INTERNATIONAL GENERAL

CERTIFICATE Candidate’s observation


(2011 specification) sheet

IGC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICATION
Sheet number 1 of 3

Student name JOJO MATHEW Student number 00153637

Place inspected: CCC Construction Site Mechanical Fabshop / Erection Area, Ras Laffan, Qatar
Date of inspection 25 / 08 / 2012
Observation Control measures
Number Observations Timescale
Immediate and longer term actions (immediate,
Hazards and consequences
1 week, etc)

Scaffolding material were stacked on Removed all workers from the location Immediately
the top rail of a tower while erecting
the tower platform Discuss with the Engineers regarding the 1 Day
1 proactive measures of wall collapse.

Training on the Excavation for all 1 Month


personnel on the project.
During lifting operation, one of the Inform to the Rigging Supervisor and Immediate
sling belt was found to be worn out at remove the sling from service.
the sling eye.
2 Arrange for the reinsertion of the lifting 1 Day
gears.

Monitoring and inspection Monthly


Increased risk of trap under load as Call the all workers to safe location Immediate
four workers found working under
suspended load of crane. Counsel them to follow Supervisors. 1 Week
3

Conduct Tool box talk and awareness 1 month


training
Increased risk of overturning of crane Lifting work stopped until wind reduces to Immediate
due to use of crane in heavy wind safe limit.
condition.
Crane Supervisor shall be made available
4 in their local language with crane 1 week
operator.

Refresher training will be conducted for 1 month


Supervisor monthly to all crane operators.
Risk falling from height due to Worker shall be called to get down and Immediate
improper anchoring for full body work to be stopped.
harness by scaffold worker
Replaced, Toolbox and Training 1 week
5
Periodical monitoring and checking of full
body harness shall be carried out 1 month
competent person
Increased Fire / Explosion due to Gas test shall be conducted to ensure the Immediate
welding work going on without PTW in hydrocarbons are in safe range and fire
Hydrocarbon area without Gas test watchers also provided.
6 and without presence of fire watchers.
Legal violation as per factory act 1948. PTW System Daily

Periodic check of such hot works Monthly


Not inspected the fire Extinguishers Informed the Fire Safety Officer. Immediately

Maintained fire extinguishers shall be 1 day


7
provided.

Monitor to ensure no re-occurrence 1 month


INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
(2011 specification) sheet

IGC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICATION Sheet number 2 of 3

Student name JOJO MATHEW Student number 00153637

Place inspected: CCC Construction Site Mechanical Fabshop / Erection Area, Ras Laffan, Qatar
Date of inspection 25 / 08 / 2012
Observation Control measures
Number Observations Timescale
Immediate and longer term actions (immediate,
Hazards and consequences
1 week, etc)
Grating clamps found loose at 3 Area barricaded with Red caution tape. Immediately
locations.
8 Loose clamps replaced. 1 day

Periodical check of all grating floor. Monthly


Increased risk of slip and trip due to Area barricaded to avoid slip and Trip Immediately
underground sump spilling over.
Carry out de-checking of outlet pipe of the 1 day
9
sump

Periodical cleaning of outlet pipe. Monthly


Hexane pump running without Inform the Plant Engineer Immediately
adequate numbers of bolts.
Fasten all 16 Bolts in the Flange. 1 day
10
Ensure proper fittings of parts and Every time after
Equipments after every maintenance maintenance.
Safe working Load (SWL) is not Withdraw all the pipe supports which has Immediately
displayed on the pipe support. no SWL.

11 Contact manufactured to enquire about 1 day


SWL

Mark all pipe supports SWL 1 month


Some workers involving sand pilling Work stopped Immediately
activity found without proper PPE
Proper PPE Provided. 1 Day
12
Periodically monitor proper PPE 1 Month
compliance.
Maintenance of air compressor engine This practice should be prohibited Immediately
oil is been discharged to the round
Provide container to contain the used 1 day
13
Engine oil

Dispose engine oils to appropriate area. 1 month


14 Fire Extinguisher left in floor Should be on wall Immediately

15 Found First Aid Box was Empty Re Stock Immediately


Remove the harness Immediately

On worker was wearing damage Visual inspection 1 Day


16
harness
Provide Harness inspection training for all 1 Month
project personnel

Vehicles are reversing in yard with Ongoing


17 Good practice to be maintained
Banksman giving proper signal monitoring
INTERNATIONAL GENERAL
CERTIFICATE Candidate’s observation
(2011 specification) sheet

IGC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICATION Sheet number 3 of 3

Student name JOJO MATHEW Student number 00153637

Place inspected: CCC Construction Site Mechanical Fabshop / Erection Area, Ras Laffan, Qatar
Date of inspection 25 / 08 / 2012
Observation Control measures
Number Observations Timescale
Immediate and longer term actions (immediate,
Hazards and consequences
1 week, etc)
Not proper signage for radioactive Barricade causation tape shall be put at Immediately
level indicator every entry point.

18 Conducted the radiation training for staff. 1 day

Provide proper signage. Every time after


the maintenance.
Painters are not been trained using Demonstrate how to use the Eye wash. 1 day
19 the eye wash.
1 week
Flagman was properly positioned in Ongoing
20 Good practice to be maintained
clear area giving directions monitoring

Proper signs found many areas as Ensure supply of ear plugs available
21 Continues
well posted for hearing protection. outside the posted area.