Академический Документы
Профессиональный Документы
Культура Документы
NO TENDER : JPS/N/TG/TB/6/15
3.2 SUBSTRUCTURE
Excavation
3.2.1 Excavate for structure
Irrespective of depth including
backfilling with excavated spoil
and disposing surplus spoil or
material not suitable. m3 9,200 8,434 12.00 110,400.00 101,208.00
BS 4449
COLLECTION FROM :
BQ 2 1,932,565.00