The building was painted 11 years back and the same is overdue by
atleast 4 years. Besides there are certain repairs and maintenance
works which are required to be carried out to give stability to the
Building and also painting works.
As a first step estimates of work, area and specification of work for
each area of building needs to be assessed. The work broadly
comprise of the following:-
1. Main Building:-