
v = 0.41 N/mm2 < v-Rdmax = 4.05 N/mm2
Shear Check (At 'd' from Column):
v = 0.13 N/mm2 < v-Rdc = 0.41 N/mm2
Y Dir: Footing Design: M = 59.5 kN.m/m
K/K' = 0.09 < 1.0
As = 688.00 mm2/m Y16-250
Shear Check (At Column Face):
v = 0.52 N/mm2 < v-Rdmax = 4.05 N/mm2
Shear Check (At 'd' from Column):
v = 0.24 N/mm2 < v-Rdc = 0.41 N/mm2
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday - Proposed Hotel
YADDAH
Development
ENG. SERVICES
for Mr Nwachokor
(*1B7-S36T-BYQY-2MEF)
O.S
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-1
BT2
--------------------------------------------------------------------------------
Columns: C30, C35, C42, C36, C43, C37, C31, C18, C16, C2, C3, C4, C5, C10
bx = 225.0 mm by = 300.0 mm
Effects: Column = C10 - Critical Combination = 15 (G+Q-Wy-Ny)
N = -1035.4 kN Mx = 0.0 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 1700.0 mm Ly = 2300.0 mm
h = 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 288.550 kN/m2 S-min = 288.550 kN/m2
Allowable Soil Stress will be amplified by the factor (x3.0) =
300.000 kN/m2
As-min (Both Dir's) = 788.00 mm2/m
Punching Check (At Column Face):
Vt = 1108.8 kN V-eff = 1108.8 kN
v = 2.68 N/mm2 < v-Rdmax = 4.05 N/mm2
Punching Check (At 'd'):
Vt = 887.1 kN V-eff = 887.1 kN
v = 0.69 N/mm2 > v-Rdc = 0.39 N/mm2 Fail !!!
X Dir: Footing Design: M = 78.5 kN.m/m
K/K' = 0.10 < 1.0
As = 788.00 mm2/m Y16-250
Shear Check (At Column Face):
v = 0.55 N/mm2 < v-Rdmax = 4.05 N/mm2
Shear Check (At 'd' from Column):
v = 0.26 N/mm2 < v-Rdc = 0.39 N/mm2
Y Dir: Footing Design: M = 144.3 kN.m/m
K/K' = 0.17 < 1.0
As = 1059.63 mm2/m Y16-175
Shear Check (At Column Face):
v = 0.72 N/mm2 < v-Rdmax = 4.05 N/mm2
Shear Check (At 'd' from Column):
v = 0.43 N/mm2 > v-Rdc = 0.40 N/mm2 Fail !!!
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday - Proposed Hotel
YADDAH
Development
ENG. SERVICES
for Mr Nwachokor
(*1B7-S36T-BYQY-2MEF)
O.S
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-1
BT3
--------------------------------------------------------------------------------
Columns: C8, C9, C15, C14, C13, C21, C22, C23, C24, C25
bx = 300.0 mm by = 225.0 mm
Effects: Column = C9 - Critical Combination = 12 (G+Q+Wx+Nx)
N = -850.3 kN Mx = 0.0 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 2100.0 mm Ly = 1600.0 mm
h = 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 276.792 kN/m2 S-min = 276.792 kN/m2
Allowable Soil Stress will be amplified by the factor (x3.0) =
300.000 kN/m2
As-min (Both Dir's) = 788.00 mm2/m
Punching Check (At Column Face):
Vt = 911.3 kN V-eff = 911.3 kN
v = 2.20 N/mm2 < v-Rdmax = 4.05 N/mm2
Punching Check (At 'd'):
Vt = 698.7 kN V-eff = 698.7 kN
v = 0.54 N/mm2 > v-Rdc = 0.39 N/mm2 Fail !!!
X Dir: Footing Design: M = 112.1 kN.m/m
K/K' = 0.13 < 1.0
As = 823.33 mm2/m Y16-225
Shear Check (At Column Face):
v = 0.62 N/mm2 < v-Rdmax = 4.05 N/mm2
Shear Check (At 'd' from Column):
v = 0.34 N/mm2 < v-Rdc = 0.39 N/mm2
Y Dir: Footing Design: M = 65.4 kN.m/m
K/K' = 0.08 < 1.0
As = 788.00 mm2/m Y16-250
Shear Check (At Column Face):
v = 0.49 N/mm2 < v-Rdmax = 4.05 N/mm2
Shear Check (At 'd' from Column):
v = 0.22 N/mm2 < v-Rdc = 0.39 N/mm2
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday - Proposed Hotel
YADDAH
Development
ENG. SERVICES
for Mr Nwachokor
(*1B7-S36T-BYQY-2MEF)
O.S
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-1
BT4
--------------------------------------------------------------------------------
Columns: C28, C29, C40, C41
bx = 300.0 mm by = 450.0 mm
Effects: Column = C40 - Critical Combination = 14 (G+Q+Wy+Ny)
N = -1871.2 kN Mx = 0.0 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 2200.0 mm Ly = 3300.0 mm
h = 600.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 285.159 kN/m2 S-min = 285.159 kN/m2
Allowable Soil Stress will be amplified by the factor (x3.0) =
300.000 kN/m2
As-min (Both Dir's) = 1088.00 mm2/m
Punching Check (At Column Face):
Vt = 2031.8 kN V-eff = 2031.8 kN
v = 2.49 N/mm2 < v-Rdmax = 4.05 N/mm2
Punching Check (At 'd'):
Vt = 1588.0 kN V-eff = 1588.0 kN
v = 0.62 N/mm2 > v-Rdc = 0.36 N/mm2 Fail !!!
X Dir: Footing Design: M = 128.7 kN.m/m
K/K' = 0.09 < 1.0
As = 1088.00 mm2/m Y16-175
Shear Check (At Column Face):
v = 0.51 N/mm2 < v-Rdmax = 4.05 N/mm2
Shear Check (At 'd' from Column):
v = 0.22 N/mm2 < v-Rdc = 0.36 N/mm2
Y Dir: Footing Design: M = 289.5 kN.m/m
K/K' = 0.18 < 1.0
As = 1548.60 mm2/m Y16-125
Shear Check (At Column Face):
v = 0.74 N/mm2 < v-Rdmax = 4.05 N/mm2
Shear Check (At 'd' from Column):
v = 0.45 N/mm2 > v-Rdc = 0.38 N/mm2 Fail !!!
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday - Proposed Hotel
YADDAH
Development
ENG. SERVICES
for Mr Nwachokor
(*1B7-S36T-BYQY-2MEF)
O.S
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-1
BT5
--------------------------------------------------------------------------------
Columns: C53, C57
bx = 390.0 mm by = 964.0 mm
Effects: Critical Combination = 15 (G+Q-Wy-Ny)
N = -575.6 kN Mx = 0.0 kN.m
My = 200.1 kN.m
Footing Dimensions:
Lx = 1200.0 mm Ly = 3000.0 mm
h = 450.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 294.230 kN/m2 S-min = 71.904 kN/m2
Allowable Soil Stress will be amplified by the factor (x3.0) =
300.000 kN/m2
As-min (Both Dir's) = 788.00 mm2/m
Punching Check (At Column Face):
Vt = 646.7 kN V-eff = 1088.2 kN
v = 2.63 N/mm2 < v-Rdmax = 4.05 N/mm2
Punching Check (At 'd'):
Vt = 506.0 kN V-eff = 947.6 kN
v = 0.73 N/mm2 > v-Rdc = 0.39 N/mm2 Fail !!!
X Dir: Footing Design: M = 24.1 kN.m/m
K/K' = 0.03 < 1.0
As = 788.00 mm2/m Y16-250
Shear Check (At Column Face):
v = 0.31 N/mm2 < v-Rdmax = 4.05 N/mm2
Shear Check (At 'd' from Column):
v = 0.01 N/mm2 < v-Rdc = 0.39 N/mm2
Y Dir: Footing Design: M = 139.4 kN.m/m
K/K' = 0.17 < 1.0
As = 1024.00 mm2/m Y16-175
Shear Check (At Column Face):
v = 0.75 N/mm2 < v-Rdmax = 4.05 N/mm2
Shear Check (At 'd' from Column):
v = 0.45 N/mm2 > v-Rdc = 0.40 N/mm2 Fail !!!
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday - Proposed Hotel
YADDAH
Development
ENG. SERVICES
for Mr Nwachokor
(*1B7-S36T-BYQY-2MEF)
O.S
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-1
BT6
--------------------------------------------------------------------------------
Columns: C47, C48
bx = 400.0 mm by = 400.0 mm
Effects: Column = C47 - Critical Combination = 1 (G+Q *F)
N = -17.0 kN Mx = 0.0 kN.m
My = 0.0 kN.m
Footing Dimensions:
Lx = 1000.0 mm Ly = 1000.0 mm
h = 250.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 35.667 kN/m2 S-min = 35.667 kN/m2
Allowable Soil Stress will be amplified by the factor (x3.0) =
300.000 kN/m2
As-min (Both Dir's) = 396.00 mm2/m
Punching Check (At Column Face):
Vt = 30.1 kN V-eff = 30.1 kN
v = 0.10 N/mm2 < v-Rdmax = 4.05 N/mm2
Punching Check (At 'd'):
Vt = 21.2 kN V-eff = 21.2 kN
v = 0.05 N/mm2 < v-Rdc = 0.49 N/mm2
X Dir: Footing Design: M = 1.6 kN.m/m
K/K' = 0.01 < 1.0
As = 396.00 mm2/m Y12-250
Shear Check (At Column Face):
v = 0.05 N/mm2 < v-Rdmax = 4.05 N/mm2
Shear Check (At 'd' from Column):
v = 0.02 N/mm2 < v-Rdc = 0.49 N/mm2
Y Dir: Footing Design: M = 1.6 kN.m/m
K/K' = 0.01 < 1.0
As = 396.00 mm2/m Y12-250
Shear Check (At Column Face):
v = 0.06 N/mm2 < v-Rdmax = 4.05 N/mm2
Shear Check (At 'd' from Column):
v = 0.02 N/mm2 < v-Rdc = 0.49 N/mm2
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday - Proposed Hotel
YADDAH
Development
ENG. SERVICES
for Mr Nwachokor
(*1B7-S36T-BYQY-2MEF)
O.S
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-1
BT7
--------------------------------------------------------------------------------
Columns: W1, W2, W3, W4
bx = 1800.0 mm by = 1800.0 mm
Effects: Critical Combination = 12 (G+Q+Wx+Nx)
N = -561.3 kN Mx = 736.4 kN.m
My = 146.7 kN.m
Footing Dimensions:
Lx = 4800.0 mm Ly = 3100.0 mm
h = 600.0 mm h-Tap = 0.0 mm
Soil Stresses:
S-max = 144.065 kN/m2 S-min = 0.000 kN/m2
Allowable Soil Stress will be amplified by the factor (x3.0) =
450.000 kN/m2
As-min (Both Dir's) = 1088.00 mm2/m
Punching Check (At Column Face):
Vt = 921.0 kN V-eff = 1561.8 kN
v = 0.74 N/mm2 < v-Rdmax = 4.05 N/mm2
Punching Check (At 'd'):
Vt = 733.8 kN V-eff = 1374.6 kN
v = 0.36 N/mm2 > v-Rdc = 0.36 N/mm2 Fail !!!
X Dir: Footing Design: M = 147.6 kN.m/m
K/K' = 0.09 < 1.0
As = 1088.00 mm2/m Y16-175
Shear Check (At Column Face):
v = 0.39 N/mm2 < v-Rdmax = 4.05 N/mm2
Shear Check (At 'd' from Column):
v = 0.25 N/mm2 < v-Rdc = 0.36 N/mm2
Y Dir: Footing Design: M = 29.9 kN.m/m
K/K' = 0.02 < 1.0
As = 1088.00 mm2/m Y16-175
Shear Check (At Column Face):
v = 0.17 N/mm2 < v-Rdmax = 4.05 N/mm2
Shear Check (At 'd' from Column):
v = 0.03 N/mm2 < v-Rdc = 0.36 N/mm2
Project: Proposed_Hotel_for_Mr_Nwachokor_Onyeka_Sunday