1 Pending CC-2016-043 Corp. Constructions Hejaz Phase 1B Road Primary Infrastructure Works Construction 48,139,132.50 Donald Francis RFP 2 Pending Pending Pending Pending Pending Pending Pending Waiting for PR and package from
Works BU
Engagement This was on-hold / Cancelled;
2 Pending N/A Corp. Constructions Outsource Resource - Sergio Loya Letter Pending Donald Francis Single Source 2 Pending Pending Pending Pending Pending N/A N/A 02/10 - released from hold
Construction Waiting for PR and package from
3 Pending CC-2016-047 Corp. Constructions KAUST (Construction) Road - Earthwork Final 4,000,000.00 Donald Francis RFP 2 Pending Pending Pending Pending Pending Pending Pending
Works BU
4 Pending CC-2016-050 Corp. Constructions HLR - Porta Cabin with Toilet Supply & Pending Donald Francis RFP 2 Pending Pending Pending Pending Pending Pending Pending Waiting for PR and package from
Installation BU
5 N/A CC-2016-051 Corp. Constructions Concrete pipe N/A Pending Donald Francis RFI 2 N/A N/A N/A N/A N/A Pending Pending
6 Pending CC-2016-054 Corp. Constructions Al Waha Electric Connection Works Construction 7,000,000.00 Donald Francis RFP 2 Pending Pending Pending Pending Pending Pending Pending Waiting for PR and package from
Works BU
7 Pending CC-2016-055 Corp. Constructions West Lagoon Blvd. Roadway Improvements Construction Pending Donald Francis RFP 2 Pending Pending Pending Pending Pending Pending Pending Waiting for PR and package from
Works BU
8 Pending CC-2016-057 Corp. Constructions IFC Package for Bay La Sun Construction Construction Pending Donald Francis RFP 2 Pending Pending Pending Pending Pending Pending Pending
Works
9 Pending CC-2016-058 Corp. Constructions Dry Gas Pipeline Construction Supervision and Supervision Pending Donald Francis RFP 2 Pending Pending Pending Pending Pending Pending Pending
Management Consultancy
1 12264 CC-2016-029 Corp. Constructions Al Talah Gardens Phase 2 & 3A Primary Infrastructure Construction 52,000,000.00 Donald Francis RFP 2 9/28/2016 10/18/2016 10/27/2016 Err:508 Err:508 Err:508 10/30/2016 Added Ph. 3A, PR aprvd for 52K
Works Works only; 04/10- Addendum#2 sent
Construction Waiting for PR and package from
2 12810 CC-2016-053 Corp. Constructions Haramain Gate Construction Supervision Works 600,000.00 Donald Francis RFP 2 10/13/2016 Pending Pending Err:508 Err:508 Err:508 BU
SL No PR No. P. No. Business Unit Project Description Contract Type Estimated Value BU Prime Procurement Method Priority Opening/ Hand Technical Commercial / Negotiation
LRA Recommended Planned Contract Action / Status
over Evaluation Financial Evaluation Completion Vendor Draft Start
1 Pending 2016-019 Corp. Constructions Dry Gas Pipeline and Distribution Network EPC 160,000,000.00 Donald Francis RFP 2 11/1/2016 Pending Pending Pending Pending Pending Pending 29/09- Notification sent
SL No PR No. P. No. Business Unit Project Description Contract Type Contract Value BU Prime Recommended Vendor Contract Start Contract End PO Initiation Contract Draft Legal BU Approval Vendor Legal Approval Action / Status
Completed Submission Acceptance
2 12518 2016-039 Corp. Constructions Telecom Connection to Haramain Link Road Construction 2,925,260.00 Donald Francis Middle Sea Telecom Compa Pending Pending 10/3/2016 10/6/2016 18/10 - Planned 10/6/2016 10/18/2016 Pending Submitting to Legal review
Works
3 12682 CC-2016-045 Corp. Constructions Haramain Link Road Landscape Works Construction 3,000,000.00 Donald Francis New Job Contracting Est. 11/3/2016 2/28/2017 10/11/2016 Pending Pending Pending Pending Pending Evaluation received
Works
4 N/A CC-2016-046 Procurement Preferred Supplier Program (Ductile Iron Pipes) - RVK Master Services N/A Hesham I. ElAbd RVK - MOHAMED RAMADAN S 10/1/2016 10/1/2019 Pending 8/31/2016 9/6/2016 Pending Pending Pending
Agreement
5 12769 PR # 12769 Corp. Constructions Resident Senior Electrical Engineer for Various Power Master Services 490,000.00 Donald Francis HDR Middle East, LLC N/A N/A 10/6/2016 Pending Pending Pending Pending Pending PO pending with CFO
Connectivity Projects Agreement
SL No PR No. P. No. Business Unit Project Description Contract Type Contract Value BU Prime Awarded Vendor Contract Start Contract End Contract Signed Contract Action / Status
by Vendor Executed Savings Vs
Budget Avg. Market Negotiations Hard
6. Closed (12)
Regret Letter
SL No PR No. P. No. Business Unit Project Description Contract Type Contract Value BU Prime Awarded Vendor Contract Start Contract End Sent Filing Sourcing Distributed
Contract Filed LRA Filed Document Filed Vendor Legal BU (Soft)
1 12086 CC-2016-023 Corp. Constructions Hejaz Phase 1A Roads - Infrastructure Construction Construction 12,250,000.00 Donald Francis Infrastructure United Constr 8/23/2016 2/9/2017 9/1/2016 Yes Yes Yes 8/30/2016 9/1/2016 9/1/2016
Works Works
2 12479 2016-025 Corp. Bus. Develop. Health Care Strategic Consultancy Services Consultancy 1,444,837.50 Mazen A. Tammar Pricewaterhouse Coopers 9/25/2016 12/18/2016 10/5/2016 10/5/2016 10/5/2016 10/5/2016 10/5/2016
Construction
3 12449 CC-2016-026 Corp. Constructions TWA Phase 2 Demolition Work Works 1,000,000.00 Donald Francis IHCC 8/16/2016 9/30/2016 9/1/2016 8/17/2016 8/15/2016 8/28/2016
4 12154 CC-2016-028 Corp. Constructions Citywide LiDAR Survey Services 1,200,000.00 Donald Francis Aerial Imaging Saudi Arabia 9/1/2016 11/15/2016 Yes Yes Yes Yes 9/4/2016 9/4/2016 8/28/2016
5 12072 CC-2016-030 Corp. Constructions Hejaz - Temporary Utility Yard Construction 8,000,000.00 Donald Francis Nesma Water & Energy 9/18/2016 5/15/2017 10/2/2016 10/3/2016 9/1/2016 10/6/2016 10/3/2016 10/2/2016 10/2/2016
Works
6 12265 CC-2016-038 Corp. Constructions Gate 1 - Visitors Center Construction Construction 625,972.00 Donald Francis Advanced Construction Syste 8/14/2016 12/14/2016 Yes Yes 9/30/2016 9/1/2016 9/1/2016
Works
7 12478 CC-2016-044 Corp. Constructions Civil Inspector for Corp. Constructions PO 474,650.00 Donald Francis HDR Middle East, LLC N/A N/A N/A Pending N/A 9/21/2016
8 N/A CC-2016-048 Procurement Preferred Supplier Program (Valves) - AVK Master Services N/A Hesham I. ElAbd AVK - SAUDI VALVES MANU 10/1/2016 10/1/2019 N/A Pending Pending Pending
Agreement
9 12697 PR # 12697 Corp. Constructions Connection for GC3 Water and Irrigation Lines with N/A 235,000.00 Donald Francis Salem Saleh Al Hareth Contra N/A N/A N/A N/A N/A N/A N/A N/A 9/27/2016
Existing Water and Irrigation Lines
10 12703 CC-2016-052 Corp. Constructions KAEC Gas Pipe Design Value Engineering Master Services 56,250.00 Donald Francis LJA Engineering, Inc. N/A N/A N/A N/A N/A N/A N/A N/A 10/6/2016
Agreement
KAEC Land Surveys & Kroukis - Retainer Agreement Master Services
11 12759 PR # 12759 Corp. Constructions Fee Agreement 100,000.00 Donald Francis Abnia Consulting Engineer N/A N/A N/A N/A N/A N/A N/A N/A 10/10/2016
Supervision
1 12419 CC-2016-041 Corp. Constructions Supervision Consultant for TWA Ph II & Boarding Schoo Consultancy 5,500,000.00 Donald Francis RFP 2 6/29/2016 29/09 - PO Rjctd by CFO
cost Centre Name of the ContrRequsition Value PR Approver Requsition DFF Should be need PR
b Approval date Not needed Not needed PR start Date + duration Not needed Not needed Comments -- PR Approval/return comm
Technical Commencemen Planned RFP
SL No PR No. P. No. Business Unit Project Description Contract Type Estimated Value BU Prime Procurement Method Priority PR Approval Date PRF Received Documents Duration RFP Ready Action / Status
Received t Date Issue
1 Pending CC-2016-043 Corp. Constructions Hejaz Phase 1B Road Primary Infrastructure Works Construction 48,139,132.50 Donald Francis RFP 2 Pending Pending Pending Pending Pending Pending Pending Waiting for PR and package from
Works BU
2 Pending N/A Corp. Constructions Outsource Resource - Sergio Loya Engagement Pending Donald Francis Single Source 2 Pending Pending Pending Pending Pending N/A N/A This was on-hold / Cancelled;
Letter 02/10 - released from hold
3 Pending CC-2016-047 Corp. Constructions KAUST (Construction) Road - Earthwork Final Construction 4,000,000.00 Donald Francis RFP 2 Pending Pending Pending Pending Pending Pending Pending Waiting for PR and package from
Works BU
4 Pending CC-2016-050 Corp. Constructions HLR - Porta Cabin with Toilet Supply & Pending Donald Francis RFP 2 Pending Pending Pending Pending Pending Pending Pending Waiting for PR and package from
Installation BU
5 N/A CC-2016-051 Corp. Constructions Concrete pipe N/A Pending Donald Francis RFI 2 N/A N/A N/A N/A N/A Pending Pending
7 Pending CC-2016-055 Corp. Constructions West Lagoon Blvd. Roadway Improvements Construction Pending Donald Francis RFP 2 Pending Pending Pending Pending Pending Pending Pending Waiting for PR and package from
Works BU
8 Pending CC-2016-057 Corp. Constructions IFC Package for Bay La Sun Construction Construction Pending Donald Francis RFP 2 Pending Pending Pending Pending Pending Pending Pending
Works
9 Pending CC-2016-058 Corp. Constructions Dry Gas Pipeline Construction Supervision and Supervision Pending Donald Francis RFP 2 Pending Pending Pending Pending Pending Pending Pending
Management Consultancy
10 Pending CC-2016-059 Corp. Constructions N/S Road Improvements and 2-1000mm Water Supervision Pending Donald Francis Pending Pending
Mains Design Consultancy
11 Pending Pending Corp. Constructions Z Road Intersection Utilities & Earth Work Construction Pending Donald Francis RFP 2 Pending Pending Pending Pending Pending Pending Pending
Works
12 Pending Pending Corp. Constructions Coastal Communities Substation Design Construction 600,000.00 Donald Francis RFP 2 Pending Pending Pending Pending Pending Pending Pending
Works
Construction
13 Pending Pending Corp. Constructions Coastal Road 1000 KM Portable & Landscaping Works Pending Donald Francis RFP 2 Pending Pending Pending Pending Pending Pending Pending
Construction
14 Pending Pending Corp. Constructions Lotus Compound 26,000,000.00 Donald Francis RFP 2 Pending Pending Pending Pending Pending Pending Pending
Works
15 Pending Pending Corp. Constructions Al Talah Gardens Phase 3A Construction Pending Donald Francis RFP 2 Pending Pending Pending Pending Pending Pending Pending
Works
16 Pending Pending Corp. Constructions Al Talah Gardens Phase 4 Construction Pending Donald Francis RFP 2 Pending Pending Pending Pending Pending Pending Pending
Works
1 12264 CC-2016-029 Corp. Constructions Al Talah Gardens Phase 2 & 3A Primary Infrastructure Construction 52,000,000.00 Donald Francis RFP 2 9/28/2016 10/18/2016 10/27/2016 Err:508 Err:508 Err:508 10/30/2016 Added Ph. 3A, PR aprvd for 52K
Works Works only; 04/10- Addendum#2 sent
2 12810 CC-2016-053 Corp. Constructions Haramain Gate Construction Supervision Construction 600,000.00 Donald Francis RFP 2 10/13/2016 Pending Pending Err:508 Err:508 Err:508 Waiting for PR and package from
Works BU
SL No PR No. P. No. Business Unit Project Description Contract Type Estimated Value BU Prime Procurement Method Priority Opening/ Hand Technical Commercial / Negotiation
LRA Recommended Planned Contract Action / Status
over Evaluation Financial Evaluation Completion Vendor Draft Start
1 Pending 2016-019 Corp. Constructions Dry Gas Pipeline and Distribution Network EPC 160,000,000.00 Donald Francis RFP 2 11/1/2016 Pending Pending Pending Pending Pending Pending 29/09- Notification sent
2 Pending CC-2016-042 Corp. Constructions TWA Phase 2 - Construction - Design & Build Constructions - 80,000,000.00 Donald Francis RFP 2 10/9/2016 Pending Pending Pending Pending Pending Pending Vendors are going to submit revised offer by
D&B 23rd Oct.
2 12518 2016-039 Corp. Constructions Telecom Connection to Haramain Link Road Construction 2,925,260.00 Donald Francis Middle Sea Telecom Compa Pending Pending 10/3/2016 10/6/2016 18/10 - Planned 10/6/2016 10/18/2016 Pending Submitting to Legal review
Works
3 12682 CC-2016-045 Corp. Constructions Haramain Link Road Landscape Works Construction 3,000,000.00 Donald Francis New Job Contracting Est. 11/3/2016 2/28/2017 10/11/2016 Pending Pending Pending Pending Pending Evaluation received
Works
4 N/A CC-2016-046 Procurement Preferred Supplier Program (Ductile Iron Pipes) - RVK Master Services N/A Hesham I. ElAbd RVK - MOHAMED RAMADAN S 10/1/2016 10/1/2019 Pending 8/31/2016 9/6/2016 Pending Pending Pending
Agreement
5 12769 PR # 12769 Corp. Constructions Resident Senior Electrical Engineer for Various Power Master Services 490,000.00 Donald Francis HDR Middle East, LLC N/A N/A 10/6/2016 Pending Pending Pending Pending Pending PO pending with CFO
Connectivity Projects Agreement
Contract Value Supplier signed EEC Signed Date(PR Value - Cont(Average of Quot
(Initial proposa Price variance . Without item quotes, this cannot be ca
5. Contract Awarding (1)
1 12429 CC-2016-034 Corp. Constructions Coastal Communities Police & Fire Station Design Design 590,000.00 Donald Francis Delano Designs Corporation 9/18/2016 12/20/2016 10/12/2016 Pending 6% 42% 22% N/A 18/10 -Contract for signing at CEO
Consultancy
1 12086 CC-2016-023 Corp. Constructions Hejaz Phase 1A Roads - Infrastructure Construction Construction 12,250,000.00 Donald Francis Infrastructure United Constr 8/23/2016 2/9/2017 19% 36% 0% N/A 8/30/2016 9/1/2016 9/1/2016
Works Works
2 12479 2016-025 Corp. Bus. Develop. Health Care Strategic Consultancy Services Consultancy 1,444,837.50 Mazen A. Tammar Pricewaterhouse Coopers 9/25/2016 12/18/2016 -2% 57% 0% N/A 10/5/2016 10/5/2016 10/5/2016
3 12449 CC-2016-026 Corp. Constructions TWA Phase 2 Demolition Work Construction 1,000,000.00 Donald Francis IHCC 8/16/2016 9/30/2016 0% 17% 13% N/A 8/17/2016 8/15/2016 8/28/2016
Works
4 12154 CC-2016-028 Corp. Constructions Citywide LiDAR Survey Services 1,200,000.00 Donald Francis Aerial Imaging Saudi Arabia 9/1/2016 11/15/2016 67% 41% 7% N/A 9/4/2016 9/4/2016 8/28/2016
Construction
5 12072 CC-2016-030 Corp. Constructions Hejaz - Temporary Utility Yard Works 8,000,000.00 Donald Francis Nesma Water & Energy 9/18/2016 5/15/2017 51% 33% 5% N/A 10/3/2016 10/2/2016 10/2/2016
6 12265 CC-2016-038 Corp. Constructions Gate 1 - Visitors Center Construction Construction 625,972.00 Donald Francis Advanced Construction Syste 8/14/2016 12/14/2016 N/A N/A N/A N/A 9/30/2016 9/1/2016 9/1/2016
Works
7 12478 CC-2016-044 Corp. Constructions Civil Inspector for Corp. Constructions PO 474,650.00 Donald Francis HDR Middle East, LLC N/A N/A N/A N/A N/A N/A Pending N/A 9/21/2016
8 N/A CC-2016-048 Procurement Preferred Supplier Program (Valves) - AVK Master Services N/A Hesham I. ElAbd AVK - SAUDI VALVES MANU 10/1/2016 10/1/2019 N/A N/A 47% N/A Pending Pending Pending
Agreement
9 12697 PR # 12697 Corp. Constructions Connection for GC3 Water and Irrigation Lines with N/A 235,000.00 Donald Francis Salem Saleh Al Hareth Contra N/A N/A 15% N/A 15% N/A N/A N/A 9/27/2016
Existing Water and Irrigation Lines
10 12703 CC-2016-052 Corp. Constructions KAEC Gas Pipe Design Value Engineering Master Services 56,250.00 Donald Francis LJA Engineering, Inc. N/A N/A 0% 0% 0% N/A N/A N/A 10/6/2016
Agreement
11 12759 PR # 12759 Corp. Constructions KAEC Land Surveys & Kroukis - Retainer Agreement Master Services 100,000.00 Donald Francis Abnia Consulting Engineer N/A N/A 0% 0% 0% N/A N/A N/A 10/10/2016
Fee Agreement
12 12813 PR # 12813 Corp. Constructions Quantity Surveyor for PI Projects Construction 413,291.00 Donald Francis TURNER N/A N/A 0% 0% 0% Add N/A N/A N/A
Works
1 12419 CC-2016-041 Corp. Constructions Supervision Consultant for TWA Ph II & Boarding Schoo Supervision 5,500,000.00 Donald Francis RFP 2 6/29/2016 29/09 - PO Rjctd by CFO
Consultancy
Construction Hejaz Phase 1A Roads - Infrastructure Construction Corp. Hossam H. Infrastructure United
12086 CC-2016-023 Link Works Works Constructions Donald Francis Malyani 5/3/2016 15,100,000.00 5/3/2016 RFP 2 ### 6 Months Construction Co - (ICC 12,250,000.00 10209 8/1/2016 8/4/2016 19% 36% 0% N/A 103118 ### ### ### ### 2/9/2017 9/1/2016 Yes Yes Yes ### 9/1/2016 9/1/2016 9/1/2016 6. Closed Mustafa
United)
Corp. Bus. Soliman K. Pricewaterhouse
12479 2016-025 Link Consultancy Health Care Strategic Consultancy Services Develop. Mazen A. Tammar Momenah ### 1,422,260.00 Pending RFP 2 12 Weeks ### ### ### N/A ### 6/7/2016 6/8/2016 6/8/2016 ### ### ### ### Coopers 1,444,837.50 10204 ### 8/1/2016 -2% 57% 0% N/A O# 2016-025 ### ### 9/8/2016 ### 9/8/2016 ### ### ### ### ### ### ### ### ### 6. Closed Sent to vendor for their signature Nadeem
10/05- Rlsd Ntfcn #1
Construction Corp. Mohammed F. 19/05- Rlsd Adndm #1
12449 CC-2016-026 Link Works TWA Phase 2 Demolition Work Constructions Donald Francis Khayyat ### 1,000,000.00 ### RFP 2 5/1/2016 ### 2 Months 5/1/2016 5/1/2016 5/1/2016 5/5/2016 N/A 6/7/2016 6/8/2016 6/8/2016 ### ### ### ### IHCC 1,000,000.00 10186 ### 8/1/2016 0% 17% 13% N/A 103226 ### ### ### 9/1/2016 ### ### ### ### 6. Closed 26/05- Rlsd Ntfcn #2 Nadeem
02/06- Rlsd Adndm #2 2016 - RFP Status Report New v3.xlsx
Corp. Aerial Imaging Saudi
12154 CC-2016-028 Link Services Citywide LiDAR Survey Constructions Donald Francis Nadim K. Alawar ### 3,600,000.00 ### RFP 2 ### ### 75 Days ### Arabia – AISA 1,200,000.00 10172 ### 8/1/2016 67% 41% 7% N/A 103143 ### 9/1/2016 ### Yes Yes Yes Yes 9/4/2016 9/4/2016 ### 9/4/2016 6. Closed Nadeem
D:\02.Work\Projects\KAEC(King Abdul Economic City)\Reporting Requirements\2nd Set\[2016 - RFP Status Report New v3.xlsx]Contratc Awarding
Construction Al Talah Gardens Phase 2 & 3A Primary Corp. Hossam H. 2. Tender Documents Added Ph. 3A, PR aprvd for 52K only;
12264 CC-2016-029 Link Works Infrastructure Works Constructions Donald Francis Malyani 6/8/2016 52,000,000.00 6/8/2016 RFP 2 Pending ### 12 Months ### ### ### ### ### ### ### Pending Pending Pending Pending Pending Pending 103171 Released 04/10- Addendum#2 sent D:\02.Work\Projects\KAEC(King Abdul Economic City)\Reporting Requirements\2nd Set\
Construction Corp. 27/09-Rcvd from vendor & stamp Lgl,
12072 CC-2016-030 Link Works Hejaz - Temporary Utility Yard Constructions Donald Francis Ahmad A. Kady ### 16,484,690.00 ### RFP 2 ### 8 Months ### ### ### ### ### 8/2/2016 8/3/2016 8/3/2016 ### ### ### ### Nesma Water & Energy 8,000,000.00 10282 ### 9/5/2016 51% 33% 5% N/A 103119 ### 9/3/2016 9/4/2016 9/4/2016 ### ### ### ### ### ### ### 9/1/2016 ### ### ### ### ### 6. Closed sent to CEO office for sign Mustafa
Bid_List!A1
Construction Haramain Gate & Area Improvements - Design & Corp. Andrew A. Saudi Green Evaluation & recommendation received,
12427 CC-2016-031 Link Works Built Constructions Donald Francis Macallister ### 10,000,000.00 ### RFP 2 ### 8 Months ### ### ### 8/1/2016 ### ### ### ### 9/6/2016 9/6/2016 Pending Pending Contracting 13,509,533.25 Pending -35% -47% -67% Add 103217 ### ### Pending ### Pending Pending Pending Pending 4. Contract Drafting contract draft sent to vendor test
Design Corp. Delano Designs
12429 CC-2016-034 Link Consultancy Coastal Communities Police & Fire Station Design Constructions Donald Francis Yasin S. Haddawi ### 630,000.00 ### RFP 2 ### 6 Months ### ### ### N/A 8/4/2016 ### ### ### ### ### ### ### Corporation 590,000.00 10362 ### ### 6% 42% 22% N/A 103218 ### ### ### ### ### ### ### Pending ### ### 5. Contract Awarding 18/10 -Contract for signing at CEO Nadeem
test Mastersheet!A1
Construction Corp. Single Advanced Construction
12265 CC-2016-038 Link Works Gate 1 - Visitors Center Construction Constructions Donald Francis 6/8/2016 625,972.00 Source 2 ### 4 Months ### Systems Ltd - ACS 625,972.00 10014 6/8/2016 8/3/2016 N/A N/A N/A N/A 103158 ### ### ### ### Yes Yes ### 9/1/2016 9/1/2016 ### 6. Closed Aref
test
Construction Corp. Hossam H. Middle Sea Telecom
12518 2016-039 Link Works Telecom Connection to Haramain Link Road Constructions Donald Francis Malyani ### 4,000,000.00 ### RFP 2 ### ### 3 Months ### ### ### N/A ### ### ### ### ### ### ### Pending Company 2,925,260.00 10416 ### 27% 56% 2% Add 103259 ### ### 18/10 - Planned ### ### Pending Pending Pending 4. Contract Drafting Submitting to Legal review
3
Supervision Supervision Consultant for TWA Ph II & Boarding Corp. Mohammed F. V3 Middle East On-hold / Postponed /
12419 CC-2016-041 Link Donald Francis ### 5,500,000.00 RFP 2 ### ### Engineering 3,200,000.00 10241 ### 42% -5% 2% Add 103210 ### ### ### 9/1/2016 9/4/2016 ### 10/9/2016 29/09 - PO Rjctd by CFO
Consultancy School Constructions Khayyat Consultants Cancelled b
Constructions Corp. Mohammed F. 3. Evaluation and Sep 9th ~ Adndm 1, 28th ~ Vendors are going to submit revised
Pending CC-2016-042 Link - D&B TWA Phase 2 - Construction - Design & Build Constructions Donald Francis Khayyat 80,000,000.00 RFP 2 ### ### ### ### ### ### Pending Pending Pending Pending Pending Pending ### Recommendation Adndm 2, 29th ~ Adndm 3 offer by 23rd Oct.
Construction Corp. 1. Planning and
Pending CC-2016-043 Link Works Hejaz Phase 1B Road Primary Infrastructure Works Constructions Donald Francis Ahmad A. Kady Pending 48,139,132.50 Pending RFP 2 Pending Pending Pending Pending Pending Pending Preparation Waiting for PR and package from BU
a a
Corp. Single
12478 CC-2016-044 Link PO Civil Inspector for Corp. Constructions Constructions Donald Francis ### 495,000.00 ### Source 2 ### ### ### ### ### ### ### HDR Middle East, LLC 474,650.00 10338 9/7/2016 ### N/A N/A N/A N/A 9/7/2016 N/A N/A N/A N/A Pending N/A ### ### 6. Closed
Engagement Corp. Single 1. Planning and This was on-hold / Cancelled; 02/10 -
Pending N/A Add Letter Outsource Resource - Sergio Loya Constructions Donald Francis Pending Pending Pending Source 2 Pending Pending Pending N/A N/A Pending N/A N/A N/A Preparation released from hold
Construction Corp. New Job Contracting
12682 CC-2016-045 Link Works Haramain Link Road Landscape Works Constructions Donald Francis Tariq A. Mirza 9/7/2016 10,000,000.00 9/7/2016 RFP 2 9/7/2016 ### 4 Months 9/8/2016 9/8/2016 9/8/2016 ### ### ### ### ### ### ### ### ### Est. 3,000,000.00 10445 ### 70% 52% 27% Add 103221 ### Pending Pending Pending Pending Pending Pending ### ### 4. Contract Drafting Evaluation received
Assistant Resident Engineer (Roadways Inspector) for Corp. RFP - 3. Evaluation and
12484 CC-2016-049 Link PO - MSA West Lagoon Boulevard Project, Construction Road Donald Francis 8/2/2016 495,000.00 8/2/2016 2 ### 11 Months 8/2/2016 ### ### ### ### HDR Middle East, LLC 474,650.00 10374 ### ### 4% 0% 0% Add 103236 Pending BU get HDR proposal, LRA hold at DCEO
Project & BLS Mass Grading Project Constructions MSA Recommendation
N/A CC-2016-051 Link N/A Concrete pipe Corp. Donald Francis N/A Pending N/A RFI 2 N/A N/A N/A Pending Pending Pending 1. Planning and
Constructions Preparation
Connection for GC3 Water and Irrigation Lines with Corp. Single Salem Saleh Al Hareth
12697 PR # 12697 Link N/A Existing Water and Irrigation Lines Constructions Donald Francis N/A ### 275,000.00 N/A Source 2 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A ### N/A N/A ### ### Contracting Est. 235,000.00 10368 ### ### 15% N/A 15% N/A 103341 N/A N/A N/A N/A N/A N/A ### N/A N/A N/A N/A N/A N/A N/A N/A N/A ### ### 6. Closed Only for issuing PO
Master Corp.
12703 CC-2016-052 Link Services KAEC Gas Pipe Design Value Engineering Constructions Donald Francis William C. Nelson ### 56,250.00 ### RFP/MSA 2 Pending ### 3 Months N/A N/A N/A N/A N/A ### ### ### ### ### ### ### LJA Engineering, Inc. 56,250.00 10430 ### ### 0% 0% 0% N/A 103343 N/A N/A N/A N/A N/A N/A N/A N/A ### ### 6. Closed PO approved
Agreement
Pending CC-2016-054 Link Construction Al Waha Electric Connection Works Corp. Donald Francis Hossam H. Pending 7,000,000.00 Pending RFP 2 Pending Pending Pending Pending Pending Pending 1. Planning and Waiting for PR and package from BU
Works Constructions Malyani Preparation
Pending CC-2016-055 Link Construction West Lagoon Blvd. Roadway Improvements Corp. Donald Francis Robert S. IVY Pending Pending Pending RFP 2 Pending Pending Pending Pending Pending Pending 1. Planning and Waiting for PR and package from BU
Works Constructions Preparation
Master
12769 PR # 12769 Link Services Resident Senior Electrical Engineer for Various Power Corp.
Donald Francis N/A ### 490,000.00 N/A
Single
2 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A ### N/A N/A N/A ### HDR Middle East, LLC 490,000.00 10435 ### ### N/A N/A N/A N/A 103333 ### Pending Pending Pending Pending Pending N/A N/A N/A N/A N/A N/A N/A N/A 4. Contract Drafting PO pending with CFO
Agreement Connectivity Projects Constructions Source
Master
12759 PR # 12759 Link Services KAEC Land Surveys & Kroukis - Retainer Agreement Corp.
Donald Francis N/A ### 100,000.00 N/A RFP/MSA 2 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A ### N/A N/A N/A N/A
Abnia Consulting
100,000.00 10437 ### ### 0% 0% 0% N/A 103353 N/A N/A N/A N/A N/A N/A N/A N/A ### ### 6. Closed PO approved
Agreement Fee Constructions Engineer
Pending CC-2016-057 Link Construction IFC Package for Bay La Sun Construction Corp. Donald Francis Richard M. Olsen Pending Pending Pending RFP 2 Pending Pending Pending Pending Pending Pending 1. Planning and
Works Constructions Preparation
12813 PR # 12813 Link Construction Quantity Surveyor for PI Projects Corp. Donald Francis N/A ### 413,291.00 N/A RFP/MSA 2 N/A ### TURNER 413,291.00 10458 ### 0% 0% 0% Add N/A N/A N/A N/A N/A ### 6. Closed
Works Constructions
Pending CC-2016-058 Add Supervision Dry Gas Pipeline Construction Supervision and Corp. Donald Francis William C. Nelson Pending Pending Pending RFP 2 Pending Pending Pending Pending Pending Pending 1. Planning and
Consultancy Management Constructions Preparation
Pending CC-2016-059 Add Supervision N/S Road Improvements and 2-1000mm Water Corp. Donald Francis Richard M. Olsen Pending Pending Pending Pending 1. Planning and
Consultancy Mains Design Constructions Preparation
Pending Pending Add Construction Z Road Intersection Utilities & Earth Work Corp. Donald Francis Pending Pending Pending Pending RFP 2 Pending Pending Pending Pending Pending Pending 1. Planning and
Works Constructions Preparation
Construction Corp. 1. Planning and
Pending Pending Add Works Coastal Communities Substation Design Constructions Donald Francis Pending Pending 600,000.00 Pending RFP 2 Pending Pending Pending Pending Pending Pending Preparation
Construction Corp. 1. Planning and
Pending Pending Add Works Coastal Road 1000 KM Portable & Landscaping Constructions Donald Francis Pending Pending Pending Pending RFP 2 Pending Pending Pending Pending Pending Pending Preparation
Construction Corp. 1. Planning and
Pending Pending Add Works Lotus Compound Constructions Donald Francis Pending Pending 26,000,000.00 Pending RFP 2 Pending Pending Pending Pending Pending Pending Preparation
Construction Corp. 1. Planning and
Pending Pending Add Works Al Talah Gardens Phase 3A Constructions Donald Francis Pending Pending Pending Pending RFP 2 Pending Pending Pending Pending Pending Pending Preparation
Construction Corp. 1. Planning and
Pending Pending Add Works Al Talah Gardens Phase 4 Constructions Donald Francis Pending Pending Pending Pending RFP 2 Pending Pending Pending Pending Pending Pending Preparation
To : A. HAK
2016-019 Err:508 HAK01 Err:508 3/3/2016 No response No response Err:508 Err:508 Err:508 Err:508 Err:508 Link Intern ati onal B.V.
Link To
1 Attn. : : DENYS
Tel . : , COMPANY
ARABIA
LTD
Attn. : Fad i Akkam/
2 2016-019 Err:508 DENYS01 Err:508 3/3/2016 Declined Not interested Err:508 Err:508 Err:508 Err:508 Err:508 Not attending Link Link Hyder Al i Shou kath
Tel . : 056 000
3273/ :054
To FLUOR
045
0806,: 013
Attn. Az iz88 7
3801
Sh areef / Abdul lah
3 2016-019 Err:508 FLUOR01 Err:508 3/3/2016 Declined Declined Err:508 Err:508 Err:508 Err:508 Err:508 Not attending Link Link Di rani
Tel . :: 053
To Al Fanar
930
0126,
Gas Services -
Midd le East
4 2016-019 Err:508 FANAR01 Err:508 3/3/2016 Confirmed Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Attn. : Sally
P.C aneso
To : Bash ir
Tel . : , +97
Ahmed Do st1Est 4 34-7
BDM
5958
Attn. : Shabir
5 2016-019 Err:508 BDOST01 Err:508 3/3/2016 Confirmed Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Attending Link Link Ahmed / Imran
To
Tel . an :: 054
GAS910
Arabi
7493,: 012
Attn. Balu66 / 3
2382
Hai tham Gaber/
6 2016-019 Err:508 GASAR01 Err:508 3/3/2016 Confirmed Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Attending Link Link Khaled Al Dabal /
Ravi
Tel . : 050 004
To
7108, : GASCO
7 2016-019 Err:508 GASCO01 Err:508 3/3/2016 Declined Declined Err:508 Err:508 Err:508 Err:508 Err:508 Not attending Link Link Attn. : Prasad
Tel . :: ,QAS Arabia
To
Co. Ltd.
Attn. : :Ati
To JGC f Shariff/
Gul f
8 2016-019 Err:508 QASAR01 Err:508 3/3/2016 Confirmed Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Attending Link Link As if AliatiKhan
Intern onal Co.
Tel . : 050 686
Ltd.
0206,: 013
Attn. Dai suke66 7
2428 / 2668 /
Umayabashi
2016-019 Err:508 JGC01 Err:508 Confirmed Err:508 E rr:508 Err:508 Err:508 Err:508 Attending Link Link Rocel viezra A.
9 Jchavez/ Vi pin S.
Kumar/ Humayun
Akhtar: NGC Energy
To
Tel . di :LLC
Sau , 01 3 806
10 2016-019 Err:508 NGC01 Err:508 Tomorrow (22/08) Err:508 Err:508 Err:508 Err:508 Err:508 Attending Link Link 9999+: Ars alan Tariq
Attn.
3669/3683
Tel . : 056 897 /6663
To
6707, : Dodsal &
Company
2016-019 Err:508 DODSAL01Err:508 Declined Err:508 Err:508 Err:508 Err:508 Err:508 Not attending Link Link Attn. : Piyus h
11 Rastogi: Al Fanar
To
Tel . : 053
Attn.
Infrastru 772
0642,: Hisham cture
Mouafak You nes/
United
2016-019 Err:508 ALFANAR01Err:508 8/22/2016 Declined Err:508 Err:508 Err:508 Err:508 Err:508 It is out of their scope Link Link Wasimructi
Const Al Mall
on Couhyo-
12 Tel . United)
(ICC : 055 953
3791/: Al
Attn. 050 la El 521ami n /
5081,
Abd al lah
92 000El-Tawi l /
6111+ 491 5/4400
Mahmoud Hi jawi /
1 CC-2016-023 Err:508 ICCU01 Err:508 5/5/2016 Confirmed 6/19/2016 Yes 12,246,351.00 12,250,000.00 Err: 508 E rr:508 Err:508 E rr:508 E rr:508 Awarded Link Link Mohammad
To : Al i Sai d Jalal
Abu lhaijaa
Est
Tel . :: 059
To SBS 394 &
Attn.
9210/
Partners: Is saCo. Ismail
Ltd. -
Tel . : 050 123
CC-2016-023 Err:508 ALISAID01Err:508 No Response Err:508 Err:508 Err:508 Err:508 Err:508 Link Link 050 562
(Saud
7303/ Bari
050 6811/
k360
Al-
2 056
Su bhi)
401 1925,
2282/ : 050 746/
6793355+223
Attn.
7991,
6793355+213
Hamed/ 012 25 7/
Mohamme
0019/
6793355
d Faheem/ 012 665
7017
3 CC-2016-023 Err:508 SBS01 Err:508 Confirmed 6/19/2016 17,310,069.20 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Mohammed
To : SalemSamad Saleh
Barak
Al Haret Al -hSobhi /
Sami Shaik
Contracting
Tel . : 053 200 Est .
Attn.
2349/: on Les
053 lie376
4 CC-2016-023 Err:508 HARETH01Err:508 Confirmed 6/19/2016 24,392,317.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link James
6113/
To :050
/ Sush
Dar085 Al
il
Sh riwastav
4008,
Arabi
Tel . a::014(DAAC)
050 32584 2
7887
Attn. Mohamed
8313, 013 /89Anas
Meskaoui 0
CC-2016-023 Err:508 DAAC01 Err:508 No response Err:508 Err:508 Err:508 E rr:508 Err:508 Link Link 1009
M. K. As wad
5
Tel . :: 056
To Buh123 oor
2233; ati onal Est.
Intern
050 562 7466, 012
Attn.
664 7788: Suhair
6 CC-2016-023 Err:508 BUHR01 Err:508 Confirmed 6/19/2016 15,958,559.80 Err:508 Err:508 E rr:508 Err:508 Err:508 Link Link Mohamadi
Tel . : 050 668
To
0670, :012
CIT69 2
Attn.
7164 : Naser
Gulaid , P ierre
CC-2016-023 Err:508 CIT01 Err:508 Confirmed 6/19/2016 14,596,824.06 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link To
Jreige : Saudi
7 Bin
Tel .ladin
: 050 Group 667
(SB G)
1505/: Shahid,
Attn. 055 540
8929,
Mustafa Eis a, Shah
8 CC-2016-023 Err:508 SBG01 Err:508 No response Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Sh ahadat
Tel . :: 059
To Bash308 ir
2866/ 059
Ahmed Do st 394Est -
0748/ 059 867
BDM
6066/054
Attn. : Shabir 221
9 CC-2016-023 Err:508 BDOST01 Err:508 Confirmed 6/19/2016 22,563,084.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link To : Nesma
8002, &/ En
Ahmed Imran
Water ergy
Tel . :: 054
To Al Harbi910
Attn. : Rayan S.
7493,ng012
Tradi & 66 3
Bukhari
2382 /
Contracting
Mahmoud
10 CC-2016-023 Err:508 NESMAW01Err:508 Confirmed 6/19/2016 Yes 15,903,051.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Attn. : Fayez Al
Fal latah/M.
Harb
Abb asi //Ab Majeddulrahma
Al shaaer /
n Yousef
Miguel ito Fais al
Tel . : 0504
Ramos / Usman 633 S.
11 CC-2016-023 Err:508 HARBI01 Err:508 No response Err:508 Err:508 Err:508 Err:508 Err:508 Link Link 995, 012 234 6213
Al -Shaaer
Tel . :: 055
To Al Ki fah
Contracting
5525552, FR 05 9
3047593,
Attn. : Sherif
Maj 056
12 CC-2016-023 Err:508 ALKIFAH01Err:508 Confirmed 6/19/2016 Yes 30,000,000.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Abb
0709023,
as / Fran
AK k966
Rose
-540431844,
Tel
To . :: 056
Al -Ejtiyaz
951011-
Co. 5252
477
9346/ 059+342
Maj
170 :, Engr. Sall am
5097
Attn.
Hamdi / Engr. Yusuf
13 CC-2016-023 Err:508 EJTIYAZ01 Err:508 No response Err:508 Err:508 Err:508 Err:508 Err:508 Link Link To
Tel . :: 054
Houston
407
Methodi
0090 / 054
st/Texas
426
0445, 012
Medical Center
24 8
8194
(Un ited
/ 8581
States)
1 2016-025 Err:508 TEXAS01 Err:508 3/14/2016 No response Err:508 Err:508 Err:508 Err:508 Err:508 No response Link Link Attn. : Hamz ah
Hararah
Tel . : 050 700
4866, :+971
To Mayo4 Cl
375ini c
2 2016-025 Err:508 MAYO01 Err:508 3/14/2016 No response Err:508 Err:508 Err:508 Err:508 Err:508 No response Link Link 4679
(Un ited States)
Attn. :
To : The
Tel . : ,
Advis ory Bo ard
(Un ited States)
Attn. : Hwang,
3 2016-025 Err:508 ADVSR01 Err:508 4/5/2016 Declined Hwang, Soyoung Err:508 HwangS@advisory.com Err:508 Err:508 07/04; They declined through e-mail Link Link So you ng
To : Ci rcle
Tel . th: (202)
Heal 672-
(United
5600 , (202) 67 2-
Kingdo m)
5700
2016-025 Err:508 CIRCLE01 Err:508 3/14/2016 Declined Err:508 Err:508 Err:508 Err:508 Err:508 06/04; Declined through e-mail Link Attn. : Mass oud
Link Fo
4 uladi
Tel . :: +44
To Shift797
Health
713
(Canada)
4169, +44 207 034
5250 : Ryan Wi ley/
Attn.
5 2016-025 Err:508 SHIFT01 Err:508 3/14/2016 Confirmed 4/11/2016 E-mail NA 5,931,973.00 Err: 508 E rr:508 E rr:508 Err:508 Err:508 Participated Link Link Borys Chaburs ky/
Vi vi en Won g
Tel . : +1 416 716
To
9423, : Partners
Heal thcare
6 2016-025 Err:508 PRTNR01 Err:508 3/23/2016 Declined Err:508 Err:508 Err:508 Err:508 Err:508 29/03; Declined through e-mail Link Link To
Attn. : :AlHDR
i Fahi
Mimddle
Eas.t, LLC
Tel : +971 50 394
7785,: Cary P.
Attn.
Stewart / Ran dy
Edwards/ Khal id
7 2016-025 Err:508 HDR01 Err:508 4/19/2016 Confirmed 5/10/2016 Share-file NA 1,825,074.00 Err:508 Err:508 Err:508 E rr:508 Err:508 29/03; Declined through e-mail Link Link Bekka
Tel . :: 054
To Houston
290
1046 st
Methodi
+971 :50
Attn. Tal457
al Brai
612dy9,/
8 2016-025 Err:508 HOUMETH01
Err:508 5/3/2016 Confirmed 6/6/2016 E-mail NA 1,425,000.00 USD 380,000 Err:508 Err:508 Err:508 Err:508 Err:508 08/05- Confirmed Link Link Sarp
+971er
43Tan
756
li 727
Tel . : +971 50 725
To
28 59 :, Oli
+971ver4 375
Wyman
4679
Attn. : Dr. Sven-Ol af
9 2016-025 Err:508 OLIVER01Err:508 5/3/2016 Confirmed 6/7/2016 Share-file NA 5,581,100.00 Err:508 Err:508 Err:508 Err:508 Err:508 09/05- Confirmed Link Link Vathje
Tel . : +971 56 177
3217, +971 4 425
To
7038 : Kurt Sal mo n
Attn. : Jesse Balo k
10 2016-025 Err:508 KURT01 Err:508 5/3/2016 Declined Err:508 Err:508 Err:508 Err:508 Err:508 03/05- Confirmed Link Link To
Tel . :: +1 612 867
Pricewaterhous e
3662,
Coopers
Attn. : Dr. Tim
Wil son / Matt
11 2016-025 Err:508 PCOOPER01Err:508 5/3/2016 Confirmed 6/7/2016 Share-file NA 1,444,837.50 USD 385,290 1,444,837.50 Err:508 Err:508 Err:508 Err:508 Err:508 08/05- Confirmed Awarded Link Link Jones
Tel . : +971 56 682
0531/ :+971
To The B56
oston
682
0524,ulti
Cons +971
ng Group
2 694
12 2016-025 Err:508 BOSTON01Err:508 5/3/2016 Confirmed 6/6/2016 Share-file NA 4,150,000.00 Err:508 Err:508 Err:508 Err:508 Err:508 05/05- Confirmed Link Link Attn.
6800 :+Jad
2551
Bi tar
To . :: +971
Tel IHCC 50 901
7861,: Iftikhar
Attn.
Hu ssai n
Hafiz Mu hammad
1 CC-2016-026 Err:508 IHCC01 Err:508 5/1/2016 Confirmed 6/7/2016 E-mail NA 1,144,986.76 1,000,000.00 Err: 508 Err:508 E rr:508 E rr:508 Err:508 Awarded Link Link To
Waqas: Hish am
Al ireza tradi ng Est.
Tel
C1. : 056 124
-7622
Attn. : Mr.0994
His ham
058 047 ,
CC-2016-026 Err:508 C101 Err:508 5/1/2016 Confirmed 6/7/2016 E-mail NA 1,604,631.00 1,195,750.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link Al ireza / Eng.
Link Basem
2
: BThe
an abilah
To Target
Tel . Est
: 056 776tech
One
1828/ - Secu
055 552
Attn. : 012
Rauf B utt/
0774, 69 2
Waqqar
3 CC-2016-026 Err:508 TARG01 Err:508 5/1/2016 Confirmed 6/7/2016 E-mail NA 1,035,660.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link 8448 B utt
Link Tel
To . :: 054
629
Salim S. Al
1793/ 056 156
Fayedy Contracting
1859, 012
Est 66 5
2425
Attn. : Khaja
4 CC-2016-026 Err:508 FAYD01 Err:508 5/1/2016 Confirmed 6/8/2016 E-mail NA 1,015,000.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link To
Madani : New
MohiJouddi
b n
Tel . : 059 545
Contracting Est .
4624,: 014
Attn. Husam
38 2
Tayara/
5446
5 CC-2016-026 Err:508 NEWJOB01Err:508 5/1/2016 Declined Err: 508 Err:508 Err:508 E rr:508 Err:508 22/05- Declined Link Link Sh ahid
Tel . : 050 532
4648 : An war
To
055 705
Const ructi
8055,
on 012
6 CC-2016-026 Err:508 ANWER01Err:508 5/1/2016 Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Company
284 2006
Attn. : Tahi r Ayaz
Tel . :: 056 976
To
7436,
Mohammad Zoman
CC-2016-026 Err:508 ALRWYLI01Err:508 5/1/2016 No Response Err:508 Err:508 Err:508 Err:508 Err:508 Link Al Rowyli Est. for G.
Link Contracting
7
Attn. :
To
Tel . :: ,Mass arah Al
Wasta
Attn. : :Hesham
8 CC-2016-026 Err:508 ALWASTA01Err:508 5/1/2016 No Response Err:508 Err:508 Err:508 Err:508 Err:508 Link Link To
Elbel iwiAb nia
Cons
Tel . ulti
ng 533
: 056
Engineer
3006,
Attn. : Is sam
Farou q Ri ziq / Essat
1 CC-2016-028 Err:508 ABNIA01 Err:508 4,560,000.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Goname / Ash
To : Aer ial raf
Nevo
Imaging Saudi
Tel . a: 059 077
Arabi
5070, – AISA
012 64 5
Attn.
2 CC-2016-028 Err:508 AISA01 Err:508 1,285,000.00 1,200,000.00 Err:508 Err:508 Err:508 Err:508 Err:508 Awarded Link 3111 : Eng. So bhi
Link Elsayed
Tel . : 059 390
0432 , :011 225
To
6802 + THE
EXPLORER 115
3 CC-2016-028 Err:508 EXPLORER01
Err:508 1,718,000.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link To
Attn. : : SAK -
Tellaiman
So . : , A.
Elkhereiji
To : MEIXNER
VERMESSUNG
Cons ultants ZT
4 CC-2016-028 Err:508 MEIXNER01Err:508 1,604,828.80 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Attn.
GMBH: Arch.
Attn.ull: ah S.
Abd
Elkhereiji
Tel . :,
/Moh ammed
Hu ssai n Kol a /
5 CC-2016-028 Err:508 SAK01 Err:508 980,000.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link To
Mohammed
: Salem Saleh
Mujee
Al Haret bh
Contracting
Tel . : M.KolEst a 050
.
788 5511
Attn.
To : :Les
Ci vi
,lie
Ml .M 050
1 CC-2016-030 Err:508 HARETH01Err:508 Confirmed 8/9/2016 17,431,249.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Electro-Mechan
122 7020
James on /, Omar
Sush ilical
053
Sh
Const
riwastav
533
ructi
3765,
on C o.
012
(CEMCCO)
669
Tel . 5961
: 050
, 66
5843
6471 :, 013
8313,
Attn. Salem
MM89 : 669
0
5832 + 173
1009
Akhrass /Amjad Al -
2 CC-2016-030 Err:508 CEMCCO01Err:508 Confirmed 8/9/2016 9,970,960.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Omari /Mas ood
Khan
To
:: 053
Saudi
Tel . an 333
Arabi Baytur
Const 1517, 012 66 5
3045/:ructi
on C o.
3 CC-2016-030 Err:508 BAYTUR01Err:508 Declined Err:508 Err:508 Err:508 Err:508 Err:508 Link Link To
Attn.
:Mustafa
668
Nesma
8854/
KOC
668. 3135
Water & En171
ergy
Tel
Attn. :: Rayan
055 S.
2208,
Bukhari /
4 CC-2016-030 Err:508 NESMAW01Err:508 Confirmed 8/9/2016 8,454,881.00 8,000,000.00 8,000,000.00 Err:508 Err:508 Err:508 Err:508 Err:508 Awarded Link Link Mahmoud
Fal latah/M.
To
Abb as :/Ab
Bash ir
dulrahma
Ahmed
n YousefDo st Est -
BDM
Tel . : 0504 633
Attn. : Shabir
5 CC-2016-030 Err:508 BDOST01 Err:508 Declined Err:508 Err:508 Err:508 Err:508 Err:508 Link Link To
995, 012
Ahmed 234
: Dar Al6213
/ Imran
Tel . a: 054
Arabi (DAAC)
910
7493,: 012
Attn. Mohamed
66 3
Meskaoui / Anas
2382
6 CC-2016-030 Err:508 DAAC01 Err:508 Confirmed Err:508 Err:508 Err:508 E rr:508 Err:508 Link Link M. K. As wad
Tel . : 056 123
2233;
050 562 7466, 012
664 7788
To : SaudiErr:508
7 CC-2016-030 Err:508 A-SAID01 Err:508 Declined Err:508 Err:508 Err:508 Err:508 Err:508 Link #N/A Bin ladin Group
(SB G)
Attn. : Shahid,
Mustafa Eis a, Shah
8 CC-2016-030 Err:508 SBG01 Err:508 Declined Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Sh ahadat
Tel . :: 059
To Al Aman
308
Company
2866/ 059 394
0748/: Mohammed
Attn. 059 867
CC-2016-030 Err:508 ALAMAN01Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Link 6066/054
Abo
Link Eldi bakr Taher
221 Tag
9 8002,n : Bash ir
To
Tel . : 055 523
Ahmed
6684 Do st
, 012 Est -
667
BDM
4238
Attn. : Shabir
1 CC-2016-031 Err:508 BDOST01 Err:508 Confirmed 8/22/2016 Dropbox NA 9,582,925.80 9,126,596.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Ahmed / Imran
To : The Target
Tel . : 054 910tech
One
7493,Est
- Secu
Attn. : 012
Rauf66 3
B utt/
2382 B utt
2 CC-2016-031 Err:508 TARG01 Err:508 Confirmed 8/24/2016 e-mail NA 9,401,674.80 10,055,553.72 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Waqqar
Tel . :: 054
To Al i Sai
629d Jalal
1793/ 056 156
Est
1859,: 012
Attn. Is sa66
Ismail
5
Tel . : 050 123
2425
3 CC-2016-031 Err:508 ALISAID01Err:508 Declined Err:508 Err:508 Err:508 Err:508 Err:508 Link Link 7303/ 050 360
2282/ :050
To IHCC
746
Attn. : 012
7991, Iftikhar
25 7
0019/
Hu ssai n
012 665
7017 Mu hammad
Hafiz
4 CC-2016-031 Err:508 IHCC01 Err:508 Declined Err: 508 Err:508 E rr:508 E rr:508 Err:508 Link Link To
Waqas: Dar Al
Tel . a: 056
Arabi (DAAC)
124
Attn. : Mohamed
7622
058
Meskaoui
To K.047
0994
/ Anas
,
CC-2016-031 Err:508 DAAC01 Err:508 Declined Err:508 Err:508 Err:508 E rr:508 Err:508 Link Link M. : Saudi
As wad
5 Bin
Tel .ladin
Group
: 056 123
(SB G)
2233;
Attn. : Shahid,
050 562 7466, 012
Mustafa Eis a, Shah
664
To 7788
: Yas ser
6 CC-2016-031 Err:508 SBG01 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Yaghmour
Sh ahadat
Tel . : 059Est.
308Fo r
Contracting &
2866/ 059 394
Maintenance
0748/: :Yas
059 867
Attn.
To Saudi
ser
6066/054 221
7 CC-2016-031 Err:508 YGHMR01Err:508 Confirmed 8/24/2016 We-Transfer NA 9,614,340.75 16,356,515.00 Err: 508 Err:508 E rr:508 E rr:508 Err:508 Link Link Amana
Yaghmour
8002, C ontracti ng
-AlJeddah
i M Zahran
Office
i
Tel . :: 055 555
Attn.
Tel . : 050 256
0902
8 CC-2016-031 Err:508 AMANA01Err:508 Declined Err:508 Err:508 Err:508 Err:508 Err:508 Link Link 055
9236/
882050
664 2715
6473/
To
0063,
:054
414 012
Saudi
+055
226
Green
3636/ 050 465
Contracting
5116/: Bil
Attn. +971al A.
50 636
To Abu rikab/
6740,
:+971012 M42ajed
ZFP -4Zuhai 0
Link Link Fayez
2950/
M. Al mahmou d r
rs885
9 CC-2016-031 Err:508 GREEN01 Err:508 Confirmed 8/25/2016 Share-file NA 8,089,072.27 13,703,979.35 13,509,533.25 Err:508 Err:508 Err:508 Err:508 Err:508 Awarded
. :Partne
hip
4449+4900
Tel 050 335
Cons
8618/ ultants
059 896Al -
Attn.
5463,: 012
Hamed
28 8
Attas/Ah med
CC-2016-034 Err:508 ZFP01 Err:508 695,000.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link 8075 Al Dajani /
Link Tawfiq
1
Ahmed: V3
To Ibrahi
Midm/dle
Mr. tAbdul
Eas Enginlah
eering
S Al-
Cons ultants
Saady
2 CC-2016-034 Err:508 V3-01 Err:508 580,000.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link To
Tel . :::Houss
Attn.
9999+ 983
Jabour/
,HAK
01 2 612
Architecture
Ah3,
mad
am
&
9 238
El
Chami ng
Engineeri
Tel . ultants
Cons : , 01 2 652
Attn. : AR CH.
6385
3 CC-2016-034 Err:508 HAK02 Err:508 2,550,000.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link To
Ho sam: SAK
al -
Abd ulkarim/ Danny
So
To laiman
: ar
SDC
iaA.ultant
- Saudi
Candel
Di
Elkhereiji
yar Cons
Tel
Attn.
Cons . ultants
:: Mr.
050Fadi581
1112, 012 65 1
4 CC-2016-034 Err:508 SDC01 Err:508 Err: 508 Err:508 Err:508 Err:508 Err:508 Link Link Attn.
Moumne
1118 : Arch.
Prin ull
Abd cipah
al S.
Elkhereiji
Tel . : , 01 2 699
9888 ammed
/Moh
5 CC-2016-034 Err:508 SAK01 Err:508 480,000.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Hu ssai n Kol a /
Mohammed
Mujee
To bDelano
:: M.Kol
Tel . igns a 050
Des
To
788 5511
: Ad, vanced
M .M 050
Link Corpo
Link Const
122 7020rati on
:ructi
6 CC-2016-034 Err:508 DELANO02Err:508 759,168.00 590,000.00 Err:508 Err:508 Err:508 Err:508 Err:508 Awarded , on
Omar
Attn. Vi to Delano
Systems
053 533 Ltd
3765, - ACS
012
Tel
669. 5961
:: Tarek
054 112
Attn.
3111, , 66 3
6471
Khotat/
, MM James: 669/
5832
You ssef
+ 173
Sbi ety /
1 CC-2016-038 Err:508 ACS01 Err:508 625,972.00 Err:508 Err:508 Err:508 Err:508 Err:508 Awarded Link Link Mis haal Almaimani
Tel . :: 056
To CIT 435
4446/: Naser
Attn. 055 589
Gulaid 054
0065/ , P ierre
242
1 2016-039 Err:508 CIT01 Err:508 Confirmed 8/28/2016 Sealed Package/ Hard copi 2 CDs 13,813,799.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link To
4214/ :050
Jreige 008Saleh
Salem
0681,
Tel
To . ::92
050
003
667
3945
Al Haret055
hcture
1505/
Infrastru 540
Contracting Est .
United
8929,
Attn. : Les lie
Const ructi
on / on
C oil-
2 2016-039 Err:508 HARETH01Err:508 Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Link Link (ICC
James
United)
Sush
Sh riwastav
Attn.
Tel . al::lah
Al la El ami n /
050 584
Abd
8313, 013El-Tawi
89 0 l //
1009 Mahmoud Hi jawi
3 2016-039 Err:508 ICCU01 Err:508 Err: 508 E rr:508 Err:508 E rr:508 E rr:508 Link Link Mohammad
Abu lhaijaa
To : Rezai k Al -
Tel . : 059
Gedaraw i Est
394.
Attn. : Ab dull ah
9210/
2016-039 Err:508 GDRW01 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Link 050 562
Rezaik
Link Ibrahi - Hani
6811/
4 056 401m -1925,
Abo Eita
-6793355+223
To
Mohs: enMiMddle
an/sor
Sea
6793355+213
Tel . : 050
ecom C omp
381/any
Attn. : Ad el Ali Al -
6793355
8352,
5 2016-039 Err:508 MIDSEA01Err:508 Confirmed 8/28/2016 Sealed Package/ Hard copi 2 CDs 2,975,260.00 2,925,260.00 Err:508 Err:508 Err:508 Err:508 Err:508 Awarded Link Link To
Esayi : Li fe
Connectio
Tel . : 056n055
7055 , 012 630
Contracting Co -
6001ON
LIFC + 100
Attn. : Eng. Mirz a
6 2016-039 Err:508 LIFCON01 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link To
Anjum: Fayaz
Arabi an
/ En
Cog..
Al iare Parts &
Sp
Maintenance
Tel . : 056 847
3859/: Mohammed
Attn. 054 500
7 2016-039 Err:508 ARSPM01Err:508 Confirmed 8/28/2016 Sealed Package/ Hard copi 2 CDs 3,074,538.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link To
0492, Hos sain /
Sakwat
Azam : Saudi
Cons ulti ng 281
Tel .vi ces
: 054
Ser Co622
.
9044/ 054
Attn.
1005, Al Badery: Ah med Al i/
1 CC-2016-041 Err:508 SAUDICONSLT01
Err:508 Confirmed 8/29/2016 2,857,800.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Waleed
Tel . : 050 983
8177/ :056
To SBCM
283
1371 :, Ah
Attn. 012med
667
2 CC-2016-041 Err:508 SBCM01 Err:508 Confirmed 3/29/2016 2,990,600.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Chaban
0500+ 240 0/2205
Tel . :: 050
To 472dle
V3 Mid
5679, 012 eering
66 4
Eas
4177 t Engin
Cons ultants
3 CC-2016-041 Err:508 V3-01 Err:508 Confirmed 8/31/2016 3,271,000.00 3,200,000.00 3,200,000.00 Err:508 Err:508 Err:508 Err:508 Err:508 Awarded Link Link Attn. : Houss am
Jabour/
To Ah mad El
: IHCC
Chami: Iftikhar
Attn.
Tel .ssai: n, 01 2 652
Hu
6385
CC-2016-042 Err:508 IHCC01 Err:508 Confirmed 10/9/2016 12/10 95,744,494.00 85,442,483.00 Err: 508 Err:508 E rr:508 E rr:508 Err:508 Link Hafiz Mu
Link To hammad
: Hish am
1
Waqas
Al ireza tradi ng Est.
-Tel
C1. : 056 124
7622 : Mr. His ham
Attn.
058 047 0994 ,
Al ireza / Eng.
2 CC-2016-042 Err:508 C101 Err:508 Confirmed 10/9/2016 11/10 104,586,227.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Basem B an abilah
To
Tel . :: 056
Al Ki776
fah
Contracting
1828/ 055 552
Attn.
0774,: 012
Sherif
69 2
3 CC-2016-042 Err:508 ALKIFAH01Err:508 No Response Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Abb
8448as / Fran k Rose
Tel . : 056 951
9346/ 059 342
5097 ,
To : Jawdat
Contracting Co . Ltd.
CC-2016-042 Err:508 JAWDAT01 Err:508 Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Link Attn. : :Ab
To
Link Yaghmour Yasdull
sera
4 Sh eikh Est. Fo r
Tel . : 059 808
Contracting &
Maintenance
0527,
Attn. : Yas ser
5 CC-2016-042 Err:508 YGHMR01Err:508 Confirmed 10/9/2016 48,212,257.13 Err: 508 Err:508 E rr:508 E rr:508 Err:508 Link Link To
Yaghmour
: Saudi Green
Al i M Zahran i
Contracting
Tel . : 055 555
Attn.
0902 : Bil al A.
Abu rikab/ M ajed
055Al882 0063,
6 CC-2016-042 Err:508 GREEN01 Err:508 Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Link Link To
M. mahmou
: Fines t d012
664 2715 + 226
Tel . :: Shadi
Attn. 050 335
Kojak /
8618/ Othman
Bahaa 059 896
5463,
Tel . :012
05028
544
8
Link 8075 055
4328/
Link To 504
7 CC-2016-042 Err:508 FINEST01 Err:508 Declined Err:508 Err:508 Err:508 Err:508 Err:508
3451/ :055
Is hraq
366Al-
Tilal
4431/ Co055 504
Attn.
3451/ : Haz
055em
366al
Ai ssa/ Engr.
Motasem
To 4431, 012 20 6
: Nesma &
8 CC-2016-042 Err:508 ALTILAL01Err:508 Confirmed 10/9/2016 13/10 111,447,897.18 99,434,370.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Partners
8393
Al nusai rat/ Eng.
Tamer El ewah
Contracting Co . Ltd.
Tel . :: Nabil
Attn. 055 577
To
0491/
Khammar :054
Ad /vanced
130
Ali Abu
9 CC-2016-042 Err:508 NSMAP01Err:508 No Response Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Const
6688, ructi
Ahmad / Aafwan
on
Nader Ltd - ACS
Systems
Tel . :: Tarek
Attn. 056 986
Khotat/055
9863/ James
607 /
3398/
You ssef055
Sbi132
ety /
10 CC-2016-042 Err:508 ACS01 Err:508 Declined Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Mis
0638,
haal Almaimani
Tel . :: 056
To 435
Saudi
4446/an055
Arabi 589
Baytur
Const 0065/ 054 242
11 CC-2016-042 Err:508 BAYTUR01Err:508 Confirmed 10/9/2016 12/10 89,500,152.83 Err:508 Err:508 Err:508 Err:508 Err:508 Link 4214/ructi
Link To :050on
RAM C o.
008
Attn. : Mustafa KOC
Contracting
0681, 92 003 3945
Tel . : 055&171
Company KPS
2208,
Ltd.
CC-2016-042 Err:508 KPS01 Err:508 Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Link Attn. : :Yaakoub
Link To Signature
12 abdoun i/
Attn. : Khaled
Mohammd kobros i
Nahed / 311
Tel . : 054
mohammed asi f
5169/ 054 311
Tel . : 050 562
13 CC-2016-042 Err:508 SGNTR01 Err:508 No Response Err:508 Err:508 Err:508 Err:508 Err:508 Link Link 6266/
5169, 053 240
0844/ 058 111
0426/ 054 648
8601/ 050 552
1 CC-2016-043 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Link #N/A To
3307, : HDR Mi ddle
Eas t, LLC
Attn. : Cary P.
Stewart / Ran dy
Edwards/ Khal id
1 CC-2016-044 Err:508 HDR01 Err:508 8/28/2016 Confirmed 8/30/2016 474,650.00 474,650.00 Err:508 Err:508 Err:508 E rr:508 Err:508 Awarded Link Link To
Bekka : New Jo b
Tel . : 054 290
Contracting Est .
Attn. : Husam
1046
+971 50 457 612 9,
Tayara/
1 CC-2016-045 Err:508 NEWJOB01Err:508 9/8/2016 Confirmed 10/2/2016 Envelope CD 4,118,613.00 3,180,006.00 3,000,000.00 Err: 508 Err:508 Err:508 E rr:508 Err:508 05/10 - submitted revised one Awarded Link Link Sh
+971
ahid
43 756 727
Tel . : 050 532
4648 : Rawabi
To
055 705 8055, 012
Fayfa
CC-2016-045 Err:508 RAWABI Err:508 9/8/2016 Confirmed 10/2/2016 Envelope 2 CDs 4,540,047.00 3,473,116.00 Err:508 Err:508 Err:508 Err:508 Err:508
Price not incl uding irrig ation ma il line
Link 284 2006
Link Attn. : Jihad
2 & wate r suppl y & pump sys te m
Munajed
Tel . :: ,Rabya
To
Lands capi ng
3 CC-2016-045 Err:508 RABYA Err:508 9/8/2016 Confirmed 10/2/2016 E-mail 4,492,714.00 2,789,968.00 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Attn. : Osama
Karkanawi
Tel . : ,
To : Bastana
Lands capi ng
4 CC-2016-045 Err:508 BASTANA Err:508 9/8/2016 Confirmed 10/2/2016 Envelope & E-mail CD 9,219,143.50 7,865,487.50 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Attn. : Bahget
Hamooh
Tel . : ,
To : Al Jaber Co.
Attn. : Claud e
5 CC-2016-045 Err:508 ALJABER Err:508 9/8/2016 Confirmed 10/2/2016 Envelope 7,829,595.50 6,710,893.50 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link To
Barmo: In itial
Tel . :capi
Lands , ng
Attn. : Ab dull ati f
Al avi /
6 CC-2016-045 Err:508 INITIAL02 Err:508 9/8/2016 Confirmed 10/2/2016 Envelope CD 6,987,394.00 6,164,709.00 Err: 508 Err:508 Err:508 Err:508 Err:508 Link Link Mohammad Afz al
Tel . :: 050
To RVK535
-
MOHAMED
6349, 012 66 5
0456+141
RAM ADAN SHAT
CC-2016-046 Err:508 RVK01 Err:508 0.00 Err:508 Err:508 Err:508 Err:508 Err:508 Awarded Link FACTOR Y FOR
Link ENGINEERING
1 AND
METAL INDUSTR IES
Attn. :
Tel . : ,
1 CC-2016-047 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Link #N/A
To : AVK - SAUDI
VALVES
CC-2016-048 Err:508 AVK01 Err:508 0.00 Err:508 Err:508 Err:508 Err:508 Err:508 Awarded Link MANUFACTURING
Link To : HDR Mi ddle
1 COMPANY LTD
Eas t, LLC
Attn. :
Attn.
Tel . :: Cary
, P.
Stewart / Ran dy
Edwards/ Khal id
1 CC-2016-049 Err:508 HDR01 Err:508 474,650.00 474,650.00 Err:508 Err:508 Err:508 E rr:508 Err:508 Awarded Link Link To
Bekka : Salem Saleh
TelHaret
Al . : 054
h 290
1046
Contracting Est .
+971 :50
Attn. Les457
lie 612 9,
1 PR # 12697 Err:508 HARETH01Err:508 9/8/2016 275,000.00 275,000.00 235,000.00 Err:508 Err:508 Err:508 Err:508 Err:508 Awarded Link Link James
+971
To 43 on 756
/ Sush
: Salem 727il
Sh
Saleh riwastav
Al Hareth
Tel
Contracting . : 050 584 Est.
TAttn.
8313, o :013 :Leslie
Saudi
89 0
1 CC-2016-029 Err:508 HARETH01Err:508 Attended Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Link Link 1009
Binladin
JamesonGroup / Sushil
(SBG)
Shriwastav
Attn.
Tel. ::S050 hahid,
584
Mustafa
T8313, o :013 AlEisa,
Mabani
890
CC-2016-029 Err:508 SBG01 Err:508 Attended Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Link Shah
1009 Shahadat
Link General
2
Contractors
Tel. ::Pierre
Attn. 059 308
2866/ 059
Mourani / Bandar
394
0748/ 059/ 867
3 CC-2016-029 Err:508 ALMBNI01Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Hasanain
TFaraj
6066/054 o : Rezaik
Joud
221 Al-
Gedarawi
T8002, el. : 055Est. 467
Attn. : Abdullah
T8288/
Rezaik o :055 -Huta
Hani
519
2994, 012
Marine 657
4 CC-2016-029 Err:508 GDRW01 Err:508 Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Link Link 3155/ Ibrahim 651 - Abo
Attn.- :Mohsen
Eita Marwan
6776,6532,6772
Abi
Mansor Karam; Johny
TAbi
To el. Karam;
::050NesmaMaan;
381 &
5 CC-2016-029 Err:508 HUTA-M01Err:508 Attended Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Link Link TPartners
Nissam
8352, Rida
el. : 050 564
Contracting Co.
4981/ 050 567
Ltd.
0607/: Nabil
Attn. 053 259
2328/ 050/515
Khammar Ali
6 CC-2016-029 Err:508 NSMAP01Err:508 Attended Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Abu 2079,Ahmad 012 662 /
TAafwan
3205+266 o : Saudi Nader
Arabian
Tel. : 056 Baytur
986
TConstruction
9863/ o :055 Nesma607Co.
7 CC-2016-029 Err:508 BAYTUR01Err:508 Attended Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Water Attn. : Mustafa
3398/ & Energy
055 132
KOC
Attn.
0638,: Rayan S.
Tel. : 055
Bukhari / 171
2208,
Mahmoud
8 CC-2016-029 Err:508 NESMAW01Err:508 Attended Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Link Link TFallatah/M. o : Al
Muhaidib
Abbas/Abdulrah
Tman
Contracting
o Yousef: Freysinnet
Co
TSaudi
Attn. el. ::Arabia
F0504
iras Al633
9 CC-2016-029 Err:508 FREYSINNET01
Err:508 Err:508 Err:508 Err:508 Err:508 E rr:508 Link Link Jobory, Attn.
T995,
: Ahmed
el. 012: ,Ahmed
012234660
Odeh;
6213 S.
2365
Al Dughaither,
Khalid
+ : 236O. Al
10 CC-2016-029 Err:508 MUHAIDIB01
Err:508 Declined Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Dulaijan,
TAbdullah
o : Al Nasser, Harbi
Mohd Adnan
Abuljadayel
Trading &
Abbas;
Company
Contracting
Tel. ::Fayez
Attn. 054 177
Eng. M.
Al R.
11 CC-2016-029 Err:508 ABJDYL01Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Subei 8338/ /054 305
Harbi Majed
T0544/
el. :050
Alshaaer 055 / 388
0710, 920012
5674149,
Miguelito 026
Faisal
220
6728216
o + :664, 012
12 CC-2016-029 Err:508 HARBI01 Err:508 Attended Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Link Link TRamos 637
S.
/ElUsman
8888 + 110
Al-Shaaer
Seif
Engineering
Tel. : 055
Contracting
5525552, Ltd.
Company FR 059
TAttn.
o ::Fahad
3047593, Mohamed
Maj
13 CC-2016-029 Err:508 SEIF01 Err:508 Declined Err:508 Err:508 Err:508 Err:508 Err:508 Link Link A. 056Al0709023,
Bajsair Swailem
/ JamalAK
Company
966 -540431844,
itani Ltd.
(MASCO)
T011-477
el. ::056
o
Attn. Al5252
: IbrahimRashed+
Maj 170
7254754,
Trading 966 -1-
14 CC-2016-029 Err:508 MASCO01Err:508 Attended Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Elbeisi 454-9191 / and
Contracting
Mohamed
Company
Abdelnaser Ltd. -
Sayed
TRTCC
el. : 054
CC-2016-029 Err:508 RTCC01 Err:508 Attended Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Mubarak Attn. : Eng.00966
2252389,
15 Al
12 6994533
Majed/ Medhat
Amer
Tel. : 050 296
1 CC-2016-050 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Link #N/A 8150, +966 -1-
401-2550
1 CC-2016-051 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Link #N/A
To : LJA
Engineering, Inc.
Attn. : Mehdi
1 CC-2016-052 Err:508 LJA01 Err:508 9/26/2016 9/28/2016 56,250.00 56,250.00 Err:508 Err:508 Err:508 Err:508 Err:508 Awarded Link Link To
Nezami, : V3
PE
Middle : ZEast
Tel. : +832
To FP -762
1811, +713
Engineering
Zuhair Fayez380
4468
Consultants
Partnership
1 CC-2016-053 Err:508 V3-01 Err:508 ### Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Attn. : Houssam
Consultants
Jabour/
Attn. : HamedAhmad
El Chami
To : Dar
Al-Attas/Ahmed
Tel. ::,AEHAF
Engineering
To
Tawfiq 012
l 652
2 CC-2016-053 Err:508 ZFP01 Err:508 ### Declined Err:508 Err:508 Err:508 Err:508 Err:508 Link Link Attn.
6385 : Sultan
Dajani/
Consulting Ahmed
Alsudais
Ibrahim/ /Mr.
engineers
Samer
Abdullah
Attn. : Dr. S Al-
CC-2016-053 Err:508 DARENG01Err:508 ### Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Link Suleiman/
Link Mohamed
Saady
3 Badreddin A l612
Tel. : ,/ 012
Fahmy Eng.
Karmy
9999+Keshk
Adel 9833,/
Tel.
9238 : 054 097
Mohamed
4 CC-2016-053 Err:508 EHAF01 Err:508 ### Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Link 4030/ 054 020/
Link Karamatullah
7344/
Amr
To Sherif:055 660
S BCM
9779,:: Ahmed
Tel.
Attn.
To : ILF-
+201222251280
Chaban
5 CC-2016-053 Err:508 SBCM01 Err:508 ### Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Link Link /Tecon &
056 :503
Tel.
Partners 0506718/
472
Adel-054
5679, 012888664
Engineering
8755, 011 263PSC
4177
To
Attn. : :Michael
HDR
CC-2016-053 Err:508 ILF01 Err:508 ### Confirmed Err:508 Err:508 Err:508 Err:508 Err:508 Link 5271, 012
Link Middle
Stanitschek/ 652
East, LLC
6
0731T:obler
Attn.
Karl Cary P.
Stewart/
Tel. : 055 Randy
030
Edwards/
5134 /:055
To Khalid
Abnia411
1 PR # 12769 Err:508 HDR01 Err:508 490,000.00 490,000.00 Err:508 Err:508 Err:508 E rr:508 Err:508 Awarded Link Link Consulting
Bek
1637,ka 011 465
Tel.
4145 : 054 290
Engineer
1046 : Issam
Attn.
+971 50Riziq
Farouq 457 /
1 PR # 12759 Err:508 ABNIA01 Err:508 100,000.00 100,000.00 Err:508 Err:508 Err:508 Err:508 Err:508 Awarded Link Link 6129, +971 43 /
Essat Goname
756 727
Ashraf Nevo
Tel. : 059 077
1 CC-2016-054 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Link #N/A 5070, 012 645
3111
1 CC-2016-055 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Link #N/A
1 CC-2016-057 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Link #N/A
To : TURNER
1 PR # 12813 Err:508 TURNER01Err:508 413,291.00 413,291.00 Err:508 Err:508 Err:508 Err:508 Err:508 Awarded Link Link Attn. :
Tel. : ,
2016-039-2 Surveyor
plesiadapis 58
Dryopithecus 20 ###
###
11110 8
2200 1
CC-2016-031 - Haramain Gate & Area Improvements - Design & Built - Proposals Summary
4
Date of Tender Sum Tender Sum
SL. Vendor Name Mode of Submittal CD Remarks
Submittal (Option.1) (Option.2)
3 Yasser Yaghmour Est. For Contracting & Maintenance We-Transfer NA 24-Aug-16 9,614,340.75 16,356,515.00
SL No Company Name Status Contact Person Designation E-mail Mobile # Tel (Off.) Remarks
1 Salem Saleh Al Hareth Contracting Est. Confirmed Leslie Jameson / Sushil Shriwastav General Manager info@salemalhareth.com; 050 584 8313 013 890 1009
lj@salemalhareth.com
pmourani@almabani.com.sa;
3 Al Mabani General Contractors 0 Pierre Mourani / Bandar Hasanain / Joud Exec. VP / BD Mgr / Ind. Engr bhasanain@almabani.com.sa; 055 467 8288/ 012 657 3155/ 651
Faraj jfaraj@almabani.com.sa 055 519 2994 6776,6532,6772
hany9009@yahoo.com;
4 Rezaik Al-Gedarawi Est. Confirmed Abdullah Rezaik - Hani Ibrahim - Abo Eita - Manager 050 381 8352 Err:508
Mohsen Mansor mohsenmansor@yahoo.com;
algedrawy@yahoo.com
Nabil Khammar / Ali Abu Ahmad / Aafwan nabil.khammar@nesma.com; 056 986 9863/
6 Nesma & Partners Contracting Co. Ltd. Confirmed Chief Officer, Corporate Development 055 607 3398/ Err:508
Nader ali.ahmadeh@nesma.com; snader@nesma.com 055 132 0638
7 Saudi Arabian Baytur Construction Co. Confirmed Mustafa KOC Err:508 koc.mustafa@baytur.com.sa 055 171 2208 Err:508
8 Nesma Water & Energy Confirmed Rayan S. Bukhari / Mahmoud Fallatah/M. Bus. Dev. Mgr rsbukhari@nesma.com; m.abbas@nesma.com; 0504 633 995 012 234 6213
Abbas/Abdulrahman Yousef aa.yousef@nesma.com
9 Freysinnet Saudi Arabia 0 Err:508 Err:508 freyssinet@fsa.com.sa Err:508 012 660 2365
+ : 236
aljobory@muhaidibco.com;
r.qureshi@muhaidibco.com;
mohdadnan@muhaidibco.com;
Firas Al Jobory, Ahmed Odeh; Ahmed S. Al mnowsath@muhaidibco.com; 054 177 8338/ 920 026 220 + 664,
10 Al Muhaidib Contracting Co Declined Dughaither, Khalid O. Al Dulaijan, Abdullah Firas-Tendering Manager abaqasi@muhaidibco.com; 054 305 0544/ 012 637 8888 +
Nasser, Mohd Adnan Abbas; info@muhaidibco.com; 050 388 0710 110
Umair@muhaidibco.com;
Khalid@muhaidibco.com;
ahmedodeh@muhaidibco.com
headoffice@abuljadayel.com;
11 Abuljadayel Company 0 Eng. M. R. Subei General Manager planning@abuljadayel.com; 055 5674149 012 6728216
feras@abuljadayel.com
fbajsair@el-seif.com.sa; j.itani@EL-
13 El Seif Engineering Contracting Company Ltd. Declined Fahad Bajsair / Jamal itani Err:508 SEIF.COM.SA; mazen@EL-SEIF.COM.SA; 056 7254754 966 -1-454-9191
l.almasri@EL-SEIF.COM.SA
4 FLUOR01 Err:508FLUOR
8 GASCO01 Err:508GASCO
10 IBS01 Err:508IBS IT
11 AWAL01 Err:508Awal IT IT
12 INVE01 Err:508Inventive
13 S-TRO01 Err:508Secutronic
29 IHCC01 Err:508IHCC
31 MID01 Err:508Midas
37 ALMAK01 Err:508Almaktaba
38 MAKTB01 Err:508Maktab
40 CIT01 Err:508CIT
42 BASS01 Err:508Bass
43 ITS01 Err:508ITS
61 MOBILY01 Err:508MOBILY
62 STC01 Err:508STC
63 NETWAY01 Err:508Netways IT
75 SAHARA01 Err:508Sahara IT
80 SATCO01 Err:508SATCO FM
82 SFRI01 Err:508SAFARI FM
83 MAB01 Err:508MAB FM
84 ELSAIF01 Err:508El-Saif
183 RTCC01 Err:508Al Rashed Trading and Contracting Company Ltd. - RTCC
Vendors
1 Abdulkhader
2 Abdusubbhan
3 Mohammed Ali
4 Babu
5 Muneer/Subbhan
6 Shahdad
7 Bint Trading
8 Tojy
Contact Person Designation E-mail Mobile #
hthiessen@ahak-saudi.com
Fadi Akkam/ Hyder Ali General Manager/ 056 000 3273/ 054
Support Services Fadi.Akkam@denysarabia.com; Hyder.Shoukath@Denysarabia.com
Shoukath 045 0806
Manager
Aziz Shareef / Abdullah Director, Business Aziz.Shareef@fluor.com; abdullah.dirani@fluor.com;
053 930
Abdul.Razzaq@Fluor.com
0126
Dirani Development
Prasad prasad@gasco.qa
aak@mqest.com; aak@qasarabia.com;
Atif Shariff/ Asif Ali Khan General Manager 050 686 0206
atif@qasarabia.com; zain@qasarabia.com
Khurram kkhan@awalitsystems.com
Wasi wasi@inventivebs.com
Faiyaz faiyazshamsi1@gmail.com
Abul Rehman Qasim Customer Sales Rep. abdulrehman.qasim@maktab.com 058 002 4004
Dr. Tamer Mostafa Regional Director and VP tmostafa@asset.com.eg 056 211 1849
pmourani@almabani.com.sa;
Pierre Mourani / Bandar Exec. VP / BD Mgr / Ind. 055 467 8288/ 055
bhasanain@almabani.com.sa;
Hasanain / Joud Faraj Engr 519 2994
jfaraj@almabani.com.sa
Malik Ghazal; Ibrahim General Manager; malek.ghazal@naghimarine.com; 050 564 7617/ 055
Hamad Project Manager ibrahim.mousa@afs-sa.com 668 6667
Marwan Abi Karam; Engineering & Proposals 050 564 4981/ 050
Manager; / Deputy engg@huta.com.sa; mis@huta.com.sa; 567 0607/ 053 259
Johny Abi Karam; Maan; Manager Budgeting & kaport@huta.com.sa 2328/ 050 515
Nissam Rida Project controller 2079
Amaal@backyard.com;
Amaal Mahmoud General Manager 050 565 1143
backyards.events@gmail.com
Mohamed Hassan hassan@knight.com.sa 054 103 2105
simon.roopchand@rezayat.net;
Simon Roopchand / General Manager / Area rcl.jubail@rezayat.com.sa; 050 081 4819/ 050
Mohammed Al-Gohary / Manager / Executive khalid.saad@rezayat.com.sa; 587 2025
Abdullah Al-Brahim Director ed.ec@rezayat.net;
mohammed.gohari@rezayat.com.sa
latif@initialsaudi.com;
afzal@initialsaudi.com;
Abdullatif Alavi / Group Sales Manager saulat@initialsaudi.com; 050 535 6349
Mohammad Afzal Alan@initialsaudi.com;
alistair@initialsaudi.com
luigim@alnaimconsultant.com;
Dr. Eng. Luigi Project Manager/ hatema@alnaimconsultant.com; 059 394 4333
Marimpietri/ Engineering Manager bandar.alnaim@alnaimconsultant.com; 050 210 2066
Hatem Abdulgayed (EM) alexisr@alnaimconsultant.com
info@suhaimidesign.com
mustafa_yousef@me.com;
eng_yy@yahoo.com
yaser@bakheet-ce.com 050 001 3500
info@deppartners.com
Chairman of Circle
Massoud Fouladi Partnership Benefit Trust massoud.fouladi@circlepartnership.co.uk +44 797 713 4169
afahim1@partners.org;
Ali Fahim +971 50 394 7785
internationalbusiness@partners.org
mirza@ritegroup.co; mirza@kleenrite-
Mirza Baig 055 727 1890
ksa.com; rm@ritegroup.co
tahir_mandouri@yahoo.com;
Tahir Ayaz 056 976 7436
info@anwarconstruction.com
shuab4411@gmail.com
Hesham Elbeliwi info@masarrat.net 056 533 3006
Business Development
Lee Valentine lee.valentine@securitas.com.sa 056 884 2230
Manager
abudhabi@dewan-architects.com;
Ammar Al Assam - ED Executive Director info@dewan-architects.com;
a.alassam@dewan-architects.com
adil@met.com.sa;
Executive & Purchase
Adel Ali Al-Esayi adel.alesayi@met.com.sa; 056 055 7055
Director info@met.com.sa
Eng. Mirza Anjum 056 847 3859/ 054
General Manager a.fayaz@lifcon.net; cfo@lifcon.net
Fayaz / Eng. Ali 500 0492
Mohammed Sakwat shakawat@arsamco.com; 054 281 9044/ 054
Project Engineer
Hossain / Azam azim@arsamco.com 622 1005
frank.rose@alkifah.com;
Sherif Abbas / Frank sherif.mohammed@alkifah.com; 056 951 9346/ 059
Rose wael.issa@alkifah.com; 342 5097
ibrahim.salem@alkifah.com
Abdulla Sheikh Business Developer sheikh.abdullarashid@hotmail.com 059 808 0527
ydy@yaghmourgroup.com;
Yasser Yaghmour a.azahrani@yaghmourgroup.com; 055 555 0902
Ali M Zahrani a.siddiqui@yaghmourgroup.com; 055 882 0063
kashif@yaghmourgroup.com
Hazem al Aissa/ Engr. Procurement Manager/ info@ishraqaltilal.com; 055 577 0491/ 054
Motasem Alnusairat/ Projects Manager/ KAEC hazem@ishraqaltilal.com; tamer@sbcm- 130 6688
Eng. Tamer Elewah Area Manager sa.com
yaakoub.abdouni@kpsworld.com;
Yaakoub abdouni / 054 311 5169/ 054
johnny.said@kpsworld.com;
Mohammd kobrosi 311 5169
Mohammed.kobrosli@kpsworld.com
fadi@diyar.com; Latif.Khan@diyar.com;
Mr. Fadi Moumne omari@diyar.com;
Principal Donald.Bordui@diyar.com;
Lutfi.Samman@diyar.com
freyssinet@fsa.com.sa
aljobory@muhaidibco.com;
r.qureshi@muhaidibco.com;
Firas Al Jobory, Ahmed mohdadnan@muhaidibco.com;
Odeh; Ahmed S. Al mnowsath@muhaidibco.com; 054 177 8338/ 054
Dughaither, Khalid O. Al Firas-Tendering Manager abaqasi@muhaidibco.com; 305 0544/ 050 388
Dulaijan, Abdullah info@muhaidibco.com; 0710
Nasser, Mohd Adnan Umair@muhaidibco.com;
Abbas; Khalid@muhaidibco.com;
ahmedodeh@muhaidibco.com
headoffice@abuljadayel.com;
Eng. M. R. Subei General Manager planning@abuljadayel.com; 055 5674149
feras@abuljadayel.com
alharbi_kaec@hotmail.com;
Fayez Al Harbi / Majed 055 5525552, FR
estimation@alharbi.com.sa;
Alshaaer / Miguelito V.P, Majed-Tendering & 059 3047593, Maj
eng@alharbi.com.sa;
Faisal Ramos / Usman S. Bidding Director 056 0709023, AK
alharbi_sbr@ymail.com;
Al-Shaaer 966 -540431844
AKamal@alharbi.com.sa
fbajsair@el-seif.com.sa; j.itani@EL-
Fahad Bajsair / Jamal SEIF.COM.SA; mazen@EL-SEIF.COM.SA; 056 7254754
itani l.almasri@EL-SEIF.COM.SA
info@masco.com.sa;
Ibrahim Elbeisi / i.elbeisi@masco.com.sa;
Mohamed Abdelnaser 054 2252389
mohamed.sayed@masco.com.sa;
Sayed isobhi35@hotmail.com
malmajed@rtcc.com.sa;
Eng. Mubarak Al Majed/ rtorregoza@rtcc.com.sa; 050 296 8150
Medhat Amer medhatamir@hotmail.com
karl.tobler@ilftecon.com;
Michael.Stanitschek@ilftecon.com;
Michael Stanitschek/ Senior Project Manager / 055 030 5134 / 055
office@ilftecon.com;
Karl Tobler Managing Director 411 1637
saleh.alnajdi@ilftecon.com;
Tamer.Hafez@ilftecon.com
eng.yussef.zakariya@gmail.com;
Engr. Sallam Hamdi / 054 407 0090 / 054
alejtiyaz@gmail.com;
Engr. Yusuf 426 0445
umar.patel143@gmail.com
Tel (Off.) Link Documents Remarks Business Unit
Link
Link Corp. Bus. Develop.
92 000 6111+
4915/4400 Link Comm. Development
Link
Link
Link
Link
Link
Link
Link
Link
Link
Link
012 652 2770 Link
Link
0126602770 Link
Link
Link
Link
Link
Link
Link
Link
012 692 7164 Link
012 808 5341 Link
013 890 1009 Link
6793355+223 /
6793355+213 / Link
6793355
Link
Link
Link
012 638 6341 Link
012 652 3098 Link
Link
920004180 +Ext:
3169 Link
Link
Link
Link
Link
Link
Link
Link
Link
Link
Link
Link
Link
Link
Link
+971 4 375 4679 Link
Link
(202) 672-5700 Link
Link
Link
Link
Link
Link
Link
Link
012 650 8338 Link
Link
Link
Link
Link
Link
Link
Link
Link
Link
Link
Link
Link
Link
Link
Link
Link
Link
Link
012 667 0500+
Link
2400/2205
Link
Link
Link
Link
012 660 2365 Link
+ : 236
Link
Construction
Donald Francis Abdalla Yassin Confirmed
Works
Constructions -
Hesham I. ElAbd Abdulaziz A. Bakhit Declined
D&B
Design
Mazen A. Tammar Adel Ba Salamah Excused
Consultancy
Master Services
Michael H. Jubb Andrew A. Macallister Agreement
Supervision
Wafa S. Al-Hameedi Javed I. Rana Consultancy
Khaled W. Sabban
Mashhoor B. Baeshen
Mohammad Alrowaithy
Mohammed F. Khayyat
Mustafa S. Husaini
Nadim K. Alawar
Nouman Khan
Richard M. Olsen
Shahdad K. Abdurahiman
Shehab S. AlHarbi
Soliman K. Momenah
Tariq A. Mirza
Waddah A. Dahah
Walaa T. Braikah
William C. Nelson
Procurement Priority
RFP Statuses
Method
6. Closed
1 IHCC
4 Ishraq Al-Tilal Co
We, the undersigned have witnessed the opening of the tenders and confirm that the data above is correct. Furthermore, we affirm that the information above is strictly confidential and will not be shared by us to
anyone outside the Tender Committee without the written approval of the Chairman of Tender committee until the award and signing of the contract.
Err:504
Contracts
No Category ContractProject Business
Type DescriptionBU Prime/Project
Unit Manager
103158 Gate 1 - Visitors Centre
Err:504
###
Aerial
Imaging
Saudi ### ###
Arabia –
AISA
IHCC
ICCU
V3
Middle
East
Engineeri
ng
Consultan
ts Co.
BU initial2 Supplier Our SignContract
Legal
Draft
Submission
Legal Approval
Date Contract
Date Executed
Contract Start
Contract
Date End Date
Status
Sign
###
###
###
Action DateAction Name
Actions HistoryRemarks
16/08 -
Collected by
supplier for
signature
Uploaded to
K-Drive, 1
set sbmttd 103143
Legal,
15/08 - 1
set dlvrd to
Legal;
17/08 - 1
set cllctd by
vendor
"15/08-
Take by
vendor for
signature;
28/08 -
Received
back from
vendor,
proceeding
to Lgl stamp
& CEO
signs"
Draft with
Legal
PR No. Business Unit Project Description Contract Type Estimated Value BU Prime Procurement Method PR Approval Date Duration Action / Status
Construction
19784 Corp. Constructions Z Road Intersection Utilities & Earth Work 790,000.00 Donald Francis RFP 14/03/2016 340 days
Works
Construction
98235 Corp. Constructions Coastal Communities Substation Design 345,000.00 Donald Francis RFP 19/11/2016 100 days
Works
Construction
98347 Corp. Constructions Coastal Road 1000 KM Portable & Landscaping Pending Donald Francis RFP 12/10/2016 250 days
Works
Construction
28673 Corp. Constructions Lotus Compound 456,700.00 Donald Francis RFP 9/10/2016 350 days
Works
Construction
76542 Corp. Constructions Al Talah Gardens Phase 3A 9,876,500.00 Donald Francis RFP 9/8/2016 720 days
Works
Al Talah Gardens Phase 2 & 3A Primary Construction Added Ph. 3A, PR aprvd for 52K
1 12264 CC-2016-029 Corp. Constructions Infrastructure Works Works 52,000,000.00 Donald Francis RFP 9/28/2016 10/18/2016 10/27/2016 Err:508 Err:508 Err:508 10/30/2016 only; 04/10- Addendum#2 sent
TWA Phase 2 - Construction - Design & Constructions - Vendors are going to submit revised offer by
Pending Corp. Constructions 80,000,000.00 Donald Francis RFP 10/9/2016 Pending Pending Pending Pending
Build D&B 23rd Oct.
Haramain Gate & Area Improvements - Construction Saudi Green Evaluation & recommendation received,
12427 Corp. Constructions 13,509,533.25 Donald Francis Pending Pending Pending 10/13/2016 Pending Pending Pending
Design & Built Works Contracting contract draft sent to vendor
2 12479 2016-025 Corp. Bus. Develop. Health Care Strategic Consultancy Services Consultancy 1,444,837.50 Mazen A. Tammar Pricewaterhouse Coopers 9/25/2016 12/18/2016 -2% 57% 0% 10/5/2016 10/5/2016 10/5/2016
3 12449 CC-2016-026 Corp. Constructions TWA Phase 2 Demolition Work Construction 1,000,000.00 Donald Francis IHCC 8/16/2016 9/30/2016 0% 17% 13% 8/17/2016 8/15/2016 8/28/2016
Works
4 12154 CC-2016-028 Corp. Constructions Citywide LiDAR Survey Services 1,200,000.00 Donald Francis Aerial Imaging Saudi Arabia 9/1/2016 11/15/2016 67% 41% 7% 9/4/2016 9/4/2016 8/28/2016
Construction
5 12072 CC-2016-030 Corp. Constructions Hejaz - Temporary Utility Yard 8,000,000.00 Donald Francis Nesma Water & Energy 9/18/2016 5/15/2017 51% 33% 5% 10/3/2016 10/2/2016 10/2/2016
Works
6 12265 CC-2016-038 Corp. Constructions Gate 1 - Visitors Center Construction Construction 625,972.00 Donald Francis Advanced Construction Syst 8/14/2016 12/14/2016 N/A N/A N/A 9/30/2016 9/1/2016 9/1/2016
Works
7 12478 CC-2016-044 Corp. Constructions Civil Inspector for Corp. Constructions PO 474,650.00 Donald Francis HDR Middle East, LLC N/A N/A N/A N/A N/A Pending N/A 9/21/2016
Master Services
8 N/A CC-2016-048 Procurement Preferred Supplier Program (Valves) - AVK Agreement N/A Hesham I. ElAbd AVK - SAUDI VALVES MANU 10/1/2016 10/1/2019 N/A N/A 47% Pending Pending Pending
9 12697 PR # 12697 Corp. Constructions Connection for GC3 Water and Irrigation Lines N/A 235,000.00 Donald Francis Salem Saleh Al Hareth Contra N/A N/A 15% N/A 15% N/A N/A 9/27/2016
with Existing Water and Irrigation Lines
10 12703 CC-2016-052 Corp. Constructions KAEC Gas Pipe Design Value Engineering Master Services 56,250.00 Donald Francis LJA Engineering, Inc. N/A N/A 0% 0% 0% N/A N/A 10/6/2016
Agreement
KAEC Land Surveys & Kroukis - Retainer Master Services
11 12759 PR # 12759 Corp. Constructions Agreement Fee Agreement 100,000.00 Donald Francis Abnia Consulting Engineer N/A N/A 0% 0% 0% N/A N/A 10/10/2016
12 12813 PR # 12813 Corp. Constructions Quantity Surveyor for PI Projects Construction 413,291.00 Donald Francis TURNER N/A N/A 0% 0% 0% N/A N/A N/A
Works
Supervision
1 12419 CC-2016-041 Corp. Constructions Supervision Consultant for TWA Ph II & Boarding Consultancy 5,500,000.00 Donald Francis RFP 2 6/29/2016 29/09 - PO Rjctd by CFO
1 12264 CC-2016-029 Corp. Constructions Al Talah Gardens Phase 2 & 3A Primary Infrastructure Construction 52,000,000.00 Donald Francis RFP 2 9/28/2016 10/18/2016 10/27/2016 Err:508 Err:508 Err:508 10/30/2016 Added Ph. 3A, PR aprvd for 52K
Works Works only; 04/10- Addendum#2 sent
2 12810 CC-2016-053 Corp. Constructions Haramain Gate Construction Supervision Construction 600,000.00 Donald Francis RFP 2 10/13/2016 Pending Pending Err:508 Err:508 Err:508 Waiting for PR and package from
Works BU
SL No PR No. P. No. Business Unit Project Description Contract Type Estimated Value BU Prime Procurement Method Priority Opening/ Hand Technical Commercial / Negotiation
LRA Recommended Planned Contract Action / Status
over Evaluation Financial Evaluation Completion Vendor Draft Start
1 Pending 2016-019 Corp. Constructions Dry Gas Pipeline and Distribution Network EPC 160,000,000.00 Donald Francis RFP 2 11/1/2016 Pending Pending Pending Pending Pending Pending 29/09- Notification sent
2 Pending CC-2016-042 Corp. Constructions TWA Phase 2 - Construction - Design & Build Constructions - 80,000,000.00 Donald Francis RFP 2 10/9/2016 Pending Pending Pending Pending Pending Pending Vendors are going to submit revised offer by
D&B 23rd Oct.
SL No PR No. P. No. Business Unit Project Description Contract Type Contract Value BU Prime Recommended Vendor Contract Start Contract End PO Initiation Contract Draft Legal BU Approval Vendor Legal Approval Action / Status
Completed Submission Acceptance
1 12427 CC-2016-031 Corp. Constructions Haramain Gate & Area Improvements - Design & Built Construction 13,509,533.25 Donald Francis Saudi Green Contracting Pending Pending Pending 10/13/2016 Pending 10/13/2016 Pending Pending Evaluation & recommendation received,
Works contract draft sent to vendor
2 12518 2016-039 Corp. Constructions Telecom Connection to Haramain Link Road Construction 2,925,260.00 Donald Francis Middle Sea Telecom Compa Pending Pending 10/3/2016 10/6/2016 18/10 - Planned 10/6/2016 10/18/2016 Pending Submitting to Legal review
Works
3 12682 CC-2016-045 Corp. Constructions Haramain Link Road Landscape Works Construction 3,000,000.00 Donald Francis New Job Contracting Est. 11/3/2016 2/28/2017 10/11/2016 Pending Pending Pending Pending Pending Evaluation received
Works
4 N/A CC-2016-046 Procurement Preferred Supplier Program (Ductile Iron Pipes) - RVK Master Services N/A Hesham I. ElAbd RVK - MOHAMED RAMADAN S 10/1/2016 10/1/2019 Pending 8/31/2016 9/6/2016 Pending Pending Pending
Agreement
5 12769 PR # 12769 Corp. Constructions Resident Senior Electrical Engineer for Various Power Master Services 490,000.00 Donald Francis HDR Middle East, LLC N/A N/A 10/6/2016 Pending Pending Pending Pending Pending PO pending with CFO
Connectivity Projects Agreement
Contract Value Supplier signed EEC Signed Date(PR Value - Cont(Average of Quot
(Initial proposa Price variance . Without item quotes, this cannot be ca
5. Contract Awarding (1)
1 12429 CC-2016-034 Corp. Constructions Coastal Communities Police & Fire Station Design Design 590,000.00 Donald Francis Delano Designs Corporation 9/18/2016 12/20/2016 10/12/2016 Pending 6% 42% 22% N/A 18/10 -Contract for signing at CEO
Consultancy
1 12086 CC-2016-023 Corp. Constructions Hejaz Phase 1A Roads - Infrastructure Construction Construction 12,250,000.00 Donald Francis Infrastructure United Constr 8/23/2016 2/9/2017 19% 36% 0% N/A 8/30/2016 9/1/2016 9/1/2016
Works Works
2 12479 2016-025 Corp. Bus. Develop. Health Care Strategic Consultancy Services Consultancy 1,444,837.50 Mazen A. Tammar Pricewaterhouse Coopers 9/25/2016 12/18/2016 -2% 57% 0% N/A 10/5/2016 10/5/2016 10/5/2016
Construction
3 12449 CC-2016-026 Corp. Constructions TWA Phase 2 Demolition Work 1,000,000.00 Donald Francis IHCC 8/16/2016 9/30/2016 0% 17% 13% N/A 8/17/2016 8/15/2016 8/28/2016
Works
4 12154 CC-2016-028 Corp. Constructions Citywide LiDAR Survey Services 1,200,000.00 Donald Francis Aerial Imaging Saudi Arabia 9/1/2016 11/15/2016 67% 41% 7% N/A 9/4/2016 9/4/2016 8/28/2016
5 12072 CC-2016-030 Corp. Constructions Hejaz - Temporary Utility Yard Construction 8,000,000.00 Donald Francis Nesma Water & Energy 9/18/2016 5/15/2017 51% 33% 5% N/A 10/3/2016 10/2/2016 10/2/2016
Works
6 12265 CC-2016-038 Corp. Constructions Gate 1 - Visitors Center Construction Construction 625,972.00 Donald Francis Advanced Construction Syste 8/14/2016 12/14/2016 N/A N/A N/A N/A 9/30/2016 9/1/2016 9/1/2016
Works
7 12478 CC-2016-044 Corp. Constructions Civil Inspector for Corp. Constructions PO 474,650.00 Donald Francis HDR Middle East, LLC N/A N/A N/A N/A N/A N/A Pending N/A 9/21/2016
9 12697 PR # 12697 Corp. Constructions Connection for GC3 Water and Irrigation Lines with N/A 235,000.00 Donald Francis Salem Saleh Al Hareth Contra N/A N/A 15% N/A 15% N/A N/A N/A 9/27/2016
Existing Water and Irrigation Lines
Master Services
10 12703 CC-2016-052 Corp. Constructions KAEC Gas Pipe Design Value Engineering Agreement 56,250.00 Donald Francis LJA Engineering, Inc. N/A N/A 0% 0% 0% N/A N/A N/A 10/6/2016
12 12813 PR # 12813 Corp. Constructions Quantity Surveyor for PI Projects Construction 413,291.00 Donald Francis TURNER N/A N/A 0% 0% 0% Add N/A N/A N/A
Works
1 12419 CC-2016-041 Corp. Constructions Supervision Consultant for TWA Ph II & Boarding Schoo Supervision 5,500,000.00 Donald Francis RFP 2 6/29/2016 29/09 - PO Rjctd by CFO
Consultancy
Procurement PR Approval
BU Prime PRF Received Action / Status
Method Date
29/09 - PO Rjctd by
Donald Francis RFP 6/29/2016 CFO