SCOPE OF SERVICES

Overview of services that architects can provide over the span of a building project.

Draft Architect’s
Stages
0 1 2 3 4 5
Scope Design
of Services Initiative Initiation Construction Building Use End of Life
ACE WG SOS 2.1 Concept Design 2.2 Preliminary Design 2.3 Developed Design 2.4 Detailed Design
Stage where the need for a construction or Stage where project objectives are Sub stage where a set of fundamental Sub stage where a design of the project is Sub stage where the project is specified in Sub stage where the project is fully Stage where the design is built in Stage where the building and external Stage where the building which is the end
urban project emerges and is established sufficiently defined to allow a decision for thoughts for the project are developed developed that offers a broad insight such detail, that clear under-standing is described to technical detail, so that accordance with the contract documents, works are in use and maintained for the of its life-cycle and is revamped or
(EN 16310 definition) design to proceed starting at the design work stage taking covering planning aspects, functional given to the stakeholders on the construction and that manufacturing and legislation and client requirements purpose that they have been designed for. dismantled.
(c.f. EN 16310 definition) into account the constraints. organisation, spatial structure and general characteristics of the end result and the installation of equipment can take place (EN 16310 definition) (EN 16310 definition)
(ISO 16813) appearance, enabling the client to make cost of implementation can be established (EN 16310 definition of «technical
Definition informed strategic choices between (EN 16310 definition) design»)
functional concepts and options envisaged
(EN 16310 definition)

Tasks
0.1 Market Study: 1.1 Project Initiation: Examine the principal elements of the Develop the concept design and chosen Develop the approved preliminary design Further develop the design to provide 3.1 Pre-Construction: 4.1 Operation: 5.1 Audit:
Appraise future requirements and market Evaluate client needs and user brief, if already defined by the client, or options as approved by the client and up to an appropriate level, providing the execution and detail drawings at the Prepare contract administration, review Support the client to maximise the use of Undertake end of life audit. Recomend
conditions for a specific project taking requirements. the objectives and requirements the previewed with the authorities. basic information required for issue of required scale ( typically 1:50, 1:20, 1:10, contracts and project objectives. his investment. Possibly review of project demolition and/or rehabilitation strategy.
into consideration the interests of society, Compile available information covering project has to satisfy. Prepare graphic presentations of the contract plans and specifications. 1:5, 1:1). 3.2 Inspection performance and additional project 5.2 Revamping:
economic impact of the project and end regulatory, infrastructure and geotechnical Produce concept sketches and undertake project for discussions with the client and Prepare a set of developed design Provide calculations and specifications Oversee the execution of the building information as required. Provide services for a new cycle taking the
users’ needs. conditions. preliminary investigations. other interested parties. drawings with floor plans, sections and intended for construction and enabling contract. Monitor construction progress 4.2 Maintenance: the built asset through stages from 0.
0.2 Business Case: Identify additional site investigations Prepare CONCEPT design proposals with Produce a set of preliminary design elevations to determine the dimensions, contractors to build the works. Determine and compliance with plans. Inspect Advise for maintenance of the building Initiative to 4. New Use. Possibly partial
Describe the viability of the project, the required including surveys of existing design options, translating into drawings drawings at an appropriate scale (typically appearance, principal technical solutions, all details including furniture and other contractors' activity and execution of the and external works for upkeep of the dismantling under controlled conditions if
likelihood of success and project risks, as buildings and structures. at an appropriate scale (typically 1:500- 1:200-1:100) with floor plans, sections, materials and construction elements of elements that are specific to the project. works. Consider contractors' drawings. client's investment. Possibly assistance required.
a basis for decision to go ahead. If necessary, carry out measured surveys 1:200) along with a preliminary design elevations and 3d modelling. Produce the project at an appropriate scale Recalculate building costs based on Undertake random inspection of materials with facility management, training, 5.3 Dismantling:
Estimate and compare overall costs. Set and condition surveys of existing report and an initial cost estimate. technical reports to explain design (typically 1:100-1:50). customary prices and possibly, bills of and quality of workmanship. environmental monitoring, life-cycle Enable facility shutdown and closing off of
out advantages and disadvantages, such structures or buildings on site. options. Produce specification and detailed quantities incorporating quotations from Undertake final clarification of design strategy and energy-waste-water the site. Identify services (electricity, gas,
as income generation, the benefit and 1.2 Feasibility Study: description of the works in the form of a specialist subcontractors. details prior to implementation. Process management procedures. fluids ..) in order to make the building
gains to society and end users against the Set out basic planning principles and written document describing the nature of Establish a project execution plan. changes required by the client and issue safe for decommissioning. Apply for any
environmental impact and it’s use of possible construction strategies. the works and defining the technical relevant instructions to contractors. necessary closure permits. Identify raw
Design Services resources. Examine how the project can meet stated specifications for each separate trade. Check and approve requests for payment materials and waste; select materials to be
& Construction requirements and aspirations. Calculate building costs based on issued by contractors. recycled. Arrange removal and treatment
A Inform the client of technical and statutory customary prices and if applicable, 3.3 Commissioning: of contaminated materials, removal of
Management constraints the project has to satisfy. produce bills of quantities (see below). Check that all works have been carried out structures, treatment and/or removal of
Investigate and evaluate expected budget in accordance to contract, and that the contaminated soil and groundwater. If
requirements. building is fit for use and compliant to necessary, select appropriate landfill.
1.3 Definition: regulations and permits obtained. Inspect dismantling of equipment and
Undertake Investigation and determination If necessary, organise statutory service disconnections. Coordinate
of client and user requirements and procedures required to open the building. demolition under controlled conditions to
expectations. Set Oversee preparation of as-built ensure: health and safety of site
out a project brief, produce a room and documentation. operatives and the general public. Propose
function schedule. 3.4 Handover: measures to control noise, air and ground
After final checks for workmanship and water pollution.
compliance with contract documents,
Supervise handover to the client and
building users as start of guarantee
periods. Oversee issue of as-built
documentation and final accounts.

Hold preliminary discussions with local Based on the approved design, produce architectural plans and documentation describing the project to a level of detail as Apply for additional permits as required, Prepare documentation to obtain permits Prepare documentation to obtain permits
authorities on the basis of the conceptual required for Planning or Building permit applications. enable possible monitoring by authorities for possible changes of use, renovation or from authorities for dismantling or
Statutory design agreed by the client. Collate additional technical documentation from technical specialist consultants; such as; acoustic, thermal, fire safety, during construction and produce redesign. revamping as required
B environmental and other appraisals as required by applicable legislation. documents to support registration of
Approval Assemble documents required for building permit applications, draft and submit applications. completion of the works with authorities if
Represent the client and assistance during planning negotiations and monitor the approvals procedure. necessary.
Advise with initial considerations for Define possible procurement strategy. Undertake tender action - convert the project design into a set of pre-contract documents setting out an unambiguous set of tender requirements - collate project Monitor revisions to construction contrats Set out procurement documentation and Set out procurement documentation and
procurement strategy if required Assemble project team. documents necessary for contractors to appreciate the type, the quantity, the quality and the scope of their works so that contractors can calculate their best offer. tender proceedures for facility tender proceedures for revamping or
Prepare and issue a tender file to tenderers, including: the conditions of tender, the proposed form of contract, plans, specifications, possibly a bill of quantities and a list of management, maintanance, and possibly dismantling
contractual documents with their order of priority, etc. renovation.
C Procurement Analyse tender returns, make recommendations to client and enable him to pass construction contracts with each respective trade.

Define an expected or desired time Set out key programme dates. Update and Review of the project Review and update proposed construction Detail and agree proposed construction Monitor construction schedule as agreed Provide advice to programme planned Schedule works for revamping or dismantling
schedule, preparation of a project Update and Review of the project execution plan. Devise fundamental schedule and of the project execution schedule. by contract maintenance and periodical performance
D Programme execution plan. execution plan.
Consider options for Construction
schedule in phases.
Propose Construction Strategy.
plan.
Review and update Construction Strategy.
Elaborate Handover and Commissioning
Strategy.
testing

Strategy.

Propose definition of Sustainability Produce preliminary definition of Develop Sustainability Strategy. Review and update Sustainability Strategy. Monitor application of Sustainability Monitor Sustainability performance. Consider waste management, environmental
objectives. Sustainability Strategy. Review and update of the environmental objectives. impacts, contamination, see above.
Environmental impact assessment - verify impact assessment if necessary.
E Sustainability the general impact of the project on the
environment, including building,
operating and dismantling.
Consider Health and Safety strategy. Prepare an Outline for Health and Safety Review and update of Health and Safety Review and update of Health and Safety Review and update of Health and Safety Monitor application of Health and Safety Update Health and Safety Documentation Consideration of Health and Safety when
Health and
F Strategy. Strategy. Strategy. Strategy. Strategy. as required revamping or dismantling see above.
Safety
Advise with initial considerations for Identify need for specialist consultants. Check design from specialist consultants for compliance with the general design and integrate as necessary into overall design documentation. (Specialist design includes Monitor input and advice from specialist
Specialist assembling the project team Assemble project team. technical sub-disciplines of construction such as structural-, mechanical-, electrical-, HVAC-, geotechnical-, fire security-, acoustics-, lighting- etc.) consultants at construction
G Consultant
Design
Check design from specialist suppliers and contractors for compliance with the general design and integrate as necessary into
Specialist overall design documentation. (Specialist contractor's design includes technical design of subcomponents).
H Subcontractor
Design
Define information exchange objectives Information exchange level 1. Produce end Information exchange level 2. Produce Information exchange level 3. Produce end Information exchange level 4. Produce end Answer requests for information from Update As-built information as required Archive as built information
Information (f.i. adjustment of the brief in case of of stage report for client approval. end of stage report for client approval. of stage report for client approval. of stage report for client approval. contractors. Compile As-built information.
I adjustment of services if necessary) Consider change of the brief.
Exchanges
J Notes Acknowledgements: This matrix scope of services is based on work undertaken by the ACE workgroup of that name. It draws on several national scopes, in particular recent HOIA 2013 from Germany, the HIA from Austria, the RIBA 2013 plan of work and the European standard on Engineering consultancy services EN 16310 published in 2013. ©  ACE WG SOS

Adopted in AG1/14 - April 2014