1- Planning is the heart of good inspection and
a) Preventive maintenance.
b) Corrective maintenance
c) None of the above
8- Most parts and materials that are used for ------------------ maintenance are
well known and can be identified in advance.
a) Corrective
b) Preventive
c) Predictive
Ans: -------------------------------------------------------------------------------
Ans:-------------------------------------------------------------------------------
15- One should negotiate the schedule with production planning so that
a balanced workload is available each week.
d) Maintenance planner
e) Maintenance Manager
f) Maintenance Engineer
16- Work orders should be kept on report until the supervisor has
checked the results for quality assurance and signed off approval.
g) open preventive maintenance
h) open corrective maintenance
i) closed preventive maintenance
17- The collected data should then be entered into a computer system
for
a) Tracking
b) Record Retention
c) Identification