Вы находитесь на странице: 1из 6

UJIAN PERCUBAAN CAMPURAN KONKRIT (TRIAL MIX)

LV CONCRETE SDN BHD


PROJEK PEMBINAAN IBU PEJABAT POLIS DAERAH MUALLIM
DATE : 4 JULY 2018
LOCATION : LV CONCRETE BACTHING PLANT, SLIM RIVER

COMPRESSIVE STRENGTH (N/mm2) TARGET


CONCRE
SLUMP (mm)
TE BACTH NO SLUMP TEST (mm)
3 DAYS 7 DAYS 28 DAYS (REF.SECTION
GRADE
D : TABLE D7)
34.66 44.89
BATCH 1 (DESIGN
MIX WITH X 37.77 42.67
130
ADMIXTURE) 37.33 44.44
SAMPLE 1,2,3
AVG: 36.59 44.00
C20/20 100-150 (S3)
BATCH 2 ( DESIGN 21.77 28.89
MIX WITHOUT X 23.55 27.56
ADMIXTURE) 110
CONTROL MIX 22.66 28.44
SAMPLE 4,5,6 AVG: 22.66 28.30
36 43.11
BATCH 1 (DESIGN
MIX WITH X 34.66 42.22
130
ADMIXTURE) 34.22 42.67
SAMPLE 1,2,3
AVG: 34.96 42.67
C20/25 100-150 (S3)
BATCH 2 ( DESIGN 28 33.78
MIX WITHOUT X 28.44 34.22
ADMIXTURE) 100
CONTROL MIX 28 33.33
SAMPLE 4,5,6
UJIAN PERCUBAAN CAMPURAN KONKRIT (TRIAL MIX)
LV CONCRETE SDN BHD
PROJEK PEMBINAAN IBU PEJABAT POLIS DAERAH MUALLIM
DATE : 4 JULY 2018
LOCATION : LV CONCRETE BACTHING PLANT, SLIM RIVER
C20/25 100-150 (S3)
COMPRESSIVE STRENGTH (N/mm2) TARGET
CONCRE BATCH 2 ( DESIGN
MIX WITHOUT SLUMP (mm)
TE BACTH NO SLUMP TEST (mm)
ADMIXTURE) 3 DAYS 7 DAYS 28 DAYS 100 (REF.SECTION
GRADE
CONTROL MIX D : TABLE D7)
SAMPLE 4,5,6 AVG: 28.15 33.78
UJIAN PERCUBAAN CAMPURAN KONKRIT (TRIAL MIX)
LV CONCRETE SDN BHD
PROJEK PEMBINAAN IBU PEJABAT POLIS DAERAH MUALLIM
DATE : 4 JULY 2018
LOCATION : LV CONCRETE BACTHING PLANT, SLIM RIVER

COMPRESSIVE STRENGTH (N/mm2) TARGET


CONCRE
SLUMP (mm)
TE BACTH NO SLUMP TEST (mm)
3 DAYS 7 DAYS 28 DAYS (REF.SECTION
GRADE
D : TABLE D7)
50.22 56.44 59.11
BATCH 1 (DESIGN
MIX WITH 53.33 57.77 60
110
ADMIXTURE) 52.44 56.44 62.22
SAMPLE 1,2,3
AVG: 52.00 56.88 60.44
BATCH 2 ( DESIGN 40.44 44 51.11
MIX WITHOUT 40.44 43.11 45.33
C30/37 ADMIXTURE) 70 100-150 (S3)
CONTROL MIX 40.00 42.66 53.33
SAMPLE 4,5,6 AVG: 40.29 43.26 49.92
51.11 56.44 64.89
BATCH 3 (JKR
SPEC WITH 53.33 56.44 64
120
ADMIXTURE) 54.67 56.44 66.67
SAMPLE 7,8,9
AVG: 53.04 56.44 65.19
UJIAN PERCUBAAN CAMPURAN KONKRIT (TRIAL MIX)
UNIQUE MIX (PG) SDN BHD
PROJEK PEMBINAAN IBU PEJABAT POLIS DAERAH MUALLIM
DATE : 5 JULY 2018
LOCATION : UNIQUE MIX (PG) BATCHING PLANT, TANJUNG MALIM

TARGET SLUMP
CONCRETE COMPRESSIVE STRENGTH (N/mm2) SLUMP TEST (mm)
BACTH NO
GRADE (mm) (REF.SECTION D :
TABLE D7)
3 DAYS 7 DAYS 28 DAYS

BATCH 1 46.22 50.66


(DESIGN MIX X 46.88 52
WITH 140
ADMIXTURE) 45.55 51.77
SAMPLE 1,2,3 AVG: 46.22 51.48
C20/20 100-150 (S3)
BATCH 2 28 35.11
( DESIGN MIX
WITHOUT X 29.11 32,44
110
ADMIXTURE) 26.22 33.55
CONTROL MIX
SAMPLE 4,5,6 AVG: 27.78 34.33

BATCH 1 46.88 51.33


(DESIGN MIX X 47.11 50.22
WITH 120
ADMIXTURE) 46.66 50.22
SAMPLE 1,2,3 AVG: 46.88 50.59
C20/25 100-150 (S3)
BATCH 2 32 41.77
( DESIGN MIX
WITHOUT X
120
ADMIXTURE)
CONTROL MIX
SAMPLE 4,5,6
C20/25 100-150 (S3)
BATCH 2
( DESIGN MIX
WITHOUT X 34.44 38.66
120
ADMIXTURE) 34.88 41.11
CONTROL MIX
SAMPLE 4,5,6 AVG: 33.77 40.51
BATCH 1 49.11 55.55 61.11
(DESIGN MIX 57.11 54 58.66
WITH 115
ADMIXTURE) 48.44 58.44 65.77
SAMPLE 1,2,3 AVG: 51.55 56.00 61.85
C30/37 75-125
BATCH 2 33.11 37.77 46.22
( DESIGN MIX
WITHOUT 36.00 38.66 44.88
85
ADMIXTURE) 34.00 39.77 47.77
CONTROL MIX
SAMPLE 4,5,6 AVG: 34.37 38.73 46.29