Project Manager
MPR 01
July 2018
Copy English
2018.7
1. Working documentation:
13/06/2018 - Technical reports on exploration on the M-12 km highway
291 + 240 - 332 + 052;
20/06/2018 - Submitted to the Resident Engineer for approval of detailed
design of section km 298 + 268 - 301 + 489.
2. Related documents:
29/05/2018 - Approved by the Resident Engineer Quality Plan (QA).
12/06/2018 - Approved by the Resident Engineer Work program.
15/06/2018 - Resident Engineer submitted for approval and approval
HSE plan
K294+700-K296+300LHS
m2 20000
K298+000-K298+300LHS
K298+680-K299+100 m2 14000
Page 1 of 6
artificial hard скельного або штучного т
material, maximum вердого матеріалу, максим
depth 0.35m альна глибина 0,35м (рих
(loosening) лення)
Фрезерування існуючого а
Milling of existing
5 сфальтобетонного покритт K294+000-K311+750 m2 49200
asphalt pavement
я
5. Progress photographs
Progress photographs as Appendix A.
Page 2 of 6
Asphalt, cement and other materials are at the signing stage of the
contract, it is planned to complete the sampling and submit for approval
this month.
8. Notifications
There isn’t any notices given under Sub-Clause 2.5 and notices given
under Sub-Clause 20.1 ;
9. Security statistics
1. There is no hazardous incident.
2. Protection of the environment: Comments from Engineers have been
taken into account and corrected.
11. Documentation
Appendix A: Progress photographs
Appendix B: A List of equipment and machinery
Page 3 of 6
Appendix A
Progress photographs
Page 4 of 6
Appendix B
A List of equipment and machinery
Page 5 of 6
Appendix B
1 CAT 0.7m³
6X4,20m³,340hp, Euro
13 Sprinkler 1 HOWO ZZ1257N4647E1
five emission
Jaw crusher,cone
crusher,vibration
16 Crushing Plant 1 MSLQ PE900*1200
sive,dust removal
equipment
Appendix C
A List of staff and labour
Page 6 of 6
Appendix C
List of the staff and labour force involved in execution of the works
on M12
№ п/п ПІБ/ Name ПОСАДА Position Remark
List of the staff and labour force involved in execution of the works
on M12
№ п/п ПІБ/ Name ПОСАДА Position Remark
engineer of
41 Якушин О.Є. Yakushin Alexander інженер ВТВ production and
technical department
List of the staff and labour force involved in execution of the works
on M12
№ п/п ПІБ/ Name ПОСАДА Position Remark