DAILY COATING INSPECTION REPORT

Customer PT. Pembangunan Perumahan (Persero)


Project Rubber Lining Water Box Condenser Add-on Grati Block 2 Power Plant Project
Equipment Water Box Condenser Inlet 1
Dimension 60,5 m²
Description Chloroprene Rubber 5mm
Date of Inspect 06-Apr-18

SURFACE PREPARATION
Methode Preparation Abrasive Type Mesh
Blasting ( SSPC SP-10 ) Steel Grit Steel Grit G-25

INSPECTION STANDARD
Items Methode Standard Results
Temperature Temperature Test 10 - 40 degree C 24,4 - 31,0 degree c
Humidity Ambient Condition M Max. 80 % 68,0 %
Surface Condition Visual No Dust, No Oil & Grease OK
Surface Cleaness SSPC VIS - 1 Rust Grade A A SP-10
Surface Roughness Rougness Test 60 µ 90µ -100 µ

Notes :
Relative Humidity : 68,0 %
Surface Temperature : 31,6 °C
Air Temperature : 31,0 °C
Dewpoint Temperature : 24,4 °C

Checked & Prepared by Witnessed by Review & Approved by Acknowledge by


PT. YPH PT. Tracon PT. PP PT. Tractable PT Indonesia Power

Name : Name : Name : Name : Name:


Date : Date : Date : Date : Date:
l Wear and Corrosion Protection Engineering l
PICTURE AFTER BLASTING

Customer PT. Pembangunan Perumahan (Persero)


Project Rubber Lining Water Box Condenser Add-on Grati Block 2 Power Plant Project
Equipment Water Box Condenser Inlet 1
Dimension 60,5 m²
Description Chloroprene Rubber 5mm
Date of Inspect 06-Apr-18

SURFACE PREPARATION
Methode Preparation Abrasive Type Mesh
Blasting ( SSPC SP-10 ) Steel Grit Steel Grit G-25

SSPC - VIS 1 Test Solvent Cleaning Rougness Test

SSPC - VIS 1 Test Ambient Condition Measurement Aplication Thixon P-21

Checked & Prepared by Witnessed by Review & Approved by Acknowledge by


PT. YPH PT. Tracon PT. PP PT. Tractable PT Indonesia Power

Name : Name : Name : Name : Name:


Date : Date : Date : Date : Date:
l Wear and Corrosion Protection Engineering l