BATHYMETRIC SURVEY FOR CENTRAL JAVA COAL FIRED

POWER PLANT (2 X 1000 MW)

This interim report:

Bathymetric Survey for Central Java Coal Fired Power Plant (2 X 1000 MW) - July 2018

has been prepared by

PT. Gomam Netra Buana, Jl. Buahbatu 174, Bandung – 40265, Indonesia

for the

PT. Bhimasena Power Indonesia, Menara Karya Building 29th Floor, Unit F, G, and H, H.R
Rasuna Said Kav 1 - 2, Blok X - 5, Jakarta - 12950, Indonesia

under the Contract No. 4500001847 issued on 28th of August 2017.

INTERIM REPORT | REV - 1 i


BATHYMETRIC SURVEY FOR CENTRAL JAVA COAL FIRED
POWER PLANT (2 X 1000 MW)

TABLE OF CONTENTS

SIGNATORIES i
TABLE OF CONTENTS ii
LIST OF FIGURES iii
LIST OF TABLES vi
I SCHEDULE 1
II RESULTS 8
II.1 TIDAL ANALYSIS 8
II.1.1 FIRST SURVEY 8
II.1.2 SECOND SURVEY 9
II.1.3 THIRD SURVEY 11
II.1.4 FOURTH SURVEY 12
II.1.5 FIFTH SURVEY 14
II.1.6 SIXTH SURVEY 15
II.2 BATHYMETRIC MAP 17
III ANALYSIS AND SUMMARY 27
III.1 COMPARISONS 27
III.2 CURRENTS ANALYSIS 41
III.3 WAVE ANALYSIS 55
III.4 WIND ANALYSIS 69
III.5 COMPILATION ANALYSIS 83
III.6 SUMMARY 99
APPENDIX 100
REFERENCES 112

INTERIM REPORT | REV - 1 ii


BATHYMETRIC SURVEY FOR CENTRAL JAVA COAL FIRED
POWER PLANT (2 X 1000 MW)

LIST OF FIGURES

Fig. 1.1. The detailed actual schedule of First Bathymetric Survey in Central Java Coal 2
Fired Power Plant (2 X 1000 MW).
Fig. 1.2. The detailed actual schedule of Second Bathymetric Survey in Central Java Coal 3
Fired Power Plant (2 X 1000 MW).
Fig. 1.3. The detailed actual schedule of Third Bathymetric Survey in Central Java Coal 4
Fired Power Plant (2 X 1000 MW).
Fig. 1.4. The detailed actual schedule of Fourth Bathymetric Survey in Central Java Coal 5
Fired Power Plant (2 X 1000 MW).
Fig. 1.5 The detailed actual schedule of Fifth Bathymetric Survey in Central Java Coal 6
Fired Power Plant (2 X 1000 MW).
Fig. 1.6 The detailed actual schedule of Sixth Bathymetric Survey in Central Java Coal 7
Fired Power Plant (2 X 1000 MW).
Fig. 2.1. Tidal record from 7 days of first survey observation at the platform of Central 8
Java Coal Fired Power Plant (2 X 1000 MW).
Fig. 2.2. Tidal record from 7 days of second survey observation at the platform of Central 10
Java Coal Fired Power Plant (2 X 1000 MW).
Fig. 2.3. Tidal record from 15 days of third survey observation at the platform of Central 11
Java Coal Fired Power Plant (2 X 1000 MW).
Fig. 2.4. Tidal record from 7 days of fourth survey observation at the platform of Central 13
Java Coal Fired Power Plant (2 X 1000 MW).
Fig. 2.5. Tidal record from 7 days of fifth survey observation at the platform of Central 14
Java Coal Fired Power Plant (2 X 1000 MW).
Fig. 2.6 Tidal record from 7 days of fifth survey observation at the platform of Central 16
Java Coal Fired Power Plant (2 X 1000 MW).
Fig. 2.7. Activities on the Survey Area. 18
Fig. 2.8. TIN surface model of the Survey Area. 19
Fig. 2.9. Raster surface model generated from TIN. 19
Fig. 2.10. The result of Focal Statistics neighborhood interpolation. 20
Fig. 2.11. Final bathymetric map of first survey with coloring and contouring. 21
Fig. 2.12. Final bathymetric map of second survey with coloring and contouring. 22
Fig. 2.13. Final bathymetric map of third survey with coloring and contouring. 23
Fig. 2.14. Final bathymetric map of fourth survey with coloring and contouring. 24
Fig. 2.15. Final bathymetric map of fifth survey with coloring and contouring. 25
Fig. 2.16. Final bathymetric map of sixth survey with coloring and contouring. 26
Fig. 3.1. The comparison of July 2016 contour with September 2017 contour. 28
Fig. 3.2. The comparison of September 2017 contour with November 2017 contour. 29
Fig. 3.3. The comparison of November 2017 contour with January 2018 contour. 30
Fig. 3.4. The comparison of January 2016 contour with March 2018 contour. 31
Fig. 3.5. The comparison of March 2016 contour with May 2018 contour. 32
Fig. 3.6. The comparison of May 2016 contour with July 2018 contour. 33
Fig. 3.7. The amount of seabed change during July 2016 until September 2017. 35
Fig. 3.8. The amount of seabed change during September 2017 until November 2017. 36

INTERIM REPORT | REV - 1 iii


BATHYMETRIC SURVEY FOR CENTRAL JAVA COAL FIRED
POWER PLANT (2 X 1000 MW)

Fig. 3.9. The amount of seabed change during November 2017 until January 2018. 37
Fig. 3.10. The amount of seabed change during January 2018 until March 2018. 38
Fig. 3.11. The amount of seabed change during March 2018 until May 2018. 39
Fig. 3.12. The amount of seabed change during May 2018 until July 2018. 40
Fig. 3.13. The average sea currents direction and velocity in August 2017. 43
Fig. 3.14. The average sea currents direction and velocity in September 2017. 44
Fig. 3.15. The average sea currents direction and velocity in October 2017. 45
Fig. 3.16. The average sea currents direction and velocity in November 2017. 46
Fig. 3.17. The average sea currents direction and velocity in December 2017. 47
Fig. 3.18. The average sea currents direction and velocity in January 2018. 48
Fig. 3.19. The average sea currents direction and velocity in February 2018. 49
Fig. 3.20. The average sea currents direction and velocity in March 2018. 50
Fig. 3.21. The average sea currents direction and velocity in April 2018. 51
Fig. 3.22. The average sea currents direction and velocity in May 2018. 52
Fig. 3.23. The average sea currents direction and velocity in June 2018. 53
Fig. 3.24. The average sea currents direction and velocity in July 2018. 54
Fig. 3.25 The average sea wave direction and height in August 2017. 57
Fig. 3.26. The average sea wave direction and height in September 2017. 58
Fig. 3.27. The average sea wave direction and height in October 2017. 59
Fig. 3.28. The average sea wave direction and height in November 2017. 60
Fig. 3.29. The average sea wave direction and height in Desember 2017. 61
Fig. 3.30. The average sea wave direction and height in January 2018. 62
Fig. 3.31. The average sea wave direction and height in February 2018. 63
Fig. 3.32. The average sea wave direction and height in March 2018. 64
Fig. 3.33. The average sea wave direction and height in April 2018. 65
Fig. 3.34. The average sea wave direction and height in May 2018. 66
Fig. 3.35. The average sea wave direction and height in June 2018. 67
Fig. 3.36. The average sea wave direction and height in July 2018. 68
Fig. 3.37. The average wind direction and velocity in August 2017. 71
Fig. 3.38. The average wind direction and velocity in September 2017. 72
Fig. 3.39. The average wind direction and velocity in October 2017. 73
Fig. 3.40. The average wind direction and velocity in November 2017. 74
Fig. 3.41. The average wind direction and velocity in December 2017. 75
Fig. 3.42. The average wind direction and velocity in January 2018. 76
Fig. 3.43. The average wind direction and velocity in February 2018. 77
Fig. 3.44. The average wind direction and velocity in March 2018. 78
Fig. 3.45. The average wind direction and velocity in April 2018. 79
Fig. 3.46. The average wind direction and velocity in May 2018. 80
Fig. 3.47. The average wind direction and velocity in June 2018. 81
Fig. 3.48. The average wind direction and velocity in July 2018. 82
Fig. 3.49. The location of depth investigation point inside wharf area. 83
Fig. 3.50. The seabed change inside wharf area during July 2016 until September 2017. 84
Fig. 3.51. The seabed change inside wharf area during September 2017 until November 85
2017.

INTERIM REPORT | REV - 1 iv


BATHYMETRIC SURVEY FOR CENTRAL JAVA COAL FIRED
POWER PLANT (2 X 1000 MW)

Fig. 3.52. The seabed change inside wharf area during November 2017 until January 2018. 86
Fig. 3.53. The seabed change inside wharf area during January 2018 until March 2018. 87
Fig. 3.54. The seabed change inside wharf area during March 2018 until May 2018. 88
Fig. 3.55. The seabed change inside wharf area during May 2018 until July 2018. 89
Fig. 3.56. The chronological seabed change inside wharf area during July 2016 until July 90
2018.
Fig. 3.57. The location of maximum (deepening at Point 1) and minimum (shallowing at 91
Point 17) seabed change inside wharf area during July 2016 until July 2018.
Fig. 3.58. The seabed cut (blue) and fill (red) inside wharf area during July 2016 until 92
September 2017.
Fig. 3.59. The seabed cut (blue) and fill (red) inside wharf area during September 2017 93
until November 2017.
Fig. 3.60. The seabed cut (blue) and fill (red) inside wharf area during November 2017 94
until January 2018.
Fig. 3.61. The seabed cut (blue) and fill (red) inside wharf area during January 2018 until 95
March 2018.
Fig. 3.62. The seabed cut (blue) and fill (red) inside wharf area during March 2018 until 96
May 2018.
Fig. 3.63. The seabed cut (blue) and fill (red) inside wharf area during May 2018 until July 97
2018.
Fig. 3.64. The seabed cut (blue) and fill (red) inside wharf area during July 2016 until July 98
2018.

INTERIM REPORT | REV - 1 v


BATHYMETRIC SURVEY FOR CENTRAL JAVA COAL FIRED
POWER PLANT (2 X 1000 MW)

LIST OF TABLES

Table. 2.1. Tidal harmonic constituent of first survey 9


Table. 2.2. Tidal reference elevation from the 7 days observation of first survey 9
Table. 2.3. Tidal harmonic constituent of second survey 10
Table. 2.4. Tidal reference elevation from the 7 days observation of second survey 11
Table. 2.5. Tidal harmonic constituent of third survey 12
Table. 2.6. Tidal reference elevation from the 15 days observation of third survey 12
Table. 2.7. Tidal harmonic constituent of fourth survey 13
Table. 2.8. Tidal reference elevation from the 7 days observation of fourth survey 14
Table. 2.9. Tidal harmonic constituent of fifth survey 15
Table. 2.10. Tidal reference elevation from the 7 days observation of fifth survey 15
Table. 2.11. Tidal harmonic constituent of sixth survey 16
Table. 2.12. Tidal reference elevation from the 7 days observation of sixth survey 17
Table. 2.13. Coordinates of jetty structure in Central Java Coal Fired Power Plant (2 X 1000 18
MW) Area
Table. A.1. Structural team list for Bathymetric Survey at Central Java Coal Fired Power 101
Plant (2 X 1000 MW)
Table. A.2. Equipment list for Bathymetric Survey at Central Java Coal Fired Power Plant (2 101
X 1000 MW)
Table. A.3. Daily report of First Bathymetric Survey at Central Java Coal Fired Power Plant 102
(2 X 1000 MW)
Table. A.4. Daily report of Second Bathymetric Survey at Central Java Coal Fired Power 103
Plant (2 X 1000 MW)
Table. A.5. Daily report of Third Bathymetric Survey at Central Java Coal Fired Power Plant 105
(2 X 1000 MW)
Table. A.6. Daily report of Fourth Bathymetric Survey at Central Java Coal Fired Power Plant 107
(2 X 1000 MW)
Table. A.7. Daily report of Fifth Bathymetric Survey at Central Java Coal Fired Power Plant 108
(2 X 1000 MW)
Table. A.8. Daily report of Sixth Bathymetric Survey at Central Java Coal Fired Power Plant 110
(2 X 1000 MW)

INTERIM REPORT | REV - 1 vi