Академический Документы
Профессиональный Документы
Культура Документы
/4031&4034)
Item Slab ref. Bar Bar Bar Nos. of Members Total Rebar Hook / Rebar Rebar Bar Bar Length
Bar Shape
Ref. Mark Dia. Bar of bar Nos Length TA lapping lapping Span Spacing (m)
Bottom
1 G/L 1-5/A-G
" Y 20 15 1 15 4.230 0.700 0.700 - 2.150 0.150 5.630 700 '4,230 700
Clash with KP3/KP4 " Y 25 3 1 3 3.700 0.700 0.700 - 0.430 0.150 5.100 700 3, 700 700
### 5 Y 20 15 2 30 4.230 0.700 0.700 - 2.070 0.150 5.630 700 '4,230 700
### Clash with KP2 " Y 20 3 1 3 3.700 0.700 - - 0.430 0.150 4.400 3,700 700
Clash with KP2/KP3 " Y 20 1 1 1 5.500 0.700 0.700 - 0.130 0.150 6.900 700 5,500 700
Clash with KP2/KP3 " Y 20 2 1 2 2.300 0.700 0.700 - 0.300 0.150 3.700 700 2,300 700
Clash with KP2/KP3 " Y 20 2 1 2 1.000 0.700 0.700 - 0.300 0.150 2.400 700 1,000 700
Clash with KP6/KP7 " Y 25 3 1 3 5.600 0.800 0.800 - 0.430 0.150 7.200 800 3500 800
Clash with KP2 " Y 20 3 2 6 1.500 0.700 - 0.900 0.400 0.150 3.100 2,400 700
Clash with KP3 & KP4 " Y 40 3 4 12 1.500 0.700 - 0.900 0.400 0.150 3.100 2,400 700
Clash with KP3 & KP4 " Y 25 3 4 12 1.500 0.700 - 0.900 0.400 0.150 3.100 2,400 700
" Y 20 30 1 30 3.900 0.700 0.700 - 4.300 0.150 5.300 700 3,900 700
Clash with KP6 " Y 25 3 2 6 2.300 0.800 - 1.150 0.400 0.150 4.250 3,450 800
Clash with KP6 " Y 25 3 2 6 2.550 0.800 - 0.900 0.400 0.150 4.250 3,450 800
Item Slab ref. Bar Bar Bar Nos. of Members Total Rebar Hook / Rebar Rebar Bar Bar Length
Bar Shape
Ref. Mark Dia. Bar of bar Nos Length TA lapping lapping Span Spacing (m)
Top -
" Y 20 7 1 7 4.230 0.700 0.700 - 0.875 0.150 5.630 700 4,230 700
Clash with KP2 " Y 20 3 1 3 2.750 0.800 - - 0.430 0.150 3.550 800 2,750 800
Clash with KP2/KP3 3./3a Y 20 1 1 1 5.500 0.800 0.800 - 0.130 0.150 7.100 800 5,500 800
Clash with KP2/KP3 3./3a Y 20 2 1 2 2.300 0.800 0.800 - 0.300 0.150 3.900 800 2,300 800
Clash with KP2/KP3 3./3a Y 20 2 1 2 1.000 0.800 0.800 - 0.300 0.150 2.600 800 1,000 800
Clash with KP3/KP4 3a/3b Y 20 3 1 3 3.700 0.700 0.700 - 0.430 0.150 5.100 700 3,700 700
Clash with KP6 /KP7 Y 16 3 1 3 5.600 0.700 0.700 - 0.430 0.150 7.000 700 5,600 700
14b Y 16 16 1 16 7.250 0.700 0.700 - 2.300 0.150 8.650 700 7,250 700
" Y 16 38 2 76 5.600 0.700 0.700 - 5.600 0.150 7.000 700 5600 700
Clash with KP2 " Y 25 3 2 6 0.550 0.800 - 1.150 0.400 0.150 2.500 800 1,700
Clash with KP3 " Y 25 3 2 6 0.550 0.800 - 1.150 0.400 0.150 2.500 800 1,700
Item Slab ref. Bar Bar Bar Nos. of Members Total Rebar Hook / Rebar Rebar Bar Bar Length
Bar Shape
Ref. Mark Dia. Bar of bar Nos Length TA lapping lapping Span Spacing (m)
Clash with KP4 " Y 32 3 2 6 0.850 0.800 - 1.150 0.400 0.150 2.800 800 1,700
Clash with KP6 " Y 16 3 2 6 2.400 0.700 - 0.900 0.430 0.150 4.000 800 3,300
Shear links at 31+D165:Y165 Y 12 104 7 728 5.300 0.100 0.100 - 15.400 0.150 5.500 100
950 1700
" Y 12 104 35 3640 2.360 0.100 0.100 - 15.400 0.150 2.560 100
950 230
100
100
5 (Refer to dwg../4031)
UB " Y 25 21 1 21 0.700 0.800 0.800 - 3.000 0.150 2.300 800 700 800
UB " Y 25 11 1 11 0.700 0.800 0.800 - 1.500 0.150 2.300 800 700 800
UB " Y 40 23 1 23 0.700 1.300 1.300 - 3.350 0.150 3.300 1,300 700 1,300
UB " Y 32 24 1 24 0.700 1.050 1.050 - 3.450 0.150 2.800 1,050 700 1,050
UB " Y 25 14 1 14 0.700 0.800 0.800 - 2.000 0.150 2.300 800 700 800
UB " Y 40 15 1 15 0.700 1.300 1.300 - 2.050 0.150 3.300 1,300 700 1,300
UB " Y 40 20 1 20 0.700 1.300 1.300 - 2.900 0.150 3.300 1,300 700 1,300
UB " Y 40 8 1 8 0.700 1.300 1.300 - 1.000 0.150 3.300 1,300 700 1,300
UB " Y 40 4 1 4 0.700 1.300 1.300 - 0.500 0.150 3.300 1,300 700 1,300
UB " Y 32 4 1 4 0.700 1.300 1.300 - 0.500 0.150 3.300 1,050 700 1,050
UB " Y 40 26 1 26 0.700 1.300 1.300 - 3.800 0.150 3.300 1,300 700 1,300
UB " Y 32 21 1 21 0.700 1.050 1.050 - 3.050 0.150 2.800 1,050 700 1,050
UB " Y 40 23 1 23 0.700 1.300 1.300 - 3.350 0.150 3.300 1,300 700 1,300
Compensation bar for TOP (T1) Y 20 1 2 2 0.500 0.650 0.650 - - - 1.800 1,800
Compensation bar for TOP (T1) Y 20 1 2 2 0.450 0.650 0.650 - - - 1.750 1,750
Compensation bar for TOP (T1) Y 20 4 2 8 0.400 0.650 0.650 - - - 1.700 1,700
Compensation bar for TOP (T1) Y 20 4 2 8 0.950 0.650 0.500 - - - 2.100 2,100
U bar Y 25 19 1 19 0.800 0.800 0.800 - 2.690 0.150 2.400 800 800 800
Item Slab ref. Bar Bar Bar Nos. of Members Total Rebar Hook / Rebar Rebar Bar Bar Length
Bar Shape
Ref. Mark Dia. Bar of bar Nos Length TA lapping lapping Span Spacing (m)
Bottom
Refer
1 G/L 4-12B/A Wall starter bar (B1) Y 25 240 1 240 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
" Y 20 232 1 232 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
2 G/L 4-12B/G Wall starter bar (B1) Y 25 308 1 308 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
" Y 20 204 1 204 3.000 - drawing 0.150 3.000 thread 3,000
Refer
" Y 16 20 1 20 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
3 G/L 3/A Wall starter bar (B1) Y 25 16 1 16 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
" Y 20 16 1 16 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
4 G/L 2A-3/G Wall starter bar (B1) Y 25 32 1 32 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
" Y 20 32 1 32 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
5 G/L 13A-14/G Wall starter bar (B1) Y 25 16 1 16 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
" Y 20 48 1 48 3.000 - - drawing - 0.150 3.000 thread 3,000
6 G/L 6-11/A-G
Clash with KP10 /KP11 38 / 36 Y 25 3 1 3 5.700 0.700 0.800 - 0.430 0.150 7.200 700 5,700 700
Clash with KP14 /KP15 &
KP15/KP16 36 / 37 & 39 Y 20 3 2 6 5.700 0.700 0.700 - 0.430 0.150 7.100 700 5,700 700
Clash with KP16 39 Y 20 3 1 3 2.150 0.700 - - 0.430 0.150 2.850 700 2,150
Clash with KP12,KP13 & KP14 46, 46a Y 20 3 6 18 2.550 0.700 - 0.750 0.400 0.150 4.000 3,300 700
Clash with KP9 & KP15 45 Y 25 3 4 12 2.550 0.700 - 0.900 0.400 0.150 4.150 3,450 700
Top
Refer
7 G/L 4-12B/A Wall starter bar (T1) Y 40 384 1 384 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
" Y 20 16 1 16 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
" Y 16 40 1 40 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
Wall starter bar (T3) Y 25 240 1 240 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
" Y 32 20 1 20 3.000 - - drawing - 0.150 3.000 thread 3,000
Item Slab ref. Bar Bar Bar Nos. of Members Total Rebar Hook / Rebar Rebar Bar Bar Length
Bar Shape
Ref. Mark Dia. Bar of bar Nos Length TA lapping lapping Span Spacing (m)
Refer
" Y 16 172 1 172 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
8 G/L 4-12B/G Wall starter bar (T1) Y 40 436 1 436 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
" Y 20 112 1 112 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
" Y 16 32 1 32 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
Wall starter bar (T3) Y 25 284 1 284 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
" Y 20 12 1 12 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
" Y 16 156 1 156 3.000 - drawing 0.150 3.000 thread 3,000
Refer
9 G/L 3/A Wall starter bar (T1) Y 40 28 1 28 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
" Y 16 4 1 4 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
Wall starter bar (T3) Y 25 28 1 28 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
10 G/L 2A-3/G Wall starter bar (T1) Y 40 56 1 56 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
" Y 16 8 1 8 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
Wall starter bar (T3) Y 25 284 1 284 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
11 G/L 13A-14/G Wall starter bar (T1) Y 32 56 1 56 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
" Y 16 8 1 8 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
Wall starter bar (T3) Y 20 32 1 32 3.000 - - drawing - 0.150 3.000 thread 3,000
Refer
" Y 16 24 1 24 3.000 - - drawing - 0.150 3.000 thread 3,000
12 G/L 6-10/A-G 9 Y 16 21 9 189 5.400 - 0.750 0.750 3.000 0.150 6.900 6,900
Clash with KP7 /KP8 11/11a Y 16 3 1 3 5.700 0.700 0.700 - 0.430 0.150 7.100 700 5,700 700
Clash with KP8 /KP9 11/11a Y 16 3 1 3 7.800 0.700 0.700 - 0.430 0.150 9.200 700 7,800 700
Clash with KP9 /KP10 11/11a Y 16 3 1 3 3.800 0.700 0.700 - 0.430 0.150 5.200 700 3,800 700
Clash with KP10 /KP11 11/11a Y 16 3 1 3 5.700 0.700 0.700 - 0.430 0.150 7.100 700 5,700 700
Clash with KP11 /KP12 11/11a Y 16 3 1 3 5.700 0.700 0.700 - 0.430 0.150 7.100 700 5,700 700
Clash with KP12 /KP13 11/11a Y 16 3 1 3 7.600 0.700 0.700 - 0.430 0.150 9.000 700 7,600 700
Clash with KP13 /KP14 11/11a Y 16 3 1 3 3.700 0.700 0.700 - 0.430 0.150 5.100 700 3,700 700
Clash with KP14 /KP15 11/11a Y 16 3 1 3 5.500 0.700 0.700 - 0.430 0.150 6.900 700 5,700 700
Clash with KP15 /KP16 11/11a Y 16 3 1 3 5.500 0.700 0.700 - 0.430 0.150 6.900 700 5,500 700
Clash with KP7 " Y 20 3 2 6 1.800 0.800 - 0.900 0.400 0.150 3.500 800 3,300
Clash with KP8 " Y 16 3 2 6 1.850 0.700 - 0.750 0.400 0.150 3.300 700 2,600
Clash with KP10 " Y 16 3 2 6 1.850 0.700 - 0.750 0.400 0.150 3.300 700 2,600
Clash with KP12 " Y 16 3 2 6 1.850 0.700 - 0.750 0.400 0.150 3.300 700 2,600
Clash with KP13 " Y 16 3 2 6 1.850 0.700 - 0.750 0.400 0.150 3.300 700 2,600
Clash with KP14 " Y 16 3 2 6 1.850 0.700 - 0.750 0.400 0.150 3.300 700 2,600
Clash with KP15 " Y 16 3 2 6 1.850 0.700 - 0.750 0.400 0.150 3.300 700 2,600
Clash with KP16 " Y 16 3 2 6 1.850 0.700 - 0.750 0.400 0.150 3.300 700 2,600
Clash with KP9 " Y 16 3 2 6 1.850 0.700 - 0.750 0.400 0.150 3.300 700 2,600
Clash with KP11 " Y 16 3 2 6 1.850 0.700 - 0.750 0.400 0.150 3.300 700 2,600
Item Slab ref. Bar Bar Bar Nos. of Members Total Rebar Hook / Rebar Rebar Bar Bar Length
Bar Shape
Ref. Mark Dia. Bar of bar Nos Length TA lapping lapping Span Spacing (m)
Bottom
1 G/L 11-15/A-G
" Y 20 20 1 20 4.780 0.700 0.700 - 3.000 0.150 6.180 700 4,780 700
Clash with KP 19 " Y 16 3 1 3 5.200 0.700 - - 0.430 0.150 5.900 5,200 700
Clash with KP 19/KP20 " Y 25 3 1 3 2.750 0.700 0.700 - 0.430 0.150 4.150 700 5, 500 700
Clash with KP 20/KP21 " Y 16 3 1 3 5.500 0.700 0.700 - 0.430 0.150 6.900 700 5, 500 700
Clash with KP 21 " Y 20 3 1 3 3.450 0.700 0.700 - 0.430 0.150 4.850 700 3, 450 700
" Y 20 8 1 8 4.750 0.700 0.700 - 1.000 0.150 6.150 700 4,750 700
" Y 16 16 1 16 6.250 0.700 0.700 - 2.320 0.150 7.650 700 6,250 700
Clash with KP 24 " Y 16 3 1 3 2.000 0.700 0.700 - 0.430 0.150 3.400 700 2,000 700
Clash with KP 24 " Y 16 3 1 3 3.760 0.700 0.700 - 0.430 0.150 5.160 700 3,760 700
Vertical 78 Y 20 141 1 141 6.300 - 0.900 0.900 21.000 0.150 8.100 8,100
Item Slab ref. Bar Bar Bar Nos. of Members Total Rebar Hook / Rebar Rebar Bar Bar Length
Bar Shape
Ref. Mark Dia. Bar of bar Nos Length TA lapping lapping Span Spacing (m)
Clash with KP 19, KP20 & KP21 " Y 20 3 6 18 2.600 0.700 - 0.900 0.400 0.150 4.200 3,500 700
Clash with KP 24 " Y 20 3 2 6 1.500 0.700 - 0.900 0.400 0.150 3.100 3,500 700
Top
2 G/L 10-15/A-G -
37d Y 32 41 1 41 9.400 0.800 0.750 0.750 6.000 0.150 11.700 10,900 800
" Y 16 14 1 14 9.100 0.700 0.700 - 2.000 0.150 10.500 700 9,100 700
Clash with KP19 " Y 16 3 1 3 5.200 0.700 0.700 - 0.430 0.150 6.600 700 5,200 700
Clash with KP19/KP20 " Y 16 3 1 3 5.500 0.700 0.700 - 0.430 0.150 6.900 700 5,500 700
Clash with KP20/KP21 " Y 16 3 1 3 5.500 0.700 0.700 - 0.430 0.150 6.900 700 5,500 700
Clash with KP21 " Y 16 3 1 3 3.500 0.700 0.700 - 0.430 0.150 4.900 700 3,500 700
39b Y 32 13 1 13 10.750 0.800 0.800 - 1.825 0.150 12.350 800 10,750 800
ESC-PIT 40 Y 12 28 1 28 6.500 0.700 0.700 - 4.000 0.150 7.900 700 6,500 700
" Y 16 13 1 13 4.800 0.700 0.700 - 1.800 0.150 6.200 700 4,800 700
" Y 16 8 1 8 3.950 0.700 0.700 - 1.000 0.150 5.350 700 3,950 700
" Y 16 8 1 8 4.750 0.700 0.700 - 1.000 0.150 6.150 700 4,750 700
" Y 16 15 1 15 1.800 0.700 0.700 - 2.150 0.150 3.200 700 1,800 700
" Y 16 12 1 12 6.300 0.700 0.700 - 1.620 0.150 7.700 700 6,300 700
Clash with KP23 " Y 16 3 2 6 2.000 0.700 0.700 - 0.430 0.150 3.400 700 2,000 700
" Y 16 20 1 20 2.800 0.700 0.700 - 2.900 0.150 4.200 700 2,800 700
Clash with KP19 " Y 16 3 2 6 1.100 - 0.750 0.750 0.400 0.150 2.600 2,600
Clash with KP20 " Y 16 3 2 6 1.100 - 0.750 0.750 0.400 0.150 2.600 2,600
Clash with KP21 " Y 16 3 2 6 1.100 - 0.750 0.750 0.400 0.150 2.600 2,600
Clash with KP23 " Y 16 3 2 6 0.650 0.700 0.700 - 0.400 0.150 2.050 700 650 700
Clash with KP24 " Y 16 3 2 6 0.150 - 0.750 0.750 0.400 0.150 1.650 700 650 700
" Y 20 14 1 14 4.000 0.800 0.800 - 2.000 0.150 5.600 800 4,000 800
(Refer to dwg../4063)
UB " Y 25 14 2 28 0.700 0.800 0.800 - 2.000 0.150 2.300 800 700 800
UB " Y 32 29 1 29 0.700 1.050 1.050 - 4.200 0.150 2.800 1,050 700 1,050
UB " Y 32 10 2 20 0.700 1.050 1.050 - 1.300 0.150 2.800 1,050 700 1,050
UB " Y 32 17 1 17 0.700 1.050 1.050 - 2.400 0.150 2.800 1,050 700 1,050
UB " Y 25 39 1 39 0.700 0.800 0.800 - 5.700 0.150 2.300 800 700 800
UB " Y 25 20 1 20 0.700 0.800 0.800 - 2.850 0.150 2.300 800 700 800
UB " Y 25 21 1 21 0.700 0.800 0.800 - 3.000 0.150 2.300 800 700 800
UB " Y 25 26 1 26 0.700 0.800 0.800 - 3.750 0.150 2.300 800 700 800
UB " Y 25 14 1 14 0.700 0.800 0.800 - 2.000 0.150 2.300 800 700 800
6 300mm Ramp slab between TOP &BOTTOM (1) Y 12 20 2 40 2.900 0.200 0.200 - 5.600 0.300 3.300 200 2900 200
173
TOP &BOTTOM (2) Y 12 21 2 42 5.300 0.550 - - 3.000 0.150 5.850 degree 550 5300
TOP &BOTTOM (3) Y 12 21 2 42 0.900 0.400 - - 3.000 0.150 1.300 400 900
97
TOP &BOTTOM (4) Y 12 21 2 42 0.650 0.400 - - 3.000 0.150 1.050 degree 650 400