CONVOCATORIA PÚBLICA No.

COMM-SAMC-006-2014
PRESUPUESTO

PROPONENTE: JORGE ELIECER BARRANCO LOPEZ

$165,516,040.00
ITEM DESCRIPCION UND CANT. VR. UNIT

1 EXCAVACIONES
1.1 Excavación para zapatas de 1,00 x1,00 x 1,00 mts M3 12.60 30,000.00
1.2 Excavación viga de cimentación, 0,30 x 0,30 mts ML 105.00 3,000.00
TOTAL ITEM
2 ESTRUCTURAS EN CONCRETO
Zapatas en concreto reforzado 1,00 x 1,00 x 0,50 mts.
2.1 Concreto 1:2:3 10Ø5/8" ambos sentidos UND 12.00 349,486.83

Columna de 0,34 x 0,34 x 8,00 mts concreto reforzado


2.2 concreto 1:2:3 4 Ø 5/8" + 2 Ø 1/2" - estribos ⅜" C/,010 UND 12.00 941,428.28
hasta ,70 mts en los estremos y C/ ,15 parte central
Viga de amarre perimetral aerea de 0,30 x 0,45 mts ML 65.00 136,483.59
2.3
concreto 1:2:3 - 4 Ø 5/8" + 2 Ø 1/2" - estribos 3/8 c/0,20mts

Viga de cimentación conc. Reforzado 0,30 x 0 ,30 mts - ML 105.00 77,060.31


2.4
concreto 1:2:3 4ؽ" - estribos ⅜" C/ ,20 mts

TOTAL ITEM
3 ESTRUCTURA METALICA
Cerchas metalica de 20 mts de largo x 1,00 mts de alto -
3.1 curva en tubo de 4" y 3mm- y soportes en tubos de 3"y UND 6.00 5,063,724.50
25mm y 2"y2mm pintadas e instaladas

Correas en perfil C - 160x60-2mm de 6mts pintadas e UND 100.00 247,757.50


3.2
instaladas
TOTAL ITEM
4 CUBIERTA
Suministro e instalación de cubbierta en lamina termo- M2 810.00 57,489.50
4.1
acustica prepintada color verde con blanco
4.2 Pintura vinilo tipo 1 para vigas y columnas ML 500.00 3,090.50
TOTAL ITEM
5 LIMPIEZA
5.1 Limpieza de la obra UND 1.00 600,000.00
TOTAL ITEM
CERRAMIENTO PROVISIONAL EN TELA VERDE 2.1 ML

SUMINISTRO E INSTALACION DE ELEMENTOS DE UND


ANCLAJE (INCLUYE 4 pernos ∅ 12mm
(1/2"),A325 l=0.20m,Angulo de respaldo L 2x2 ¼"
(50x6) mm a36;Placa base,200x200x5mm
SUBTOTAL PRESUPUESTO
ADMINISTRACION 10.00%
IMPREVISTOS 5.00%
UTILIDAD 5.00%
IVA SOBRE LA UTILIDAD 16.00%
VALOR TOTAL PRESUPUESTO

ARQ. JORGE ELIECER BARRANCO LOPEZ 5174055


C.C 19’593.205 de Fundación, Magdalena
$165,516,040.00
VR.TOTAL VR. UNIT CANT. VR.TOTAL

378,000.00 30,000.00 12.60 378,000.00 378000


315,000.00 3,000.00 114.00 342,000.00 342000
693,000.00 720,000.00 720000

4,193,841.90 403,068.33 12.00 4,836,819.90


4836819.9

11,297,139.32 851,787.15 12.00 10,221,445.80


10221445.8
8,871,433.42 136,483.59 64.00 8,734,949.82
8734949.824

8,091,332.39 77,060.31 114.00 8,784,875.17


8784875.169
32,453,747.03 32,578,090.69
32578090.69

30,382,347.00 6,048,016.97 6.00 36,288,101.82


35329111.41
24,775,750.00 247,757.50 127.00 31,465,202.50
31465202.5
55,158,097.00 67,753,304.32
66794313.91

46,566,495.00 42,500.75 900.00 38,250,675.00 38246849.93 900


1,545,250.00 3,090.50 530.40 1,639,201.20 1639201.2
48,111,745.00 39,889,876.20
39886051.13

600,000.00 600,000.00 1.00 600,000.00 600000


600,000.00 600,000.00
600000

14,074.16 130 1,829,640.53

123,357.37 12 1,480,288.38
1210377.582
3,309,928.91 1494876
2705253.582
137,016,589.03 144,851,200.12 7,834,611.10
13,701,658.90 14,485,120.01 143283709
6,850,829.45 14328370.93
6,850,829.45 7,242,560.01
1,096,132.71 1,158,809.60 7164185.466
165,516,040.00 167,737,690.00 1146269.675
- - 165922535

126.5

COL 28.2 12

VIGA 192
42,500.75 38,250,675.00
169,487,674.73
165,589,458.21
165,419,970.54
165,250,482.86

0.9765668227

338.4

530.4
CONVOCATORIA PÚBLICA No. COMM-SAMC-006-2014
ANALISIS UNITARIOS

PROPONENTE: JORGE ELIECER BARRANCO LOPEZ

ITEM: 1.1Excavación para zapatas de 1,00 x1,00 x 1,00 mts Unidad: M3

DESCRIPCION UND CANT. Vr.UNITARIO Vr. PARCIAL

SUB TOTAL MATERIALES

Mano de Obra und 1.00 29,500.00 29,500.00


SUB TOTAL MANO DE OBRA 29,500.00

Herramientas menores GLB 1.00 500.00 500.00


SUB TOTALO EQUIPO 500.00

TOTAL ITEM 30,000.00

ITEM :1.2. Excavación viga de cimentación, 0,30 x 0,30 mts Unidad: Ml

DESCRIPCION UND CANT. Vr.UNITARIO Vr. PARCIAL

SUB TOTAL MATERIALES

Mano de Obra und 1.00 2,500.00 2,500.00


SUB TOTAL MANO DE OBRA 2,500.00

Herramientas menores GLB 1.00 500.00 500.00


SUB TOTALO EQUIPO 500.00

TOTAL ITEM 3,000.00

ITEM: 2.1. Zapatas en concreto reforzado 1,00 x 1,00 x 0,50 mts. Unidad:UND
Concreto 1:2:3 10Ø5/8" ambos sentidos
DESCRIPCION UND CANT. Vr.UNITARIO Vr. PARCIAL
Concreto 1:2:3 M3 0.50 486,453.00 243,226.50
Varilla 5/8" corrugada UND 1.90 21,000.00 39,900.00
Alambre de amarre KG 0.25 4,000.00 1,000.00
Puntillas de 21/2" LB 0.25 3,000.00 750.00
Desperdicio % 5.00 14,206.33
SUB TOTAL MATERIALES 299,082.83

Mano de Obra und 1.00 50,000.00 50,000.00


SUB TOTAL MANO DE OBRA 50,000.00

Herramientas menores GLB 1.00 404.00 404.00


SUB TOTALO EQUIPO 404.00
TOTAL ITEM 349,486.83

ITEM: 2,2 Columna de 0,34 x 0,34 x 8,00 mts concreto reforzado Unidad: UND
concreto 1:2:3 4 Ø 5/8" + 2 Ø 1/2" - estribos ⅜" C/,010 hasta ,70 mts en
los estremos y C/ ,15 parte central

DESCRIPCION UND CANT. Vr.UNITARIO Vr. PARCIAL

Concreto 1:2:3 M3 0.81 486,453.00 394,026.93


Varilla 5/8" corrugada UND 6.00 21,000.00 126,000.00
Varilla 1/2" corrugada UND 3.00 15,000.00 45,000.00
Varilla 3/8" corrugada UND 12.00 8,000.00 96,000.00
Alambre de amarre KG 2.00 4,000.00 8,000.00
Puntillas de 21/2" LB 1.00 3,000.00 3,000.00
Desperdicio % 5.00 33,601.35
SUB TOTAL MATERIALES 705,628.28

Mano de Obra und 1.00 184,500.00 184,500.00

SUB TOTAL MANO DE OBRA 184,500.00


Formaleta metálica UND 1.00 50,000.00 50,000.00
Gatos metálicos UND 2.00 400.00 800.00
Herramientas menores GLB 1.00 500.00 500.00

SUB TOTALO EQUIPO 51,300.00


TOTAL ITEM 941,428.28

ITEM: 2,3 Viga de amarre perimetral aerea de 0,30 x 0,45 mts concreto Unidad: ML
1:2:3 - 4 Ø 5/8" + 2 Ø 1/2" - estribos 3/8 c/0,20mts
DESCRIPCION UND CANT. Vr.UNITARIO Vr. PARCIAL
Concreto 1:2:3 M3 0.14 486,453.00 68,103.42
Varilla 5/8" corrugada UND 1.00 21,000.00 21,000.00
Varilla 1/2" corrugada UND 0.50 15,000.00 7,500.00
Varilla 3/8" corrugada UND 1.50 8,000.00 12,000.00
Alambre de amarre KG 0.10 4,000.00 400.00
Tabla para formaleta UND 0.50 15,000.00 7,500.00
Listón de 2" x 2" UND 0.20 4,000.00 800.00
Puntillas de 21/2" LB 0.20 3,000.00 600.00
Desperdicio % 5.00 5,480.17
SUB TOTAL MATERIALES 123,383.59

Mano de Obra und 1.00 12,000.00 12,000.00


SUB TOTAL MANO DE OBRA 12,000.00

Gatos metálicos UND 2.00 400.00 800.00


Herramientas menores GLB 1.00 300.00 300.00
SUB TOTALO EQUIPO 1,100.00

TOTAL ITEM 136,483.59


ITEM: 2,4 Viga de cimentación conc. Reforzado 0,30 x 0 ,30 mts - Unidad: ML
concreto 1:2:3 4ؽ" - estribos ⅜" C/ ,20 mts
DESCRIPCION UND CANT. Vr.UNITARIO Vr. PARCIAL
Concreto 1:2:3 M3 0.09 486,453.00 43,780.77
Varilla 1/2" corrugada UND 0.75 15,000.00 11,250.00
Varilla 3/8" corrugada UND 0.92 8,000.00 7,360.00
Alambre de amarre KG 0.10 4,000.00 400.00
Puntillas de 21/2" LB 0.20 3,000.00 600.00
Desperdicio % 5.00 3,169.54
SUB TOTAL MATERIALES 66,560.31

Mano de Obra und 1.00 10,000.00 10,000.00


SUB TOTAL MANO DE OBRA 10,000.00

Herramientas menores GLB 1.00 500.00 500.00


SUB TOTALO EQUIPO 500.00

TOTAL ITEM 77,060.31

ITEM: 3,1Cerchas metalica de 20 mts de largo x 1,00 mts de alto - curva Unidad: UND
en tubo de 4" y 3mm- y soportes en tubos de 3"y 25mm y 2"y2mm
pintadas e instaladas

DESCRIPCION UND CANT. Vr.UNITARIO Vr. PARCIAL

Tubo 4" - 3 mms. - 6 mts. ML 55.00 45,680.00 2,512,400.00


Tubo 4" - 3 mms. - 6 mts. ML 15.00 28,950.00 434,250.00
Tubo 2" - 2 mms. - 6 mts. ML 22.00 13,245.00 291,390.00
Soldadura 60 -11- electrodo de alta
KG 5.75 25,000.00 143,750.00
penetración 25 Kg
Pintura anticorrosiva GL 2.30 35,000.00 80,500.00
Pintura esmalte blanco GL 2.30 58,000.00 133,400.00
Desperdicio % 5.00 179,784.50
SUB TOTAL MATERIALES 3,775,474.50

Mano de Obra und 1.00 1,230,000.00 1,230,000.00


SUB TOTAL MANO DE OBRA 1,230,000.00

Andamios Cuerpo 6.00 2,000.00 12,000.00


Tablones UND 10.00 200.00 2,000.00
Pluma grua UND 1.00 35,000.00 35,000.00
Equipo de soldadura UND 0.25 35,000.00 8,750.00
Herramientas menores GLB 1.00 500.00 500.00
SUB TOTALO EQUIPO 58,250.00
TOTAL ITEM 5,063,724.50

ITEM: 3,2 Correas en perfil C - 160x60-2mm de 6mts pintadas e Unidad: UND


instaladas

DESCRIPCION UND CANT. Vr.UNITARIO Vr. PARCIAL

Correa en perfil C - 160 X 60 - 2 mms


200,000.00
de 6 mts UND 1.00 200,000.00
Soldadura 60 -11- electrodo de alta
KG 0.10 25,000.00 2,500.00
penetración 25 Kg
Pintura anticorrosiva GL 0.05 35,000.00 1,750.00
Pintura esmalte blanco GL 0.05 58,000.00 2,900.00
Desperdicio % 5.00 10,357.50
SUB TOTAL MATERIALES 217,507.50

Mano de Obra und 1.00 25,000.00 25,000.00


SUB TOTAL MANO DE OBRA 25,000.00

Andamios Cuerpo 0.50 2,000.00 1,000.00


Tablones UND 10.00 200.00 2,000.00
Equipo de soldadura UND 0.05 35,000.00 1,750.00
Herramientas menores GLB 1.00 500.00 500.00
SUB TOTALO EQUIPO 5,250.00

TOTAL ITEM 247,757.50

ITEM: 4,1Suministro e instalación de cubbierta en lamina termo- Unidad: M2


acustica prepintada color verde con blanco
DESCRIPCION UND CANT. Vr.UNITARIO Vr. PARCIAL

Lámina termo-acústica prepintada. M2 1.00 37,800.00 37,800.00


Tornillo autoperforante UND 4.00 350.00 1,400.00
Tornillo de ala UND 2.00 525.00 1,050.00
Desperdicio % 5.00 2,012.50
SUB TOTAL MATERIALES 42,262.50

Mano de Obra und 1.00 12,000.00 12,000.00


SUB TOTAL MANO DE OBRA 12,000.00

Andamios Cuerpo 1.00 2,000.00 2,000.00


Tablones UND 4.00 200.00 800.00
Herramientas menores GLB 1.00 427.00 427.00
SUB TOTALO EQUIPO 3,227.00
TOTAL ITEM 57,489.50

ITEM: 4,2 Pintura vinilo tipo 1 para vigas y columnas Unidad: ML

DESCRIPCION UND CANT. Vr.UNITARIO Vr. PARCIAL

Pintura vinilo tipo 1 1,050.00


GLN 0.03 35,000.00
Desperdicio
52.50
% 5.00
SUB TOTAL MATERIALES 1,102.50

Mano de Obra und 1.00 1,700.00 1,700.00


SUB TOTAL MANO DE OBRA 1,700.00

Andamios Cuerpo 0.02 2,000.00 40.00


Tablones UND 0.30 200.00 60.00
Herramientas menores GLB 1.00 188.00 188.00
SUB TOTALO EQUIPO 288.00

TOTAL ITEM 3,090.50

ITEM: 5,1 Limpieza de obra Unidad:M2

DESCRIPCION UND CANT. Vr.UNITARIO Vr. PARCIAL

SUB TOTAL MATERIALES

Mano de Obra und 1.00 595,000.00 595,000.00


SUB TOTAL MANO DE OBRA 595,000.00

Herramientas menores GLB 1.00 5,000.00 5,000.00


SUB TOTALO EQUIPO 5,000.00

TOTAL ITEM 600,000.00


CERRAMIENTO PROVISIONAL EN TELA VERDE 2.1 Unidad: ML

DESCRIPCION UND CANT. Vr.UNITARIO Vr. PARCIAL

TELA VERDE ESTABILIZADA 2.1 ML 1.00 2,400.00 2,400.00


PUNTILLA CON CABEZA 2 lb 0.03 2,615.80 70.63
ALGARROBILLO 4X2"de 2,50 ml largo UN 0.75 10,000.00 7,500.00
Desperdicio % 5.00 15,015.80 498.53
SUB TOTAL MATERIALES 10,469.16

Mano de Obra und 1.00 3,500.00 3,500.00


SUB TOTAL MANO DE OBRA 3,500.00

0.00
0.00
Herramientas menores % 0.03 3,500.00 105.00
SUB TOTALO EQUIPO 105.00

TOTAL ITEM 14,074.16

SUMINISTRO E INSTALACION DE ELEMENTOS DE ANCLAJE Unidad: UN


(INCLUYE 4 pernos ∅ 12mm (1/2"),A325 l=0.20m,Angulo de
respaldo L 2x2 ¼" (50x6) mm a36;Placa base,200x200x5mm

DESCRIPCION UND CANT. Vr.UNITARIO Vr. PARCIAL

SUMINISTRO E INSTALACION DE ELEMENTOS


DE ANCLAJE (INCLUYE 4 pernos ∅ 12mm
94,921.30
(1/2"),A325 l=0.20m,Angulo de respaldo L 2x2 ¼"
(50x6) mm a36;Placa base,200x200x5mm ML 1.00 94,921.30

Desperdicio % 5.00 4,746.07


SUB TOTAL MATERIALES 99,667.37

Mano de Obra und 1.00 23,000.00 23,000.00


SUB TOTAL MANO DE OBRA 23,000.00

0.00
0.00
Herramientas menores % 0.03 23,000.00 690.00
SUB TOTALO EQUIPO 690.00

TOTAL ITEM 123,357.37


ITEM: 4,1Suministro e instalación de cubbierta en lamina Unidad: M2
Master 1000

DESCRIPCION UND CANT. Vr.UNITARIO Vr. PARCIAL

Lámina Master 1000


23,525.00
M2 1.00 23,525.00
Tornillo autoperforante
1,400.00
UND 4.00 350.00
Tornillo de ala UND 2.00 525.00 1,050.00
Desperdicio % 5.00 1,298.75
SUB TOTAL MATERIALES 27,273.75

Mano de Obra und 1.00 12,000.00 12,000.00


SUB TOTAL MANO DE OBRA 12,000.00

Andamios Cuerpo 1.00 2,000.00 2,000.00


Tablones UND 4.00 200.00 800.00
Herramientas menores GLB 1.00 427.00 427.00
SUB TOTALO EQUIPO 3,227.00

TOTAL ITEM 42,500.75


ITEM: 3,1Cerchas metalica de 27 mts de largo x 1,00 mts de Unidad: UND
alto - curva en tubo de 4" y 3mm- y soportes en tubos de 3"y
25mm y 2"y2mm pintadas e instaladas

DESCRIPCION UND CANT. Vr.UNITARIO Vr. PARCIAL

Tubo 4" - 3 mms. - 6 mts. ML 55.00 45,680.00 2,512,400.00


Tubo 4" - 3 mms. - 6 mts. ML 20.50 28,950.00 593,475.00
Tubo 2" - 2 mms. - 6 mts. ML 28.86 13,245.00 382,250.70
Soldadura 60 -11- electrodo de alta
KG 7.76 25,000.00 194,000.00
penetración 25 Kg
Pintura anticorrosiva GL 3.11 35,000.00 108,675.00
Pintura esmalte blanco GL 3.11 58,000.00 180,090.00
Desperdicio % 5.00 198,544.54
SUB TOTAL MATERIALES 4,169,435.24

Mano de Obra und 1.00 1,660,500.00 1,660,500.00


SUB TOTAL MANO DE OBRA 1,660,500.00
Andamios Cuerpo 6.00 2,000.00 12,000.00
Tablones UND 10.00 200.00 2,000.00
Pluma grua UND 1.00 35,000.00 35,000.00
Equipo de soldadura UND 0.25 35,000.00 8,750.00
Herramientas menores GLB 1.00 500.00 500.00
SUB TOTALO EQUIPO 58,250.00

TOTAL ITEM 5,888,185.24

ITEM: 2,2 Columna de 0,30x 0,30 x 7,05 mts concreto reforzado Unidad: UND
concreto 1:2:3 4 Ø 5/8" + 2 Ø 1/2" - estribos ⅜" C/,010 hasta ,
70 mts en los estremos y C/ ,15 parte central

DESCRIPCION UND CANT. Vr.UNITARIO Vr. PARCIAL

Concreto 1:2:3 M3 0.63 486,453.00 308,654.43


Varilla 5/8" corrugada UND 6.00 21,000.00 126,000.00
Varilla 1/2" corrugada UND 3.00 15,000.00 45,000.00
Varilla 3/8" corrugada UND 12.00 8,000.00 96,000.00
Alambre de amarre KG 2.00 4,000.00 8,000.00
Puntillas de 21/2" LB 1.00 3,000.00 3,000.00
Desperdicio % 5.00 29,332.72
SUB TOTAL MATERIALES 615,987.15

Mano de Obra und 1.00 184,500.00 184,500.00


SUB TOTAL MANO DE OBRA 184,500.00
Formaleta metálica UND 1.00 50,000.00 50,000.00
Gatos metálicos UND 2.00 400.00 800.00
Herramientas menores GLB 1.00 500.00 500.00

SUB TOTALO EQUIPO 51,300.00


TOTAL ITEM 851,787.15

ITEM: 2.1. Zapatas en concreto reforzado 1,00 x 1,00 x 0,50 mts. Unidad:UND
Concreto 1:2:3 10Ø5/8" ambos sentidos

DESCRIPCION UND CANT. Vr.UNITARIO Vr. PARCIAL


Concreto 1:2:3 M3 0.50 486,453.00 243,226.50
Varilla 5/8" corrugada UND 4.33 21,000.00 90,930.00
Alambre de amarre KG 0.25 4,000.00 1,000.00
Puntillas de 21/2" LB 0.25 3,000.00 750.00
Desperdicio % 5.00 16,757.83
SUB TOTAL MATERIALES 352,664.33

Mano de Obra und 1.00 50,000.00 50,000.00


SUB TOTAL MANO DE OBRA 50,000.00

Herramientas menores GLB 1.00 404.00 404.00


SUB TOTALO EQUIPO 404.00

TOTAL ITEM 403,068.33

PERFORACIONES, ANCLAJE DE VARILLAS DE 5/8" Unidad:UND

DESCRIPCION UND CANT. Vr.UNITARIO Vr. PARCIAL


PERFORACIONES DE 3/4" CON PEGANTE UND 1.00 20,880.00 20,880.00
VARILLA DE 5/8" UND 0.25 21,000.00 5,250.00
0.00
0.00
Desperdicio % 0.03 26,130.00 1,306.50
SUB TOTAL MATERIALES 27,436.50

Mano de Obra und 1.00 0.00


SUB TOTAL MANO DE OBRA 0.00

Herramientas menores GLB 1.00 500.00 500.00


SUB TOTALO EQUIPO 500.00

TOTAL ITEM 27,936.50

PERFORACIONES, ANCLAJE DE VARILLAS DE 1/2". Unidad:UND


PERFORACIONES, ANCLAJE DE VARILLAS DE 1/2".

DESCRIPCION UND CANT. Vr.UNITARIO Vr. PARCIAL


PERFORACIONES DE 5/8" CON PEGANTE UND 1.00 18,560.00 18,560.00
VARILLA DE 1/2" UND 0.25 15,000.00 3,750.00
0.00
0.00
Desperdicio % 0.03 22,310.00 1,115.50
SUB TOTAL MATERIALES 23,425.50

Mano de Obra und 1.00 0.00


SUB TOTAL MANO DE OBRA 0.00

Herramientas menores GLB 1.00 500.00 500.00


SUB TOTALO EQUIPO 500.00

TOTAL ITEM 23,925.50


ITEM: Zapatas en concreto reforzado 1,00 x 1,00 x 0,50 mts.
Concreto 1:2:3 10Ø5/8" ambos sentidos
DESCRIPCION UND CANT. Vr.UNITARIO
Concreto 1:2:3 M3 0.50 486,453.00
Varilla 5/8" corrugada UND 4.33 21,000.00
Alambre de amarre KG 0.25 4,000.00
Puntillas de 21/2" LB 0.25 3,000.00
Desperdicio % 5.00
SUB TOTAL MATERIALES

Mano de Obra und 1.00 50,000.00


SUB TOTAL MANO DE OBRA

Herramientas menores GLB 1.00 404.00


SUB TOTALO EQUIPO
TOTAL ITEM

ITEM: Columna de 0,30x 0,30 x 7,05 mts concreto reforzado


concreto 1:2:3 4 Ø 5/8" + 2 Ø 1/2" - estribos ⅜" C/,010 hasta ,
70 mts en los estremos y C/ ,15 parte central

DESCRIPCION UND CANT. Vr.UNITARIO

Concreto 1:2:3 M3 0.63 486,453.00


Varilla 5/8" corrugada UND 6.00 21,000.00
Varilla 1/2" corrugada UND 3.00 15,000.00
Varilla 3/8" corrugada UND 12.00 8,000.00
Alambre de amarre KG 2.00 4,000.00
Puntillas de 21/2" LB 1.00 3,000.00
Desperdicio % 5.00
SUB TOTAL MATERIALES

Mano de Obra und 1.00 184,500.00

SUB TOTAL MANO DE OBRA


Formaleta metálica UND 1.00 50,000.00
Gatos metálicos UND 2.00 400.00
Herramientas menores GLB 1.00 500.00

SUB TOTALO EQUIPO

TOTAL ITEM

8 184500
7.05
162590.625
ITEM: Cerchas metalica de 27,4 mts de largo x 1,00 mts de alto
- curva en tubo de 4" X 3mm- y soportes en tubos de 3"X
2.5mm y 2"X2mm pintadas e instaladas

DESCRIPCION UND CANT. Vr.UNITARIO

Tubo 4" - 3 mms. - 6 mts. ML 55.68 45,680.00


Tubo 3" - 3 mms. - 6 mts. ML 23.34 28,950.00
Tubo 2" - 2 mms. - 6 mts. ML 31.80 13,245.00
Soldadura 60 -11- electrodo de alta
KG 7.76 25,000.00
penetración 25 Kg
Pintura anticorrosiva GL 3.11 35,000.00
Pintura esmalte blanco GL 3.11 58,000.00
Desperdicio % 5.00
SUB TOTAL MATERIALES

Mano de Obra und 1.00 1,660,500.00


SUB TOTAL MANO DE OBRA

Andamios Cuerpo 6.00 2,000.00


Tablones UND 10.00 200.00
Pluma grua UND 1.00 35,000.00
Equipo de soldadura UND 0.25 35,000.00
Herramientas menores GLB 1.00 500.00
SUB TOTALO EQUIPO
TOTAL ITEM

ITEM: 4,1Suministro e instalación de cubbierta en lamina


Master 1000
DESCRIPCION UND CANT. Vr.UNITARIO

Lámina Master 1000 M2 1.00 23,525.00


Tornillo autoperforante UND 4.00 350.00
Tornillo de ala UND 2.00 525.00
Desperdicio % 5.00
SUB TOTAL MATERIALES

Mano de Obra und 1.00 12,000.00


SUB TOTAL MANO DE OBRA

Andamios Cuerpo 1.00 2,000.00


Tablones UND 4.00 200.00
Herramientas menores GLB 1.00 427.00
SUB TOTALO EQUIPO
TOTAL ITEM
165,516,040.00 OFIC
166,918,367.00
1 6
0.25 1.5
Unidad:UND

Vr. PARCIAL
243,226.50
90,930.00 4.3333333333
1,000.00
750.00
16,757.83
352,664.33

50,000.00
50,000.00

404.00
404.00
403,068.33

Unidad: UND

Vr. PARCIAL

308,654.43
126,000.00
45,000.00
96,000.00
8,000.00
3,000.00
29,332.72
615,987.15

184,500.00

184,500.00
50,000.00
800.00
500.00

51,300.00
851,787.15
Unidad: UND

Vr. PARCIAL

2,543,462.40
675,693.00
421,191.00

194,000.00

108,675.00 20 5.75
180,090.00 27
206,155.57
4,329,266.97

1,660,500.00
1,660,500.00 7.7625

12,000.00
2,000.00
35,000.00
8,750.00
500.00
58,250.00
6,048,016.97

Unidad: M2

Vr. PARCIAL

23,525.00
1,400.00
1,050.00
1,298.75
27,273.75

12,000.00
12,000.00

2,000.00
800.00
427.00
3,227.00
42,500.75

CERRAMIENTO
PROVISIONAL EN ML
TELA VERDE 2.1
TELA VERDE
ESTABILIZADA ML 1.00 2,400.00
2.1
PUNTILLA CON lb 0.03 2,615.80
CABEZA 2
ALGARROBILLO UN 0.75 10,000.00
4X2"de 2,50 ml
DESPERDICIO % 0.05 9,970.63
largo
TRANSPORTE % 0.05 10,469.16
HERRAMIENTAS %MO 0.03 4,961.00
MENORES
MANO DE OBRA AA UN 1.00 4,961.00
20.5 593,475.00
28.86 382,250.70
16,102.00

2,400.00

70.63
7,500.00
498.53
523.46
148.83

4,961.00
CONTRATO No. 001197
CONSTRUCCION DE LA ESTRUCTURA Y LA CUBIERTA PARA LA CANCHA O ESCENARIO DEPORTIVO DEL CENTRO DE OPERACIÓN Y
MANTENIMIENTO MINERO "COMM”
CONTRATISTA: JORGE ELIECER BARRANCO LOPEZ

CONDICIONES INICIALMENTE CONTRATADAS CONDICIONES MODIFICADAS


ITEM DESCRIPCION UND CANT. VR. UNIT VR.TOTAL VR. UNIT CANT.

1 EXCAVACIONES
1.1 Excavación para zapatas de 1,00 x1,00 x 1,00 mts M3 12.60 30,000.00 378,000.00 30,000.00 12.60
1.2 Excavación viga de cimentación, 0,30 x 0,30 mts ML 105.00 3,000.00 315,000.00 3,000.00 103.12
TOTAL ITEM 693,000.00
2 ESTRUCTURAS EN CONCRETO
Zapatas en concreto reforzado 1,00 x 1,00 x 0,50 mts.
2.1 Concreto 1:2:3 10Ø5/8" ambos sentidos UND 12.00 349,486.83 4,193,841.90 399,466.83 12.00

Columna de 0,34 x 0,34 x 8,00 mts concreto reforzado


2.2 concreto 1:2:3 4 Ø 5/8" + 2 Ø 1/2" - estribos ⅜" C/,010 UND 12.00 941,428.28 11,297,139.32 842,187.15 12.00
hasta ,70 mts en los estremos y C/ ,15 parte central
Viga de amarre perimetral aerea de 0,30 x 0,45 mts ML 65.00 136,483.59 8,871,433.42 136,483.59 129.0720
2.3
concreto 1:2:3 - 4 Ø 5/8" + 2 Ø 1/2" - estribos 3/8 c/0,20mts

Viga de cimentación conc. Reforzado 0,30 x 0 ,30 mts - ML 105.00 77,060.31 8,091,332.39 77,060.31 111.53200
2.4
concreto 1:2:3 4ؽ" - estribos ⅜" C/ ,20 mts

TOTAL ITEM 32,453,747.03


3 ESTRUCTURA METALICA
Cerchas metalica de 20 mts de largo x 1,00 mts de alto -
3.1 curva en tubo de 4" y 3mm- y soportes en tubos de 3"y UND 6.00 5,063,724.50 30,382,347.00 6,048,016.97 6.00
25mm y 2"y2mm pintadas e instaladas

Correas en perfil C - 160x60-2mm de 6mts pintadas e UND 100.00 247,757.50 24,775,750.00 247,757.50 137.50
3.2
instaladas
TOTAL ITEM 55,158,097.00
4 CUBIERTA
Suministro e instalación de cubbierta en lamina termo- M2 810.00 57,489.50 46,566,495.00 42,054.50 920.70
4.1
acustica prepintada color verde con blanco
4.2 Pintura vinilo tipo 1 para vigas y columnas ML 500.00 3,090.50 1,545,250.00 3,090.50 0.00
TOTAL ITEM 48,111,745.00
5 LIMPIEZA
5.1 Limpieza de la obra UND 1.00 600,000.00 600,000.00 600,000.00 1.00
TOTAL ITEM 600,000.00
6 ACTIVIDADES COMPLEMENTARIAS
6.1 SUMINISTRO E INSTALACION DE ELEMENTOS DE UND
ANCLAJE (INCLUYE 4 pernos ∅ 12mm
(1/2"),A325 l=0.20m,Angulo de respaldo L 2x2 ¼" 81,357.05 12
(50x6) mm a36;Placa base,200x200x5mm
6.2 PERFORACIONES, ANCLAJE DE VARILLAS DE 5/8" UND
27,205.70 80
6.3 PERFORACIONES, ANCLAJE DE VARILLAS DE 1/2". UND 23,560.10 40

SUBTOTAL PRESUPUESTO 137,016,589.03


ADMINISTRACION 10.00% 13,701,658.90
IMPREVISTOS 5.00% 6,850,829.45
UTILIDAD 5.00% 6,850,829.45
IVA SOBRE LA UTILIDAD 16.00% 1,096,132.71
VALOR TOTAL PRESUPUESTO 165,516,040.00
-

ARQ. JORGE ELIECER BARRANCO LOPEZ


C.C 19’593.205 de Fundación, Magdalena

126.5
NTRO DE OPERACIÓN Y

CIONES MODIFICADAS
VR.TOTAL

378,000.00 12.6
309,360.00 103.12
687,360.00

4,793,601.90
0

10,106,245.80
0
17,616,210.06
129.07

8,594,690.33
111.53
41,110,748.08

36,288,101.82
0
34,066,656.25
148.5
70,354,758.07
38,719,578.15 0 900 42,500.75 38,250,675.00
0.00 786.4
38,719,578.15
0

600,000.00 1
600,000.00
137.5
0.00

976,284.60

2,176,456.00

942,404.00
4,095,144.60
155,567,588.90 18,550,999.88
15,556,758.89 169,487,674.73
165,589,458.21
7,778,379.45 165,419,970.54
1,244,540.71 165,250,482.86
180,147,268.00
-

14,631,228 0.9765668227

183415902.356848

15363414

165,516,040
180,879,454
732,185.54

COL 28.2 12 338.4

VIGA 192

530.4
SERVICIO NACIONAL D

REGION
ACTA MODIFICATORIA Y DE RECIBO FINAL DE No. 0

No. DE CONTRATO 001197 DE 2014.


CONTRATISTA JORGE ELIECER BARRANCO LOPEZ
CEDULA 19593205
REPRESENTANTE LEGAL JORGE ELIECER BARRANCO LOPEZ

FECHA DE INICIO 11/11/2014

FECHA DE TERMINACIÓN INICIAL 12/11/2014


PRORROGA 001 20 dias
FECHA DE TERMINACION DESPUES DE
12/31/2014
PRORROGA 001
VALOR ACTUAL DEL CONTRATO $ 165,516,039.54
VALOR ADICIONAL DEL CONTRATO $ 15,542,253.14
VALOR FINAL DEL CONTRATO $ 181,058,292.68
En la ciudad de Valledupar, Cesar a los veinte (20) dias del mes de enero de 2015 se reunieron el Arq. JORGE ELIECER BARRANCO
modificaciones y recibo final de obras del contrato No. 001197 DE 2014 como se describe a continuacion.

CONDICIONES ORIGINALES DEL CONTRATO

DESCRIPCION DE LA ACTIVIDAD UND V. UNIT. CANTIDAD VALOR TOTAL

1 EXCAVACIONES

Excavación para zapatas de 1,00 x1,00 x 1,00


1.1 mts M3 30,000.00 12.60 378,000.00

Excavación viga de cimentación, 0,30 x 0,30


1.2 ML 3,000.00 105.00 315,000.00
mts
TOTAL ITEM 693,000.00
ESTRUCTURAS EN CONCRETO
2

Zapatas en concreto reforzado 1,00 x 1,00 x


2.1 0,50 mts. Concreto 1:2:3 10Ø5/8" ambos UND 349,486.83 12.00 4,193,841.90
sentidos
Columna de 0,34 x 0,34 x 8,00 mts concreto
reforzado concreto 1:2:3 4 Ø 5/8" + 2 Ø 1/2" -
2.2 UND 941,428.28 12.00 11,297,139.32
estribos ⅜" C/,010 hasta ,70 mts en los
estremos y C/ ,15 parte central
Viga de amarre perimetral aerea de 0,30 x 0,45
2.3 mts concreto 1:2:3 - 4 Ø 5/8" + 2 Ø 1/2" - ML 136,483.59 65.00 8,871,433.42
estribos 3/8 c/0,20mts
Viga de cimentación conc. Reforzado 0,30 x 0 ,
2.4 30 mts - ML 77,060.31 105.00 8,091,332.39
concreto 1:2:3 4ؽ" - estribos ⅜" C/ ,20 mts
TOTAL ITEM 32,453,747.03
ESTRUCTURA METALICA
3
Cerchas metalica de 20 mts de largo x 1,00
mts de alto - curva en tubo de 4" y 3mm- y
3.1 soportes en tubos de 3"y 25mm y 2"y2mm UND 5,063,724.50 6.00 30,382,347.00
pintadas e instaladas

Correas en perfil C - 160x60-2mm de 6mts


3.2 UND 247,757.50 100.00 24,775,750.00
pintadas e instaladas
TOTAL ITEM 55,158,097.00
4 CUBIERTA
Suministro e instalación de cubbierta en lamina
4.1 termo-acustica prepintada color verde con M2 57,489.50 810.00 46,566,495.00
blanco
4.2 Pintura vinilo tipo 1 para vigas y columnas ML 3,090.50 500.00 1,545,250.00
TOTAL ITEM 48,111,745.00
5 LIMPIEZA
5.1 Limpieza de la obra UND 600,000.00 1.00 600,000.00
TOTAL ITEM 600,000.00

6 ACTIVIDADES COMPLEMENTARIAS

SUMINISTRO E INSTALACION DE
ELEMENTOS DE ANCLAJE (INCLUYE 4
6.1 VARILLAS ∅ 12mm (1/2"),A325 UND 123,357.37
l=0.20m,Angulo de respaldo L 2x2 ¼" (50x6)
mm a36;Placa base,200x200x5mm

Zapatas en concreto reforzado 1,00 x 1,00 x


6.2 0,50 mts. Concreto 1:2:3 10Ø5/8" ambos UND 399,466.83
sentidos

Columna de 0,30x 0,30 x 7,05 mts concreto


reforzado concreto 1:2:3 4 Ø 5/8" + 2 Ø 1/2" -
6.3 UND 842,187.15
estribos ⅜" C/,010 hasta ,70 mts en los
estremos y C/ ,15 parte central
Cerchas metalica de 27,40 mts de largo x 1,00
mts de alto - curva en tubo de 4" y 3mm- y
6.4 UND 6,048,016.97
soportes en tubos de 3"y 2.5mm y 2"X2mm
pintadas e instaladas

Suministro e instalación de cubierta en lamina


6.5 M2 42,054.50
Master 1000 pintada.

PERFORACIONES, ANCLAJE DE VARILLAS


6.6 UND 27,205.70
DE 5/8"

PERFORACIONES, ANCLAJE DE VARILLAS


6.7 UND 23,560.10
DE 1/2".

TOTAL ITEM

COSTOS DIRECTO 137,016,589


ADMINISTRACION 10.00% 13,701,659
IMPREVISTOS 5.00% 6,850,829
UTILIDAD 5.00% 6,850,829
IVA / UTILIDAD 16% 1,096,133
COSTOS DIRECTO + INDIRECTOS 165,516,040
NOTA: LAS CANTIDADES Y VALORES CONSIGNADOS EN LA PRESENTE ACTA SON RESPONSABILIDAD DEL CONTRATISTA Y SUPERVISOR, DADO EL PRINCIPIO DE CON

Arq. JORGE E. BARRANCO LOPEZ ING. STALIN GALVIS DAZA.


CONTRATISTA INTERVENTOR
SERVICIO NACIONAL DE APRENDIZAJE - SENA

REGIONAL CESAR
Y DE RECIBO FINAL DE No. 01 CONTRATOS DE OBRA PÚBLICA No. 001197 DE 2014

CONSTRUCCION DE LA ESTRUCTURA Y LA CUBIERTA PARA


OBJETO DEL
CONTRATO
LA CANCHA O ESCENARIO DEPORTIVO DEL CENTRO DE Amparo
OPERACIÓN Y MANTENIMIENTO MINERO "COMM” Manejo de Anticipo
PRORROGA 002 20 dias. Cumplimiento
FECHA DE
TERMINACION 1/20/2015 Salarios/Prestaciones
FINAL

PLAZO INICIAL DEL Estabilidad de Obra


CONTRATO
UN MES
Resp civil extra contractual
PLAZO FINAL DEL
CONTRATO
DOS MESES + 10 DIAS. Aseguradora

165,516,039.54
INTERVENTOR GRUPO TDA LTDA
15,542,253.14 FECHA DEL ACTA
181,058,292.68
Arq. JORGE ELIECER BARRANCO LOPEZ , en calidad de contratista, el Ing. STALIN GALVIS DAZA en su calidad de Representante Legal GRUPO
on.

MAYORES Y/0 MENORES


OBRAS NO PREVISTAS CONDICIONES ACTUALIZADAS POR EJECUTAR
CANTIDADES DE OBRA

CANTIDAD (+)
CANT VALOR VALOR CANTIDAD VALOR CANT
(-)

0.00 0.00 0.00 12.60 378,000 0.00

0.00 -1.88 -5,640 103.12 309,360 0.00

0.00 -5,640.00 687,360.00

0.00 -12.00 -4,193,842 0.00 0.00 0.00

0.00 -12.00 -11,297,139 0.00 0.00 0.00

0.00 64.07 8,744,777 129.0720 17,616,210 0.00

0.00 6.53 503,358 111.5320 8,594,690 0.00

0.00 -6,242,846.64 26,210,900.39


0.00 -6.00 -30,382,347 0.00 0.00 0.00

0.00 37.50 9,290,906 137.50 34,066,656 0.00

0.00 -21,091,440.75 34,066,656.25

0.00 -810.00 -46,566,495 0.00 0.00 0.00

0.00 -408.53 -1,262,562 91.47 282,688 0.00


0.00 -47,829,056.97 0.00 282,688.04

0.00 0 1.00 600,000 0.00


0.00 0.00 0.00 600,000.00

12.00 1,480,288 0.00 0.00 12.00 1,480,288 0.00

12.00 4,793,602 0.00 0.00 12.00 4,793,602 0.00

12.00 10,106,246 0.00 0.00 12.00 10,106,246 0.00

6.00 36,288,102 0.00 0.00 6.00 36,288,102 0.00

920.70 38,719,578 0.00 0.00 920.70 38,719,578 0.00

80.00 2,176,456 0.00 0.00 80.00 2,176,456 0.00

40.00 942,404 0.00 0.00 40.00 942,404 0.00

94,506,676 0.00 94,506,676

94,506,676 -75,168,984 156,354,281


9,450,668 -7,516,898 15,635,428
4,725,334 -3,758,449
4,725,334 -3,758,449 7,817,714
756,053 -601,352 1,250,834
114,164,065 -90,804,133 181,058,257
SUPERVISOR, DADO EL PRINCIPIO DE CONFIABILIDAD Y RESPONSABILIDAD CON LA QUE EL SUPERVISOR Y EL CONTRATISTA REALIZAN MEDICIONES EN CAMPO Y LAS REVISIONES

VALOR INICIAL DEL CONTRATO DE


VALOR FINAL DEL CONTRATO DE

ING. STALIN GALVIS DAZA. VIRGINIA ESTHER OJEDA ARBOLEDA


INTERVENTOR SUB DIRECTOR CENTRO

adicional 15,542,253.14
181,058,292.68
SALDO 35.61
GARANTÍAS DEL CONTRATO DE OBRA
Amparo Numero Monto Inicio Terminación
Manejo de Anticipo
Cumplimiento 35GU009801 $ 33,103,208.00 12/31/2014 7/21/2015

alarios/Prestaciones 35GU009801 $ 16,551,604.00 12/31/2014 1/21/2018

stabilidad de Obra 35GU009801 $ 33,103,208.00 12/31/2014 11/12/2019


Resp civil extra contractual RE000746 $ 50,000,000.00 12/31/2014 2/21/2015

seguradora CONFIANZA

ECHA DEL ACTA 20-Jan-15

resentante Legal GRUPO TDA LTDA para dejar constancia por medio de la presente acta N° 02 de las

POR EJECUTAR ACUMULADO PRESENTE ACTA

VALOR CANT VALOR CANT VALOR

0.00 12.60 378,000 12.60 378,000

0.00 103.12 309,360 103.12 309,360

0.00 687,360.00 687,360.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0 129.07 17,616,210 129.07 17,616,210

0 111.53 8,594,690 111.53 8,594,690

0.00 26,210,900.39 26,210,900.39


0.00 0.00 0.00 0.00 0.00

0.00 137.50 34,066,656.25 137.50 34,066,656.25

0.00 34,066,656.25 34,066,656.25

0.00 0.00 0.00 0.00 0.00

0.00 91.47 282,688.04 91.47 282,688.04


0.00 282,688.04 282,688.04

0.00 1.00 600,000.00 1.00 600,000.00


0.00 600,000.00 600,000.00

0.00 12.00 1,480,288 12.00 1,480,288

0.00 12.00 4,793,602 12.00 4,793,602

0.00 12.00 10,106,246 12.00 10,106,246

0.00 6.00 36,288,101.82 6.00 36,288,101.82

0.00 920.70 38,719,578.15 920.70 38,719,578.15

0.00 80.00 2,176,456.00 80.00 2,176,456.00

0.00 40.00 942,404.00 40.00 942,404.00

0.00 94,506,676 94,506,676

0 156,354,281 156,354,281
0 15,635,428 15,635,428

0 7,817,714 7,817,714
0 1,250,834 1,250,834
0 181,058,257 181,058,257
S EN CAMPO Y LAS REVISIONES EFECTUADAS POR PARTE DE LA INTERVENTORIA.

NICIAL DEL CONTRATO DE OBRA 165,516,040


FINAL DEL CONTRATO DE OBRA 181,058,257

RUBEN VILLALOBOS
SUPERVISOR
38000 478800

5000 515600

64500 4192500

25000 2788300
75000 900000

395000 4740000

$ 13,615,200.00
FECHA DD 29 MM 12 AA 2014 CORTE N° 1 ELAB
OBJETO CONSTRUCCION DE LA ESTRUCTURA Y LA CUBIERTA PARA LA CANCHA O ESCENARIO DEPORTIVO DEL CENTRO DE OPERACIÓN Y MA
INTERVENTOR GRUPO TDA LTDA. R/L: ING. STALIN GALVIS DAZA NIT O C.C.
CONTRATISTA ARQ. JORGE ELIECER BARRANCO LOPEZ NIT O C.C.
Excavación para zapatas de 1,00 x1,00 x 1,00 mts
CAPÍTULO 1 ITEM 1.1 DESCRIPCION

1 2 3 4 5 6

Z1 Z1 Z1 Z1 Z1 Z1
A
30.00
1.00

ZONA DE GRADERIAS FUTURAS

1.00
PLANTA

NIVEL DE TERRENO
1.05

EXCAVACION ZAPATA

1.00 ZONA DE GRADERIAS FUTURAS

CORTE Z1 Z1 Z1 Z1 Z1 Z1
B
OBSERVACIONES:

CONTRATISTA: ARQ. JORGE ELIECER BARRANCO LOPEZ


MAT. PROF. A08042001-19593205 CONSEJO DE ARQUITECTURA Y SUS PROF AUXILIARES
MEMORIAS DE CALCULO

ELABORÓ ARQ. JORGE ELIECER BARRANCO LOPEZ


DEL CENTRO DE OPERACIÓN Y MANTENIMIENTO MINERO "COMM”
CONTRATO N°
19,593,205 CONTRATO N° 001197 DE 2014.
0 x1,00 x 1,00 mts
UNID. M3 UBICACIÓN CANCHA MULTIPLE
Dimensiones TOTAL
Descripción y/o Localización
L1 L2 H CANT
Zapatas 1.00 1.00 1.05 12.00 12.60
Subtotal 12.60
Vienen 12.60
TOTAL 12.60
INTERVENTORÍA: GRUPO TDA LTDA. R/L: ING. STALIN GALVIS DAZA
MAT. PROF.
FECHA DD 29 MM 12 AA 2014 CORTE N° 1 ELABO
OBJETO CONSTRUCCION DE LA ESTRUCTURA Y LA CUBIERTA PARA LA CANCHA O ESCENARIO DEPORTIVO DEL CENTRO DE OPERACIÓN Y MA
INTERVENTOR GRUPO TDA LTDA. R/L: ING. STALIN GALVIS DAZA NIT O C.C.
CONTRATISTA ARQ. JORGE ELIECER BARRANCO LOPEZ NIT O C.C.

CAPÍTULO 1 ITEM 1.2 DESCRIPCION Excavación viga de cimentación, 0,30 x 0,30 mts

0.30
NIVEL DE TERRENO EXCAVACION VIGA
NATURAL CIMENTACION

EXCAVACION DE ZAPATA

CORTE
1.00
1.00 1.00 1.00 1.00 1.00
5.61 5.55 5.58 5.56 5.56
23.70

OBSERVACIONES:

CONTRATISTA: ARQ. JORGE ELIECER BARRANCO LOPEZ


MAT. PROF. A08042001-19593205 CONSEJO DE ARQUITECTURA Y SUS PROF AUXILIARES
MEMORIAS DE CALCULO

ELABORÓ ARQ. JORGE ELIECER BARRANCO LOPEZ


DEL CENTRO DE OPERACIÓN Y MANTENIMIENTO MINERO "COMM”
CONTRATO N°
19,593,205 CONTRATO N° 001197 DE 2014.

, 0,30 x 0,30 mts UNID. ML UBICACIÓN CANCHA MULTIPLE


Dimensiones TOTAL
Descripción y/o Localización
Longitudes

EXCAVACION VIGA DE CIMENTACION ((5,61+5,55+5,58+5,56+5,56)*2)+(23,7+23,7) 103.12


Subtotal 103.12
Vienen 103.12
TOTAL 103.12
INTERVENTORÍA: GRUPO TDA LTDA. R/L: ING. STALIN GALVIS DAZA
MAT. PROF.
FECHA DD 29 MM 12 AA 2014 CORTE N° 1 ELAB
OBJETO CONSTRUCCION DE LA ESTRUCTURA Y LA CUBIERTA PARA LA CANCHA O ESCENARIO DEPORTIVO DEL CENTRO DE OPERACIÓN Y MA
INTERVENTOR GRUPO TDA LTDA. R/L: ING. STALIN GALVIS DAZA NIT O C.C.
CONTRATISTA ARQ. JORGE ELIECER BARRANCO LOPEZ NIT O C.C.

CAPÍTULO 2 ITEM 2.3 DESCRIPCION Viga de amarre perimetral aerea de 0,30 x 0,45 mts concreto 1:2:3 - 4 Ø 5

0.45
VIGA AEREA
33.17

ZAPATA ZAPATA ZAP ATA ZAPATA ZAPATA


OBSERVACIONES:

CONTRATISTA: ARQ. JORGE ELIECER BARRANCO LOPEZ


MAT. PROF. A08042001-19593205 CONSEJO DE ARQUITECTURA Y SUS PROF AUXILIARES
MEMORIAS DE CALCULO

ELABORÓ ARQ. JORGE ELIECER BARRANCO LOPEZ


DEL CENTRO DE OPERACIÓN Y MANTENIMIENTO MINERO "COMM”
CONTRATO N°
19,593,205 CONTRATO N° 001197 DE 2014.

a de 0,30 x 0,45 mts concreto 1:2:3 - 4 Ø 5/8" + 2 Ø 1/2" - estribos 3/8 c/0,20mts UNID. ML UBICACIÓN CANCHA MULTIPLE

Dimensiones TOTAL
Descripción y/o Localización
L A H CANT
VIGA AEREA 33.17 2.00 66.34
Subtotal 66.34
Vienen 66.34
TOTAL 66.34
INTERVENTORÍA: GRUPO TDA LTDA. R/L: ING. STALIN GALVIS DAZA
MAT. PROF.
FECHA DD 29 MM 12 AA 2014 CORTE N° 1 ELAB
OBJETO CONSTRUCCION DE LA ESTRUCTURA Y LA CUBIERTA PARA LA CANCHA O ESCENARIO DEPORTIVO DEL CENTRO DE OPERACIÓN Y MA
INTERVENTOR GRUPO TDA LTDA. R/L: ING. STALIN GALVIS DAZA NIT O C.C.
CONTRATISTA ARQ. JORGE ELIECER BARRANCO LOPEZ NIT O C.C.

Viga de cimentación conc. Reforzado 0,30 x 0 ,30 mts -


CAPÍTULO 2 ITEM 2.4 DESCRIPCION
concreto 1:2:3 4ؽ" - estribos ⅜" C/ ,20 mts

0.30 0.30 0.30 0.30


6.31 6.25 6.28 6.26 6.26
24.40
OBSERVACIONES:

CONTRATISTA: ARQ. JORGE ELIECER BARRANCO LOPEZ


MAT. PROF. A08042001-19593205 CONSEJO DE ARQUITECTURA Y SUS PROF AUXILIARES
MEMORIAS DE CALCULO

ELABORÓ ARQ. JORGE ELIECER BARRANCO LOPEZ


DEL CENTRO DE OPERACIÓN Y MANTENIMIENTO MINERO "COMM”
CONTRATO N°
19,593,205 CONTRATO N° 001197 DE 2014.

rzado 0,30 x 0 ,30 mts -


UNID. ML UBICACIÓN CANCHA MULTIPLE
⅜" C/ ,20 mts
Dimensiones TOTAL
Descripción y/o Localización
LONGITUDES CANT
VIGA DE CIMENTACION (6,31+6,25+6,28+6,26+6,266) 2.00 62.73

24.4 2.00 48.80


Subtotal 111.53
Vienen 111.53
TOTAL 111.53
INTERVENTORÍA: GRUPO TDA LTDA. R/L: ING. STALIN GALVIS DAZA
MAT. PROF.
FECHA DD 29 MM 12 AA 2014 CORTE N° 1 ELAB
OBJETO CONSTRUCCION DE LA ESTRUCTURA Y LA CUBIERTA PARA LA CANCHA O ESCENARIO DEPORTIVO DEL CENTRO DE OPERACIÓN Y MA
INTERVENTOR GRUPO TDA LTDA. R/L: ING. STALIN GALVIS DAZA NIT O C.C.
CONTRATISTA ARQ. JORGE ELIECER BARRANCO LOPEZ NIT O C.C.

SUMINISTRO E INSTALACION DE ELEMENTOS DE ANCLAJE (INCLUY


CAPÍTULO 6 ITEM 6.1 DESCRIPCION
l=0.20m,Angulo de respaldo L 2x2 ¼" (50x6) mm a36;Placa base,200x200

U DE 5MM

PLACA DE 200 MM X 200 MM X 5MM

VARILLA 12 MM
VARILLA 12 MM

OBSERVACIONES:

CONTRATISTA: ARQ. JORGE ELIECER BARRANCO LOPEZ


MAT. PROF. A08042001-19593205 CONSEJO DE ARQUITECTURA Y SUS PROF AUXILIARES
MEMORIAS DE CALCULO

ELABORÓ ARQ. JORGE ELIECER BARRANCO LOPEZ


DEL CENTRO DE OPERACIÓN Y MANTENIMIENTO MINERO "COMM”
CONTRATO N°
19,593,205 CONTRATO N° 001197 DE 2014.

DE ELEMENTOS DE ANCLAJE (INCLUYE 4 VARILLAS ∅ 12mm (1/2"),A325


UNID. UND UBICACIÓN CANCHA MULTIPLE
x2 ¼" (50x6) mm a36;Placa base,200x200x5mm

Dimensiones TOTAL
Descripción y/o Localización
UNIDAD. CANT
ANCLAJES 1.00 12.00 12.00
Subtotal 12.00
Vienen 12.00
TOTAL 12.00
INTERVENTORÍA: GRUPO TDA LTDA. R/L: ING. STALIN GALVIS DAZA
MAT. PROF.
FECHA DD 29 MM 12 AA 2014 CORTE N° 1 ELAB
OBJETO CONSTRUCCION DE LA ESTRUCTURA Y LA CUBIERTA PARA LA CANCHA O ESCENARIO DEPORTIVO DEL CENTRO DE OPERACIÓN Y MA
INTERVENTOR GRUPO TDA LTDA. R/L: ING. STALIN GALVIS DAZA NIT O C.C.
CONTRATISTA ARQ. JORGE ELIECER BARRANCO LOPEZ NIT O C.C.

CAPÍTULO 6 ITEM 6.2 DESCRIPCION Zapatas en concreto reforzado 1,00 x 1,00 x 0,50 mts. Concreto 1:2:3 10Ø

Z1 Z2 Z3 Z4 Z5 Z6

Z7 Z8 Z9 Z10 Z11 Z12


Z7 Z8 Z9 Z10 Z11 Z12

OBSERVACIONES:

CONTRATISTA: ARQ. JORGE ELIECER BARRANCO LOPEZ


MAT. PROF. A08042001-19593205 CONSEJO DE ARQUITECTURA Y SUS PROF AUXILIARES
MEMORIAS DE CALCULO

ELABORÓ ARQ. JORGE ELIECER BARRANCO LOPEZ


DEL CENTRO DE OPERACIÓN Y MANTENIMIENTO MINERO "COMM”
CONTRATO N°
19,593,205 CONTRATO N° 001197 DE 2014.

1,00 x 1,00 x 0,50 mts. Concreto 1:2:3 10Ø5/8" ambos sentidos UNID. UND UBICACIÓN CANCHA MULTIPLE

Dimensiones TOTAL
Descripción y/o Localización
UNIDAD. CANT
ZAPATAS 1.00 12.00 12.00
Subtotal 12.00
Vienen 12.00
TOTAL 12.00
INTERVENTORÍA: GRUPO TDA LTDA. R/L: ING. STALIN GALVIS DAZA
MAT. PROF.
FECHA DD 29 MM 12 AA 2014 CORTE N° 1 ELAB
OBJETO CONSTRUCCION DE LA ESTRUCTURA Y LA CUBIERTA PARA LA CANCHA O ESCENARIO DEPORTIVO DEL CENTRO DE OPERACIÓN Y MA
INTERVENTOR GRUPO TDA LTDA. R/L: ING. STALIN GALVIS DAZA NIT O C.C.
CONTRATISTA ARQ. JORGE ELIECER BARRANCO LOPEZ NIT O C.C.

Columna de 0,30x 0,30 x 7,05 mts concreto reforzado concreto 1:2:3 4 Ø


CAPÍTULO 6 ITEM 6.3 DESCRIPCION
hasta ,70 mts en los estremos y C/ ,15 parte central

0.45
VIGA
6.50

COLUMNA

VIGA DE CIMENTACION
0.30

ZAPATA

1.00
.50
VIGA DE CIMENTACION

0.30
ZAPATA

1.00

0.50
COL1 COL2 COL3 COL4 COL5 COL6

COL7 COL8 COL9 COL10 COL11 COL12

OBSERVACIONES:

CONTRATISTA: ARQ. JORGE ELIECER BARRANCO LOPEZ


MAT. PROF. A08042001-19593205 CONSEJO DE ARQUITECTURA Y SUS PROF AUXILIARES
MEMORIAS DE CALCULO

ELABORÓ ARQ. JORGE ELIECER BARRANCO LOPEZ


DEL CENTRO DE OPERACIÓN Y MANTENIMIENTO MINERO "COMM”
CONTRATO N°
19,593,205 CONTRATO N° 001197 DE 2014.

mts concreto reforzado concreto 1:2:3 4 Ø 5/8" + 2 Ø 1/2" - estribos ⅜" C/,010
UNID. UND UBICACIÓN CANCHA MULTIPLE
C/ ,15 parte central

Dimensiones TOTAL
Descripción y/o Localización
UNIDAD. CANT
COLUMNAS 1.00 12.00 12.00
Subtotal 12.00
Vienen 12.00
TOTAL 12.00
INTERVENTORÍA: GRUPO TDA LTDA. R/L: ING. STALIN GALVIS DAZA
MAT. PROF.
FECHA DD 29 MM 12 AA 2014 CORTE N° 1 ELAB
OBJETO CONSTRUCCION DE LA ESTRUCTURA Y LA CUBIERTA PARA LA CANCHA O ESCENARIO DEPORTIVO DEL CENTRO DE OPERACIÓN Y MA
INTERVENTOR GRUPO TDA LTDA. R/L: ING. STALIN GALVIS DAZA NIT O C.C.
CONTRATISTA ARQ. JORGE ELIECER BARRANCO LOPEZ NIT O C.C.

CAPÍTULO 2 ITEM 2.3 DESCRIPCION Viga de amarre perimetral aerea de 0,30 x 0,45 mts concreto 1:2:3 - 4 Ø 5

0.45
VIGA AEREA
33.17

ZAPATA ZAPATA ZAP ATA ZAPATA ZAPATA

VIGA AEREA

0.45
VIGA AEREA
VIGA AEREA

0.45
VIGA AEREA

6.31 6.25 6.28 6.26 6.27

ZAPATA ZAPATA ZAPATA ZAPATA ZAPATA

OBSERVACIONES:

CONTRATISTA: ARQ. JORGE ELIECER BARRANCO LOPEZ


MAT. PROF. A08042001-19593205 CONSEJO DE ARQUITECTURA Y SUS PROF AUXILIARES
MEMORIAS DE CALCULO

ELABORÓ ARQ. JORGE ELIECER BARRANCO LOPEZ


DEL CENTRO DE OPERACIÓN Y MANTENIMIENTO MINERO "COMM”
CONTRATO N°
19,593,205 CONTRATO N° 001197 DE 2014.

a de 0,30 x 0,45 mts concreto 1:2:3 - 4 Ø 5/8" + 2 Ø 1/2" - estribos 3/8 c/0,20mts UNID. ML UBICACIÓN CANCHA MULTIPLE

Dimensiones TOTAL
Descripción y/o Localización
L A H CANT
VIGA AEREA 33.17 2.00 66.34

(6,31+6,25+6,28+6,26+6,266) 2.00 62.73


Subtotal 129.07
Vienen 129.07
TOTAL 129.07
INTERVENTORÍA: GRUPO TDA LTDA. R/L: ING. STALIN GALVIS DAZA
MAT. PROF.
ITEM: Zapatas en concreto reforzado 1,00 x 1,00 x
0,50 mts. Concreto 1:2:3 10Ø5/8" ambos sentidos

DESCRIPCION UND CANT. Vr.UNITARIO


Concreto 1:2:3 M3 0.50 486,453.00
Varilla 5/8" corrugada UND 4.17 21,000.00
Alambre de amarre KG 0.25 4,000.00
Puntillas de 21/2" LB 0.25 3,000.00
Desperdicio % 5.00
SUB TOTAL MATERIALES

Mano de Obra und 1.00 50,000.00


SUB TOTAL MANO DE OBRA

Herramientas menores GLB 1.00 404.00


SUB TOTALO EQUIPO

TOTAL ITEM

ITEM: Columna de 0,30x 0,30 x 7,05 mts concreto


reforzado concreto 1:2:3 4 Ø 5/8" + 2 Ø 1/2" -
estribos ⅜" C/,010 hasta ,70 mts en los estremos y
C/ ,15 parte central
DESCRIPCION UND CANT. Vr.UNITARIO

Concreto 1:2:3 M3 0.63 486,453.00


Varilla 5/8" corrugada UND 6.00 21,000.00
Varilla 1/2" corrugada UND 3.00 15,000.00
Varilla 3/8" corrugada UND 12.00 8,000.00
Alambre de amarre KG 2.00 4,000.00
Puntillas de 21/2" LB 1.00 3,000.00
Desperdicio % 5.00
SUB TOTAL MATERIALES

Mano de Obra und 1.00 174,900.00

SUB TOTAL MANO DE OBRA


Formaleta metálica UND 1.00 50,000.00
Gatos metálicos UND 2.00 400.00
Herramientas menores GLB 1.00 500.00

SUB TOTALO EQUIPO


TOTAL ITEM

ITEM: Cerchas metalica de 27 mts de largo x 1,00 mts


de alto - curva en tubo de 4" x 3mm- y soportes en
tubos de 3"x 25mm y 2"x2mm pintadas e instaladas
DESCRIPCION UND CANT. Vr.UNITARIO
Tubo 4" - 3 mms. - 6 mts. ML 55.00 45,680.00
Tubo 3" - 3 mms. - 6 mts. ML 20.50 28,950.00
Tubo 2" - 2 mms. - 6 mts. ML 28.86 13,245.00
Soldadura 60 -11- electrodo de alta KG 7.76 25,000.00
penetración 25 Kg
Pintura anticorrosiva GL 3.11 35,000.00
Pintura esmalte blanco GL 3.11 58,000.00
Desperdicio % 5.00
SUB TOTAL MATERIALES

Mano de Obra und 1.00 1,640,000.00


SUB TOTAL MANO DE OBRA

Andamios Cuerpo 6.00 2,000.00


Tablones UND 10.00 200.00
Pluma grua UND 1.00 35,000.00
Equipo de soldadura UND 0.25 35,000.00
Herramientas menores GLB 1.00 500.00
SUB TOTALO EQUIPO

TOTAL ITEM

ITEM: 4,1Suministro e instalación de cubbierta en


lamina Master 1000

DESCRIPCION UND CANT. Vr.UNITARIO

Lámina Master 1000


M2 1.00 23,100.00
Tornillo autoperforante
UND 4.00 350.00
Tornillo de ala UND 2.00 525.00
Desperdicio % 5.00
SUB TOTAL MATERIALES

Mano de Obra und 1.00 12,000.00


SUB TOTAL MANO DE OBRA

Andamios Cuerpo 1.00 2,000.00


Tablones UND 4.00 200.00
Herramientas menores GLB 1.00 427.00
SUB TOTALO EQUIPO

TOTAL ITEM

SUMINISTRO E INSTALACION DE ELEMENTOS DE ANCLAJE


(INCLUYE 4 pernos ∅ 12mm (1/2"),A325 l=0.20m,Angulo
de respaldo L 2x2 ¼" (50x6) mm a36;Placa
base,200x200x5mm

DESCRIPCION UND CANT. Vr.UNITARIO


SUMINISTRO E INSTALACION DE ELEMENTOS DE
ANCLAJE (INCLUYE 4 pernos ∅ 12mm
(1/2"),A325 l=0.20m,Angulo de respaldo L
2x2 ¼" (50x6) mm a36;Placa
base,200x200x5mm ML 1.00 54,921.00

Desperdicio % 5.00
SUB TOTAL MATERIALES

Mano de Obra und 1.00 23,000.00


SUB TOTAL MANO DE OBRA

Herramientas menores % 0.03 23,000.00


SUB TOTALO EQUIPO

TOTAL ITEM

PERFORACIONES, ANCLAJE DE VARILLAS DE 5/8"

DESCRIPCION UND CANT. Vr.UNITARIO


PERFORACIONES DE 3/4" CON PEGANTE UND 1.00 20,184.00
VARILLA DE 5/8" UND 0.25 21,000.00

Desperdicio % 0.03 25,434.00


SUB TOTAL MATERIALES

Mano de Obra und 1.00


SUB TOTAL MANO DE OBRA

Herramientas menores GLB 1.00 500.00


SUB TOTALO EQUIPO

TOTAL ITEM

PERFORACIONES, ANCLAJE DE VARILLAS DE 1/2".

DESCRIPCION UND CANT. Vr.UNITARIO


PERFORACIONES DE 5/8" CON PEGANTE UND 1.00 18,212.00
VARILLA DE 1/2" UND 0.25 15,000.00

Desperdicio % 0.03 21,962.00


SUB TOTAL MATERIALES

Mano de Obra und 1.00


SUB TOTAL MANO DE OBRA

Herramientas menores GLB 1.00 500.00


SUB TOTALO EQUIPO

TOTAL ITEM
Unidad:UND

Vr. PARCIAL
243,226.50
87,500.00
1,000.00 25
750.00 6 1
16,586.33
349,062.83 4.1666667

50,000.00
50,000.00

404.00
404.00

399,466.83

Unidad: UND

Vr. PARCIAL

308,654.43
126,000.00
45,000.00
96,000.00
8,000.00
3,000.00
29,332.72
615,987.15

174,900.00

174,900.00
50,000.00
800.00
500.00

51,300.00
842,187.15
3000000
Unidad: UND 1600000

3500000
Vr. PARCIAL 8100000
2,512,400.00
593,475.00
382,250.70
194,000.00
108,675.00
180,090.00
198,544.54
4,169,435.24

1,640,000.00 9840000
1,640,000.00

12,000.00
2,000.00
35,000.00
8,750.00
500.00
58,250.00

5,867,685.24

Unidad: M2

Vr. PARCIAL

23,100.00

1,400.00
1,050.00
1,277.50
26,827.50

12,000.00
12,000.00

2,000.00
800.00
427.00
3,227.00

42,054.50

Unidad: UN

Vr. PARCIAL
54,921.00

14,631,228.00

2,746.05
57,667.05

23,000.00
23,000.00

0.00
0.00
690.00
690.00

81,357.05

Unidad:UND

Vr. PARCIAL
20,184.00
5,250.00
0.00
0.00
1,271.70
26,705.70

0.00
0.00

500.00
500.00

27,205.70

Unidad:UND

Vr. PARCIAL
18,212.00
3,750.00
0.00
0.00
1,098.10
23,060.10

0.00
0.00

500.00
500.00

23,560.10
CONTRATO No. 001197
CONSTRUCCION DE LA ESTRUCTURA Y LA CUBIERTA PARA LA CANCHA O ESCENARIO DEPORTIVO DEL CENTRO DE OPERACIÓN Y MA
"COMM”
CONTRATISTA: JORGE ELIECER BARRANCO LOPEZ

CONDICIONES INICIALMENTE CONTRATADAS CONDICIONES MOD


ITEM DESCRIPCION UND CANT. VR. UNIT VR.TOTAL VR. UNIT

1 EXCAVACIONES
1.1 Excavación para zapatas de 1,00 x1,00 x 1,00 mts M3 12.60 30,000.00 378,000.00 30,000.00
1.2 Excavación viga de cimentación, 0,30 x 0,30 mts ML 105.00 3,000.00 315,000.00 3,000.00
TOTAL ITEM 693,000.00
2 ESTRUCTURAS EN CONCRETO
Zapatas en concreto reforzado 1,00 x 1,00 x 0,50 mts.
2.1 Concreto 1:2:3 10Ø5/8" ambos sentidos UND 12.00 349,486.83 4,193,841.90 403,068.33

Columna de 0,34 x 0,34 x 8,00 mts concreto reforzado


2.2 concreto 1:2:3 4 Ø 5/8" + 2 Ø 1/2" - estribos ⅜" C/,010 UND 12.00 941,428.28 11,297,139.32 851,787.15
hasta ,70 mts en los estremos y C/ ,15 parte central
Viga de amarre perimetral aerea de 0,30 x 0,45 mts ML 65.00 136,483.59 8,871,433.42 136,483.59
2.3
concreto 1:2:3 - 4 Ø 5/8" + 2 Ø 1/2" - estribos 3/8 c/0,20mts

Viga de cimentación conc. Reforzado 0,30 x 0 ,30 mts - ML 105.00 77,060.31 8,091,332.39 77,060.31
2.4
concreto 1:2:3 4ؽ" - estribos ⅜" C/ ,20 mts

TOTAL ITEM 32,453,747.03


3 ESTRUCTURA METALICA
Cerchas metalica de 20 mts de largo x 1,00 mts de alto -
3.1 curva en tubo de 4" y 3mm- y soportes en tubos de 3"y UND 6.00 5,063,724.50 30,382,347.00 6,048,016.97
25mm y 2"y2mm pintadas e instaladas

Correas en perfil C - 160x60-2mm de 6mts pintadas e UND 100.00 247,757.50 24,775,750.00 247,757.50
3.2
instaladas
TOTAL ITEM 55,158,097.00
4 CUBIERTA
Suministro e instalación de cubbierta en lamina termo- M2 810.00 57,489.50 46,566,495.00 42,500.75
4.1
acustica prepintada color verde con blanco
4.2 Pintura vinilo tipo 1 para vigas y columnas ML 500.00 3,090.50 1,545,250.00 3,090.50
TOTAL ITEM 48,111,745.00
5 LIMPIEZA
5.1 Limpieza de la obra UND 1.00 600,000.00 600,000.00 600,000.00
TOTAL ITEM 600,000.00
6 ACTIVIDADES COMPLEMENTARIAS
6.1 CERRAMIENTO PROVISIONAL EN TELA VERDE 2.1 ML
14,074.16

6.2 SUMINISTRO E INSTALACION DE ELEMENTOS DE UND


ANCLAJE (INCLUYE 4 VARILLAS ∅ 12mm
(1/2"),A325 l=0.20m,Angulo de respaldo L 2x2 ¼" 123,357.37
(50x6) mm a36;Placa base,200x200x5mm

SUBTOTAL PRESUPUESTO 137,016,589.03


ADMINISTRACION 10.00% 13,701,658.90
IMPREVISTOS 5.00% 6,850,829.45
UTILIDAD 5.00% 6,850,829.45
IVA SOBRE LA UTILIDAD 16.00% 1,096,132.71
VALOR TOTAL PRESUPUESTO 165,516,040.00
-

ARQ. JORGE ELIECER BARRANCO LOPEZ


C.C 19’593.205 de Fundación, Magdalena

ITEM DESCRIPCION UND CANT. VR. UNIT VR.TOTAL


7 PRESUPUESTO VIGA CENTRAL, PERIMETRAL AEREA.

7.1 PERFORACIONES, ANCLAJE DE VARILLAS DE 5/8" UN 80.00 27,936.50 2,234,920.00


7.2 PERFORACIONES, ANCLAJE DE VARILLAS DE 1/2". UN 40.00 23,925.50 957,020.00
Viga de amarre (CENTRAL) perimetral aerea de 0,30 x 0,45
7.3 mts concreto 1:2:3 - 4 Ø 5/8" + 2 Ø 1/2" - estribos 3/8 ML 64.00 136,483.59 8,734,949.82
c/0,20mts
Pintura vinilo tipo 1 para vigas. ML 256.00 3,090.50 791,168.00
TOTAL ITEM 12,718,057.82

SUBTOTAL PRESUPUESTO 12,718,057.82


ADMINISTRACION 10.00% 1,271,805.78
IMPREVISTOS 5.00% 635,902.89
UTILIDAD 5.00% 635,902.89
IVA SOBRE LA UTILIDAD 16.00% 101,744.46
VALOR TOTAL PRESUPUESTO 15,363,414.00

ITEM DESCRIPCION UND CANT. VR. UNIT VR.TOTAL

7 PRESUPUESTO VIGA CENTRAL, PERIMETRAL AEREA.

PERFORACIONES, ANCLAJE DE VARILLAS


7.1 UN 80.00 27,205.70 2,176,456.00
DE 5/8"
PERFORACIONES, ANCLAJE DE VARILLAS
7.2
DE 1/2".
UN 40.00 23,560.10 942,404.00
Viga de amarre (CENTRAL) perimetral
aerea de 0,30 x 0,45 mts concreto
7.3
1:2:3 - 4 Ø 5/8" + 2 Ø 1/2" -
ML 64.00 136,483.59 8,734,949.82
estribos 3/8 c/0,20mts
Pintura vinilo tipo 1 para vigas. ML 256.00 3,090.50 791,168.00
TOTAL ITEM 12,644,977.82

SUBTOTAL PRESUPUESTO 12,644,977.82


ADMINISTRACION 10.00% 1,264,497.78
IMPREVISTOS 5.00% 632,248.89
UTILIDAD 5.00% 632,248.89
IVA SOBRE LA UTILIDAD 16.00% 101,159.82
VALOR TOTAL PRESUPUESTO 15,275,133.00
DEL CENTRO DE OPERACIÓN Y MANTENIMIENTO MINERO

CONDICIONES MODIFICADAS
CANT. VR.TOTAL

12.60 378,000.00
114.00 342,000.00
720,000.00

12.00 4,836,819.90

12.00 10,221,445.80

64.00 8,734,949.82

114.00 8,784,875.17

32,578,090.69
17,519,824.99

6.00 36,288,101.82

127.00 31,465,202.50
67,753,304.32
899.91 38,246,849.93 900 42,500.75 38,250,675.00
530.40 1,639,201.20
39,886,051.13

1.00 600,000.00
600,000.00
153
26.00

80 1,125,932.63 6,441,695.00

12 1,480,288.38

2,606,221.01
144,143,667.16 7,127,078.13
14,414,366.72 169,487,674.73
165,589,458.21
7,207,183.36 165,419,970.54
1,153,149.34 165,250,482.86
166,918,367.00
-

0.9765668227

126.5
COL 28.2 12 338.4

VIGA 192

530.4
SUMINISTRO E INSTALACION DE ELEMENTOS DE ANCLAJE
6.1 (INCLUYE 4 pernos ∅ 12mm (1/2"),A325 l=0.20m,Angulo de respaldo UND
L 2x2 ¼" (50x6) mm a36;Placa base,200x200x5mm

Zapatas en concreto reforzado 1,00 x 1,00 x 0,50 mts. Concreto 1:2:3


6.2 UND
10Ø5/8" ambos sentidos

Columna de 0,30x 0,30 x 7,05 mts concreto reforzado concreto 1:2:3


6.3 4 Ø 5/8" + 2 Ø 1/2" - estribos ⅜" C/,010 hasta ,70 mts en los UND
estremos y C/ ,15 parte central

Cerchas metalica de 27 mts de largo x 1,00 mts de alto - curva en


6.4 tubo de 4" y 3mm- y soportes en tubos de 3"y 25mm y 2"y2mm UND
pintadas e instaladas

6.5 Suministro e instalación de cubierta en lamina Master 1000 M2

6.6 PERFORACIONES, ANCLAJE DE VARILLAS DE 5/8" UND


6.7 PERFORACIONES, ANCLAJE DE VARILLAS DE 1/2". UND

SUMINISTRO E INSTALACION DE ELEMENTOS DE ANCLAJE


(INCLUYE 4 pernos ∅ 12mm (1/2"),A325 l=0.20m,Angulo
6.1 UND
de respaldo L 2x2 ¼" (50x6) mm a36;Placa
base,200x200x5mm
Zapatas en concreto reforzado 1,00 x 1,00 x 0,50
6.2 UND
mts. Concreto 1:2:3 10Ø5/8" ambos sentidos
Columna de 0,30x 0,30 x 7,05 mts concreto reforzado
concreto 1:2:3 4 Ø 5/8" + 2 Ø 1/2" - estribos ⅜"
6.3 UND
C/,010 hasta ,70 mts en los estremos y C/ ,15 parte
central
Cerchas metalica de 27 mts de largo x 1,00 mts de
6.4 alto - curva en tubo de 4" y 3mm- y soportes en UND
tubos de 3"y 25mm y 2"y2mm pintadas e instaladas
Suministro e instalación de cubierta en lamina
6.5 M2
Master 1000
6.6 PERFORACIONES, ANCLAJE DE VARILLAS DE 5/8" UND
6.7 PERFORACIONES, ANCLAJE DE VARILLAS DE 1/2". UND
$ 81,357.37

$ 403,068.33

$ 851,787.15

$ 5,888,185.24

$ 42,500.75

$ 27,936.50

$ 23,925.50

$ 81,357.05

$ 399,466.83

$ 842,187.15

$ 5,867,685.24

$ 42,054.50
$ 27,205.70
$ 23,560.10
CONVOCATORIA PÚBLICA No. COMM-SAMC-006-2014
ANALISIS DEL A.I.U

PROPONENTE: JORGE ELIECER BARRANCO LOPEZ

COSTO DIRECTO:

CONCEPTO

COSTOS PARA EL SISTEMA DE SEGURIDAD INDUSTRIAL, MANEJO AMBIENTAL Y ASEGURAMIENTO DE LA


CALIDAD.
MONTAJE DE CAMPAMENTO, OFICINA, Y DEMAS INSTALACIONES PROVISIONALES, VALLAS,
SEÑALIZACION DE SEGURIDAD, CELADURIA, Y DEMAS ASUNTOS AFINES.
COSTO DE SERVICIOS PUBLICOS DURANTE EL TRANSCURSO DE LA OBRA, Y EL VALOR DEL TRAMITE
ANTE LAS EMPRESAS DE SERVICIOS PUBLICOS PROVISIONALES
COSTO DE TRANSPORTE NO INCLUIDOS EN LOS COSTOS DIRECTOS Y ALMACENAMIENTO.
POLIZAS TIMBRES, PUBLICACION, IMPUESTOS, Y DEMAS GASTOS AFINES QUE APLIQUEN A LA
LEGALIZACION DEL CONTRATO
ENSAYOS DE LABORATORIO PARA MATERIALES, PRUEBAS DE RESISTENCIA DE CONCRETO, Y OTRAS
REQUERIDAS PARA VERIFICAR EL CUMPLIMIENTO DE LAS NORMAS TECNICAS Y CODIGOS VIGENTES.
COSTOS DE PERSONAL TECNICO,Y VIGILANCIA.
PERSONAL PARA LA ADMINISTRACION Y DIRECCION DE LA OBRA.
COSTO DE PRESTACIONES SOCIALES Y APORTES PARAFISCALES DEL PERSONAL, DE ACUERDO CON LA
LEY.

PAPELERIA, REGISTRO FOTOGRAFICO, VIDEOS E INFORMES; ELABORACION DE PLANOS RECORD..


IMPREVISTOS
UTILIDAD

TOTAL A.I.U.

ARQ. JORGE E. BARRANCO LOPEZ.


Mat. Prof. A08042001-19593205
$ 137,016,589

VALOR %

1,370,165.89 1.00%

2,055,248.84 1.50%

1,370,165.89 1.00%
1,370,165.89 1.00%

685,082.95 0.50%

685,082.95 0.50%
1,370,165.89 1.00%
2,740,331.78 2.00%

1,370,165.89 1.00%
685,082.95 0.50%
6,850,829.45 5.00%
6,850,829.45 5.00%

$ 27,403,318 20.00%
CONVOCATORIA PÚBLICA No. COMM-SAMC-006-2014
PRESUPUESTO

PROPONENTE: JORGE ELIECER BARRANCO LOPEZ

$0.00
ITEM DESCRIPCION UND CANT. VR. UNIT

1 EXCAVACIONES
1.1 Excavación para zapatas de 1,00 x1,00 x 1,00 mts M3 12.60
1.2 Excavación viga de cimentación, 0,30 x 0,30 mts ML 105.00
TOTAL ITEM
2 ESTRUCTURAS EN CONCRETO
Zapatas en concreto reforzado 1,00 x 1,00 x 0,50 mts.
2.1 Concreto 1:2:3 10Ø5/8" ambos sentidos UND 12.00

Columna de 0,34 x 0,34 x 8,00 mts concreto reforzado


2.2 concreto 1:2:3 4 Ø 5/8" + 2 Ø 1/2" - estribos ⅜" C/,010 UND 12.00
hasta ,70 mts en los estremos y C/ ,15 parte central
Viga de amarre perimetral aerea de 0,30 x 0,45 mts ML 65.00
2.3
concreto 1:2:3 - 4 Ø 5/8" + 2 Ø 1/2" - estribos 3/8 c/0,20mts

Viga de cimentación conc. Reforzado 0,30 x 0 ,30 mts - ML 105.00


2.4
concreto 1:2:3 4ؽ" - estribos ⅜" C/ ,20 mts

TOTAL ITEM
3 ESTRUCTURA METALICA
Cerchas metalica de 20 mts de largo x 1,00 mts de alto -
3.1 curva en tubo de 4" y 3mm- y soportes en tubos de 3"y UND 6.00
25mm y 2"y2mm pintadas e instaladas

Correas en perfil C - 160x60-2mm de 6mts pintadas e UND 100.00


3.2
instaladas
TOTAL ITEM
4 CUBIERTA
Suministro e instalación de cubbierta en lamina termo- M2 810.00
4.1
acustica prepintada color verde con blanco
4.2 Pintura vinilo tipo 1 para vigas y columnas ML 500.00
TOTAL ITEM
5 LIMPIEZA
5.1 Limpieza de la obra UND 1.00
TOTAL ITEM

SUBTOTAL PRESUPUESTO
ADMINISTRACION 10.00%
IMPREVISTOS 5.00%
UTILIDAD 5.00%
IVA SOBRE LA UTILIDAD 16.00%
VALOR TOTAL PRESUPUESTO
ARQ. JORGE ELIECER BARRANCO LOPEZ
C.C 19’593.205 de Fundación, Magdalena
$0.00
VR.TOTAL

0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00
0.00

0.00
0.00

0.00
0.00 169,487,674.73
0.00 165,589,458.21
0.00 165,419,970.54
0.00 165,250,482.86
0.00
-

0
CONTRATO No. 001197
CONSTRUCCION DE LA ESTRUCTURA Y LA CUBIERTA PARA LA CANCHA O ESCENARIO DEPORTIVO DEL CENTRO DE OPERACIÓN Y
MANTENIMIENTO MINERO "COMM”
CONTRATISTA: JORGE ELIECER BARRANCO LOPEZ
No. DE
PROFUNDIDAD
ITEM DESCRIPCION UND ELEMENTO LONG LONG RESULTADO OBSERVACIONES
O ALTURA
S

1 EXCAVACIONES
Excavación para zapatas de 1,00 x1,00 x 1,00 mts SON EXCAVACIONES DE 1,00 X 100 DE LADO
1.1 M3 12.00 1.00 1.00 1.05 12.60
POR UNA PROFUNDIDAD DE 1,05 M
SON EXCAVACIONES DE 32 ML + 32
1.2 Excavación viga de cimentación, 0,30 x 0,30 mts ML 64.00 50.00 114.00
ML+25ML+25ML
2 ESTRUCTURAS EN CONCRETO
Zapatas en concreto reforzado 1,00 x 1,00 x 0,50 mts. Concreto SON 12 UNIDADES DEL ELEMENTO
2.1 1:2:3 10Ø5/8" ambos sentidos UND 12.00 12.00
SON 12 UNIDADES DEL ELEMENTO
Columna de 0,34 x 0,34 x 8,00 mts concreto reforzado concreto
2.2 1:2:3 4 Ø 5/8" + 2 Ø 1/2" - estribos ⅜" C/,010 hasta ,70 mts en los UND 12.00 12.00
estremos y C/ ,15 parte central
SON 32 ML POR UN LADO Y 32 ML POR EL
Viga de amarre perimetral aerea de 0,30 x 0,45 mts concreto 1:2:3
2.3 ML 32.00 32.00 64.00
- 4 Ø 5/8" + 2 Ø 1/2" - estribos 3/8 c/0,20mts OTRO
SON VIGAS DE 32 ML + 32 ML+25ML+25ML
Viga de cimentación conc. Reforzado 0,30 x 0 ,30 mts -
2.4 ML 64.00 50.00 114.00
concreto 1:2:3 4ؽ" - estribos ⅜" C/ ,20 mts
3 ESTRUCTURA METALICA
Cerchas metalica de 20 mts de largo x 1,00 mts de alto - curva en SON 6 UNIDADES DEL ELEMENTO
3.1 tubo de 4" y 3mm- y soportes en tubos de 3"y 25mm y 2"y2mm UND 6.00 6.00
pintadas e instaladas
(SON 23 CORREAS X 33 ML) DIVIDIDO ENTRE (6
3.2 Correas en perfil C - 160x60-2mm de 6mts pintadas e instaladas UND 759.00 6.00 127.00 ML) LONGITUD DEL PERFIL
4 CUBIERTA
Suministro e instalación de cubbierta en lamina termo-acustica SON (27,27 ML ) LONGITUD DEL ARCO -ANCHO
4.1 M2 27.27 33.00 899.91
prepintada color verde con blanco POR (33 ML) LARGO
LONG DE LA COLUMNA (7,05) POR (4) CARAS)
4.2 Pintura vinilo tipo 1 para vigas y columnas ML 338.40 192.00 530.40 POR 12 UNIDADES + (32 ML+32ML) X 3 CARAS
DE VIGA
5 LIMPIEZA
5.1 Limpieza de la obra UND 1.00 1.00
6 ACTIVIDADES COMPLEMENTARIAS
6.1 CERRAMIENTO PROVISIONAL EN TELA VERDE 2.1 ML 25 55.00 80.00 SON (25 ML+55 ML)

6.2 SUMINISTRO E INSTALACION DE ELEMENTOS DE ANCLAJE UND SON 12 ELEMENTOS, UNO POR CADA
(INCLUYE 4 pernos ∅ 12mm (1/2"),A325 l=0.20m,Angulo de
respaldo L 2x2 ¼" (50x6) mm a36;Placa base,200x200x5mm 12 12.00
COLUMNA

ARQ. JORGE ELIECER BARRANCO LOPEZ


C.C 19’593.205 de Fundación, Magdalena

126.5
RO DE OPERACIÓN Y

OBSERVACIONES

N EXCAVACIONES DE 1,00 X 100 DE LADO


R UNA PROFUNDIDAD DE 1,05 M
N EXCAVACIONES DE 32 ML + 32
+25ML+25ML

N 12 UNIDADES DEL ELEMENTO

N 12 UNIDADES DEL ELEMENTO

N 32 ML POR UN LADO Y 32 ML POR EL

RO
N VIGAS DE 32 ML + 32 ML+25ML+25ML

N 6 UNIDADES DEL ELEMENTO

ON 23 CORREAS X 33 ML) DIVIDIDO ENTRE (6


) LONGITUD DEL PERFIL

N (27,27 ML ) LONGITUD DEL ARCO -ANCHO


R (33 ML) LARGO 900 42,500.75 38,250,675.00
NG DE LA COLUMNA (7,05) POR (4) CARAS)
R 12 UNIDADES + (32 ML+32ML) X 3 CARAS
VIGA
N (25 ML+55 ML)
N 12 ELEMENTOS, UNO POR CADA

LUMNA

#REF!

COL 28.2 12 338.4

VIGA 192

530.4

Вам также может понравиться