Вы находитесь на странице: 1из 1

ABSTRACT

The improvement of transportation Indispensable, In line with the fast


growth Socioeconomic In almost the entire region of Indonesia. So Infrastructure
development, transportation Very decisive In supporting the achievement of the
development programs has been planned. Infrastructure development,
transportation In the form of an increase in roads and bridges must be in
accordance with regional development in question and planted followed the path
that path a long it already is. Bridge is a construction that serves to connect two
that part of a road the most severed by the presence of they as the in, a groove a
river, lakes, irrigation channels, times, a street railway, the highway that passing
not a piece of and others.
A Bridge to replace the old A bridge Way sekampung has already been
old, and is quite a lot damage to the A bridge. Chosen bridge type a cable stayed.
And bridges type a cable stayed Style-style who working from a burden vertical
synchronization converted be the force horizontal / press so as to be Advantaged
himself to the bridge. Higher in a phylon planned 20 m. Burden - burden that used
to plan bridge is based on the regulation of RSNI T-02-2005.
The bridge was designed with landscapes of 105,5 m, wide 14,85 m.
Construction the bridge designed use plate reinforced concrete with thick 20cm,
and Layers asphalt thick 10cm. To the steel structure Girder transverse uses steel
400.400.13.21, to Girder elongated 350.350.12, to Girder truss 800.300.14.26.
The quality of steel used for a bridge is bj55.And the quality of concrete used is fc
25.
Password: bridges, bridge steel frame, arch bridge

Вам также может понравиться