Вы находитесь на странице: 1из 3

VINDAIR ENGINEERS PVT.

LTD
Page No:
1 of 3
PREREQUISITES CHECK LIST – VALIDATION

SL. NO DESCRIPTION OBSERVATION REMARKS

AHU Installed with complete


1
accessories

Fan & Motor installed and alignment


2
completed

Utilities like Chilled water/brine,


3 Electrical connection and HOT water
connected

Chilled water Pipe Hydro tested and


4
insulated

Ducting completed, Duct leak test


5 done and all leaks arrested and
insulated

All dampers checked for proper


6
functioning

7 All grilles/diffuser installed

Is AHU deep cleaned and blow down


8
completed?

9 Is AHU pre and fine filter installed?

All areas catered by this AHU


construction is complete with flooring,
1
false ceiling, light fittings, doors view
panels and other utilities?

2 Is area “Deep Cleaned”?

DOCUMENT NO: VEPL//01


VINDAIR ENGINEERS PVT. LTD
Page No:
2 of 3
PREREQUISITES CHECK LIST – VALIDATION

SL. NO DESCRIPTION OBSERVATION REMARKS

All field sensors installed, loop


1
checked and calibrated

2 Is VFD installed and commissioned?

All filters in AHU installed as per


1
specification and GA drgs?

All Terminal filters installed as per


2
specification and GA drawings?

Magnehelic gauges/DP sensors


1
installed and calibrated?

All leaks in area like cut outs for utility


2 pipes, electrical pendants,
instrumentation pendants closed?

The machines with exhaust to be


3
switched on.

The man & material movement


4
discipline is enforced strictly.

All doors, view panels, Pass box etc


5
are installed?

The power is made available


6 uninterrupted to attain stability in
conditions.

DOCUMENT NO: VEPL//01


VINDAIR ENGINEERS PVT. LTD
Page No:
3 of 3
PREREQUISITES CHECK LIST – VALIDATION

SL. NO DESCRIPTION OBSERVATION REMARKS

The preliminary fiters like EU3, 4 & EU


1 7, 8 ,as the case may be, should be
installed in the AHUs.

The fiters in the RA path like EU3, 4 as


2
the case may be should be installed.

Hepa filters to be installed and visible


3
gaps sealed with silicon sealent.

Cable connections to be checked at


4
fan motor end & panel end.

he utility viz. CHW / CHB / HW/ Steam


1 to be made available at the requisite
conditions.

2 Internal load to be switched on.

Chilled Water / Brine system is


3
balanced

The power is made available


4 uninterrupted to attain stability in
conditions.

Area deep cleaned and gowning


1
procedures

The man & material movement


2
discipline is enforced strictly.

DOCUMENT NO: VEPL//01