Place inspected: CCC Construction Site Mechanical Fabshop / Erection Area, Ras Laffan, Qatar
Date of inspection 25 / 08 / 2012
Observation Control measures
Number Observations Timescale
Immediate and longer term actions (immediate,
Hazards and consequences
1 week, etc)
Scaffolding material were stacked on Removed all workers from the location Immediately
the top rail of a tower while erecting
the tower platform Discuss with the Engineers regarding the 1 Day
1 proactive measures of wall collapse.
Place inspected: CCC Construction Site Mechanical Fabshop / Erection Area, Ras Laffan, Qatar
Date of inspection 25 / 08 / 2012
Observation Control measures
Number Observations Timescale
Immediate and longer term actions (immediate,
Hazards and consequences
1 week, etc)
Grating clamps found loose at 3 Area barricaded with Red caution tape. Immediately
locations.
8 Loose clamps replaced. 1 day
Place inspected: CCC Construction Site Mechanical Fabshop / Erection Area, Ras Laffan, Qatar
Date of inspection 25 / 08 / 2012
Observation Control measures
Number Observations Timescale
Immediate and longer term actions (immediate,
Hazards and consequences
1 week, etc)
Not proper signage for radioactive Barricade causation tape shall be put at Immediately
level indicator every entry point.
Proper signs found many areas as Ensure supply of ear plugs available