Вы находитесь на странице: 1из 1

NOTES

1. THIS DRAWING IS TO BE READ IN CONJUNCTION


WITH ALL STRUCTURAL SPECIFICATIONS AND DETAILS
AND ALL OTHER RELEVANT CONSULTANTS DRAWINGS
AND SPECIFICATIONS.

EE FF GG HH II JJ 2. THE GRID SYSTEM USED IS BASED ON THE


OF SITE BOUNDARY ARCHITECTURAL LAYOUTS. REFERENCE SHOULD BE
10500 10500 10500 10500 10500 MADE TO THE ARCHITECTS DRAWINGS FOR SETTING
OUT OF THE GRID WITHIN THE SITE BOUNDARY.

3. PILED FOUNDATIONS HAVE BEEN BASED ON THE


FOLLOWING CRITERIA PROVIDED IN THE FURGO
PRELIMINARY GEOTECHNICAL REPORT REF.
PA/2306/07 DATED 11 FEBRUARY 2008.

DIAMETER 600%%c
LENGTH 25m
SAFE WORKING LOAD 3400 kN

DIAMETER 900%%c
LENGTH 25m
SAFE WORKING LOAD 5400 kN

DIAMETER 1200%%c
LENGTH 25m
SAFE WORKING LOAD 7600 kN

THE ABOVE IS BASED ON GEOTECHNICAL ASSUMPTIONS.


THE FINAL DESIGN OF THE PILES INCLUDING DIAMETER,
5 LENGTH AND REINFORCEMENT IS TO BE UNDERTAKEN BY
C
THE SPECIALIST PILING CONTRACTOR AND WILL ALSO BE
SUBJECT TO THE RESULTS OF THE FINAL GEOTECHNICAL
REPORTS.
ALL PILES ARE TO BE DESIGNED TO RESIST A HORIZONTAL
LOAD OF (TO BE CONFIRMED BY LOCAL ENGINEER) kN
TO MEET THE REQUIREMENTS FOR LATERAL AND SEISMIC
STABILITY.

4. PILE CUT OFF LEVELS ARE SUBJECT TO THE FINALISATION


OF THE ARCHITECTS AND SERVICE ENGINEERS
PROPOSED FINISHED FLOOR LEVELS AND THE LOCATION
OF SERVICE TRENCHES, LIFT PITS, ESCALATOR PITS AND
ANY OTHER RECESSES REQUIRED.
00 5. FOUNDATION LOADS HAVE BEEN BASED ON THE
FOLLOWING IMPOSED LOADING CRITERIA SHOWN ON AKT
LOADING DIAGRAMS No.s A042153-s-080 TO A042153-s-086

6. PILE LOADINGS PROVIDED HAVE BEEN DERIVED FROM THE


IMPOSED LOADINGS GIVEN ON THE DRAWINGS ABOVE
TOGETHER WITH AN ALLOWANCE FOR THE SELF WEIGHT
OF THE STRUCTURE BASED ON THE SPANS AND ASSUMED
POSITIONS OFCOLUMNS AND WALLS. ANY CHANGES TO THE
LAYOUT, POSITION OR NUMBER OF SUPPORTING
COLUMNS/WALLS/CORES WILL AFFECT THESE ASSUMPTIONS
AND MAY REQUIRE ADDITIONAL PILES AS A RESULT.

KEY
10500

LENGTH OF

10,000 kN TYPE 1 25m


11,000 kN TYPE 1 25m
V W X Y

12,000 kN
Z AA BB CC

TYPE 1
DD EE FF GG HH

25m
II JJ KK LL MM
10500 10500 10500 10500 10500 10500 10500 10500 10500 10500 10500 10500 10500 10500 10500 10500 10500

13,000 kN TYPE 1 25m


01

14,000 kN TYPE 2

10500
02

15,000 kN TYPE 2

10500
03
16,000 kN TYPE 2

10500
04
TYPE 2

10500
05

01

10500
06
REFER TO DRAWING NUMBER S/112

REFER TO DRAWING NUMBER S/113


KEY PLAN

10500
07

10500
08

10500
09

10500
10

KEY PLAN
10500

02

P1 04.03.08 ISSUED FOR CONCEPT JCM PE

REV DATE DESCRIPTION BY CHECKED


10500

REFER TO DRAWING NUMBER S/116


Consulting Structural and Civil Engineers

100 St. John Street


London EC1M 4EH

T +44 (0)20 7250 7555


F +44 (0)20 7608 1549

E info@akt-uk.com
W www.akt-uk.com

03
MASDAR

CLIENT

MASDAR UNIVERSITY
PROJECT

PILING LAYOUT
GENERAL ARRANGEMENT
TITLE
SHEET 2 OF 11 PHASE 1A

JCM 1:100 A042153-s-112.dgn


DRAWN SCALE CAD FILENAME

FEB’ 2008 PE PRELIMINARY


DATE CHECKED STATUS

A042153 S/112 P1
PRELIMINARY PROJECT No. DRAWING No. REVISION

PLOT DATE $DATE$ BY $USERNAME$