No major issues were faced during the implementation of the l Payback – 36 months
project. The project feasibility study was conducted and all
equipments were installed. The hook up of the system with
the existing system was taken up during the annual
About CII & CII-Godrej GBC
maintenance shut down.
CII is a non-government, not-for-profit, industry led and
Comments from the plant team industry managed organisation, playing a proactive role in
The project was implemented by Ultratech Cement Limited, India's development process. Founded over 112 years ago, it
A.P Cement Works in the year 2005 is India's premier business association, with a direct
membership of over 6500 organisations from the private as
The project was identified by the plant team during the course well as public sectors, including SMEs and MNCs, and an
of a detailed energy audit. The same was taken up for indirect membership of over 90,000 companies from around
implementation after a detailed feasibility study by the 350 national and regional sectoral associations.
manufacturer of the variable frequency drive. No major issues
were faced during implementation. Cll-Godrej GBC is a Centre of Excellence in Energy Efficiency,
Green Buildings, Renewable Energy, Water, Environment &
Financing of the project Recycling and Climate Change activities in India.
The plant invested about Rs 0.35 million (USD 0.00875
About 3 Country Energy Efficiency
million) for implementation of the project. The investment
was taken up fully with internal funds. The Project "Developing Financial Intermediation
Results of the project Mechanisms for Energy Efficiency Projects in Brazil, China
and India" aimed to substantially increase investments in
Implementing this project resulted in annual energy saving of energy efficiency by the domestic financial sectors in Brazil,
0.4 million kWh per year. This amounts to a saving of Rs 0.12 China and India.
million (USD 0.003 million) with an investment of Rs 0.35
million (USD 0.00875 million) and had a simple pay back The project was a partnership between the World Bank, the
period of 36 months. United Nations Environment Programme (UNEP) through the
UNEP Risoe Centre on Energy, Climate and Sustainable
Development (URC), and institutions in Brazil, China and India.
Benefits of the project Additional information is available at www.3countryee.org
l Reduction in fan power consumption This Energy Efficiency Bulletin comprises of a series of case
by 35% studies on successful energy efficiency projects
implemented by Indian industry. The bulletin is supported
l Better operational control of the fan under the "3 Country EE" initiative and by USAID.
Mr. C.S.Reddy
Vice President
Ultratech Cement Limited
AP Cement Works
Bogasamudram
Mr K S Venkatagiri / Mr K Sivaram
Ananthapur dist - 515415
Survey No 64, Kothaguda, Near Hitech City
Ph - 08558 288801, Fax - 08558 2888
Hyderabad - 500 032
Email: csreddy@adityabirla.com Tel: 040-23112971 – 73, Fax: 040-23112837
Email : k.s.venkatagiri@ciionline.org / k.sivaram@ciionline.org
www.greenbusinesscentre.com