Вы находитесь на странице: 1из 37

Learning experience powered by

Alcatel-Lucent University

Section 1
Operations and Maintenance
Module 6
System turnup
TOP30003_V3.0-SG-6.0.0-Ed1 Module 1.6 Edition 1
1830 PSS
6.0.0 WDM Operations and Maintenance
TOP30003_V3.0-SG Edition 1

1·6·1 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
Module objectives

Upon completion of this module, you should be able to:

 Perform the detailed procedures required to commission the 1830


Photonic Service Switch (1830 PSS) network using the Commissioning
Power balancing tool (CPB) and/or the 1354 RM-PhM Photonic Manager
(1354 RM-PhM) on a TOADM ring and TOADM linear system

1·6·3 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
Table of Contents

1 System turn-up 7
2 Exercises 10

1·6·5 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
Table of Contents [cont.]

1·6·6 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
1 System turn-up

1·6·7 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
1 System turn-up
1.1 Provisioning in-service feature demonstration
Note: this feature demonstration will be performed by your instructor at the
end of the hands-on exercises. You will perform the necessary procedures
in this lesson to achieve an end-to-end functional TOADM system
configuration.

Procedure Outline:
1. Provision the NE with the EPT network commissioning file.
2. Demonstrate the shelf view.
3. Provide Wavelength Tracker channel trace view for a specific channel (bar
view and signal flow).
4. Provide A-to-Z and Z-to-A view.
5. Provide path trace view within the shelf.
6. Discuss the Z bars and threshold settings.
7. Show real time channel power view.
8. Add a new channel to existing traffic.
9. Simulate a line side failure between NE’s.
10. Simulate a fiber failure between a TOADM and OT.

1·6·8 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
1 System turn-up
1.2 Turn-up and testing sequence
System Turn-up and Testing
1. Preconditioning (verify circuit packs, cabling, etc. from Lesson 3 has been
completed)
2. Establish connection to the network
3. Provision the system
4. Power Commissioning
5. Commission a TOADM using EPT configuration file
6. Commission a TOADM linear system
7. Generate and review loss report
8. Provision protection (OPS, E-SCNP or Y-cable) based on circuit pack
configuration
Note: Use of CPB (Commissioning Power Balancing) tool:
The CPB tool can be used in conjunction with 1354 RM-PhM or can also be installed and used as a
stand-alone tool. The Provisioning, Commissioning and Power Balancing menus and respective
functionality of the CPB tool integrated in 1354 RM-PhM and the standalone CPB are the same.
However, the stand-alone CPB tool requires the user to have access to another Network
Management System (e.g. 1350 OMS, etc.) or utilize the NE built in user interfaces (CLI or WebUI) in
order to make the relevant adjustments required in support of Provisioning, Commissioning, and
Power Balancing the Network Element that would have otherwise been performed by utilizing the
1354 RM-PhM.
Important! We will use the 1354 RM-PhM during this Lesson to commission the system.

1·6·9 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises

1 · 6 · 10 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.1 Lab configuration diagram example
TXPSS32-7 TXPSS32-8 TXPSS32-9

WR WR WR WR WR WR
6 3 2 6 7 3
8 4 4 8 8 4
7 2 3 7 6 2

27 ITLU 25 ITLU 25 ITLU 27 ITLU 27 ITLU 25 ITLU

28 SFD44 26 SFD44 26 SFD44 28 SFD44 28 SFD44 26 SFD44

1 1 1 1 1 1 1 4 1 1 1 1 4 1
1 1 1 1 1 1 1 3 1 1 1 1 3 1
Q S Q 2 D D D S S 2 D Q S Q
P T P S P P P T T S P P T P
A A A C M E M X A C E A X A
4 R 4 X 1 1 1 4 R X 1 4 4 4
1 1 2 2 2 P 1 1 2 P
L L 0 L E L 0 E L L
3 9 1 9 1 1 1 3
9 2 9 2 9 9 9 9 9 9 9 9 9 9
3 3 3 1 1 4 1 2 2 2 4 3 2 3
4 0 4 0 9 8 9 0 3 1 8 4 0 4
0 0 0 0 0 0 0 0 0 0 0 0

1 · 6 · 11 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.2 Preconditioning
This procedure will ensure that the network and PC are ready for commissioning
using the 1354 RM-PhM.
1. Ensure that all the outside plant fibers (or test set) have been properly
connected to the correct line driver cards on each network element.
2. Verify one pair of OT cards is installed and fibered on the end terminals for a
TOADM system.
3. Obtain the loopback IP addresses of all the NE’s in the network.
4. Determine which NE in the network will be used as the connection
commissioning process, as directed by your instructor. Obtain the OAMP port
IP address.
5. Obtain the .xml commissioning file produced by EPT and used for
commissioning from your instructor. As defined by the installation report that
is a product of the EPT file for your node (if available from your instructor).
6. Ensure that both the client 1354 RM-PhM software has been installed on the
PC. Refer to the 1354 RM-PhM Photonic Manager EMS Reference Guide for
detailed procedures on installing and configuring the software.

1 · 6 · 12 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.3 Installation report examples
EPT example of installation report and bill of materials.

1 · 6 · 13 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.4 Establish connection to the network
Purpose
This procedure will establish connection to the network and discover all the
network elements. Refer to the 1354RM-PhM Photonic Manager EMS Reference
Guide for additional information on configuring the server and client as well as
discovering network elements.
Note: If another management system will be used, refer to the documentation for
that system for discovering the NEs. The procedures in this exercise reference
1354 RM-PhM, but the procedures can be performed with another management
system along with stand-alone CPB.

1354RM-PhM login screen

1 · 6 · 14 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.4 Establish connection to the network [cont.]
1354RM-PhM new server port window

1 · 6 · 15 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.4 Establish connection to the network [cont.]
1354RM-PhM topology view and auto discovery settings screens

1 · 6 · 16 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.4 Establish connection to the network [cont.]
1354RM-PhM create NE and newly discovered NE screens

1 · 6 · 17 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.5 Provision the system
This procedure will provision the cards and topological links for all the NE’s in
each system of the Alcatel-Lucent 1830 PSS network using the EPT commissioning
file(s) as input to the CPB tool provisioning wizard. The CPB tool is accessed from
1354 RM-PhM.
1354RM-PhM CPB login and main window

1 · 6 · 18 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.5 Provision the system [cont.]
1354RM-PhM CPB wizard screens

1 · 6 · 19 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.5 Provision the system [cont.]
1354RM-PhM CPB wizard select EPT output file screens

1 · 6 · 20 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.5 Provision the system [cont.]
1354RM-PhM CPB wizard system stages screen

1 · 6 · 21 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.6 Commissioning a TOADM ring
This procedure will perform power commissioning on each Alcatel-Lucent 1830
PSS network using parameters provided by the EPT commissioning file(s). This is
done using the CPB tool commissioning system wizard.
The wizard will only complete commissioning on a TOADM ring system with
automatic managed lines. Linear TOADM lines require additional steps to
complete commissioning which we will perform once the TOADM ring is
commissioned.

1354RM-PhM inventory and power management screens

1 · 6 · 22 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.6 Commissioning a TOADM ring [cont.]
1354RM-PhM CPB wizard and mode screens

1 · 6 · 23 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.6 Commissioning a TOADM ring [cont.]
1354RM-PhM CPB TL1 and power provisioning screens

1 · 6 · 24 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.6 Commissioning a TOADM ring [cont.]
1354RM-PhM CPB select EPT file and commissioning stage screens

1 · 6 · 25 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.6 Commissioning a TOADM ring [cont.]
1354RM-PhM CPB select EPT finish and loss report example screens

1 · 6 · 26 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.7 Commissioning a TOADM linear system
This procedure will complete commissioning at the terminal ends of a linear
system. This is performed by provisioning a service between the transponders
installed in each terminal node; then executing power adjustments on the
terminal ends and adjacent lines.

The auto managed lines on a linear system adjacent to the terminal sites as well
as the terminal sites themselves will not complete using the commissioning wizard
(ass per the loss report). Those lines must have further power adjustments to
complete commissioning.

Adjustment example linear system

1 2 3 4
NE A NE B NE C NE D NE E
Static Filter TOADM TOADM TOADM TOADM
Terminal A A A A A A A A Terminal

A = optical power management Auto


L = optical power management Auto

1 · 6 · 27 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.7 Commissioning a TOADM linear system [cont.]

1354RM-Phm wavelength services screens

1 · 6 · 28 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.7 Commissioning a TOADM linear system [cont.]

1354RM-Phm power adjustment and flag screens

1 · 6 · 29 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.7 Commissioning a TOADM linear system [cont.]

1354RM-Phm power adjustment complete screen

1 · 6 · 30 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.8 Provision new wavelength services
This procedure provides the steps required to provision a new wavelength service
between transponders installed at two end-point nodes. The procedure assumes
the transponders have already been installed and fibered in the nodes, and the
1354 RM-PhM server is up and connected to the network.

1354RM-PhM topology screens

1 · 6 · 31 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.8 Wavelength services [cont.]
1354RM-PhM inventory and client port assignment screens

1 · 6 · 32 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.8 Wavelength services [cont.]
1354RM-PhM client admin status up and provision wavelength service screens

1 · 6 · 33 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.8 Wavelength services [cont.]
1354RM-PhM provision wavelength service screens

1 · 6 · 34 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.8 Wavelength services [cont.]
1354RM-PhM provision wavelength service screens

1 · 6 · 35 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.9 Wavelength services job aid
Use this Job Aid to establish a new wavelength service.
1. Identify the transponders that have been installed and fibered to carry the wavelength service.
2. Right click on one of the nodes at the wavelength end-point and select Provision -> Physical Topology... from the
menu.
3. Click on the Line (L1) port of the transponder card.
4. With the transponder Line (L1) port still highlighted, select the port where the other end of the fiber is connected
(CWR8, CWR8-88, or filter).
5. With both ports highlighted, click the “Connect the fiber endpoints” button.
6. Repeat above Steps for the second transponder at the other end point.
Enable transponder ports
7. From the 1354 RM-PhM topological view, double click on one of the nodes at an endpoint of the service.
8. Click on the client port of the transponder card that will carry the service.
9. Right-click on the unassigned client port and select “Assign Port”
10. From the drop-down list, select the service type that will be transported and click the “OK” button.
11. Right click on the now assigned client port and select Administration -> Interface Admin Status up
12. Provision the second transponder.
13. In the topological view of the 1354 RM-PhM, identify the two NE’s at the end-points of the wavelength service on the
map. Select both NE’s by left clicking on the NE’s while holding the <ctrl> key.
14. Select Provision -> Provision Wavelength Service... from the top menu.
15. Provision the parameters as required by the wavelength service including any protection options.
16. Select the aid of each transponder for the A End and Z End. Then click on the “Next>” button.
17. Verify the provisioning is correct and click the “Finish” button.
18. Select one of the service options and click “OK”.
19. Verify both A to Z and Z to A directions through Wave Tracker and enable the 10 second auto refresh function.
20. When both directions are all green, a test set can be setup at on client port end and a fiber loop at the other client
port end to perform the error free testing, observe optical TX and RX levels and install attenuators as needed.
21. Capture the test results from the test set for error free testing.

1 · 6 · 36 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
2 Exercises
2.10 Power adjustments
If the path through the network the new service takes crosses lines whose optical
power management type is set to Manual, the system will create expected powers
and default power deviations at only two key points per line, the ingress line's
ingress LD Sig Out port and the egress line's LD Line Out port. The goal of the
service turn-up procedure is to modify the lightpath's power using a combination
of add target power setpoint adjustment, LD gain adjustment and manual pad
placement to try to reach the expected powers set up by the system.

1. Refer to your 1830 PSS-32/16 Installation Guide, Part V, Chapter 11, and
perform “Perform power adjustments” procedure.

1 · 6 · 37 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
Module summary

We defined and performed the:


 The detailed procedures required to commission the 1830 Photonic
Service Switch (1830 PSS) network using the Commissioning Power
balancing tool (CPB) and/or the 1354 RM-PhM Photonic Manager (1354
RM-PhM) on a TOADM ring and TOADM linear system.

1 · 6 · 38 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance
End of module
System turnup

1 · 6 · 39 COPYRIGHT © ALCATEL-LUCENT 2013. ALL RIGHTS RESERVED.


Operations and Maintenance · System turnup
1830 PSS · 6.0.0 WDM Operations and Maintenance

Вам также может понравиться