ified Bisnoon to
eats SRR io SeDCUN 1-1900-8000-84
Se nemanmoanene Page 1 of 1
Circulation Controlled/ Uncontrolled
Serial number of this copy i
Document Description/ Title: Quality Manual of Construction Division
Document Number: 1-1900-8000 Revision Number: 4
In the document described above, existing information has been updated and is being
issued for implementation at your end, The information affected by this addendum is
referred below:
Clause No. Section-4, Quality Objectives Sheet/ Pege No. 30 of 48
From (starting words):"
Up to (ending words)
(For addition of new clause, indicate position by writing Clause Number and Sheet Number
only)
Please take necessary action as per clause 5.1.4.1 of Corporate Procedure Number 5-
0000-0040. The above-described information is replaced/ further elaborated by following
informati
‘Sheet 30 of 46 to be replaced by the enclosed sheet.
(Suike out whatever is not epplicable In these form-Attach addtional sheets, if required)
ppc
Date: 29/01/2007 Prepared BY.
To be implemented before: With immedi
‘Template No. §-0000-0040-F4 Rev. 2 Copyrights Ei ~ All rights reservedAddendum-1V to
Document No.
g5HEaZ BH ENCNEERS QUALITY MANUAL OF 11900-8000
sear! teks ONAL UMITED CONSTRUCTION DIVISION Rev. No.4
Page 30 of 48
SECTION - 4 QUALITY OBJECTIVES
Refer document titled “Quality Objectives of Construction Division”, No. 9-1900-0001.
‘Template Na, §-0000.0001-7 Rev. 1 Copyrights Ell ~ All ghts resorved