Вы находитесь на странице: 1из 20

LeaseWellNumber OilCoName

AFEnum Legal Location


Permit # County
API # State
GL_ELEVATN
KBcorrection CompanyMan
ProposedTD Co Man Cell
CompanyManEmail
Spud Date RigCompanyAndNum
RigCompany
Report # 1 RigNum
Current Date RigPhone
Current Depth
Calc Daily Footage Lithology
TVD

Present Operations/Executive Summary

Mud Infor

Mud Type MW ECD Vis

pH Pm Pf Mf

DRILL STRING & PIPE COLLARS (top to bottom)


OD
# jts Length (Size) Wt
BHA #

BHA # Total Length Wt BHA Description

BIT
Bit # 1 RPM
Bit In @ WOB
Bit Out @ Calc BHA efficiency
Bit Size 17.50 Calc Bit Hours Ttl
Bit Manf Baker-Hughes Daily Bit Hours
Bit Type GTX-1 Calc Bit Ft Hr Daily
Bit SN Bit HP
Bit Jets .

PUMPS
Pump Make Model
Pump PSI
Pump Plunger Stroke
Pump Plunger Diam
Pump SPM
Pump Efficiency
Calc GPS
Calc GPM
Pump Slow Pump Rate

Dai
Start Time End Time Hrs
ADDITIONAL COMMENTS

Mud/Chemical # Used

# Used Product Total $

Total $ 0

DIESEL Today Total


Delivered
On Hand
Used

Daily Costs Vendor Daily Costs Description


Pit Drill BOP Test BOP Drill Tour (BOP)
tions/Executive Summary

Mud Information
Cake
Plastic Visc Yield Point Gel Initial Gel -10 Min Thickness WL

Washout (%
CL CA LCM vol) Vol Hole Vol Pits

Kelly
S (top to bottom) Down:
Annular
ID type Grade Velocity Size

GA
Background
Gas

String

BHA Description Hook Load

BIT GRADE
Bit # Depth Inner Outer

Dull Characteristics Reason Pulled

DEVIATION
Measured Depth
Angle
Direction
TVD
NS
EW
Dog Leg

Daily Operations
Comments
ADDITIONAL COMMENTS

CREWS
Evening
Morning Tour Day Tour Tour Relief Tour

Ton Miles
Line on Spool: Ft./Size
Ton Miles: Current/Total
Drilling Line: Cut Today/Total

Daily Costs Description Daily Cost


Accidents
PVT Check Reported Today Daily $ $0.00
Cum $
Solids Percent Percent Mud
Content Oil Water Losses

Storage
Bbls Min to Bit Btms Up Full Circ

CASING
Btm @ Btm @ Shoe
Top @ MD MD TVD Wt Grade TOC Test

GAS
Connection Max Gas
Gas Trip Gas Max Gas @

String Load DS Max


Drag Pull
Drag Up (+) Down (-) Allowed Torque
AUTHORITY FOR EXPENDITURE
Date:
Lease Name: Well Number: 1 AFE #:
Location Description: State: County:
Area/Prospect Name: Operator:
Project: Prepared by:
Type: Exploration Recompletion Expense WO Oil Acctg. #:
Development Facilities Other Gas Total Depth:

8/8 Well Cost


Dry Hole Completion
DRILLING INTANGIBLES:
1-56 Administrative Overhead & Wellsite Supervision
1-05 Cement & Cementing Services
1-12 Contract Drlg - Footage: ft. @ $ per foot
1-09 Contract Drlg - Daywork: days @ $ per day
1-02 Bits, Reamers & Stabilizers
1-16 Drill Stem Tests, Coring & Analysis
1-22 Dirtwork: Location, Road, Pits, Damages, ROW
1-25 Equipment Rental
1-37 Geophysical/Seismic
1-40 Insurance, Well Control
1-41 Labor & Transportation
1-98 Logging (OH)/Wireline
1-48 Miscellaneous Services (Incl P&A Cost)
1-50 Mud & Chemicals
1-51 Mud Logging Services
1-38 Professional Services (Geol., Engr., Legal, etc.)
1-90 Water/Waterwell & Fuel
S.T.
1-15 Contingency @ %
Total Drilling Intangibles
COMPLETION INTANGIBLES:
3-01 Administrative Overhead & Wellsite Supervision
3-18 Cement & Cementing Services
3-19 Completion Unit: days @ $ per day
3-43 Dirtwork: Location, Road, Pits, Damages, ROW
3-32 Equipment Rental
3-87 Labor & Transportation
3-48 Miscellaneous Services
3-46 Mud & Chemicals
3-53 Professional Services (Geol., Engr., Legal, etc.)
3-75 Stimulation (Acid, frac, etc.)
3-90 Water/Waterwell & Fuel
3-95 Wireline/Logging/Perforating
S.T.
3-21 Contingency @ %
Total Completion Intangibles
Total Intangibles
DRILLING & COMPLETION TANGIBLES:
2-02 Cond. Csg: ft. of @ $ per foot
2-02 Surf. Csg: ft. of @ $ per foot
2-02 Inter. Csg: ft. of @ $ per foot
4-08 Prod. Csg: ft. of @ $ per foot
ft. of @ $ per foot
4-76 Tubing: ft. of @ $ per foot
ft. of @ $ per foot
4-70 Rods: ft. of @ $ per foot
ft. of @ $ per foot
4-48 Line Pipe: ft. of @ $ per foot
ft. of @ $ per foot
4-06 Bottomhole Pump
4-11 Compression Equipment
4-14 Dehydration Equipment
4-28 Electrical System
4-36 Float Equipment, Centralizers, Scratchers
4-40 Heater, Heater Treater, Separator
4-95 Miscellaneous Equipment
4-65 Pumping Unit
4-30 Prime Mover
4-73 Sub-Surface Equipment (Packer, Anchor, Seal Assembly, etc.)
4-74 Tank Battery (Oil Tanks, Water Tanks, Transfer pumps, etc.)
4-82 Wellhead Equipment
S.T.
4-21 Contingency @ %
Total Tangibles
6-01 EXPENSE WORKOVER - INTANGIBLES: (Use for Exp WO AFE only)

7-01 EXPENSE WORKOVER - TANGIBLES: (Use for Exp WO AFE only)

TOTAL WELL COST


WI%: Joint Interest Approval: Approve
[Signature Name] Date
Do Not Approve

Date AFE sent to Accounting: Approved by: - Title


Date:
AFE #:
County:

Total Depth:

8/8 Well Cost


Completion Total
Approve WI%:

Do Not Approve

Date
TOTAL WELL ANALYSIS Drilling Curve

Well Name & No.: Projected TD:


Location: Operator:
County: State: Field:
AFE #: Property Number: API#:
DHC: Formation:

Dril ngSTteirmlinegCurve CO.,


Crane
Project dTD,ft: ProjectdDays:
ActualTD,ft: DAaycstualDys:
0 5 10 15 20 25 30
0
SpudDate:

TD ate:

4
D
h
p
e
t

'

10

'

12

ActualDepth ProjectdDepth
10

'

12

ActualDepth ProjectdDepth
Enter Data here

Projected TD:

Spud Date: TD Date:

Tot Proj
Days Projected Depth Actual Depth Days
0
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
22
Tot Act
Days

Вам также может понравиться