Вы находитесь на странице: 1из 13

LEC 1 3) Classifications

1) Intro a) Control
a) Land Surveying i) Geodetic
i) Property Surveying ii) Project
(1) Using surveying techniques and b) Cadastral
procedures to obtain size, i) Numerical
shape and location of land, ii) Graphical
owned by people/s iii) Public Land
(2) Goal is to produce accurate c) Isolated – not more than 1500 ha
maps and technical data d) Mineral Land
approved by govt agencies e) Forestlands
ii) Purposes 4) Who may Execute
(1) Secure necessary data for a) Licensed GE
writing legal desc and finding i) PRC Reg
area and boundaries ii) PRC ID
(2) Reestablish boundaries of iii) PTR
surveyed land iv) TIN
(1) Subdivide tract v) Member of PRC association
ii) Notes vi) Govt GE upon SA/O
(1) Claimants may/not be owners b) Survey Order – by DENR to GE for
(2) True owners will be determined survey of public domain or specific
by admin or judicial project
(3) Purpose is to obtain patent/ c) Survey Authority – by DENR to private
title to a land if A/D or private GE for isolated survey on public land
b) Manuals 5) Instruments
i) DENR Memo 2010-13 a) EDM
ii) DAO 2007-29; Rules and b) Steel, Invar, Tapes
Regulations c) TS
iii) DAO 98-12, 1998 d) GPS receivers
2) Terms
a) Cadastral Map
b) Cadaster
c) Land Registration
d) Metes and Bounds
e) Monument
f) Muniments of Titles
g) Patrimonial Property
h) Projection Map
i) PRS 92
j) Reference Point
k) Survey Plan
l) Survey Returns
m) Unique Parcel Identifier
n) GE
LEC 2 LEC 3
1) Points of Reference 1) Control PreSurvey
a) Locations a) Geodetic
i) Bureau of Lands Location i) PRS 92, GNSS
Monuments ii) DAO 2007-29 Sec15
ii) PBM/ MBM/ CBM/ BBM iii) Party
iii) Triangulation Stations (1) Project Main Office –
iv) Primary Stations of Cad Surveys supervision, coordination,
v) Prominent structures of known PRS administration
coords (2) Office Operations -research,
vi) 3rd order GPS stations computations, cartographic
b) Points of Reference (3) Field Operations – recon,
i) Luzon Datum monuments, observations
(1) Origin: Balanacan iv) Work Plan
(1) South of San Andres point, NW (1) Project Mgmt. Plan
of Marinduque (a) Control Survey Party
(2) N 13-33-41, E 121-52-03 (a) Financial Plan
(3) N = 0.34 (b) Equipment
(4) Az to Baltazar – 9-12-37 (c) Duration (PERT-CPM)
37680.9m (2) Technical Plan
6) Coordinate Systems (a) Boundary Sketch
a) Local – floating, astronomic (b) # of control points
b) PPCS/ Luzon 1911 – triangulation, (c) Leveling measurement if no
c) PPCS/ PRS92 data from NAMRIA
d) GPS Coord ii) Data Research and Old Monuments
i) WGS84 ellipsoid Inventory
ii) a= 6378137 (1) monument recovery report
iii) f= 1/298.26 (2) Position of Ref points
iv) Geocentric iii) Notification
v) Cartesian (1) Provincial Engineer
7) PPCS-TM/ PRS 92 (2) PENRO
a) Same as Luzon 1911 (3) DPWH District Engineer
b) Clarke Spheroid 1866 (4) CENRO
c) TM 2 deg net width (5) City/Municipal Engineer
d) Scale: 0.99995 (6) Head of Field Office of agency
e) Geographic to Grid with jurisdiction
i) N = (I) + (II)P^2 + (III)P^4 (7) Barangay Chairman
ii) E = (IV)P + (V)P^3 + (VI)P^5 + 500K (8) Lot Owner
iii) P = 0.0001(ΔLongi”) b) Project
f) Grid to Geographic i) Reference for Cad, Public Land or
i) Lat = Lat’ – (VII)q^2 + (VIII)q^4 Townsite Reservation
ii) Long = (IX)q – (X)q^3 + LongCM ii) Instruments
iii) q = 0.000001(E-500k) (1) ETS, GNSS receiver, combined
8) Common Point iii) Work Plan
(1) Same as Geodetic v) Established controls
(2) Included in Work Plan of Survey (1) Print out of position derivation
Project of controls
iv) Data Research and Old Monuments (2) Monument Description Book
Inventory (3) PRS92 Geodetic Network
(1) Projection Maps of area w/ Control map, 54x54, margin
previous surveys 50x50
(2) Copy of plan and computations b) Project (same with geodetic)
of all previous surveys i) Copy of Req Certs and Legal Docs
(3) Progress map of prev. cad (1) Approved Project Control work
projects plan
(4) Approved traverse stations of (2) Instrument cert before and
adjoining projs. after used from LMB
(5) Approved data on MBM (3) Cert of Acceptability and
9) Control Survey Returns Endorsement Letter from LMS
a) Geodetic GE Proj Inspector addressed to
i) Copy of Req Certs and Legal Docs RTD
(1) Transmittal letter ii) References and tech docs
(2) Project Contract iii) GPS Observation
(3) Survey Order iv) ETS Observation
(4) Approved Geodetic Control v) Established Controls
Work Plan 10) IVAS
(5) Cert of Reg of GPS with model, a) Geodetic – NAMRIA shall verify
serial number i) Preliminary Eval – survey returns
(6) Notification Letter are complete
(7) Field Inspection Report ii) Technical Eval – conducted to
(8) GE Cert signed by Chief determine accuracy, analyze error,
(9) Cert of Instrument Reg detect mistakes
ii) References and Tech Docs (1) Office processing
(1) Monument Recovery Report (2) Field Checking
iii) GPS observation b) Project – LMS shall verify
(1) Raw GPS data in RINEX i) Preliminary Eval
(2) Processed GPS Data ii) Technical Eval
(3) Accomplished GPS Field Sheet (1) Examine Field Notes
(4) Description of controls (2) Verifying traverse
(5) Photos of monuments (3) Check astro observation,
iv) ETS Observation azimuth deriv, grid distance
(1) Field Notes
(2) Original Computation for
control traverse, astro, elev, sea
level reductions, scale factor,
grid distance, azimuth deriv
(3) Test traverse field notes
(4) Geodetic Control map
LEC 4 (4) Foreshore Lands
1) Pre-survey Activities and Field Ops ii) Amendment
a) Control iii) Private Land Surveys
i) Tertiary – A < 1500 has (1) Simple/ Complex Subd.
ii) Secondary – 1500 < A < 15000 (2) PCS, PCN, PSD
iii) Primary – A > 15000 has iv) Government Land Surveys
b) SA/O (1) Friar Land Estates
i) DENR (2) Nat’l Gov’t Land Surveys
ii) Owner/ Claimant (3) Local Gov’t Land Surveys
c) Who can conduct survey v) Conversion Surveys
i) Licensed DENR GE (1) CADM, PCADM
ii) Licensed GE vi) Public Land Subd. Surveys
d) Parameters (1) A/D lands a > 1500has
i) Tie-point, reference survey, vii) Group Settlement Project/ Townsite
common point Subd. Survey
ii) Tie-line info (4) A/D lands a< 1500has into 50
iii) Azimuth/ angle and distance parcels or more
measurement iii) Other Land
iv) Traverse/ control survey (1) Verification Survey
v) Monumentation (2) Segregation Survey
vi) Side-Shots (3) Relocation
vii) TD computation (4) Resurvey
e) Adjoining Claims iv) Cases
i) Survey notification letter (1) Case 1
ii) Names and addresses of adjoining (a) Frontage is short by some
claimants distance, fence of adjoining
iii) Tenants, occupants, officials lot is inside two old posts
f) Marking of Lot Corners (b) Relocation
i) Monumentation – adjoining owners (i) Check boundary
presence agreement to TD
ii) Adverse Claim – boundary of (ii) Establish common
counter claim be monumented and points as reference
indicated on plan (iii) Verify position of
g) Lot Survey existing boundary
i) Subject lot survey after (iv) Relocate if wrong
monumentation (2) Case 2
ii) Traverse (a) # of boundary monuments
iii) Accuracy – closed tertiary does not tally with TCT
iv) Corners by side shots (b) Amendment
h) Kinds (i) Check numbering of lot
i) Public Land corners
(1) Original Survey (ii) If wrong, prepare
(2) CSD, CCN, CCS report for request
(3) Reclaimed lands (iii) Execute amendment
(3) Case 3 11) Survey Returns
(a) No TD in TCT, no other docs
with TD
(b) Conversion
(i) Notify all adjoining
owners
(ii) Survey property as
pointed and in TCT
(iii) Submit new survey plan
(4) Case 4
(a) Area reflected on plan
doesn’t include adjacent
owned land
(b) Resurvey
(i) Surrender approved
plan
(ii) Submit proof that plan
is not subject of any
proceedings
(iii) Notify adjoining lot
owners
(iv) Survey all corners
(v) Prepare detailed
explanation
v) Overlapping
(1) Common boundaries if untitled
(2) Boundary of previously
approved survey must be
accepted if titled
vi) Within Cad project
(1) Submit list of surveys in
progress to project chief of cad
survey
vii) Field Notes
(1) Contain all angle/ direction
observations of traverse, side
shots, reference azimuths and
monuments
viii) Computations and Plans
(1) Includes LDC, traverse
computation, azimuth
computation, in LMB
(2) Proper LMB form showing info
related to survey
LEC 5
1) Concept of Cadastre
a) Inventory, consensus or record of real
estate
b) Record of farms, their values and
proprietors
c) System of territorial info related to real
estate, purpose is to obtain a census of
physical, qualitative, legal, fiscal and
administrative features of properties
d) Foundation and integral component of
parcel-based LIS that contain records of
interests in land
2) Benefits
a) Provides comprehensive and accurate
data on land resources
b) Facilitate land disposition and
accelerate settlement of claims and
conflicts
c) Delineate boundaries of all subds of
12) IVAS country based on IRA
a) DMC 2010-13, DAO 2010-17 d) Provide economic data for land devt
b) LMS verifies accuracy e) Provide map-based data for zoning ang
land use
3) History
a) Friar Land 1903
b) Nov 1909 Cad1 in Bataan
c) 1921 all Filipino surveyors
d) Feb 11, 1913 Cadastral Act 2259
formalization
e) 1992 RA 7160 surveys devolved to
LGU’s
f) DAO 2001-23, Aug 19, cad survey
returned to DENR
4) Cad survey Process
a) Activities
i) Project Control
ii) Political Boundary
iii) Cadastral Lot
b) Categories
i) A – complete cad; control,
boundary and lot survey in 2 years
ii) B – control and boundary in 1 year
iii) C- Lot survey in 1 year
5) Types 7) Survey Returns
a) Graphical a) Final Report
i) Plane Table i) Project Profile
ii) Photogrammetry (1) Geographical location
iii) RS (2) Demography
b) Numerical (3) Local History
6) Cad survey ops (4) Government
a) Preliminary (5) Commerce and industry
i) Projection Map ii) Inauguration of Survey
ii) Previous plans and computations iii) Survey
iii) Progress Map (1) Local condition
iv) Data of adjoining controls (2) Method of work
v) List of approved surveys (3) Analyzed result of work
b) Scheme (4) General matters regarding
i) Establish cad office boundary questions, conflicts,
ii) Post notices etc.
iii) Monument main and sub controls, iv) Land Questions
in primary and secondary accuracy (1) Conditions of and ownership
iv) Start manufacture of concrete (2) Situation, problems, questions
monuments v) Party Administration
v) Prepare progress map, project (1) Project Control map
control map (2) Political boundary map
vi) Conduct Static GNSS (a) Municipal index map
vii) Submit controls to DENR (b) Brgy index map
viii) Prepare sketch sheets and cad (3) Cad maps
maps (4) Land use plan
ix) Post 30-day notices (5) LDC
(1) Survey Notifications (6) Lot description
(a) General Public notice (7) Monument description
(b) Notification to Lot (8) List of claimants
Claimants (9) Parcel Info Sheet
x) Put concrete monuments (10)Boundary argument
xi) Start survey and other details (11)Traverse Computation
xii) Plot on cad maps (12)Valid controls by NAMRIA/ LMS
xiii) Provide final lot and corner (13)Tax maps
numbers (14)Miscellaneous data
xiv) Prepare tracing of cad maps and 8) LAMS
verify. Post copies in brgy halls a) DAO 2010-18
xv) Complete and ink maps b) System of data capture, storage,
xvi) Prepare brgy/case boundary and analysis and info generation in land
index maps and complete progress record
map c) Program
xvii) Prepare complete survey i) Building infrastructure
returns ii) Computerization of records
iii) Decentralization of records standards and tech reqs for economic
iv) Integration and database Systems and socialized housing
Dev’t 4) Design Considerations
d) Steps a) Lot Allocation
i) Inventory i) 30% open space
ii) Indexing ii) 70% saleable areas
iii) Encoding b) Parks and Playgrounds
iv) Scanning
v) Database
vi) Systems Dev’t

LEC 6
1) Overview
a) Simple – not more than 10 lots, ROW is i)
3 + 0.5 per additional lot, DAO 2007-29
b) Complex
i) Subdivision project – parcel
partitioned for different purposes ii)
for public sale, including residential, c) Community Facilities
commercial, industrial and
recreational areas
ii) EO 648, 1981 – vests HLURB with
quasi-judicial powers to enforce
i)
mandates including housing laws
2) Classifications
a) Economic – 30% gross, box type, bare
interior, 1 toilet and bath, 2 bedrooms
ii)
b) Socialized – 30% gross, undertaken by
Gov’t for homeless, attached in a row,
no amenities
c) Medium cost – better and more
amenities
d) Open market – high-end, houses
according to buyer’s preference
3) Laws
a) RA 7279 – Urban Dev’t and Housing Act, iii)
Balanced housing program, 15% of area d) Housing Units
of project for socialized housing i) Single-detached
b) PD 957 – Subd. And Condo Buyer’s (1) Med 100
Protective Degree, ensure protection of (2) Open Mar 120
buyers from fraud ii) Duplex
c) BP 220 – authorizes Ministry of Human (1) Med 80
Settlement to promulgate levels of (2) Open mar 96
iii) Row House 5) Procedures
(1) Med 50 a) Pre-design stage:
(2) Open Mar 60 i) Control
e) Minimum Lot Area ii) Relocation
iii) Topographic
b) Design Stage
i) Complex Subdivision Design
ii) Site Grading
i)
f) Minimum Lot Frontage c) Implementation
i) Stake out of lot corners
ii) Setting out of utilities
d) Approval
i) Survey Returns
(1) 2 sets of Site Dev’t Plan
i) (2) Set of documents signed and
g) Length of Block sealed by GE
i) Maximum length of block shall be (a) Vicinity Map
400 meters, however, blocks (b) Topographic Plan
exceeding 250 meters shall be (c) Survey Plan of Lots
provided with a 2-m alley (3) 2 copies of Certified True Copy
approximately at mid-length. of Titles and Current Tax
h) Shelter Component Receipt

i)
i) Minimum Level of Completion

i)
j) RROW

i)

ii)
LEC 7 LEC 8
1) RTK-GNSS for Property Surveys 1) Concepts
a) Land Surveys a) Definition of Land
i) RTK-GNSS as alternative i) Surface of earth, all above and
ii) DAO 2007-29, DMC 2010-13, below, set of rights to trade it,
provisions to consider description
iii) 2015, LMB issued LMC 2015-01, ii) Sustainable Dev’t = Property +
“Guidelines on the Use of RTK-GNSS Natural Resource
in the Conduct of All Kinds of Lot b) Control of Land
Surveys with Tertiary Accuracy” i) Tenure – holding of property over a
b) Recommendations period time or reference to a
i) 15° clearance can be waived if error superior
is less than 5 cm under obstructions (1) Owner – surface, water, sub-
ii) Held rovers are applicable if bubble surface rights, access,
is stable boundaries, liability
iii) Precision is better than 5 cm if RMS (2) Superior – rights to tax,
not provided condemn, police power,
iv) Observation time can be lessened escheat, revert to gov’t
to 5 1-sec observation ii) Interests – rights to use land in
v) Minimum of 10 satellites needed conformity with laws and practices
vi) PDOP should be better than 2 are owned
c) Conclusions (1) Rights
i) RTK-GNSS is applicable (2) Restrictions
ii) Limitations due to accuracy and (3) Responsibilities
obstruction c) Man-Land Relationship
iii) Rapid-Static GNSS is recommended i) Dynamic
iv) Submittals must include base-point ii) Driven by economic paradigm
used and horizontal precision iii) Tempered by environmental and
2) UAS for Land Survey social priorities
a) Land Survey iv) Global drivers are sustainable dev’t,
i) DAO 2007-29 provided provisions globalization, IT, urbanization and
ii) LMB issued LMC 2017-13 economic reform
2) Land Administration
a) Administration
i) process of regulating land and
property dev’t and use and
conservation, gathering of revenues
through sales, lease and tax and
resolving conflicts of ownership and
use of land
ii) Process of determining, recording,
and disseminating info about
tenure, value and use of land
iii) Includes land registration, cad ii) Operational
survey and mapping, fiscal, legal, (1) Land registration and cadaster
multi-purpose cadastres, parcel- iii) Context of good governance and
based land info systems, and info rule of law
supporting land use planning and d) Land Registration
valuation or taxation i) Formalization of land tenure
b) Functions ii) Provides means for recognizing
i) Juridical/Judicial – adjudication and formalized property rights, and
registration of rights in land regulating character and transfer of
ii) Regulatory – development and use these rights
of land through restrictions, zoning e) Land Titling
and designations i) adjudicating rights in land,
iii) Fiscal – emphasizes on economic surveying and mapping, establishing
utility of land office and land registry to store and
iv) Information management manage maps, titles and deeds
(1) LIS – Land information Systems ii) Transaction Evidence
(a) Cadaster – technical record (1) Oral agreement – Witnesses
of parcellation of land and (2) Private conveyance – deed, no
authoritative documentary registration
record of fiscal/ proprietary (3) Deeds registration –
nature registration no guarantee
3) Land Tenure and Registration (4) Title registration – registration,
a) Tenure proof of title
i) mode where rights to land are held f) Torrens System – registration of
ii) rights in land interests in land where docs are
iii) habitual/ legal rights to land, regulated, monitored and examined by
resulting relationships between authority to ensure correctness and
members title is transferred without flaw
iv) bundle of rights i) Mirror – registration reflects
b) Tenure Security current situation
i) Exists when individual has rights to ii) Curtain – no need for investigations
land on continuous basis, free from in past
interference, ability to reap benefits iii) Insurance – state assumes
ii) Agreement between owner and responsibility for authenticity of
property governed by legal and register
admin framework g) Recording rights, restrictions and
iii) Certainty that rights will be valid as responsibilities
long not revoked in legal way i) Ownership
c) How to provide security ii) Easements
i) Institutional Level iii) Restrictions as to user
(1) Land policy iv) Rights of Way
(2) Legal framework and social v) Native Title Rights
inclusion vi) Mortgages
(3) Public administration vii) Leases
h) Certificate of Title LEC 9
i) Parcel – parcel, identifier, metes 1) Land Valuation
and bounds a) Definitions
ii) Proprietorship – owner i) Appraisal – making an estimate on
iii) Encumbrances – other interests e.g. value of any asset/ property in
mortgage, easement or restriction accordance with standards
i) Registration ii) Valuation – determining monetary
i) Original (OCT) value of property rights at a specific
(1) Judicial Registration time
(2) Administrative Registration iii) Value – worth, usefulness or utility
ii) Subsequent iv) Market Value – highest price
(1) TCT, CCT estimate
(2) Inscription of annotations b) Property Valuation Approaches
j) LRA i) Sale comparison – MV = Sp + Va
i) Mandates for land registration, (1) Application – comparable
attached to DOJ, preservation of objects, owners
record of all transactions (2) Type – Residential/ agricultural
ii) 1 central office, 15 regional RD, 147 (3) Necessary Data – Sales prices
RD’s ii) Income – V = I/R
k) Steps in Transferring Title (1) Application – comparable
i) E properties, renters
ii) Sales (2) Type – Commercial, rental
(1) Deed of Sale (500-1000) (3) Necessary Data – Rent Prices
(2) Capital Gains Tax (6%) iii) Cost – MV = LV + DV
(3) Tax Receipt (1) Application – Special Objects
(4) Doc stamps (1.5%) (2) Type – Industrial, schools,
(5) Transfer tax (0.5%) hospitals
(6) Tax Clearance (3) Necessary Data – Building Costs
(7) Tax Dec (150-300) c) Factors
(8) Title i) Social
(9) Reg Fee (0.25%) ii) Economic
iii) Government
iv) Environmental
d) Taxation
i) Types
(1) Property Tax – recurrent tax
related to ownership of land
(2) Annual land gain tax – tax on
annual increase in land value
(3) Transfer tax – tax on transfer of
immovable property
(4) Land Gain tax – tax on increase
of land value
(5) Dev’t gain tax – tax on increase c) Legal Basis for CLUP
of land value due to event i) RA 7160 – cities and municipalities
(6) Death and gift tax – tax on prepare CLUP enacted through zone
inheritance and gifts ordinances
(7) Capital gain tax – tax on capital ii) RA 7586 (Nat’l Integrated Protected
gains Areas System act of 1992) –
ii) Legal Basis protected areas are incorporated in
(1) Real property tax code PD 464 – CLUP
appraisal of real property for iii) EO 72 – Providing for the
taxation and levy of tax Preparation and Implementation of
(2) Local Gov’t code of 1991 RA CLUP of Local Gov’t Units
7160 – legal framework to d) Elements
devolve taxing i) Policy and Strategy Framework
(3) Local ordinances (1) Goals
iii) Phases (a) Population Framework
(1) Discovery – finding out taxable (b) Visions on Land Use
(a) Self-Declaration (c) Urban Dev’t and ReDev’t
(b) Gov’t inventory Framework
(2) Valuation – calculate relative (2) Strategies
value (a) Transportation
(3) Assessment – calculate tax (b) Redev’t
(a) Total Tax Value = (TRL x LV) (c) Housing Supply and
+ (TRI x IV) Socialized Housing
(4) Billing – inform taxpayer (d) Environmental Protection
(5) Payment - collect (e) Urban Disaster Mitigation
2) Land Use ii) Implementation Scheme
a) Definitions iii) Regulatory Framework
i) Land use – platform of activities (1) Zoning Ordinance
ii) Conversion - change in character of (a) Locational Clearance
land (2) Building and Subd Codes
iii) Capacity – limit a land unit to (a) Building Permit
productive use (i) Floor-Area Ratio
iv) Classification – systematic grouping (ii) Building Coverage Ratio
of activities (iii) Height and Shadow
v) Map – output of classification Restriction
process
vi) Planning - proper management of
land resources, hierarchical and
comprehensive
b) Categories
i) Protection Land Use
ii) Settlement Dev’t
iii) Production Land Use
iv) Infrastructure Dev’t

Вам также может понравиться