Академический Документы
Профессиональный Документы
Культура Документы
for
)* + )
Doc Version Description Prepared by Date Reviewed by Approved by
00 Original Palani Dorai 24.12.2009 Amita Batra &
Ankita Paul
Project: MISSION SURE
Introduction
# # , #
! " # $ %& &'
$ %& &'
( $ %& & '('
) * + ,- $ %& & '('
- * + ,- $ %& & '('
. * + ( ,- $ %& & '('
/ * + ) ,- $ %& & '('
0 * + - ,- $ %& & '('
1 , 2 3 4 '5 # $ %& & ')
6 7 $ %& &)'
, $ %& &)'
$ 4,, , $ %& &.'(
( $ 4,, , $ %& &.'(
) $ %& &/'6
- $ %& &0'
. $ %& &0'
For each of the above processes, separate End User Training Manuals are available
This document covers sl. No. 12 & 13 of the above list that is Training & Event
Management processes.
This End User Training manual on Training & Event Management process consists of the
Following sequence of sub-processes
Page 2 of 11
Project: MISSION SURE
Procedural Steps
Purpose
Attendance Menu
Menu Path
SAP Easy Access -> SAP menu Human Resources Training and Event
Management > Attendance > PSV1 – Attendance Menu
Transaction Code
PSV1
Procedure
Enter the Transaction code PSV1 in the command field (refer the following
screen)
Or go as per the navigation shown below and click PSV1 – Attendance Menu
Page 3 of 11
Project: MISSION SURE
Page 4 of 11
Project: MISSION SURE
Select (click once on this node) the PLC line (refer screen below)
and click once on the Attendance on the top menu bar and navigate to Prebook List
option (refer screen above),
Page 5 of 11
Project: MISSION SURE
Once the above values are keyed-in, the screen will look as below
Page 6 of 11
Project: MISSION SURE
Click on the Prebook List push button, the following pop up window appears
In the above window, key in the values using the drop down list of the following fields
Page 7 of 11
Project: MISSION SURE
b) Attendee (The system will show employee list, the) following list is available,
And check mark the check boxes of the employees, and click the
Check mark button, to get the value populated on the attendee field.
Once the above activity is completed the pop up window will look as shown below
Page 8 of 11
Project: MISSION SURE
Click on the check mark button,, the system will return back to the following screen
Page 9 of 11
Project: MISSION SURE
Click on the check mark button,, the system will return back to the following screen
Page 10 of 11
Project: MISSION SURE
Page 11 of 11