Ac vity ID Ac vity Name Original BL Project Start BL Project Finish

Dura on 2018 2019


Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
297 23-Aug-17 08-Aug-18 220/132/11KV AL SHAHANIYAH SUPER SUBSTATION
220/132/11KV AL SHAHANIYAH SUPER SUBSTATION
A2000 Start of Substation 0 23-Aug-17 Start of Substation
A11500 Overall substantial Completion of Civil Works 0 08-Aug-18 Overall substantial Completion of Civil Works

SITE PERMITS 76 23-Aug-17 21-Nov-17 SITE PERMITS

A2010 NTP-1 ( Mobilization / Site Establishment Works) 0 23-Aug-17 NTP-1 ( Mobilization / Site Establishment Works)
A2020 Excavation Permit 0 23-Aug-17 Excavation Permit
A2170 NTP-2 0 02-Oct-17 NTP-2
A3520 DC-1 0 21-Nov-17 DC-1

SITE MOBILIZATION 24 24-Aug-17 21-Sep-17 SITE MOBILIZATION

A2040 Site hoarding and fencing work 8 24-Aug-17 02-Sep-17 Site hoarding and fencing work
A2160 Site offices and establishment work 22 27-Aug-17 21-Sep-17 Site offices and establishment work

MILESTONE DATES 119 25-Jan-18 14-Jun-18 MILESTONE DATES

132 KV MILESTONES 119 25-Jan-18 14-Jun-18 132 KV MILESTONES


A5260 132 KV Basement 0 25-Jan-18 132 KV Basement
A7170 11 KV Switchgear Room 0 11-Mar-18 11 KV Switchgear Room
A7180 LVAC/D C Panel Room 0 11-Mar-18 LVAC/D C Panel Room
A7190 Control, Relay & Telec om Room 0 11-Mar-18 Control, Relay & Telec om Room
A7930 132 kV GIS Room 0 21-Mar-18 132 kV GIS Room
A7940 Battery Room 0 21-Mar-18 Battery Room
A7950 Store Room 0 21-Mar-18 Store Room
A7960 FM 200 Room 0 21-Mar-18 FM 200 Room
A8320 40 MVA Power Transformers 0 31-Mar-18 40 MVA Power Transformers
A9340 Auxiliary Trans former s 0 30-Apr-18 Auxiliary Trans former s
A9350 132KV Lower Roof Acc ess 0 30-Apr-18 132KV Lower Roof Acc ess
A9360 315 MVA Power Transformers 0 30-Apr-18 315 MVA Power Transformers
A9370 132KV Upper Roof Acc ess 0 30-Apr-18 132KV Upper Roof Acc ess
A10750 Guard Room 0 10-Jun-18 Guard Room
A10850 Fire Pump Room 0 14-Jun-18 Fire Pump Room

220 KV MILESTONES 80 25-Jan-18 30-Apr-18 220 KV MILESTONES


A5270 220 KV Basement 0 25-Jan-18 220 KV Basement
A6610 220 kV GIS Room 0 01-Mar-18 220 kV GIS Room
A7200 Relay Panel Room 0 11-Mar-18 Relay Panel Room
A9380 60 MVA Power Transformers 0 30-Apr-18 60 MVA Power Transformers
A9390 220 KV Lower Roof Acces s 0 30-Apr-18 220 KV Lower Roof Acces s
A9400 220 KV Upper Roof Acces s 0 30-Apr-18 220 KV Upper Roof Acces s

DESIGN AND DRAWING 231 23-Aug-17 22-May-18 DESIGN AND DRAWING

ARCHITECTURAL 76 23-Aug-17 21-Nov-17 ARCHITECTURAL


A2030 Excavation layout for Main Building & Tr ansformers 1 23-Aug-17 23-Aug-17 Excavation layout for Main Building & Tr ansformers

A2090 Building plans, elevations, sections, etc 1 17-Sep-17 17-Sep-17 Building plans, elevations, sections, etc
A3530 Finishing schedule & drawings 1 20-Nov-17 21-Nov-17 Finishing schedule & drawings

STRUCTURAL 57 17-Sep-17 21-Nov-17 STRUCTURAL


Structural Package 01 1 17-Sep-17 17-Sep-17 Structural Package 01
A2120 Substructure Drawings ( Building Raft,Walls & columns / Transformer etc) 1 17-Sep-17 17-Sep-17 Substructure Drawings ( Building Raft,Walls & columns / Transformer etc)

A2130 Basement Foundation earthing typical details 1 17-Sep-17 17-Sep-17 Basement Foundation earthing typical details
A2140 Substation Building Cutout Details 1 17-Sep-17 17-Sep-17 Substation Building Cutout Details
A2150 Structural Drawing for Ground floor Slab 1 17-Sep-17 17-Sep-17 Structural Drawing for Ground floor Slab

Data Date : 23-Aug-17 AL SHAHHANIYAH SUPER SUBSTATION


220/132/11KV AL SHAHANIYAH SUPER SUBSTATION Actual Work
Date Revision Checked Approved
Remaining Work
(Page1 of 22) 16-Sep-17 Baseline Contract Programme_Rev.00 SKS SKM
Critical Remaining Work
05-Nov-17 Baseline Contract Programme_Rev.01 SKS SKM
Milestone
Summary
Ac vity ID Ac vity Name Original BL Project Start BL Project Finish
Dura on 2018 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
Structural Package 02 1 21-Nov-17 21-Nov-17 Structural Package 02
A3560 Super Structure (Lower and upper roof, parapet wall, etc ) 1 21-Nov-17 21-Nov-17 Super Structure (Lower and upper roof, parapet wall, etc )

EXTERNAL WORKS 211 17-Sep-17 22-May-18 EXTERNAL WORKS


A2100 Transformers substructure 1 17-Sep-17 17-Sep-17 Transformers substructure
A2110 Oil Containment Tank 1 17-Sep-17 17-Sep-17 Oil Containment Tank
A3550 Door and windows 1 20-Nov-17 20-Nov-17 Door and windows
A3540 Transformers super structure 1 21-Nov-17 21-Nov-17 Transformers super structure
A8070 Boundary wall & Gate work 1 07-Mar-18 07-Mar-18 Boundary wall & Gate work
A7290 Pump room 1 13-Mar-18 13-Mar-18 Pump room
A8050 Guard room 1 25-Mar-18 25-Mar-18 Guard room
A8060 Under ground services 1 25-Mar-18 25-Mar-18 Under ground services
A8830 Ground water tank 1 05-Apr-18 05-Apr-18 Ground water tank
A9600 Fire water tank 1 11-Apr-18 11-Apr-18 Fire water tank
A8840 Miscellaneous structures 1 17-Apr-18 17-Apr-18 Miscellaneous structures
A9860 Road work 1 22-May-18 22-May-18 Road work

CONSTRUCTION WORKS 288 03-Sep-17 08-Aug-18 CONSTRUCTION WORKS

132 KV GIS BUILIDING 275 03-Sep-17 24-Jul-18 132 KV GIS BUILIDING


SUBSTRUCTURE-132 KV BUILDING 124 03-Sep-17 27-Jan-18 SUBSTRUCTURE-132 KV BUILDING
A2050 Building Layout marking 1 03-Sep-17 03-Sep-17 Building Layout marking
A2070 Inspection of Building laout by SIEMENS / Kahramaa 1 05-Sep-17 05-Sep-17 Inspection of Building laout by SIEMENS / Kahramaa
A2180 Excavation for main building & Tr anasfor mers 23 06-Sep-17 02-Oct-17 Excavation for main building & Tr anasfor mers
A2200 Trimming work & Preparation for Blinding 6 27-Sep-17 03-Oct-17 Trimming work & Preparation for Blinding
A2220 Blinding ( Anti ter mite treatment & Blinding concreting ) 2 04-Oct-17 05-Oct-17 Blinding ( Anti ter mite treatment & Blinding concreting )
A2280 Blinding Curing 3 06-Oct-17 08-Oct-17 Blinding Curing
A2320 Waterproofing 2 09-Oct-17 10-Oct-17 Waterproofing
A2380 Screed 1 11-Oct-17 11-Oct-17 Screed
A2440 Screed Curing 3 12-Oct-17 14-Oct-17 Screed Curing
A2530 Raft rebar work 6 15-Oct-17 21-Oct-17 Raft rebar work
A2580 Raft Outer Shuttering work 5 18-Oct-17 23-Oct-17 Raft Outer Shuttering work
A2630 Wall Rebar fixing 3 22-Oct-17 24-Oct-17 Wall Rebar fixing
A2690 Foundation Embedded works ( Foundation Earthing Instalaltion, MEP Services etc) 4 22-Oct-17 25-Oct-17 Foundation Embedded works ( Foundation Earthing Instalaltion, MEP Services etc)
A2750 Kicker Shutter & Water bar Installation 3 24-Oct-17 26-Oct-17 Kicker Shutter & Water bar Installation
A2820 Raft foundation QA/QC Inspection & concreting 1 28-Oct-17 28-Oct-17 Raft foundation QA/QC Inspection & concreting
A3000 Raft Foundation Curing 7 29-Oct-17 04-Nov-17 Raft Foundation Curing
BASEMENT WALL AND COLUMNS 76 30-Oct-17 27-Jan-18 BASEMENT WALL AND COLUMNS
1ST SEGMENT 16 30-Oct-17 16-Nov-17 1ST SEGMENT
A2960 Basement walls and columns Scaffolding work 3 30-Oct-17 01-Nov-17 Basement walls and columns Scaffolding work
A3020 Basement walls and columns rebar work 4 31-Oct-17 04-Nov-17 Basement walls and columns rebar work
A3080 MEP Embeded Fittings ( Sleeves Fixing, Electrical conduits etc) 3 04-Nov-17 06-Nov-17 MEP Embeded Fittings ( Sleeves Fixing, Electrical conduits etc)
A3140 Basement walls and columns shuttering work 6 02-Nov-17 08-Nov-17 Basement walls and columns shuttering work
A3190 Basement walls and columns concrete work 4 06-Nov-17 09-Nov-17 Basement walls and columns concrete work
A3410 Curing Works 7 10-Nov-17 16-Nov-17 Curing Works
2ND SEGMENT 16 01-Nov-17 19-Nov-17 2ND SEGMENT
A3010 Basement walls and columns Scaffolding work 3 01-Nov-17 04-Nov-17 Basement walls and columns Scaffolding work
A3070 Basement walls and columns rebar work 4 02-Nov-17 06-Nov-17 Basement walls and columns rebar work
A3120 MEP Embeded Fittings ( Sleeves Fixing, Electrical conduits etc) 3 05-Nov-17 07-Nov-17 MEP Embeded Fittings ( Sleeves Fixing, Electrical conduits etc)
A3240 Basement walls and columns shuttering work 6 05-Nov-17 11-Nov-17 Basement walls and columns shuttering work
A3290 Basement walls and columns concrete work 4 08-Nov-17 12-Nov-17 Basement walls and columns concrete work
A3500 Curing Works 7 13-Nov-17 19-Nov-17 Curing Works
3RD SEGMENT 18 04-Nov-17 23-Nov-17 3RD SEGMENT
A3090 Basement walls and columns Scaffolding work 3 04-Nov-17 06-Nov-17 Basement walls and columns Scaffolding work
A3160 Basement walls and columns rebar work 4 05-Nov-17 08-Nov-17 Basement walls and columns rebar work

Data Date : 23-Aug-17 AL SHAHHANIYAH SUPER SUBSTATION


220/132/11KV AL SHAHANIYAH SUPER SUBSTATION Actual Work
Date Revision Checked Approved
Remaining Work
(Page2 of 22) 16-Sep-17 Baseline Contract Programme_Rev.00 SKS SKM
Critical Remaining Work
05-Nov-17 Baseline Contract Programme_Rev.01 SKS SKM
Milestone
Summary
Ac vity ID Ac vity Name Original BL Project Start BL Project Finish
Dura on 2018 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
A3260 MEP Embeded Fittings ( Sleeves Fixing, Electrical conduits etc) 3 08-Nov-17 11-Nov-17 MEP Embeded Fittings ( Sleeves Fixing, Electrical conduits etc)
A3390 Basement walls and columns shuttering work 6 09-Nov-17 15-Nov-17 Basement walls and columns shuttering work
A3430 Basement walls and columns concrete work 4 13-Nov-17 16-Nov-17 Basement walls and columns concrete work
A3640 Curing Works 7 17-Nov-17 23-Nov-17 Curing Works
4TH SEGMENT 17 06-Nov-17 25-Nov-17 4TH SEGMENT
A3150 Basement walls and columns Scaffolding work 3 06-Nov-17 08-Nov-17 Basement walls and columns Scaffolding work
A3200 Basement walls and columns rebar work 3 07-Nov-17 09-Nov-17 Basement walls and columns rebar work
A3250 MEP Embeded Fittings ( Sleeves Fixing, Electrical conduits etc) 2 09-Nov-17 11-Nov-17 MEP Embeded Fittings ( Sleeves Fixing, Electrical conduits etc)
A3420 Basement walls and columns shuttering work 4 13-Nov-17 16-Nov-17 Basement walls and columns shuttering work
A3470 Basement walls and columns concrete work 3 15-Nov-17 18-Nov-17 Basement walls and columns concrete work
A3670 Curing Works 7 19-Nov-17 25-Nov-17 Curing Works
BASEMENT WALL BACKFILLING WORKS 32 21-Dec-17 27-Jan-18 BASEMENT WALL BACKFILLING WORKS
A4710 Basement Wall Waterproofing works 17 21-Dec-17 09-Jan-18 Basement Wall Waterproofing works
A5280 Basement Wall Backfilling Wor ks 25 30-Dec-17 27-Jan-18 Basement Wall Backfilling Wor ks
GROUND FLOOR SLAB 34 11-Nov-17 20-Dec-17 GROUND FLOOR SLAB
A3580 Ground floor slab staging work 10 11-Nov-17 21-Nov-17 Ground floor slab staging work
A3730 Ground floor beam bottom shuttering 12 14-Nov-17 27-Nov-17 Ground floor beam bottom shuttering
A3760 Ground floor slab bottom shuttering work 12 16-Nov-17 29-Nov-17 Ground floor slab bottom shuttering work
A3780 Grouns floor slab Beam rebar work 12 18-Nov-17 30-Nov-17 Grouns floor slab Beam rebar work
A3850 Ground floor slab rebar work 9 25-Nov-17 04-Dec-17 Ground floor slab rebar work
A3870 Ground floor slab embedded works ( Electrical conduits, cutouts, etc) 5 30-Nov-17 05-Dec-17 Ground floor slab embedded works ( Electrical conduits, cutouts, etc)
A3880 Ground floor slab side shutter installation & slab extra supports installation 5 30-Nov-17 05-Dec-17 Ground floor slab side shutter installation & slab extra supports installation
A3900 Ground slab Concrete work 1 06-Dec-17 06-Dec-17 Ground slab Concrete work
A4230 Ground floor Slab Curing 14 07-Dec-17 20-Dec-17 Ground floor Slab Curing
DUCT BACK WORKS ( APPROXIMATELY 6 MTR) 34 11-Nov-17 20-Dec-17 DUCT BACK WORKS ( APPROXIMATELY 6 MTR)
A3590 Excavation 10 11-Nov-17 21-Nov-17 Excavation
A3680 Blinding preparation & Blinding Concrete 8 16-Nov-17 25-Nov-17 Blinding preparation & Blinding Concrete
A3940 Pipe Laying 14 22-Nov-17 07-Dec-17 Pipe Laying
A4090 Encasement Concreting ( Form work & Concrete) 14 28-Nov-17 13-Dec-17 Encasement Concreting ( Form work & Concrete)
A4240 Waterproofing & Backfilling works 15 03-Dec-17 20-Dec-17 Waterproofing & Backfilling works
SUPER STRUCTURE-132 KV BUILDING 48 09-Dec-17 03-Feb-18 SUPER STRUCTURE-132 KV BUILDING
LOWER ROOF 36 09-Dec-17 20-Jan-18 LOWER ROOF
A4020 Scaffolding for walls and columns 3 09-Dec-17 11-Dec-17 Scaffolding for walls and columns
A4060 Rebar for walls and columns 3 10-Dec-17 12-Dec-17 Rebar for walls and columns
A4100 Shuttering for walls and columns 4 11-Dec-17 14-Dec-17 Shuttering for walls and columns
A4140 Concrete work for walls and columns 4 12-Dec-17 16-Dec-17 Concrete work for walls and columns
A4280 Lower roof slab staging work 7 14-Dec-17 23-Dec-17 Lower roof slab staging work
A4360 Lower roof beam bottom shuttering 7 19-Dec-17 26-Dec-17 Lower roof beam bottom shuttering
A4390 Lower roof slab shuttering 6 21-Dec-17 27-Dec-17 Lower roof slab shuttering
A4460 Lower roof beam rebar fixing 7 23-Dec-17 30-Dec-17 Lower roof beam rebar fixing
A4520 Lower roof slab rebar fixing 6 28-Dec-17 03-Jan-18 Lower roof slab rebar fixing
A4560 Lower roof slab embedded works ( Electrical conduits, cutouts, etc) 4 01-Jan-18 04-Jan-18 Lower roof slab embedded works ( Electrical conduits, cutouts, etc)
A4570 Lower roof slab side shutter installation & slab extra supports instalaltion 5 31-Dec-17 04-Jan-18 Lower roof slab side shutter installation & slab extra supports instalaltion
A4620 Lower roof slab concrete work 1 06-Jan-18 06-Jan-18 Lower roof slab concrete work
A5050 Lower roof slab curing 14 07-Jan-18 20-Jan-18 Lower roof slab curing
UPPER ROOF 48 09-Dec-17 03-Feb-18 UPPER ROOF
A4030 Scaffolding for walls and columns upto corbel level 3 09-Dec-17 11-Dec-17 Scaffolding for walls and columns upto corbel level
A4110 Rebar for walls and columns upto corbel level 5 10-Dec-17 14-Dec-17 Rebar for walls and columns upto corbel level
A4200 Wall & Columns embedded works ( Cutouts , conduits, etc) upto corbel level 3 16-Dec-17 19-Dec-17 Wall & Columns embedded works ( Cutouts , conduits, etc) upto corbel level
A4400 Shuttering for walls and columns upto corbel level 7 20-Dec-17 27-Dec-17 Shuttering for walls and columns upto corbel level
A4490 Concrete work for walls and columns upto corbel level 6 26-Dec-17 01-Jan-18 Concrete work for walls and columns upto corbel level
A4670 Scaffolding for walls and columns above corbel level 2 07-Jan-18 08-Jan-18 Scaffolding for walls and columns above corbel level

Data Date : 23-Aug-17 AL SHAHHANIYAH SUPER SUBSTATION


220/132/11KV AL SHAHANIYAH SUPER SUBSTATION Actual Work
Date Revision Checked Approved
Remaining Work
(Page3 of 22) 16-Sep-17 Baseline Contract Programme_Rev.00 SKS SKM
Critical Remaining Work
05-Nov-17 Baseline Contract Programme_Rev.01 SKS SKM
Milestone
Summary
Ac vity ID Ac vity Name Original BL Project Start BL Project Finish
Dura on 2018 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
A4700 Rebar for walls and columns above corbel level 2 08-Jan-18 09-Jan-18 Rebar for walls and columns above corbel level
A4760 Wall & Columns embedded works ( Cutouts , conduits, etc) above corbel level 2 09-Jan-18 10-Jan-18 Wall & Columns embedded works ( Cutouts , conduits, etc) above corbel level
A4790 Shuttering for walls and columns above corbel level 3 09-Jan-18 11-Jan-18 Shuttering for walls and columns above corbel level
A4840 Concrete work for walls and columns above corbel level 3 10-Jan-18 13-Jan-18 Concrete work for walls and columns above corbel level
A4890 Upper roof slab staging work 10 03-Jan-18 14-Jan-18 Upper roof slab staging work
A4900 Upper roof beam bottom shuttering 6 09-Jan-18 15-Jan-18 Upper roof beam bottom shuttering
A4940 Upper roof slab shuttering work 6 10-Jan-18 16-Jan-18 Upper roof slab shuttering work
A4950 Upper roof beam rebar fixing 4 13-Jan-18 16-Jan-18 Upper roof beam rebar fixing
A4990 Upper roof slab rebar work 3 15-Jan-18 17-Jan-18 Upper roof slab rebar work
A5020 Upper roof slab side shutter installation & slab extra supports instalaltion 2 17-Jan-18 18-Jan-18 Upper roof slab side shutter installation & slab extra supports instalaltion
A5030 Upper roof slab embedded works ( Electrical conduits, cutouts, etc) 2 17-Jan-18 18-Jan-18 Upper roof slab embedded works ( Electrical conduits, cutouts, etc)
A5060 Upper roof slab inspection & concrete work 2 18-Jan-18 20-Jan-18 Upper roof slab inspection & concrete work
A5540 Upper roof slab curing 14 21-Jan-18 03-Feb-18 Upper roof slab curing
FINISHING WORK 139 23-Dec-17 03-Jun-18 FINISHING WORK
132 KV BASEMENT FINISHING WORKS 30 23-Dec-17 25-Jan-18 132 KV BASEMENT FINISHING WORKS
A4410 Ground slab deshuttering 5 23-Dec-17 27-Dec-17 Ground slab deshuttering
A4580 Basement Block work 7 28-Dec-17 04-Jan-18 Basement Block work
A4680 Ceiling surface preparation 10 28-Dec-17 08-Jan-18 Ceiling surface preparation
A4860 Wall Surface preparation 10 02-Jan-18 13-Jan-18 Wall Surface preparation
A4870 Basement Plastering 7 06-Jan-18 13-Jan-18 Basement Plastering
A4920 Ceiling painting work 12 02-Jan-18 15-Jan-18 Ceiling painting work
A5080 Wall painting work 14 04-Jan-18 20-Jan-18 Wall painting work
A5100 MEP works - Ceiling 14 06-Jan-18 21-Jan-18 MEP works - Ceiling
A5220 Basement clean access 0 25-Jan-18 Basement clean access
A5230 MEP Works - Wall 14 10-Jan-18 25-Jan-18 MEP Works - Wall
132 KV GIS ROOM - FINISHING WORKS 39 04-Feb-18 21-Mar-18 132 KV GIS ROOM - FINISHING WORKS
A5700 Upper roof slab deshuttering 4 04-Feb-18 07-Feb-18 Upper roof slab deshuttering
A5900 Ceiling Surface preparation 3 08-Feb-18 11-Feb-18 Ceiling Surface preparation
A6020 Ceiling painting works 5 10-Feb-18 15-Feb-18 Ceiling painting works
A6110 MEP Work (Siemens) - Ceiling 7 11-Feb-18 19-Feb-18 MEP Work (Siemens) - Ceiling
A6160 Block work 10 08-Feb-18 20-Feb-18 Block work
A6260 Scaffold dismantling after ceiling painting & Ceiling MEP Works 2 20-Feb-18 21-Feb-18 Scaffold dismantling after ceiling painting & Ceiling MEP Works
A6340 Floor Screed 2 22-Feb-18 24-Feb-18 Floor Screed
A6650 Internal Plastering 6 25-Feb-18 03-Mar-18 Internal Plastering
A7110 Wall Painting work 7 04-Mar-18 11-Mar-18 Wall Painting work
A7220 Window installation 4 08-Mar-18 12-Mar-18 Window installation
A7230 Door installation 4 08-Mar-18 12-Mar-18 Door installation
A7450 Roller shutter Installation 4 12-Mar-18 15-Mar-18 Roller shutter Installation
A7530 MEP Works (Siemens) - Wall 7 10-Mar-18 17-Mar-18 MEP Works (Siemens) - Wall
A7540 Ganrty Crane Installation ( By SIEMENS) 7 10-Mar-18 17-Mar-18 Ganrty Crane Installation ( By SIEMENS)
A7640 Scaffolding removal after Ganrty Crane Installation ( By SIEMENS) 2 18-Mar-18 19-Mar-18 Scaffolding removal after Ganrty Crane Installation ( By SIEMENS)
A7820 Floor epoxy finish 2 20-Mar-18 21-Mar-18 Floor epoxy finish
A7830 GIS Room Clean access to Siemens 0 21-Mar-18 GIS Room Clean access to Siemens
11KV SWITCHGEAR ROOM - FINISHIN G WO RKS 42 21-Jan-18 11-Mar-18 11KV SWITCHGEAR ROOM - FINISHING WORKS
A5160 Lower roof slab deshuttering 3 21-Jan-18 23-Jan-18 Lower roof slab deshuttering
A5400 Ceiling Surface preparation 5 24-Jan-18 29-Jan-18 Ceiling Surface preparation
A5570 Ceiling painting works 7 28-Jan-18 04-Feb-18 Ceiling painting works
A5660 Block work 12 24-Jan-18 06-Feb-18 Block work
A5710 MEP Work (Siemens) - Ceiling 7 31-Jan-18 07-Feb-18 MEP Work (Siemens) - Ceiling
A5840 Scaffold dismantling after ceiling painting & Ceiling MEP Works 2 08-Feb-18 10-Feb-18 Scaffold dismantling after ceiling painting & Ceiling MEP Works
A5970 Floor Screed 2 11-Feb-18 12-Feb-18 Floor Screed
A6270 Internal Plastering 7 14-Feb-18 21-Feb-18 Internal Plastering

Data Date : 23-Aug-17 AL SHAHHANIYAH SUPER SUBSTATION


220/132/11KV AL SHAHANIYAH SUPER SUBSTATION Actual Work
Date Revision Checked Approved
Remaining Work
(Page4 of 22) 16-Sep-17 Baseline Contract Programme_Rev.00 SKS SKM
Critical Remaining Work
05-Nov-17 Baseline Contract Programme_Rev.01 SKS SKM
Milestone
Summary
Ac vity ID Ac vity Name Original BL Project Start BL Project Finish
Dura on 2018 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
A6660 Wall Painting work 8 22-Feb-18 03-Mar-18 Wall Painting work
A6670 Window & doors installation 4 27-Feb-18 03-Mar-18 Window & doors installation
A6890 MEP Works (Siemens) - Wall 7 28-Feb-18 07-Mar-18 MEP Works (Siemens) - Wall
A7130 Floor epoxy finish 3 08-Mar-18 11-Mar-18 Floor epoxy finish
A7140 Switchgear Clean access to Siemens 0 11-Mar-18 Switchgear Clean access to Siemens
132 KV CONTROL , RELAY & TELECOM ROOM - FINISHING WORKS 42 21-Jan-18 11-Mar-18 132 KV CONTROL , RELAY & TELEC OM RO OM - F INISH ING WO RKS
A5150 Lower roof slab deshuttering 3 21-Jan-18 23-Jan-18 Lower roof slab deshuttering
A5320 Ceiling Surface preparation 3 24-Jan-18 27-Jan-18 Ceiling Surface preparation
A5510 Ceiling painting works 7 25-Jan-18 01-Feb-18 Ceiling painting works
A5640 Block work 12 24-Jan-18 06-Feb-18 Block work
A5650 MEP Work (Siemens) - Ceiling 7 30-Jan-18 06-Feb-18 MEP Work (Siemens) - Ceiling
A5760 Scaffold dismantling after ceiling painting & Ceiling MEP Works 2 07-Feb-18 08-Feb-18 Scaffold dismantling after ceiling painting & Ceiling MEP Works
A5890 Floor Screed 2 10-Feb-18 11-Feb-18 Floor Screed
A6250 Internal Plastering 8 12-Feb-18 21-Feb-18 Internal Plastering
A6630 Wall Painting work 8 22-Feb-18 03-Mar-18 Wall Painting work
A6640 Window & doors installation 4 27-Feb-18 03-Mar-18 Window & doors installation
A6880 MEP Works (Siemens) - Wall 7 28-Feb-18 07-Mar-18 MEP Works (Siemens) - Wall
A7070 Floor epoxy finish 3 08-Mar-18 11-Mar-18 Floor epoxy finish
A7080 Control Room Clean access to Siemens 0 11-Mar-18 Control Room Clean access to Siemens
LVAC/D C PANEL ROOM - FINISHING WORKS 39 24-Jan-18 11-Mar-18 LVAC/D C PANEL ROOM - FINISHING WORKS
A5360 Lower roof slab deshuttering 4 24-Jan-18 28-Jan-18 Lower roof slab deshuttering
A5470 Ceiling Surface preparation 3 29-Jan-18 31-Jan-18 Ceiling Surface preparation
A5610 Ceiling painting works 6 30-Jan-18 05-Feb-18 Ceiling painting works
A5830 MEP Work (Siemens) - Ceiling 7 03-Feb-18 10-Feb-18 MEP Work (Siemens) - Ceiling
A5880 Block work 12 29-Jan-18 11-Feb-18 Block work
A5960 Scaffold dismantling after ceiling painting & Ceiling MEP Works 2 11-Feb-18 12-Feb-18 Scaffold dismantling after ceiling painting & Ceiling MEP Works
A6010 Floor Screed 2 14-Feb-18 15-Feb-18 Floor Screed
A6330 Internal Plastering 7 17-Feb-18 24-Feb-18 Internal Plastering
A6760 Wall Painting work 8 24-Feb-18 04-Mar-18 Wall Painting work
A6770 Window & doors installation 4 28-Feb-18 04-Mar-18 Window & doors installation
A6920 MEP Works (Siemens) - Wall 7 01-Mar-18 08-Mar-18 MEP Works (Siemens) - Wall
A7050 Floor epoxy finish 2 10-Mar-18 11-Mar-18 Floor epoxy finish
A7060 LVAC/D C R oom Clean ac ces s to Siemens 0 11-Mar-18 LVAC/D C R oom Clean ac ces s to Siemens
BATTERY ROOM- FINISHING WORKS 51 21-Jan-18 21-Mar-18 BATTERY ROOM- FINISHING WORKS
A5140 Lower roof slab deshuttering 3 21-Jan-18 23-Jan-18 Lower roof slab deshuttering
A5310 Ceiling preparation work 3 24-Jan-18 27-Jan-18 Ceiling preparation work
A5500 Painting for ceiling 7 25-Jan-18 01-Feb-18 Painting for ceiling
A5620 Block work 12 24-Jan-18 06-Feb-18 Block work
A5630 Ceiling MEP Work 7 30-Jan-18 06-Feb-18 Ceiling MEP Work
A5750 Scaffold dismantling after ceiling painting & Ceiling MEP Works 2 07-Feb-18 08-Feb-18 Scaffold dismantling after ceiling painting & Ceiling MEP Works
A6100 Internal Plastering 8 10-Feb-18 19-Feb-18 Internal Plastering
A6480 Battery Wall tiling works 8 20-Feb-18 28-Feb-18 Battery Wall tiling works
A6750 Under slab Piping work (Siemens) 3 01-Mar-18 04-Mar-18 Under slab Piping work (Siemens)
A6850 Structural screed concrete 2 05-Mar-18 06-Mar-18 Structural screed concrete
A7040 Door / window installation 4 07-Mar-18 11-Mar-18 Door / window installation
A7380 Wall painting 7 07-Mar-18 14-Mar-18 Wall painting
A7680 MEP Works (Siemens) - Wall 7 13-Mar-18 20-Mar-18 MEP Works (Siemens) - Wall
A7800 Battery room Clean access to Siemens 0 21-Mar-18 Battery room Clean access to Siemens
A7810 Battery Floor tiling works 6 15-Mar-18 21-Mar-18 Battery Floor tiling works
TOILET ROOM 48 24-Jan-18 21-Mar-18 TOILET ROOM
A5290 Lower roof slab deshuttering 3 24-Jan-18 27-Jan-18 Lower roof slab deshuttering
A5820 Block work 8 01-Feb-18 10-Feb-18 Block work

Data Date : 23-Aug-17 AL SHAHHANIYAH SUPER SUBSTATION


220/132/11KV AL SHAHANIYAH SUPER SUBSTATION Actual Work
Date Revision Checked Approved
Remaining Work
(Page5 of 22) 16-Sep-17 Baseline Contract Programme_Rev.00 SKS SKM
Critical Remaining Work
05-Nov-17 Baseline Contract Programme_Rev.01 SKS SKM
Milestone
Summary
Ac vity ID Ac vity Name Original BL Project Start BL Project Finish
Dura on 2018 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
A6040 Internal Plastering 5 11-Feb-18 17-Feb-18 Internal Plastering
A6090 Ceiling Surface preparation 2 18-Feb-18 19-Feb-18 Ceiling Surface preparation
A6320 Ceiling painting works 4 20-Feb-18 24-Feb-18 Ceiling painting works
A6520 MEP Work (Siemens) - Ceiling 7 22-Feb-18 01-Mar-18 MEP Work (Siemens) - Ceiling
A6740 Wall Tiling work 7 25-Feb-18 04-Mar-18 Wall Tiling work
A6810 Window & Door installation 3 03-Mar-18 05-Mar-18 Window & Door installation
A6930 Floor waterproofing, Pipe laying and Screed 5 05-Mar-18 10-Mar-18 Floor waterproofing, Pipe laying and Screed
A7430 Wall Painting work 5 11-Mar-18 15-Mar-18 Wall Painting work
A7670 MEP Works (Siemens) - Wall 7 13-Mar-18 20-Mar-18 MEP Works (Siemens) - Wall
A7770 Floor Tiling work 5 17-Mar-18 21-Mar-18 Floor Tiling work
A7780 Toilet Room Clean access to Siemens 0 21-Mar-18 Toilet Room Clean access to Siemens
PANTRY ROOM 45 28-Jan-18 21-Mar-18 PANTRY ROOM
A5430 Lower roof slab deshuttering 3 28-Jan-18 30-Jan-18 Lower roof slab deshuttering
A5810 Block work 6 04-Feb-18 10-Feb-18 Block work
A6060 Internal Plastering 6 11-Feb-18 18-Feb-18 Internal Plastering
A6150 Ceiling Surface preparation 2 19-Feb-18 20-Feb-18 Ceiling Surface preparation
A6380 Ceiling painting works 4 21-Feb-18 25-Feb-18 Ceiling painting works
A6510 MEP Work (Siemens) - Ceiling 7 22-Feb-18 01-Mar-18 MEP Work (Siemens) - Ceiling
A6730 Window & Door installation 4 28-Feb-18 04-Mar-18 Window & Door installation
A6800 Wall Tiling work 7 26-Feb-18 05-Mar-18 Wall Tiling work
A7020 Floor waterproofing, Pipe laying and Screed 5 06-Mar-18 11-Mar-18 Floor waterproofing, Pipe laying and Screed
A7520 Wall Painting work 5 12-Mar-18 17-Mar-18 Wall Painting work
A7660 MEP Works (Siemens) - Wall 7 13-Mar-18 20-Mar-18 MEP Works (Siemens) - Wall
A7750 Floor Tiling work 5 17-Mar-18 21-Mar-18 Floor Tiling work
A7760 Pantry Room Clean access to Siemens 0 21-Mar-18 Pantry Room Clean access to Siemens
STORE ROOM 35 08-Feb-18 21-Mar-18 STORE ROOM
A5910 Lower roof slab deshuttering 3 08-Feb-18 11-Feb-18 Lower roof slab deshuttering
A6170 Block work 7 12-Feb-18 20-Feb-18 Block work
A6430 Internal Plastering 6 21-Feb-18 27-Feb-18 Internal Plastering
A6550 Ceiling Surface preparation 2 28-Feb-18 01-Mar-18 Ceiling Surface preparation
A6860 Ceiling painting works 5 01-Mar-18 06-Mar-18 Ceiling painting works
A7120 MEP Work (Siemens) - Ceiling 7 04-Mar-18 11-Mar-18 MEP Work (Siemens) - Ceiling
A7240 Wall Painting work 7 05-Mar-18 12-Mar-18 Wall Painting work
A7250 Window & door installation 4 08-Mar-18 12-Mar-18 Window & door installation
A7460 Screed 4 12-Mar-18 15-Mar-18 Screed
A7550 MEP Works (Siemens) - Wall 7 10-Mar-18 17-Mar-18 MEP Works (Siemens) - Wall
A7840 Floor Epoxy Work 4 18-Mar-18 21-Mar-18 Floor Epoxy Work
A7850 Store Room Clean access to Siemens 0 21-Mar-18 Store Room Clean access to Siemens
FM200 ROOM 35 08-Feb-18 21-Mar-18 FM200 ROOM
A5920 Lower roof slab deshuttering 3 08-Feb-18 11-Feb-18 Lower roof slab deshuttering
A6180 Block work 7 12-Feb-18 20-Feb-18 Block work
A6440 Internal Plastering 6 21-Feb-18 27-Feb-18 Internal Plastering
A6680 Screed 3 28-Feb-18 03-Mar-18 Screed
A6830 Ceiling Surface preparation 2 04-Mar-18 05-Mar-18 Ceiling Surface preparation
A6940 Ceiling painting works 4 06-Mar-18 10-Mar-18 Ceiling painting works
A7330 Wall Painting work 6 07-Mar-18 13-Mar-18 Wall Painting work
A7340 Window & door installation 4 10-Mar-18 13-Mar-18 Window & door installation
A7350 MEP Work (Siemens) - Ceiling 7 06-Mar-18 13-Mar-18 MEP Work (Siemens) - Ceiling
A7590 MEP Works (Siemens) - Wall 7 11-Mar-18 18-Mar-18 MEP Works (Siemens) - Wall
A7860 Floor Epoxy Work 3 19-Mar-18 21-Mar-18 Floor Epoxy Work
A7870 FM200 Room Clean access to Siemens 0 21-Mar-18 FM200 Room Clean access to Siemens
STAIR CASE-1 52 21-Feb-18 22-Apr-18 STAIR CASE-1

Data Date : 23-Aug-17 AL SHAHHANIYAH SUPER SUBSTATION


220/132/11KV AL SHAHANIYAH SUPER SUBSTATION Actual Work
Date Revision Checked Approved
Remaining Work
(Page6 of 22) 16-Sep-17 Baseline Contract Programme_Rev.00 SKS SKM
Critical Remaining Work
05-Nov-17 Baseline Contract Programme_Rev.01 SKS SKM
Milestone
Summary
Ac vity ID Ac vity Name Original BL Project Start BL Project Finish
Dura on 2018 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
A6540 Block work 8 21-Feb-18 01-Mar-18 Block work
A7090 Plastering 8 03-Mar-18 11-Mar-18 Plastering
A8190 Painting work 15 12-Mar-18 28-Mar-18 Painting work
A8440 MEP Works 7 29-Mar-18 05-Apr-18 MEP Works
A8980 Terrazzo Tiling work 14 07-Apr-18 22-Apr-18 Terrazzo Tiling work
STAIR CASE-2 80 03-Mar-18 03-Jun-18 STAIR CASE-2
A7100 Block work 8 03-Mar-18 11-Mar-18 Block work
A7690 Plastering 8 12-Mar-18 20-Mar-18 Plastering
A9570 Painting work 15 23-Apr-18 09-May-18 Painting work
A9760 MEP Works 7 10-May-18 17-May-18 MEP Works
A10080 Terrazzo Tiling work 14 19-May-18 03-Jun-18 Terrazzo Tiling work
ROOF AREA 96 08-Jan-18 30-Apr-18 ROOF AR EA
LOWER ROOF 96 08-Jan-18 30-Apr-18 LOWER ROOF
EQUIPMENT FOUNDATION 30 08-Jan-18 11-Feb-18 EQUIPMENT FOUNDATION
A4850 Lower roof parapet scaffold installation 5 08-Jan-18 13-Jan-18 Lower roof parapet scaffold installation
A5070 Lower roof parapet rebar fixing 6 14-Jan-18 20-Jan-18 Lower roof parapet rebar fixing
A5130 Lower roof parapet embedded works ( Electrical conduits, Cutouts etc) 5 18-Jan-18 23-Jan-18 Lower roof parapet embedded works ( Electrical conduits, Cutouts etc)
A5170 Upstand/HVAC Eqip foundation rebar fixing 4 21-Jan-18 24-Jan-18 Upstand/HVAC Eqip foundation rebar fixing
A5380 Upstand/HVAC Eqip foundation form work 4 25-Jan-18 29-Jan-18 Upstand/HVAC Eqip foundation form work
A5480 Upstand/HVAC Eqip foundation/Pedestal concreting 3 30-Jan-18 01-Feb-18 Upstand/HVAC Eqip foundation/Pedestal concreting
A5560 Lower roof parapet form work 10 24-Jan-18 04-Feb-18 Lower roof parapet form work
A5870 Lower roof parapet wall concrete 7 04-Feb-18 11-Feb-18 Lower roof parapet wall concrete
ROOF WATER PROOFING 66 12-Feb-18 30-Apr-18 ROOF WATER PROOFING
A6240 Foam concreting (Curing and drying) 8 12-Feb-18 21-Feb-18 Foam concreting (Curing and drying)
A6820 Primer application 10 22-Feb-18 05-Mar-18 Primer application
A7030 Torched applied bitumen 8 03-Mar-18 11-Mar-18 Torched applied bitumen
A7320 Leak test 2 12-Mar-18 13-Mar-18 Leak test
A7790 Teram sheet 7 14-Mar-18 21-Mar-18 Teram sheet
A8260 Insulation boards 7 22-Mar-18 29-Mar-18 Insulation boards
A8470 Tiles 7 31-Mar-18 07-Apr-18 Tiles
A8800 Aggregate 8 08-Apr-18 16-Apr-18 Aggregate
A9230 Roof HVAC access for Siemens 0 30-Apr-18 Roof HVAC access for Siemens
A9240 Parapet wall painting inside 12 17-Apr-18 30-Apr-18 Parapet wall painting inside
UPPER ROOF 84 22-Jan-18 30-Apr-18 UPPER ROOF
EQUIPMENT FOUNDATION 22 22-Jan-18 17-Feb-18 EQUIPMENT FOUNDATION
A5180 Upper roof parapet scaffold installation 3 22-Jan-18 24-Jan-18 Upper roof parapet scaffold installation
A5300 Upper roof parapet rebar fixing 5 22-Jan-18 27-Jan-18 Upper roof parapet rebar fixing
A5390 Upper roof parapet embedded works ( Electrical conduits, Cutouts etc) 5 24-Jan-18 29-Jan-18 Upper roof parapet embedded works ( Electrical conduits, Cutouts etc)
A5460 Upper roof parapet form work 7 24-Jan-18 31-Jan-18 Upper roof parapet form work
A5490 Upper parapet wall inspection & concreting 5 28-Jan-18 01-Feb-18 Upper parapet wall inspection & concreting
A5690 Upstand/HVAC Eqip foundation rebar fixing 4 04-Feb-18 07-Feb-18 Upstand/HVAC Eqip foundation rebar fixing
A5950 Upstand/HVAC Eqip foundation form work 4 08-Feb-18 12-Feb-18 Upstand/HVAC Eqip foundation form work
A6050 Upstand/HVAC Eqip foundation/Pedestal concreting 4 12-Feb-18 17-Feb-18 Upstand/HVAC Eqip foundation/Pedestal concreting
ROOF WATER PROOFING 62 18-Feb-18 30-Apr-18 ROOF WATER PROOFING
A6530 Foam concreting (Curing and drying) 11 18-Feb-18 01-Mar-18 Foam concreting (Curing and drying)
A6910 Primer application 8 28-Feb-18 08-Mar-18 Primer application
A7440 Torched applied bitumen 8 07-Mar-18 15-Mar-18 Torched applied bitumen
A7580 Leak test 2 17-Mar-18 18-Mar-18 Leak test
A8120 Teram sheet 7 19-Mar-18 26-Mar-18 Teram sheet
A8390 Insulation boards 7 27-Mar-18 03-Apr-18 Insulation boards
A8620 Tiles 7 04-Apr-18 11-Apr-18 Tiles
A8900 Aggregate 7 12-Apr-18 19-Apr-18 Aggregate

Data Date : 23-Aug-17 AL SHAHHANIYAH SUPER SUBSTATION


220/132/11KV AL SHAHANIYAH SUPER SUBSTATION Actual Work
Date Revision Checked Approved
Remaining Work
(Page7 of 22) 16-Sep-17 Baseline Contract Programme_Rev.00 SKS SKM
Critical Remaining Work
05-Nov-17 Baseline Contract Programme_Rev.01 SKS SKM
Milestone
Summary
Ac vity ID Ac vity Name Original BL Project Start BL Project Finish
Dura on 2018 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
A9250 Roof access for Siemens 0 30-Apr-18 Roof access for Siemens
A9260 Parapet wall painting inside 9 21-Apr-18 30-Apr-18 Parapet wall painting inside
TRANSFORMERS 177 04-Oct-17 30-Apr-18 TRANSFORMERS
40 MVA POWER TRANSFORMERS 151 04-Oct-17 31-Mar-18 40 MVA POWER TRANSFO RMERS
A2230 Blinding concrete ( Anti termite treatment & Blinding concr eting ) 2 04-Oct-17 05-Oct-17 Blinding concrete ( Anti termite treatment & Blinding concr eting )
A2290 Blinding Curing 3 06-Oct-17 08-Oct-17 Blinding Curing
A2330 Base waterproofing 2 09-Oct-17 10-Oct-17 Base waterproofing
A2390 Screed 1 11-Oct-17 11-Oct-17 Screed
A2450 Screed Curing 3 12-Oct-17 14-Oct-17 Screed Curing
A2540 Raft Rebar fixing 6 15-Oct-17 21-Oct-17 Raft Rebar fixing
A2590 Raft Outer shutter installation 5 18-Oct-17 23-Oct-17 Raft Outer shutter installation
A2640 Wall Rebar fixing 3 22-Oct-17 24-Oct-17 Wall Rebar fixing
A2700 Foundation Embedded works ( Foundation Earthing Instalaltion, MEP Services etc) 4 22-Oct-17 25-Oct-17 Foundation Embedded works ( Foundation Earthing Instalaltion, MEP Services etc)
A2760 Kicker Shutter & Water bar Installation 3 24-Oct-17 26-Oct-17 Kicker Shutter & Water bar Installation
A2830 Raft concrete inspection & Concreting 2 26-Oct-17 28-Oct-17 Raft concrete inspection & Concreting
A2930 Raft Curing 3 29-Oct-17 31-Oct-17 Raft Curing
A3300 Dyke wall scaffolding installation 8 04-Nov-17 12-Nov-17 Dyke wall scaffolding installation
A3600 Dyke walls rebar Installation 8 13-Nov-17 21-Nov-17 Dyke walls rebar Installation
A3740 Dyke walls embedded works ( Electrical conduits , cutouts etc) 6 22-Nov-17 28-Nov-17 Dyke walls embedded works ( Electrical conduits , cutouts etc)
A3910 Dyke walls shutter installation 15 20-Nov-17 06-Dec-17 Dyke walls shutter installation
A3970 Dyke walls inspection & concreting 8 30-Nov-17 09-Dec-17 Dyke walls inspection & concreting
A4070 Dyke wall curing 3 10-Dec-17 12-Dec-17 Dyke wall curing
A5790 Fire walls Rebar, Shuttering & c oncr eting - 1st lift 10 30-Jan-18 10-Feb-18 Fire walls Rebar, Shuttering & c oncr eting - 1st lif t
A6290 Fire walls Rebar, Shuttering & c oncr eting - 2nd lift 14 06-Feb-18 22-Feb-18 Fire walls Rebar, Shuttering & c oncr eting - 2nd lift
A6360 Fire Wall Curing 3 23-Feb-18 25-Feb-18 Fire Wall Curing
A6620 Fire wall surface preparation 5 26-Feb-18 03-Mar-18 Fire wall surface preparation
A7210 Painting for fire walls 8 04-Mar-18 12-Mar-18 Painting for fire walls
A7490 Dike wall surface preparation 5 12-Mar-18 17-Mar-18 Dike wall surface preparation
A8100 Epoxy for dyke walls 8 18-Mar-18 26-Mar-18 Epoxy for dyke walls
A8290 Grating support & grating installation 4 27-Mar-18 31-Mar-18 Grating support & grating installation
A8300 Clean access for 40 MVA Transformers 0 31-Mar-18 Clean access for 40 MVA Transformers
Flame Trap 48 30-Jan-18 27-Mar-18 Flame Trap
A5800 Excavation 10 30-Jan-18 10-Feb-18 Excavation
A5940 Blinding concrete 7 05-Feb-18 12-Feb-18 Blinding concrete
A6030 Blinding Curing 9 06-Feb-18 17-Feb-18 Blinding Curing
A6140 Base waterproofing 9 10-Feb-18 20-Feb-18 Base waterproofing
A6230 Screed 8 12-Feb-18 21-Feb-18 Screed
A6370 Screed Curing 10 14-Feb-18 25-Feb-18 Screed Curing
A6410 Raft rebar fixing 9 18-Feb-18 27-Feb-18 Raft rebar fixing
A6500 Raft form work 9 20-Feb-18 01-Mar-18 Raft form work
A6720 Wall rebar / Kicker Shutter & Water stopper installation 9 22-Feb-18 04-Mar-18 Wall rebar / Kicker Shutter & Water stopper installation
A6840 Raft concreting 8 26-Feb-18 06-Mar-18 Raft concreting
A6990 Wall rebar Installation 10 28-Feb-18 11-Mar-18 Wall rebar Installation
A7300 Wall Embedded works ( Sleeves fixing etc) 8 05-Mar-18 13-Mar-18 Wall Embedded works ( Sleeves fixing etc)
A7400 Wall & Slab form work 10 05-Mar-18 15-Mar-18 Wall & Slab form work
A7560 Wall & Slab concrete inspection & concreting 8 10-Mar-18 18-Mar-18 Wall & Slab concrete inspection & concreting
A7970 Flame Trap wall Curing 12 11-Mar-18 22-Mar-18 Flame Trap wall Curing
A8140 Waterproofing and backfilling work 13 13-Mar-18 27-Mar-18 Waterproofing and backfilling work
315 MVA POWER TRANSFORMERS 177 04-Oct-17 30-Apr-18 315 MVA POWER TRANSFOR MERS
A2240 Blinding concrete ( Anti termite treatment & Blinding concr eting ) 2 04-Oct-17 05-Oct-17 Blinding concrete ( Anti termite treatment & Blinding concr eting )
A2300 Blinding Curing 3 06-Oct-17 08-Oct-17 Blinding Curing
A2340 Base waterproofing 2 09-Oct-17 10-Oct-17 Base waterproofing

Data Date : 23-Aug-17 AL SHAHHANIYAH SUPER SUBSTATION


220/132/11KV AL SHAHANIYAH SUPER SUBSTATION Actual Work
Date Revision Checked Approved
Remaining Work
(Page8 of 22) 16-Sep-17 Baseline Contract Programme_Rev.00 SKS SKM
Critical Remaining Work
05-Nov-17 Baseline Contract Programme_Rev.01 SKS SKM
Milestone
Summary
Ac vity ID Ac vity Name Original BL Project Start BL Project Finish
Dura on 2018 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
A2400 Screed 1 11-Oct-17 11-Oct-17 Screed
A2460 Screed Curing 3 12-Oct-17 14-Oct-17 Screed Curing
A2550 Raft Rebar fixing 6 15-Oct-17 21-Oct-17 Raft Rebar fixing
A2610 Raft Outer shutter installation 5 18-Oct-17 23-Oct-17 Raft Outer shutter installation
A2650 Wall Rebar fixing 3 22-Oct-17 24-Oct-17 Wall Rebar fixing
A2710 Foundation Embedded works ( Foundation Earthing Instalaltion, MEP Services etc) 4 22-Oct-17 25-Oct-17 Foundation Embedded works ( Foundation Earthing Instalaltion, MEP Services etc)
A2780 Kicker Shutter & Water bar Installation 3 24-Oct-17 26-Oct-17 Kicker Shutter & Water bar Installation
A2840 Raft concrete inspection & Concreting 2 26-Oct-17 28-Oct-17 Raft concrete inspection & Concreting
A2940 Raft Curing 3 29-Oct-17 31-Oct-17 Raft Curing
A3610 Dyke wall scaffolding installation 8 13-Nov-17 21-Nov-17 Dyke wall scaffolding installation
A3790 Dyke walls rebar Installation 8 22-Nov-17 30-Nov-17 Dyke walls rebar Installation
A3950 Dyke walls embedded works ( Electrical conduits , cutouts etc) 6 02-Dec-17 07-Dec-17 Dyke walls embedded works ( Electrical conduits , cutouts etc)
A4150 Dyke walls shutter installation 15 29-Nov-17 16-Dec-17 Dyke walls shutter installation
A4210 Dyke walls inspection & concreting 8 10-Dec-17 19-Dec-17 Dyke walls inspection & concreting
A4270 Dyke wall curing 3 20-Dec-17 22-Dec-17 Dyke wall curing
A6420 Fire walls Rebar, Shuttering & c oncr eting - 1st lift 14 11-Feb-18 27-Feb-18 Fire walls Rebar, Shuttering & c oncr eting - 1st lif t
A7410 Fire walls Rebar, Shuttering & c oncr eting - 2nd lift 14 28-Feb-18 15-Mar-18 Fire walls Rebar, Shuttering & c oncr eting - 2nd lift
A7570 Fire Wall Curing 3 16-Mar-18 18-Mar-18 Fire Wall Curing
A8080 Fire wall surface preparation 6 19-Mar-18 25-Mar-18 Fire wall surface preparation
A8430 Painting for fire walls 10 26-Mar-18 05-Apr-18 Painting for fire walls
A8680 Dike wall surface preparation 6 07-Apr-18 12-Apr-18 Dike wall surface preparation
A9030 Epoxy for dyke walls 10 14-Apr-18 24-Apr-18 Epoxy for dyke walls
A9190 Grating support & grating installation 5 25-Apr-18 30-Apr-18 Grating support & grating installation
A9200 Clean access for 315 MVA Transformer 0 30-Apr-18 Clean access for 315 MVA Transformer
Flame Trap 50 28-Feb-18 26-Apr-18 Flame Trap
A7000 Excavation 10 28-Feb-18 11-Mar-18 Excavation
A7310 Blinding concrete 7 06-Mar-18 13-Mar-18 Blinding concrete
A7500 Blinding Curing 9 07-Mar-18 17-Mar-18 Blinding Curing
A7650 Base waterproofing 9 11-Mar-18 20-Mar-18 Base waterproofing
A7730 Screed 8 13-Mar-18 21-Mar-18 Screed
A8090 Screed Curing 10 14-Mar-18 25-Mar-18 Screed Curing
A8150 Raft rebar fixing 9 18-Mar-18 27-Mar-18 Raft rebar fixing
A8240 Raft form work 9 20-Mar-18 29-Mar-18 Raft form work
A8330 Wall rebar / Kicker Shutter & Water stopper installation 9 22-Mar-18 01-Apr-18 Wall rebar / Kicker Shutter & Water stopper installation
A8380 Raft concreting 8 26-Mar-18 03-Apr-18 Raft concreting
A8530 Wall rebar Installation 10 28-Mar-18 08-Apr-18 Wall rebar Installation
A8600 Wall Embedded works ( Sleeves fixing etc) 8 02-Apr-18 10-Apr-18 Wall Embedded works ( Sleeves fixing etc)
A8690 Wall form work 10 02-Apr-18 12-Apr-18 Wall form work
A8750 Wall concrete inspection & concreting 8 07-Apr-18 15-Apr-18 Wall concrete inspection & concreting
A8890 Flame Trap wall Curing 12 08-Apr-18 19-Apr-18 Flame Trap wall Curing
A9110 Waterproofing and backfilling work 15 10-Apr-18 26-Apr-18 Waterproofing and backfilling work
AUXILIARY TR ANSFOR MERS 177 04-Oct-17 30-Apr-18 AUXILIARY T RANSFORMERS
A2250 Blinding concrete ( Anti termite treatment & Blinding concr eting ) 2 04-Oct-17 05-Oct-17 Blinding concrete ( Anti termite treatment & Blinding concr eting )
A2310 Blinding Curing 3 06-Oct-17 08-Oct-17 Blinding Curing
A2350 Base waterproofing 2 09-Oct-17 10-Oct-17 Base waterproofing
A2410 Screed 1 11-Oct-17 11-Oct-17 Screed
A2470 Screed Curing 3 12-Oct-17 14-Oct-17 Screed Curing
A2560 Raft Rebar fixing 6 15-Oct-17 21-Oct-17 Raft Rebar fixing
A2620 Raft Outer shutter installation 5 18-Oct-17 23-Oct-17 Raft Outer shutter installation
A2660 Wall Rebar fixing 3 22-Oct-17 24-Oct-17 Wall Rebar fixing
A2720 Foundation Embedded works ( Foundation Earthing Instalaltion, MEP Services etc) 4 22-Oct-17 25-Oct-17 Foundation Embedded works ( Foundation Earthing Instalaltion, MEP Services etc)
A2790 Kicker Shutter & Water bar Installation 3 24-Oct-17 26-Oct-17 Kicker Shutter & Water bar Installation

Data Date : 23-Aug-17 AL SHAHHANIYAH SUPER SUBSTATION


220/132/11KV AL SHAHANIYAH SUPER SUBSTATION Actual Work
Date Revision Checked Approved
Remaining Work
(Page9 of 22) 16-Sep-17 Baseline Contract Programme_Rev.00 SKS SKM
Critical Remaining Work
05-Nov-17 Baseline Contract Programme_Rev.01 SKS SKM
Milestone
Summary
Ac vity ID Ac vity Name Original BL Project Start BL Project Finish
Dura on 2018 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
A2850 Raft concrete inspection & Concreting 2 26-Oct-17 28-Oct-17 Raft concrete inspection & Concreting
A2950 Raft Curing 3 29-Oct-17 31-Oct-17 Raft Curing
A3920 Dyke wall scaffolding installation 8 28-Nov-17 06-Dec-17 Dyke wall scaffolding installation
A4160 Dyke walls rebar Installation 8 07-Dec-17 16-Dec-17 Dyke walls rebar Installation
A4310 Dyke walls embedded works ( Electrical conduits , cutouts etc) 6 17-Dec-17 24-Dec-17 Dyke walls embedded works ( Electrical conduits , cutouts etc)
A4540 Dyke walls shutter installation 15 17-Dec-17 03-Jan-18 Dyke walls shutter installation
A4640 Dyke walls inspection & concreting 8 28-Dec-17 06-Jan-18 Dyke walls inspection & concreting
A4720 Dyke wall curing 3 07-Jan-18 09-Jan-18 Dyke wall curing
A6470 Fire walls Rebar, Shuttering & c oncr eting - 1st lift 14 12-Feb-18 28-Feb-18 Fire walls Rebar, Shuttering & c oncr eting - 1st lift
A7510 Fire walls Rebar, Shuttering & c oncr eting - 2nd lift 14 01-Mar-18 17-Mar-18 Fire walls Rebar, Shuttering & c oncr eting - 2nd lift
A8000 Fire Wall Curing 7 18-Mar-18 24-Mar-18 Fire Wall Curing
A8250 Fire wall surface preparation 5 25-Mar-18 29-Mar-18 Fire wall surface preparation
A8610 Painting for fire walls 10 31-Mar-18 10-Apr-18 Painting for fire walls
A8700 Dike wall surface preparation 7 05-Apr-18 12-Apr-18 Dike wall surface preparation
A9040 Epoxy for dyke walls 10 14-Apr-18 24-Apr-18 Epoxy for dyke walls
A9210 Grating support & grating installation 5 25-Apr-18 30-Apr-18 Grating support & grating installation
A9220 Clean access for Auxiliary Transformers 0 30-Apr-18 Clean access for Auxiliary Transformers
Flame Trap 48 22-Feb-18 18-Apr-18 Flame Trap
A6790 Excavation 10 22-Feb-18 05-Mar-18 Excavation
A6870 Blinding concrete 7 28-Feb-18 07-Mar-18 Blinding concrete
A7010 Blinding Curing 9 01-Mar-18 11-Mar-18 Blinding Curing
A7370 Base waterproofing 9 05-Mar-18 14-Mar-18 Base waterproofing
A7420 Screed 8 07-Mar-18 15-Mar-18 Screed
A7630 Screed Curing 10 08-Mar-18 19-Mar-18 Screed Curing
A7740 Raft rebar fixing 9 12-Mar-18 21-Mar-18 Raft rebar fixing
A8010 Raft form work 9 14-Mar-18 24-Mar-18 Raft form work
A8110 Wall rebar / Kicker Shutter & Water stopper installation 9 17-Mar-18 26-Mar-18 Wall rebar / Kicker Shutter & Water stopper installation
A8180 Raft concreting 8 20-Mar-18 28-Mar-18 Raft concreting
A8360 Wall rebar Installation 10 22-Mar-18 02-Apr-18 Wall rebar Installation
A8410 Wall Embedded works ( Sleeves fixing etc) 8 27-Mar-18 04-Apr-18 Wall Embedded works ( Sleeves fixing etc)
A8460 Wall & Slab form work 10 27-Mar-18 07-Apr-18 Wall & Slab form work
A8560 Wall & Slab concrete inspection & concreting 8 01-Apr-18 09-Apr-18 Wall & Slab concrete inspection & concreting
A8710 Flame Trap wall Curing 12 02-Apr-18 13-Apr-18 Flame Trap wall Curing
A8860 Waterproofing and backfilling work 13 04-Apr-18 18-Apr-18 Waterproofing and backfilling work
OIL CONTAINMENT WORK 111 04-Oct-17 11-Feb-18 OIL CONTAINMENT WORK
A2520 Excavation 14 04-Oct-17 19-Oct-17 Excavation
A2600 Blinding 2 22-Oct-17 23-Oct-17 Blinding
A2770 Blinding Curing 3 24-Oct-17 26-Oct-17 Blinding Curing
A2890 Base waterproofing 2 28-Oct-17 29-Oct-17 Base waterproofing
A2920 Screed 1 30-Oct-17 30-Oct-17 Screed
A2980 Screed Curing 3 31-Oct-17 02-Nov-17 Screed Curing
A3210 Raft / Wall rebar fixing 6 04-Nov-17 09-Nov-17 Raft / Wall rebar fixing
A3310 Raft form work 4 08-Nov-17 12-Nov-17 Raft form work
A3320 Kicker Shutter & Water stopper Installation 2 11-Nov-17 12-Nov-17 Kicker Shutter & Water stopper Installation
A3380 Raft Inspection & Concreting 2 13-Nov-17 14-Nov-17 Raft Inspection & Concreting
A3510 Scaffold erection for wall works 3 16-Nov-17 19-Nov-17 Scaffold erection for wall works
A3650 Wall rebar fixing 4 20-Nov-17 23-Nov-17 Wall rebar fixing
A3700 Wall Embedded Works 3 23-Nov-17 26-Nov-17 Wall Embedded Works
A3860 Wall form work 7 27-Nov-17 04-Dec-17 Wall form work
A3890 Wall Inspection & Concreting 2 04-Dec-17 05-Dec-17 Wall Inspection & Concreting
A4010 Slab Staging 4 06-Dec-17 10-Dec-17 Slab Staging
A4170 Slab form work 6 11-Dec-17 17-Dec-17 Slab form work

Data Date : 23-Aug-17 AL SHAHHANIYAH SUPER SUBSTATION


220/132/11KV AL SHAHANIYAH SUPER SUBSTATION Actual Work
Date Revision Checked Approved
Remaining Work
(Page10 of 22) 16-Sep-17 Baseline Contract Programme_Rev.00 SKS SKM
Critical Remaining Work
05-Nov-17 Baseline Contract Programme_Rev.01 SKS SKM
Milestone
Summary
Ac vity ID Ac vity Name Original BL Project Start BL Project Finish
Dura on 2018 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
A4250 Slab rebar fixing 3 19-Dec-17 21-Dec-17 Slab rebar fixing
A4300 Slab Embedded works & Slab Sides shuttering 2 23-Dec-17 24-Dec-17 Slab Embedded works & Slab Sides shuttering
A4350 Slab Inspection & concreting 4 21-Dec-17 25-Dec-17 Slab Inspection & concreting
A4440 Neck/ Shaft rebar fixing 3 26-Dec-17 28-Dec-17 Neck/ Shaft rebar fixing
A4530 Neck/ Shaft Form work 5 30-Dec-17 03-Jan-18 Neck/ Shaft Form work
A4630 Neck/ Shaft concreting 2 04-Jan-18 06-Jan-18 Neck/ Shaft concreting
A4910 Slab Deshuttering 6 09-Jan-18 15-Jan-18 Slab Deshuttering
A5000 Leak testing 2 16-Jan-18 17-Jan-18 Leak testing
A5350 Wall Vertical waterproofing 8 20-Jan-18 28-Jan-18 Wall Vertical waterproofing
A5860 Backfilling works 12 29-Jan-18 11-Feb-18 Backfilling works
BUILDING EXTERNAL WORKS 56 14-Feb-18 19-Apr-18 BUILDING EXTERNAL WORKS
ELEVATIO N-1 36 14-Feb-18 27-Mar-18 ELEVATION -1
BUILDING EXTERNAL WORK 36 14-Feb-18 27-Mar-18 BUILDING EXTERNAL WORK
A6690 External plastering 15 14-Feb-18 03-Mar-18 External plastering
A7980 External Painting and GRC 15 06-Mar-18 22-Mar-18 External Painting and GRC
A8160 Scaffolding removal 4 24-Mar-18 27-Mar-18 Scaffolding removal
ELEVATIO N-2 34 04-Mar-18 11-Apr-18 ELEVATION -2
BUILDING EXTERNAL WORK 34 04-Mar-18 11-Apr-18 BUILDING EXTERNAL WORK
A7700 External plastering 15 04-Mar-18 20-Mar-18 External plastering
A8480 External Painting and GRC 15 21-Mar-18 07-Apr-18 External Painting and GRC
A8630 Scaffolding removal 4 08-Apr-18 11-Apr-18 Scaffolding removal
ELEVATIO N-3 34 12-Mar-18 19-Apr-18 ELEVATION-3
BUILDING EXTERNAL WORK 34 12-Mar-18 19-Apr-18 BUILDING EXTERNAL WORK
A8210 External plastering 15 12-Mar-18 28-Mar-18 External plastering
A8770 External Painting and GRC 15 29-Mar-18 15-Apr-18 External Painting and GRC
A8920 Scaffolding removal 4 16-Apr-18 19-Apr-18 Scaffolding removal
ELEVATIO N-4 34 12-Mar-18 19-Apr-18 ELEVATION-4
BUILDING EXTERNAL WORK 34 12-Mar-18 19-Apr-18 BUILDING EXTERNAL WORK
A8200 External plastering 15 12-Mar-18 28-Mar-18 External plastering
A8760 External Painting and GRC 15 29-Mar-18 15-Apr-18 External Painting and GRC
A8910 Scaffolding removal 4 16-Apr-18 19-Apr-18 Scaffolding removal
EXTERNAL WORKS 101 28-Mar-18 24-Jul-18 EXTERNAL WORKS
ELEVATIO N-1 41 28-Mar-18 14-May-18 ELEVATION -1
MANHOLES & CATCHPITS 41 28-Mar-18 14-May-18 MANHOLES & CATCHPITS
A9120 Manholes Construction 26 28-Mar-18 26-Apr-18 Manholes Construction
A9450 Catchpits Construction 26 03-Apr-18 02-May-18 Catchpits Construction
A9660 Septic Tank Constr uc tion 35 04-Apr-18 14-May-18 Septic Tank Constr uc tion
ELEVATIO N-2 77 12-Apr-18 11-Jul-18 ELEVATION-2
DUCT BANK 41 12-Apr-18 29-May-18 DUCT BANK
A9150 Excavation 14 12-Apr-18 28-Apr-18 Excavation
A9720 Duct Bank Construction 15 29-Apr-18 15-May-18 Duct Bank Construction
A9960 WP and Backfilling 12 16-May-18 29-May-18 WP and Backfilling
CABLE TRENCHES 44 23-Apr-18 12-Jun-18 CABLE TRENCHES
A9500 Excavation 12 23-Apr-18 06-May-18 Excavation
A9920 Cable Trenches Construction 18 07-May-18 27-May-18 Cable Trenches Construction
A10280 WP/Backfilling/Internal finishing work 10 02-Jun-18 12-Jun-18 WP/Backfilling/Internal finishing work
MANHOLES & CATCHPITS 22 02-Jun-18 27-Jun-18 MANHOLES & CATCHPITS
A10790 Manholes Construction 22 02-Jun-18 27-Jun-18 Manholes Construction
A10800 Catchpits Construction 22 02-Jun-18 27-Jun-18 Catchpits Construction
SOAKAWAYS 34 02-Jun-18 11-Jul-18 SOAKAWAYS
A10290 Excavation 10 02-Jun-18 12-Jun-18 Excavation
A10660 Soak aways Construction 9 13-Jun-18 23-Jun-18 Soak aways Construction

Data Date : 23-Aug-17 AL SHAHHANIYAH SUPER SUBSTATION


220/132/11KV AL SHAHANIYAH SUPER SUBSTATION Actual Work
Date Revision Checked Approved
Remaining Work
(Page11 of 22) 16-Sep-17 Baseline Contract Programme_Rev.00 SKS SKM
Critical Remaining Work
05-Nov-17 Baseline Contract Programme_Rev.01 SKS SKM
Milestone
Summary
Ac vity ID Ac vity Name Original BL Project Start BL Project Finish
Dura on 2018 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
A10970 WP and Gravel Laying 7 24-Jun-18 02-Jul-18 WP and Gravel Laying
A11160 Top Slab and manhole work 8 03-Jul-18 11-Jul-18 Top Slab and manhole work
ELEVATIO N-3 61 21-Apr-18 01-Jul-18 ELEVATION -3
DUCT BANK 38 21-Apr-18 03-Jun-18 DUCT BANK
A9460 Excavation 12 21-Apr-18 03-May-18 Excavation
A9830 Duct Bank Construction 14 05-May-18 20-May-18 Duct Bank Construction
A10100 WP and Backfilling 12 21-May-18 03-Jun-18 WP and Backfilling
CABLE TRENCHES 44 21-Apr-18 10-Jun-18 CABLE TRENCHES
A9410 Excavation 10 21-Apr-18 01-May-18 Excavation
A9870 Cable Trenches Construction 18 02-May-18 22-May-18 Cable Trenches Construction
A10210 WP/Backfilling/Internal finishing work 12 28-May-18 10-Jun-18 WP/Backfilling/Internal finishing work
MANHOLES & CATCHPITS 26 28-May-18 27-Jun-18 MANHOLES & CATCHPITS
A10760 Manholes Construction 26 28-May-18 27-Jun-18 Manholes Construction
A10770 Catchpits Construction 26 28-May-18 27-Jun-18 Catchpits Construction
FIRE SHELTER 27 28-May-18 28-Jun-18 FIRE SHELTER
A10230 Excavation/Blinding/WP/Screed 12 28-May-18 10-Jun-18 Excavation/Blinding/WP/Screed
A10620 Construction 10 11-Jun-18 21-Jun-18 Construction
A10870 Painting and Epoxy work 5 23-Jun-18 28-Jun-18 Painting and Epoxy work
DELUGE TRENCH 29 28-May-18 01-Jul-18 DELUGE TRENCH
A10260 Excavation/Blinding/WP/Screed 13 28-May-18 11-Jun-18 Excavation/Blinding/WP/Screed
A10450 Construction 5 12-Jun-18 17-Jun-18 Construction
A10950 WP and Backfilling 10 19-Jun-18 01-Jul-18 WP and Backfilling
DELUGE MANIFOLD 24 28-May-18 24-Jun-18 DELUGE MANIFOLD
A10120 Excavation/Blinding/WP/Screed 7 28-May-18 04-Jun-18 Excavation/Blinding/WP/Screed
A10220 Construction 5 05-Jun-18 10-Jun-18 Construction
A10690 WP/Backfilling/Epoxy 10 13-Jun-18 24-Jun-18 WP/Backfilling/Epoxy
ELEVATIO N-4 81 21-Apr-18 24-Jul-18 ELEVATION -4
DUCT BANK 23 21-Apr-18 16-May-18 DUCT BANK
A9140 Excavation 7 21-Apr-18 28-Apr-18 Excavation
A9580 Duct Bank Construction 10 29-Apr-18 09-May-18 Duct Bank Construction
A9740 WP and Backfilling 6 10-May-18 16-May-18 WP and Backfilling
CABLE TRENCHES 38 21-Apr-18 03-Jun-18 CABLE TRENCHES
A9130 Excavation 7 21-Apr-18 28-Apr-18 Excavation
A9710 Cable Trenches Construction 15 29-Apr-18 15-May-18 Cable Trenches Construction
A10090 WP/Backfilling/Internal finishing work 12 21-May-18 03-Jun-18 WP/Backfilling/Internal finishing work
MANHOLES & CATCHPITS 25 24-May-18 21-Jun-18 MANHOLES & CATCHPITS
A10600 Manholes Construction 25 24-May-18 21-Jun-18 Manholes Construction
A10610 Catchpits Construction 25 24-May-18 21-Jun-18 Catchpits Construction
SOAKAWAYS 29 04-Jun-18 08-Jul-18 SOAKAWAYS
A10340 Excavation 9 04-Jun-18 13-Jun-18 Excavation
A10560 Soak aways Construction 6 14-Jun-18 20-Jun-18 Soak aways Construction
A10940 WP and Gravel Laying 6 24-Jun-18 01-Jul-18 WP and Gravel Laying
A11070 Top Slab and manhole work 6 02-Jul-18 08-Jul-18 Top Slab and manhole work
FIRE SHELTER 34 14-Jun-18 24-Jul-18 FIRE SHELTER
A10710 Excavation/Blinding/WP/Screed 10 14-Jun-18 26-Jun-18 Excavation/Blinding/WP/Screed
A11080 Construction 10 27-Jun-18 08-Jul-18 Construction
A11360 Painting and Epoxy work 7 17-Jul-18 24-Jul-18 Painting and Epoxy work
DELUGE TRENCH 29 14-Jun-18 18-Jul-18 DELUGE TRENCH
A10720 Excavation/Blinding/WP/Screed 10 14-Jun-18 26-Jun-18 Excavation/Blinding/WP/Screed
A11090 Construction 10 27-Jun-18 08-Jul-18 Construction
A11290 WP and Backfilling 7 11-Jul-18 18-Jul-18 WP and Backfilling
DELUGE MANIFOLD 24 14-Jun-18 12-Jul-18 DELUGE MANIFOLD

Data Date : 23-Aug-17 AL SHAHHANIYAH SUPER SUBSTATION


220/132/11KV AL SHAHANIYAH SUPER SUBSTATION Actual Work
Date Revision Checked Approved
Remaining Work
(Page12 of 22) 16-Sep-17 Baseline Contract Programme_Rev.00 SKS SKM
Critical Remaining Work
05-Nov-17 Baseline Contract Programme_Rev.01 SKS SKM
Milestone
Summary
Ac vity ID Ac vity Name Original BL Project Start BL Project Finish
Dura on 2018 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
A10550 Excavation/Blinding/WP/Screed 6 14-Jun-18 20-Jun-18 Excavation/Blinding/WP/Screed
A10860 Construction 6 21-Jun-18 28-Jun-18 Construction
A11180 WP/Backfilling/Epoxy 10 02-Jul-18 12-Jul-18 WP/Backfilling/Epoxy
KERB STONE AND INTER LOCK PAVING 32 03-Jun-18 10-Jul-18 KERB STONE AND INTERLOCK PAVING
A10780 Blinding for kerb stone 21 03-Jun-18 27-Jun-18 Blinding for kerb stone
A10960 Kerb stone fixing 21 07-Jun-18 02-Jul-18 Kerb stone fixing
A11060 Sand laying for interlock paving 21 12-Jun-18 07-Jul-18 Sand laying for interlock paving
A11120 Interlock paving work 21 16-Jun-18 10-Jul-18 Interlock paving work

220 KV GIS BUILIDING 270 03-Sep-17 18-Jul-18 220 KV GIS BUILIDING


SUBSTRUCTURE-220 KV BUILDING 124 03-Sep-17 27-Jan-18 SUBSTRUCTURE-220 KV BUILDING
A2060 Building Layout marking 1 03-Sep-17 03-Sep-17 Building Layout marking
A2080 Inspection of Building laout by SIEMENS / Kahramaa 1 05-Sep-17 05-Sep-17 Inspection of Building laout by SIEMENS / Kahramaa
A2190 Excavation for main building & Tr ansformer 23 06-Sep-17 02-Oct-17 Excavation for main building & Tr ansformer
A2210 Trimming work & Preparation for Blinding 6 28-Sep-17 04-Oct-17 Trimming work & Preparation for Blinding
A2260 Blinding concrete ( Anti termite treatment & Blinding concr eting ) 2 05-Oct-17 07-Oct-17 Blinding concrete ( Anti termite treatment & Blinding concr eting )
A2360 Blinding Curing 3 08-Oct-17 10-Oct-17 Blinding Curing
A2420 Base Waterproofing 2 11-Oct-17 12-Oct-17 Base Waterproofing
A2480 Screed 1 14-Oct-17 14-Oct-17 Screed
A2500 Screed Curing 3 15-Oct-17 17-Oct-17 Screed Curing
A2670 Raft rebar Instalaltion 6 18-Oct-17 24-Oct-17 Raft rebar Instalaltion
A2800 Wall Rebar fixing 4 23-Oct-17 26-Oct-17 Wall Rebar fixing
A2810 Foundation Embedded works ( Foundation Earthing Instalaltion, MEP Services etc) 4 23-Oct-17 26-Oct-17 Foundation Embedded works ( Foundation Earthing Instalaltion, MEP Services etc)
A2860 Raft Outer Shuttering work 4 24-Oct-17 28-Oct-17 Raft Outer Shuttering work
A2870 Kicker Shutter & Water bar Installation 4 24-Oct-17 28-Oct-17 Kicker Shutter & Water bar Installation
A2900 Raft foundation QA/QC Inspection & concreting 1 29-Oct-17 29-Oct-17 Raft foundation QA/QC Inspection & concreting
A3330 Raft foundation curing 14 30-Oct-17 12-Nov-17 Raft foundation curing
BASEMENT WALL AND COLUMNS 75 31-Oct-17 27-Jan-18 BASEMENT WALL AND COLUMNS
1ST SEGMENT 16 31-Oct-17 18-Nov-17 1ST SEGMENT
A2990 Basement walls and columns Scaffolding work 3 31-Oct-17 02-Nov-17 Basement walls and columns Scaffolding work
A3040 Basement walls and columns rebar work 4 01-Nov-17 05-Nov-17 Basement walls and columns rebar work
A3100 MEP Embeded Fittings ( Sleeves Fixing, Electrical conduits etc) 3 04-Nov-17 06-Nov-17 MEP Embeded Fittings ( Sleeves Fixing, Electrical conduits etc)
A3220 Basement walls and columns shuttering work 6 04-Nov-17 09-Nov-17 Basement walls and columns shuttering work
A3270 Basement walls and columns concrete work 4 07-Nov-17 11-Nov-17 Basement walls and columns concrete work
A3480 Curing Works 7 12-Nov-17 18-Nov-17 Curing Works
2ND SEGMENT 17 01-Nov-17 20-Nov-17 2ND SEGMENT
A3030 Basement walls and columns Scaffolding work 3 01-Nov-17 04-Nov-17 Basement walls and columns Scaffolding work
A3130 Basement walls and columns rebar work 4 04-Nov-17 07-Nov-17 Basement walls and columns rebar work
A3170 MEP Embeded Fittings ( Sleeves Fixing, Electrical conduits etc) 3 06-Nov-17 08-Nov-17 MEP Embeded Fittings ( Sleeves Fixing, Electrical conduits etc)
A3340 Basement walls and columns shuttering work 5 07-Nov-17 12-Nov-17 Basement walls and columns shuttering work
A3370 Basement walls and columns concrete work 4 09-Nov-17 13-Nov-17 Basement walls and columns concrete work
A3570 Curing Works 7 14-Nov-17 20-Nov-17 Curing Works
3RD SEGMENT 19 02-Nov-17 23-Nov-17 3RD SEGMENT
A3050 Basement walls and columns Scaffolding work 3 02-Nov-17 05-Nov-17 Basement walls and columns Scaffolding work
A3180 Basement walls and columns rebar work 4 05-Nov-17 08-Nov-17 Basement walls and columns rebar work
A3230 MEP Embeded Fittings ( Sleeves Fixing, Electrical conduits etc) 3 07-Nov-17 09-Nov-17 MEP Embeded Fittings ( Sleeves Fixing, Electrical conduits etc)
A3400 Basement walls and columns shuttering work 6 09-Nov-17 15-Nov-17 Basement walls and columns shuttering work
A3440 Basement walls and columns concrete work 4 13-Nov-17 16-Nov-17 Basement walls and columns concrete work
A3660 Curing Works 7 17-Nov-17 23-Nov-17 Curing Works
4TH SEGMENT 18 05-Nov-17 25-Nov-17 4TH SEGMENT
A3110 Basement walls and columns Scaffolding work 2 05-Nov-17 06-Nov-17 Basement walls and columns Scaffolding work
A3280 Basement walls and columns rebar work 4 07-Nov-17 11-Nov-17 Basement walls and columns rebar work
A3350 MEP Embeded Fittings ( Sleeves Fixing, Electrical conduits etc) 3 09-Nov-17 12-Nov-17 MEP Embeded Fittings ( Sleeves Fixing, Electrical conduits etc)

Data Date : 23-Aug-17 AL SHAHHANIYAH SUPER SUBSTATION


220/132/11KV AL SHAHANIYAH SUPER SUBSTATION Actual Work
Date Revision Checked Approved
Remaining Work
(Page13 of 22) 16-Sep-17 Baseline Contract Programme_Rev.00 SKS SKM
Critical Remaining Work
05-Nov-17 Baseline Contract Programme_Rev.01 SKS SKM
Milestone
Summary
Ac vity ID Ac vity Name Original BL Project Start BL Project Finish
Dura on 2018 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
A3450 Basement walls and columns shuttering work 5 12-Nov-17 16-Nov-17 Basement walls and columns shuttering work
A3490 Basement walls and columns concrete work 4 14-Nov-17 18-Nov-17 Basement walls and columns concrete work
A3690 Curing Works 7 19-Nov-17 25-Nov-17 Curing Works
BASEMENT WALL BACKFILLING WORKS 32 21-Dec-17 27-Jan-18 BASEMENT WALL BACKFILLING WORKS
A4730 Basement Wall Waterproofing works 17 21-Dec-17 09-Jan-18 Basement Wall Waterproofing works
A5330 Basement Wall Backfilling Wor ks 25 30-Dec-17 27-Jan-18 Basement Wall Backfilling Wor ks
GROUND FLOOR SLAB 31 12-Nov-17 17-Dec-17 GROUND FLOOR SLAB
A3620 Ground floor slab staging work 10 12-Nov-17 22-Nov-17 Ground floor slab staging work
A3710 Ground floor beam bottom shuttering 10 15-Nov-17 26-Nov-17 Ground floor beam bottom shuttering
A3750 Ground floor slab bottom shuttering work 10 18-Nov-17 28-Nov-17 Ground floor slab bottom shuttering work
A3770 Grouns floor slab Beam rebar work 10 19-Nov-17 29-Nov-17 Grouns floor slab Beam rebar work
A3800 Ground floor slab rebar work 10 20-Nov-17 30-Nov-17 Ground floor slab rebar work
A3810 Ground floor slab side shutter installation & slab extra supports instalaltion 3 29-Nov-17 02-Dec-17 Ground floor slab side shutter installation & slab extra supports instalaltion
A3820 Ground floor slab embedded works ( Electrical conduits, cutouts, etc) 4 28-Nov-17 02-Dec-17 Ground floor slab embedded works ( Electrical conduits, cutouts, etc)
A3830 Ground slab Concrete inspection & concreting 1 03-Dec-17 03-Dec-17 Ground slab Concrete inspection & concreting
A4180 Ground slab Concrete curing 14 04-Dec-17 17-Dec-17 Ground slab Concrete curing
DUCT BACK WORKS 34 12-Nov-17 21-Dec-17 DUCT BACK WORKS
A3630 Excavation 10 12-Nov-17 22-Nov-17 Excavation
A3720 Blinding preparation & Blinding Concrete 8 18-Nov-17 26-Nov-17 Blinding preparation & Blinding Concrete
A3980 Pipe Laying 14 23-Nov-17 09-Dec-17 Pipe Laying
A4120 Encasement Concreting ( Form work & Concrete) 14 29-Nov-17 14-Dec-17 Encasement Concreting ( Form work & Concrete)
A4260 Waterproofing & Backfilling works 15 04-Dec-17 21-Dec-17 Waterproofing & Backfilling works
SUPER STRUCTURE-220 KV BUILDING 46 04-Dec-17 27-Jan-18 SUPER STRUCTURE-220 KV BUILDING
LOWER ROOF 33 04-Dec-17 11-Jan-18 LOWER ROOF
A3930 Scaffolding for walls and columns 3 04-Dec-17 06-Dec-17 Scaffolding for walls and columns
A3990 Rebar for walls and columns 4 05-Dec-17 09-Dec-17 Rebar for walls and columns
A4040 Shuttering for walls and columns 5 06-Dec-17 11-Dec-17 Shuttering for walls and columns
A4130 Concrete work for walls and columns 6 09-Dec-17 14-Dec-17 Concrete work for walls and columns
A4220 Lower roof slab staging work 6 12-Dec-17 19-Dec-17 Lower roof slab staging work
A4320 Lower roof slab shuttering work 5 19-Dec-17 24-Dec-17 Lower roof slab shuttering work
A4330 Lower roof beam bottom shuttering work 6 17-Dec-17 24-Dec-17 Lower roof beam bottom shuttering work
A4370 Lower roof slab rebar fixing 4 23-Dec-17 26-Dec-17 Lower roof slab rebar fixing
A4380 Lower roof beam rebar fixing 6 20-Dec-17 26-Dec-17 Lower roof beam rebar fixing
A4420 Lower roof slab embedded works ( Electrical conduits, cutouts, etc) 3 25-Dec-17 27-Dec-17 Lower roof slab embedded works ( Electrical conduits, cutouts, etc)
A4430 Lower roof slab side shutter installation & slab extra supports instalaltion 3 25-Dec-17 27-Dec-17 Lower roof slab side shutter installation & slab extra supports instalaltion
A4450 Lower roof slab inspection & concreting 1 28-Dec-17 28-Dec-17 Lower roof slab inspection & concreting
A4800 Lower roof slab Curing 14 29-Dec-17 11-Jan-18 Lower roof slab Curing
UPPER ROOF 45 05-Dec-17 27-Jan-18 UPPER ROOF
A3960 Scaffolding for walls and columns upto corbel level 3 05-Dec-17 07-Dec-17 Scaffolding for walls and columns upto corbel level
A4050 Rebar for walls and columns upto corbel level 5 06-Dec-17 11-Dec-17 Rebar for walls and columns upto corbel level
A4190 Shuttering for walls and columns upto corbel level 7 10-Dec-17 17-Dec-17 Shuttering for walls and columns upto corbel level
A4290 Concrete work for walls and columns upto corbel level 6 16-Dec-17 23-Dec-17 Concrete work for walls and columns upto corbel level
A4470 Scaffolding for walls and columns above corbel level 2 28-Dec-17 30-Dec-17 Scaffolding for walls and columns above corbel level
A4480 Rebar for walls and columns above corbel level 2 30-Dec-17 31-Dec-17 Rebar for walls and columns above corbel level
A4510 Shuttering for walls and columns above corbel level 3 31-Dec-17 02-Jan-18 Shuttering for walls and columns above corbel level
A4550 Concrete work for walls and columns above corbel level 3 01-Jan-18 03-Jan-18 Concrete work for walls and columns above corbel level
A4590 Upper roof slab staging work 10 25-Dec-17 04-Jan-18 Upper roof slab staging work
A4650 Upper roof beam bottom shuttering 4 03-Jan-18 07-Jan-18 Upper roof beam bottom shuttering
A4690 Upper roof slab shuttering work 5 03-Jan-18 08-Jan-18 Upper roof slab shuttering work
A4740 Upper roof beam rebar fixing 4 06-Jan-18 09-Jan-18 Upper roof beam rebar fixing
A4770 Upper roof slab rebar work 4 07-Jan-18 10-Jan-18 Upper roof slab rebar work
A4810 Upper roof slab side shutter installation & slab extra supports instalaltion 3 09-Jan-18 11-Jan-18 Upper roof slab side shutter installation & slab extra supports instalaltion

Data Date : 23-Aug-17 AL SHAHHANIYAH SUPER SUBSTATION


220/132/11KV AL SHAHANIYAH SUPER SUBSTATION Actual Work
Date Revision Checked Approved
Remaining Work
(Page14 of 22) 16-Sep-17 Baseline Contract Programme_Rev.00 SKS SKM
Critical Remaining Work
05-Nov-17 Baseline Contract Programme_Rev.01 SKS SKM
Milestone
Summary
Ac vity ID Ac vity Name Original BL Project Start BL Project Finish
Dura on 2018 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
A4820 Upper roof slab embedded works ( Electrical conduits, cutouts, etc) 3 09-Jan-18 11-Jan-18 Upper roof slab embedded works ( Electrical conduits, cutouts, etc)
A4880 Upper roof slab inspection & concrete work 1 13-Jan-18 13-Jan-18 Upper roof slab inspection & concrete work
A5340 Upper Roof Slab Curing 14 14-Jan-18 27-Jan-18 Upper Roof Slab Curing
FINISHING WORK 113 19-Dec-17 30-Apr-18 FINISHING WORK
220 KV BASEMENT FINISHING WORKS 33 19-Dec-17 25-Jan-18 220 KV BASEMENT FINISHING WORKS
A4340 Ground slab deshuttering & Material shifting works 5 19-Dec-17 24-Dec-17 Ground slab deshuttering & Material shifting works
A4500 Basement Block work 7 25-Dec-17 01-Jan-18 Basement Block work
A4600 Ceiling surface preparation 10 25-Dec-17 04-Jan-18 Ceiling surface preparation
A4660 Wall Surface preparation 10 27-Dec-17 07-Jan-18 Wall Surface preparation
A4750 Basement Plastering 7 02-Jan-18 09-Jan-18 Basement Plastering
A4780 Ceiling painting work 12 28-Dec-17 10-Jan-18 Ceiling painting work
A4960 Wall painting work 15 31-Dec-17 16-Jan-18 Wall painting work
A5040 MEP work - Ceiling 14 03-Jan-18 18-Jan-18 MEP work - Ceiling
A5240 Basement clean access 0 25-Jan-18 Basement clean access
A5250 MEP works - Wall 14 10-Jan-18 25-Jan-18 MEP works - Wall
220 KV GIS ROOM - FINISHING WORKS 28 28-Jan-18 01-Mar-18 220 KV GIS ROOM - FINISHING WORKS
A5440 Upper roof slab deshuttering & Material shifting 3 28-Jan-18 30-Jan-18 Upper roof slab deshuttering & Material shifting
A5520 Ceiling Surface preparation 2 31-Jan-18 01-Feb-18 Ceiling Surface preparation
A5720 Block work 7 31-Jan-18 07-Feb-18 Block work
A5730 Ceiling painting works 5 03-Feb-18 07-Feb-18 Ceiling painting works
A5930 MEP Work (Siemens) - Ceiling 7 04-Feb-18 11-Feb-18 MEP Work (Siemens) - Ceiling
A5990 Internal Plastering 5 08-Feb-18 14-Feb-18 Internal Plastering
A6000 Scaffold dismantling after ceiling painting & Ceiling MEP Works 2 12-Feb-18 14-Feb-18 Scaffold dismantling after ceiling painting & Ceiling MEP Works
A6190 Wall Painting work 7 12-Feb-18 20-Feb-18 Wall Painting work
A6200 Window installation 4 17-Feb-18 20-Feb-18 Window installation
A6210 Door installation 4 17-Feb-18 20-Feb-18 Door installation
A6220 Rollershutter Installation 3 18-Feb-18 20-Feb-18 Rollershutter Installation
A6300 Ganrty Crane Installation ( By SIEMENS) 7 15-Feb-18 22-Feb-18 Ganrty Crane Installation ( By SIEMENS)
A6310 MEP Works (Siemens) - Wall 7 15-Feb-18 22-Feb-18 MEP Works (Siemens) - Wall
A6390 Scaffolding removal after Ganrty Crane Installation ( By SIEMENS) 2 24-Feb-18 25-Feb-18 Scaffolding removal after Ganrty Crane Installation ( By SIEMENS)
A6450 Floor Screed 2 26-Feb-18 27-Feb-18 Floor Screed
A6560 Floor epoxy finish 2 28-Feb-18 01-Mar-18 Floor epoxy finish
A6570 GIS Room Clean access to Siemens 0 01-Mar-18 GIS Room Clean access to Siemens
220 KV RELAY PANEL ROOM - FINISHING WORKS 49 13-Jan-18 11-Mar-18 220 KV RELAY PANEL ROOM - FINISHING WORKS
A4970 Lower roof slab deshuttering 4 13-Jan-18 16-Jan-18 Lower roof slab deshuttering
A5120 Ceiling Surface preparation 5 17-Jan-18 22-Jan-18 Ceiling Surface preparation
A5410 Ceiling painting works 6 23-Jan-18 29-Jan-18 Ceiling painting works
A5530 Block work 14 17-Jan-18 01-Feb-18 Block work
A5580 MEP Work (Siemens) - Ceiling 7 28-Jan-18 04-Feb-18 MEP Work (Siemens) - Ceiling
A5670 Scaffold dismantling after ceiling painting & Ceiling MEP Works 2 05-Feb-18 06-Feb-18 Scaffold dismantling after ceiling painting & Ceiling MEP Works
A5770 Floor Screed 2 07-Feb-18 08-Feb-18 Floor Screed
A6120 Internal Plastering 8 10-Feb-18 19-Feb-18 Internal Plastering
A6580 Wall Painting work 9 20-Feb-18 01-Mar-18 Wall Painting work
A6590 Window & doors installation 4 26-Feb-18 01-Mar-18 Window & doors installation
A6900 MEP Work (Siemens) - Wall 7 28-Feb-18 07-Mar-18 MEP Work (Siemens) - Wall
A7150 Floor epoxy finish 4 07-Mar-18 11-Mar-18 Floor epoxy finish
A7160 Control Room Clean access to Siemens 0 11-Mar-18 Control Room Clean access to Siemens
FM 200 ROOM 58 13-Jan-18 21-Mar-18 FM 200 ROOM
A4930 Lower roof slab deshuttering 3 13-Jan-18 15-Jan-18 Lower roof slab deshuttering
A5190 Block work 8 16-Jan-18 24-Jan-18 Block work
A5550 Internal Plastering 8 25-Jan-18 03-Feb-18 Internal Plastering
A5780 Screed 5 04-Feb-18 08-Feb-18 Screed

Data Date : 23-Aug-17 AL SHAHHANIYAH SUPER SUBSTATION


220/132/11KV AL SHAHANIYAH SUPER SUBSTATION Actual Work
Date Revision Checked Approved
Remaining Work
(Page15 of 22) 16-Sep-17 Baseline Contract Programme_Rev.00 SKS SKM
Critical Remaining Work
05-Nov-17 Baseline Contract Programme_Rev.01 SKS SKM
Milestone
Summary
Ac vity ID Ac vity Name Original BL Project Start BL Project Finish
Dura on 2018 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
A5980 Ceiling Surface preparation 3 10-Feb-18 12-Feb-18 Ceiling Surface preparation
A6280 Ceiling painting works 7 14-Feb-18 21-Feb-18 Ceiling painting works
A6600 MEP Work (Siemens) - Ceiling 7 22-Feb-18 01-Mar-18 MEP Work (Siemens) - Ceiling
A6950 Wall Painting work 9 28-Feb-18 10-Mar-18 Wall Painting work
A6960 Window installation 3 07-Mar-18 10-Mar-18 Window installation
A6970 Door installation 3 07-Mar-18 10-Mar-18 Door installation
A7600 MEP Work (Siemens) - Wall 7 11-Mar-18 18-Mar-18 MEP Work (Siemens) - Wall
A7880 Floor Epoxy Work 4 18-Mar-18 21-Mar-18 Floor Epoxy Work
A7890 FM200 Room Clean access to Siemens 0 21-Mar-18 FM200 Room Clean access to Siemens
STAIR CASE-1 49 08-Feb-18 07-Apr-18 STAIR CASE-1
A6070 Block work 8 08-Feb-18 18-Feb-18 Block work
A6460 Plastering 8 19-Feb-18 27-Feb-18 Plastering
A7470 Painting work 14 28-Feb-18 15-Mar-18 Painting work
A8020 MEP works (SIEMENS) 7 17-Mar-18 24-Mar-18 MEP works (SIEMENS)
A8490 Terrazzo Tiling work 12 25-Mar-18 07-Apr-18 Terrazzo Tiling work
STAIR CASE-2 63 08-Feb-18 23-Apr-18 STAIR CASE-2
A6080 Block work 8 08-Feb-18 18-Feb-18 Block work
A6400 Plastering 6 19-Feb-18 25-Feb-18 Plastering
A8340 Painting work 14 17-Mar-18 01-Apr-18 Painting work
A8570 MEP works (SIEMENS) 7 02-Apr-18 09-Apr-18 MEP works (SIEMENS)
A9000 Terrazzo Tiling work 12 10-Apr-18 23-Apr-18 Terrazzo Tiling work
ROOF AREA 103 31-Dec-17 30-Apr-18 ROOF AR EA
LOWER ROOF 103 31-Dec-17 30-Apr-18 LOWER ROOF
PARAPET WALL / EQUIPMENT FOUN DATION 31 31-Dec-17 04-Feb-18 PARAPET WALL / EQUIPMENT FOUNDATION
A4610 Lower roof parapet scaffold installation 5 31-Dec-17 04-Jan-18 Lower roof parapet scaffold installation
A4830 Lower roof parapet rebar fixing 6 06-Jan-18 11-Jan-18 Lower roof parapet rebar fixing
A4980 Upstand/HVAC Eqip foundation rebar fixing 4 13-Jan-18 16-Jan-18 Upstand/HVAC Eqip foundation rebar fixing
A5010 Lower roof parapet embedded works ( Electrical conduits, Cutouts etc) 5 13-Jan-18 17-Jan-18 Lower roof parapet embedded works ( Electrical conduits, Cutouts etc)
A5110 Upstand/HVAC Eqip foundation form work 4 17-Jan-18 21-Jan-18 Upstand/HVAC Eqip foundation form work
A5200 Upstand/HVAC Eqip foundation/Pedestal concreting 3 22-Jan-18 24-Jan-18 Upstand/HVAC Eqip foundation/Pedestal concreting
A5420 Lower roof parapet form work 10 18-Jan-18 29-Jan-18 Lower roof parapet form work
A5590 Lower roof parapet wall concrete 7 28-Jan-18 04-Feb-18 Lower roof parapet wall concrete
ROOF WATER PROOFING 72 05-Feb-18 30-Apr-18 ROOF WATER PROOFING
A6130 Foam concreting (Curing and drying) 12 05-Feb-18 19-Feb-18 Foam concreting (Curing and drying)
A6700 Primer application 10 20-Feb-18 03-Mar-18 Primer application
A7260 Torched applied bitumen 8 04-Mar-18 12-Mar-18 Torched applied bitumen
A7480 Leak test 2 14-Mar-18 15-Mar-18 Leak test
A8030 Teram sheet 7 17-Mar-18 24-Mar-18 Teram sheet
A8350 Insulation boards 7 25-Mar-18 01-Apr-18 Insulation boards
A8580 Tiles 7 02-Apr-18 09-Apr-18 Tiles
A8870 Aggregate 8 10-Apr-18 18-Apr-18 Aggregate
A9270 Roof HVAC access for Siemens 0 30-Apr-18 Roof HVAC access for Siemens
A9280 Parapet wall painting inside 10 19-Apr-18 30-Apr-18 Parapet wall painting inside
UPPER ROOF 90 15-Jan-18 30-Apr-18 UPPER ROOF
EQUIPMENT FOUNDATION 23 15-Jan-18 10-Feb-18 EQUIPMENT FOUNDATION
A5090 Upper roof parapet scaffold installation 5 15-Jan-18 20-Jan-18 Upper roof parapet scaffold installation
A5210 Upper roof parapet rebar fixing 5 20-Jan-18 24-Jan-18 Upper roof parapet rebar fixing
A5370 Upper roof parapet embedded works ( Electrical conduits, Cutouts etc) 5 23-Jan-18 28-Jan-18 Upper roof parapet embedded works ( Electrical conduits, Cutouts etc)
A5450 Upstand/HVAC Eqip foundation rebar fixing 4 27-Jan-18 30-Jan-18 Upstand/HVAC Eqip foundation rebar fixing
A5600 Upstand/HVAC Eqip foundation form work 4 31-Jan-18 04-Feb-18 Upstand/HVAC Eqip foundation form work
A5680 Upper roof parapet form work 8 29-Jan-18 06-Feb-18 Upper roof parapet form work
A5740 Upstand/HVAC Eqip foundation/Pedestal concreting 4 04-Feb-18 07-Feb-18 Upstand/HVAC Eqip foundation/Pedestal concreting

Data Date : 23-Aug-17 AL SHAHHANIYAH SUPER SUBSTATION


220/132/11KV AL SHAHANIYAH SUPER SUBSTATION Actual Work
Date Revision Checked Approved
Remaining Work
(Page16 of 22) 16-Sep-17 Baseline Contract Programme_Rev.00 SKS SKM
Critical Remaining Work
05-Nov-17 Baseline Contract Programme_Rev.01 SKS SKM
Milestone
Summary
Ac vity ID Ac vity Name Original BL Project Start BL Project Finish
Dura on 2018 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
A5850 Upper parapet wall inspection & concreting 5 05-Feb-18 10-Feb-18 Upper parapet wall inspection & concreting
ROOF WATER PROOFING 67 11-Feb-18 30-Apr-18 ROOF WATER PROOFING
A6350 Foam concreting (Curing and drying) 11 11-Feb-18 24-Feb-18 Foam concreting (Curing and drying)
A6710 Primer application 8 22-Feb-18 03-Mar-18 Primer application
A6980 Torched applied bitumen 8 01-Mar-18 10-Mar-18 Torched applied bitumen
A7360 Leak test 2 12-Mar-18 13-Mar-18 Leak test
A7900 Teram sheet 7 14-Mar-18 21-Mar-18 Teram sheet
A8270 Insulation boards 7 22-Mar-18 29-Mar-18 Insulation boards
A8500 Tiles 7 31-Mar-18 07-Apr-18 Tiles
A8810 Aggregate 8 08-Apr-18 16-Apr-18 Aggregate
A9290 Roof access for Siemens 0 30-Apr-18 Roof access for Siemens
A9300 Parapet wall painting inside 12 17-Apr-18 30-Apr-18 Parapet wall painting inside
TRANSFORMERS 176 05-Oct-17 30-Apr-18 TRANSFORMERS
POWER TRANSFORMERS 176 05-Oct-17 30-Apr-18 POWER TRANSFORMERS
A2270 Blinding concrete ( Anti termite treatment & Blinding concr eting ) 2 05-Oct-17 07-Oct-17 Blinding concrete ( Anti termite treatment & Blinding concr eting )
A2370 Blinding Curing 3 08-Oct-17 10-Oct-17 Blinding Curing
A2430 Base waterproofing 2 11-Oct-17 12-Oct-17 Base waterproofing
A2490 Screed 1 14-Oct-17 14-Oct-17 Screed
A2510 Screed Curing 3 15-Oct-17 17-Oct-17 Screed Curing
A2570 Raft Rebar fixing 4 18-Oct-17 22-Oct-17 Raft Rebar fixing
A2680 Raft Outer shutter installation 4 21-Oct-17 24-Oct-17 Raft Outer shutter installation
A2730 Wall Rebar fixing 4 22-Oct-17 25-Oct-17 Wall Rebar fixing
A2740 Foundation Embedded works ( Foundation Earthing Instalaltion, MEP Services etc) 4 22-Oct-17 25-Oct-17 Foundation Embedded works ( Foundation Earthing Instalaltion, MEP Services etc)

A2880 Kicker Shutter & Water bar Installation 3 25-Oct-17 28-Oct-17 Kicker Shutter & Water bar Installation
A2910 Raft concrete inspection & Concreting 2 28-Oct-17 29-Oct-17 Raft concrete inspection & Concreting
A3060 Dyke wall scaffolding installation 5 31-Oct-17 05-Nov-17 Dyke wall scaffolding installation
A2970 Raft Curing 7 30-Oct-17 05-Nov-17 Raft Curing
A3360 Dyke walls rebar Installation 6 06-Nov-17 12-Nov-17 Dyke walls rebar Installation
A3460 Dyke walls embedded works ( Electrical conduits , cutouts etc) 4 13-Nov-17 16-Nov-17 Dyke walls embedded works ( Electrical conduits , cutouts etc)
A3840 Dyke walls shutter installation 14 18-Nov-17 03-Dec-17 Dyke walls shutter installation
A4000 Dyke walls inspection & concreting 8 30-Nov-17 09-Dec-17 Dyke walls inspection & concreting
A4080 Dyke wall curing 7 10-Dec-17 16-Dec-17 Dyke wall curing
A6490 Fire walls Rebar, Shuttering & c oncr eting - 1st lift 15 11-Feb-18 28-Feb-18 Fire walls Rebar, Shuttering & c oncr eting - 1st lift
A7610 Fire walls Rebar, Shuttering & c oncr eting - 2nd lift 15 01-Mar-18 18-Mar-18 Fire walls Rebar, Shuttering & c oncr eting - 2nd lift
A7910 Fire Wall Curing 3 19-Mar-18 21-Mar-18 Fire Wall Curing
A8170 Fire wall surface preparation 5 22-Mar-18 27-Mar-18 Fire wall surface preparation
A8540 Painting for fire walls 10 28-Mar-18 08-Apr-18 Painting for fire walls
A8720 Dike wall surface preparation 5 09-Apr-18 14-Apr-18 Dike wall surface preparation
A9080 Epoxy for dyke walls 10 15-Apr-18 25-Apr-18 Epoxy for dyke walls
A9310 Grating support & grating installation 5 25-Apr-18 30-Apr-18 Grating support & grating installation
A9320 Clean access for 60 MVAr Reactor 0 30-Apr-18 Clean access for 60 MVAr Reactor
Flame Trap 50 01-Mar-18 28-Apr-18 Flame Trap
A7270 Excavation 10 01-Mar-18 12-Mar-18 Excavation
A7390 Blinding concrete 7 07-Mar-18 14-Mar-18 Blinding concrete
A7620 Blinding Curing 9 08-Mar-18 18-Mar-18 Blinding Curing
A7920 Base waterproofing 9 12-Mar-18 21-Mar-18 Base waterproofing
A7990 Screed 8 14-Mar-18 22-Mar-18 Screed
A8130 Screed Curing 10 15-Mar-18 26-Mar-18 Screed Curing
A8220 Raft rebar fixing 9 19-Mar-18 28-Mar-18 Raft rebar fixing
A8310 Raft form work 9 21-Mar-18 31-Mar-18 Raft form work
A8370 Wall rebar / Kicker Shutter & Water stopper installation 9 24-Mar-18 02-Apr-18 Wall rebar / Kicker Shutter & Water stopper installation
A8420 Raft concreting 8 27-Mar-18 04-Apr-18 Raft concreting

Data Date : 23-Aug-17 AL SHAHHANIYAH SUPER SUBSTATION


220/132/11KV AL SHAHANIYAH SUPER SUBSTATION Actual Work
Date Revision Checked Approved
Remaining Work
(Page17 of 22) 16-Sep-17 Baseline Contract Programme_Rev.00 SKS SKM
Critical Remaining Work
05-Nov-17 Baseline Contract Programme_Rev.01 SKS SKM
Milestone
Summary
Ac vity ID Ac vity Name Original BL Project Start BL Project Finish
Dura on 2018 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
A8590 Wall rebar Installation 10 29-Mar-18 09-Apr-18 Wall rebar Installation
A8640 Wall Embedded works ( Sleeves fixing etc) 8 03-Apr-18 11-Apr-18 Wall Embedded works ( Sleeves fixing etc)
A8730 Wall form work 10 03-Apr-18 14-Apr-18 Wall form work
A8820 Wall concrete inspection & concreting 8 08-Apr-18 16-Apr-18 Wall concrete inspection & concreting
A8970 Flame Trap wall Curing 12 09-Apr-18 20-Apr-18 Flame Trap wall Curing
A9160 Waterproofing and backfilling work 15 11-Apr-18 28-Apr-18 Waterproofing and backfilling work
BUILDING EXTERNAL WORKS 48 15-Feb-18 11-Apr-18 BUILDING EXTERNAL WORKS
ELEVATIO N-1 36 15-Feb-18 28-Mar-18 ELEVATION -1
BUILDING EXTERNAL WORK 36 15-Feb-18 28-Mar-18 BUILDING EXTERNAL WORK
A6780 External plastering 15 15-Feb-18 04-Mar-18 External plastering
A8040 External Painting and GRC 15 07-Mar-18 24-Mar-18 External Painting and GRC
A8230 Scaffolding removal 4 25-Mar-18 28-Mar-18 Scaffolding removal
ELEVATIO N-2 34 24-Feb-18 03-Apr-18 ELEVATION-2
BUILDING EXTERNAL WORK 34 24-Feb-18 03-Apr-18 BUILDING EXTERNAL WORK
A7280 External plastering 15 24-Feb-18 12-Mar-18 External plastering
A8280 External Painting and GRC 15 13-Mar-18 29-Mar-18 External Painting and GRC
A8400 Scaffolding removal 4 31-Mar-18 03-Apr-18 Scaffolding removal
ELEVATIO N-3 34 04-Mar-18 11-Apr-18 ELEVATION -3
BUILDING EXTERNAL WORK 34 04-Mar-18 11-Apr-18 BUILDING EXTERNAL WORK
A7710 External plastering 15 04-Mar-18 20-Mar-18 External plastering
A8510 External Painting and GRC 15 21-Mar-18 07-Apr-18 External Painting and GRC
A8650 Scaffolding removal 4 08-Apr-18 11-Apr-18 Scaffolding removal
ELEVATIO N-4 34 04-Mar-18 11-Apr-18 ELEVATION -4
BUILDING EXTERNAL WORK 34 04-Mar-18 11-Apr-18 BUILDING EXTERNAL WORK
A7720 External plastering 15 04-Mar-18 20-Mar-18 External plastering
A8520 External Painting and GRC 15 21-Mar-18 07-Apr-18 External Painting and GRC
A8660 Scaffolding removal 4 08-Apr-18 11-Apr-18 Scaffolding removal
EXTERNAL WORKS 95 29-Mar-18 18-Jul-18 EXTERNAL WORKS
ELEVATIO N-1 41 29-Mar-18 15-May-18 ELEVATION -1
MANHOLES & CATCHPITS 41 29-Mar-18 15-May-18 MANHOLES & CATCHPITS
A9170 Manholes Construction 26 29-Mar-18 28-Apr-18 Manholes Construction
A9470 Catchpits Construction 26 04-Apr-18 03-May-18 Catchpits Construction
A9730 Septic Tank Constr uc tion 35 05-Apr-18 15-May-18 Septic Tank Constr uc tion
ELEVATIO N-2 61 04-Apr-18 13-Jun-18 ELEVATION -2
DUCT BANK 41 04-Apr-18 21-May-18 DUCT BANK
A8930 Excavation 14 04-Apr-18 19-Apr-18 Excavation
A9520 Duct Bank Construction 15 21-Apr-18 07-May-18 Duct Bank Construction
A9850 WP and Backfilling 12 08-May-18 21-May-18 WP and Backfilling
CABLE TRENCHES 44 10-Apr-18 30-May-18 CABLE TRENCHES
A9010 Excavation 12 10-Apr-18 23-Apr-18 Excavation
A9670 Cable Trenches Construction 18 24-Apr-18 14-May-18 Cable Trenches Construction
A9990 WP/Backfilling/Internal finishing work 10 20-May-18 30-May-18 WP/Backfilling/Internal finishing work
MANHOLES & CATCHPITS 22 20-May-18 13-Jun-18 MANHOLES & CATCHPITS
A10350 Manholes Construction 22 20-May-18 13-Jun-18 Manholes Construction
A10360 Catchpits Construction 22 20-May-18 13-Jun-18 Catchpits Construction
SOAKAWAYS 22 20-May-18 13-Jun-18 SOAKAWAYS
A9940 Excavation 8 20-May-18 28-May-18 Excavation
A10150 Soak aways Construction 10 26-May-18 05-Jun-18 Soak aways Construction
A10190 WP and Gravel Laying 7 02-Jun-18 09-Jun-18 WP and Gravel Laying
A10370 Top Slab and manhole work 8 05-Jun-18 13-Jun-18 Top Slab and manhole work
ELEVATIO N-3 61 12-Apr-18 21-Jun-18 ELEVATION -3
DUCT BANK 38 12-Apr-18 26-May-18 DUCT BANK

Data Date : 23-Aug-17 AL SHAHHANIYAH SUPER SUBSTATION


220/132/11KV AL SHAHANIYAH SUPER SUBSTATION Actual Work
Date Revision Checked Approved
Remaining Work
(Page18 of 22) 16-Sep-17 Baseline Contract Programme_Rev.00 SKS SKM
Critical Remaining Work
05-Nov-17 Baseline Contract Programme_Rev.01 SKS SKM
Milestone
Summary
Ac vity ID Ac vity Name Original BL Project Start BL Project Finish
Dura on 2018 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
A9090 Excavation 12 12-Apr-18 25-Apr-18 Excavation
A9620 Duct Bank Construction 14 26-Apr-18 12-May-18 Duct Bank Construction
A9900 WP and Backfilling 12 13-May-18 26-May-18 WP and Backfilling
CABLE TRENCHES 44 12-Apr-18 02-Jun-18 CABLE TRENCHES
A9020 Excavation 10 12-Apr-18 23-Apr-18 Excavation
A9680 Cable Trenches Construction 18 24-Apr-18 14-May-18 Cable Trenches Construction
A10050 WP/Backfilling/Internal finishing work 12 20-May-18 02-Jun-18 WP/Backfilling/Internal finishing work
MANHOLES & CATCHPITS 26 20-May-18 18-Jun-18 MANHOLES & CATCHPITS
A10490 Manholes Construction 26 20-May-18 18-Jun-18 Manholes Construction
A10500 Catchpits Construction 26 20-May-18 18-Jun-18 Catchpits Construction
FIRE SHELTER 27 20-May-18 19-Jun-18 FIRE SHELTER
A10060 Excavation/Blinding/WP/Screed 12 20-May-18 02-Jun-18 Excavation/Blinding/WP/Screed
A10380 Construction 10 03-Jun-18 13-Jun-18 Construction
A10510 Painting and Epoxy work 5 14-Jun-18 19-Jun-18 Painting and Epoxy work
DELUGE TRENCH 29 20-May-18 21-Jun-18 DELUGE TRENCH
A10110 Excavation/Blinding/WP/Screed 13 20-May-18 03-Jun-18 Excavation/Blinding/WP/Screed
A10200 Construction 5 04-Jun-18 09-Jun-18 Construction
A10630 WP and Backfilling 10 11-Jun-18 21-Jun-18 WP and Backfilling
DELUGE MANIFOLD 24 20-May-18 16-Jun-18 DELUGE MANIFOLD
A9930 Excavation/Blinding/WP/Screed 7 20-May-18 27-May-18 Excavation/Blinding/WP/Screed
A10070 Construction 5 28-May-18 02-Jun-18 Construction
A10420 WP/Backfilling/Epoxy 10 05-Jun-18 16-Jun-18 WP/Backfilling/Epoxy
ELEVATIO N-4 81 12-Apr-18 16-Jul-18 ELEVATION -4
DUCT BANK 23 12-Apr-18 08-May-18 DUCT BANK
A8940 Excavation 7 12-Apr-18 19-Apr-18 Excavation
A9420 Duct Bank Construction 10 21-Apr-18 01-May-18 Duct Bank Construction
A9550 WP and Backfilling 6 02-May-18 08-May-18 WP and Backfilling
CABLE TRENCHES 38 12-Apr-18 26-May-18 CABLE TRENCHES
A8950 Excavation 7 12-Apr-18 19-Apr-18 Excavation
A9530 Cable Trenches Construction 15 21-Apr-18 07-May-18 Cable Trenches Construction
A9910 WP/Backfilling/Internal finishing work 12 13-May-18 26-May-18 WP/Backfilling/Internal finishing work
MANHOLES & CATCHPITS 25 16-May-18 13-Jun-18 MANHOLES & CATCHPITS
A10390 Manholes Construction 25 16-May-18 13-Jun-18 Manholes Construction
A10400 Catchpits Construction 25 16-May-18 13-Jun-18 Catchpits Construction
SOAKAWAYS 29 27-May-18 30-Jun-18 SOAKAWAYS
A10160 Excavation 9 27-May-18 05-Jun-18 Excavation
A10300 Soak aways Construction 6 06-Jun-18 12-Jun-18 Soak aways Construction
A10640 WP and Gravel Laying 6 16-Jun-18 21-Jun-18 WP and Gravel Laying
A10910 Top Slab and manhole work 6 23-Jun-18 30-Jun-18 Top Slab and manhole work
FIRE SHELTER 34 06-Jun-18 16-Jul-18 FIRE SHELTER
A10460 Excavation/Blinding/WP/Screed 10 06-Jun-18 17-Jun-18 Excavation/Blinding/WP/Screed
A10920 Construction 10 18-Jun-18 30-Jun-18 Construction
A11220 Painting and Epoxy work 7 09-Jul-18 16-Jul-18 Painting and Epoxy work
DELUGE TRENCH 29 06-Jun-18 10-Jul-18 DELUGE TRENCH
A10470 Excavation/Blinding/WP/Screed 10 06-Jun-18 17-Jun-18 Excavation/Blinding/WP/Screed
A10930 Construction 10 18-Jun-18 30-Jun-18 Construction
A11150 WP and Backfilling 7 03-Jul-18 10-Jul-18 WP and Backfilling
DELUGE MANIFOLD 24 06-Jun-18 04-Jul-18 DELUGE MANIFOLD
A10310 Excavation/Blinding/WP/Screed 6 06-Jun-18 12-Jun-18 Excavation/Blinding/WP/Screed
A10520 Construction 6 13-Jun-18 19-Jun-18 Construction
A11010 WP/Backfilling/Epoxy 10 23-Jun-18 04-Jul-18 WP/Backfilling/Epoxy
GROUND WATER TANK 60 09-May-18 18-Jul-18 GROUND WATER TANK

Data Date : 23-Aug-17 AL SHAHHANIYAH SUPER SUBSTATION


220/132/11KV AL SHAHANIYAH SUPER SUBSTATION Actual Work
Date Revision Checked Approved
Remaining Work
(Page19 of 22) 16-Sep-17 Baseline Contract Programme_Rev.00 SKS SKM
Critical Remaining Work
05-Nov-17 Baseline Contract Programme_Rev.01 SKS SKM
Milestone
Summary
Ac vity ID Ac vity Name Original BL Project Start BL Project Finish
Dura on 2018 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
A9640 Excavation 4 09-May-18 13-May-18 Excavation
A9880 Blinding /WP/Screed 8 14-May-18 22-May-18 Blinding /WP/Screed
A10030 Raft rebar/shutter/concrete 8 23-May-18 31-May-18 Raft rebar/shutter/concrete
A10320 Shed structure work 10 02-Jun-18 12-Jun-18 Shed structure work
A10990 Block work and plastering 12 18-Jun-18 02-Jul-18 Block work and plastering
A11100 Raft epoxy work 6 03-Jul-18 09-Jul-18 Raft epoxy work
A11310 Shed painting work 8 10-Jul-18 18-Jul-18 Shed painting work
FIRE PUMP ROOM 66 31-Mar-18 14-Jun-18 FIRE PUMP ROOM
A8450 Excavation Work 5 31-Mar-18 04-Apr-18 Excavation Work
A8550 Trimming / Levelling & Blinding Concrete 2 04-Apr-18 05-Apr-18 Trimming / Levelling & Blinding Concrete
A8670 Blinding Curing 3 06-Apr-18 08-Apr-18 Blinding Curing
A8740 Base waterproofing 2 09-Apr-18 10-Apr-18 Base waterproofing
A8780 Screed Concrete 1 11-Apr-18 11-Apr-18 Screed Concrete
A8880 Screed Curing 3 12-Apr-18 14-Apr-18 Screed Curing
A8990 Foundation rebar fixing 3 15-Apr-18 17-Apr-18 Foundation rebar fixing
A9050 Foundation form work 2 17-Apr-18 18-Apr-18 Foundation form work
A9060 Foundation embedded works 2 17-Apr-18 18-Apr-18 Foundation embedded works
A9100 Foundation concrete 1 19-Apr-18 19-Apr-18 Foundation concrete
A9330 W/P backfilling and compaction 4 21-Apr-18 24-Apr-18 W/P backfilling and compaction
A9490 Plinth beam Blinding/Rebar/shutter/concrete 3 25-Apr-18 28-Apr-18 Plinth beam Blinding/Rebar/shutter/concrete
A9540 MEP Pipe work 2 29-Apr-18 30-Apr-18 MEP Pipe work
A9630 Blinding/WP/Screed for Grade slab 4 01-May-18 05-May-18 Blinding/WP/Screed for Grade slab
A9750 Grade Slab & Pump foundation Rebar/ Shutter/Concrete 4 06-May-18 09-May-18 Grade Slab & Pump foundation Rebar/ Shutter/Concrete
A9790 Columns rebar/shutter/concrete 4 10-May-18 14-May-18 Columns rebar/shutter/concrete
A10000 Roof slab staging/shutter/rebar/concrete 10 15-May-18 26-May-18 Roof slab staging/shutter/rebar/concrete
A10330 Block work 7 27-May-18 03-Jun-18 Block work
A10570 Internal Plastering 5 04-Jun-18 09-Jun-18 Internal Plastering
A10580 External Plastering 5 04-Jun-18 09-Jun-18 External Plastering
A10810 Roof parapet walls/Watarproofing/tiles/gravel 15 27-May-18 12-Jun-18 Roof parapet walls/Watarproofing/tiles/gravel
A10820 Internal Painting 7 07-Jun-18 14-Jun-18 Internal Painting
A10830 Pump room handing over for MEP 0 14-Jun-18 Pump room handing over for MEP
A10840 External Painting and GRC Fixing 7 07-Jun-18 14-Jun-18 External Painting and GRC Fixing
FIRE WATER TANK 46 29-Apr-18 20-Jun-18 FIRE WATER TANK
A9770 Excavation 6 29-Apr-18 05-May-18 Excavation
A9980 Blinding/Wp/Screed 10 06-May-18 16-May-18 Blinding/Wp/Screed
A10650 Raft Rebar/shutter/concrete 20 17-May-18 09-Jun-18 Raft Rebar/shutter/concrete
A11020 Epoxy work 10 10-Jun-18 20-Jun-18 Epoxy work
GUARD ROOM 52 11-Apr-18 10-Jun-18 GUARD ROOM
A8790 Excavation 2 11-Apr-18 12-Apr-18 Excavation
A8960 Blinding/Wp/Screed 3 14-Apr-18 16-Apr-18 Blinding/Wp/Screed
A9070 Footing rebar/shutter/concrete 3 17-Apr-18 19-Apr-18 Footing rebar/shutter/concrete
A9180 Pedestal columns upto Grade beam 3 21-Apr-18 23-Apr-18 Pedestal columns upto Grade beam
A9430 WP and Backfilling 3 24-Apr-18 26-Apr-18 WP and Backfilling
A9510 Blinding/WP and screed for grade slab 3 28-Apr-18 30-Apr-18 Blinding/WP and screed for grade slab
A9560 Grade slab rebar and concrete 2 01-May-18 02-May-18 Grade slab rebar and concrete
A9690 Columns rebar/shutter/concrete 4 03-May-18 07-May-18 Columns rebar/shutter/concrete
A9780 Slab staging work 3 08-May-18 10-May-18 Slab staging work
A9840 Slab shuttering work 3 10-May-18 13-May-18 Slab shuttering work
A9890 Slab rebar & concrete work 2 14-May-18 15-May-18 Slab rebar & concrete work
A10040 Parapet wall structural work 6 16-May-18 22-May-18 Parapet wall structural work
A10240 Block work 5 21-May-18 26-May-18 Block work
A10430 Internal Plastering 5 27-May-18 31-May-18 Internal Plastering

Data Date : 23-Aug-17 AL SHAHHANIYAH SUPER SUBSTATION


220/132/11KV AL SHAHANIYAH SUPER SUBSTATION Actual Work
Date Revision Checked Approved
Remaining Work
(Page20 of 22) 16-Sep-17 Baseline Contract Programme_Rev.00 SKS SKM
Critical Remaining Work
05-Nov-17 Baseline Contract Programme_Rev.01 SKS SKM
Milestone
Summary
Ac vity ID Ac vity Name Original BL Project Start BL Project Finish
Dura on 2018 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
A10250 Roof waterproofing work 8 23-May-18 31-May-18 Roof waterproofing work
A10440 External plastering 5 27-May-18 31-May-18 External plastering
A10530 Wall Tiling work 3 02-Jun-18 04-Jun-18 Wall Tiling work
A10540 Door and windows fixing work 2 03-Jun-18 04-Jun-18 Door and windows fixing work
A10700 External painting and GRC 5 02-Jun-18 06-Jun-18 External painting and GRC
A10680 Terrazzo floor tiling work 3 05-Jun-18 07-Jun-18 Terrazzo floor tiling work
A10730 Internal Painting 4 06-Jun-18 10-Jun-18 Internal Painting
A10740 Guard room Clean access 0 10-Jun-18 Guard room Clean access
KERB STONE AND INTER LOCK PAVING 32 09-Jun-18 16-Jul-18 KERB STONE AND INTERLOCK PAVING
A11030 Blinding for kerb stone 21 09-Jun-18 03-Jul-18 Blinding for kerb stone
A11110 Kerb stone fixing 21 13-Jun-18 08-Jul-18 Kerb stone fixing
A11200 Sand laying for interlock paving 21 18-Jun-18 12-Jul-18 Sand laying for interlock paving
A11270 Interlock paving work 21 21-Jun-18 16-Jul-18 Interlock paving work

MISCELLANEOUS WORK 165 27-Jan-18 08-Aug-18 MISCELLANEOUS WORK


A9970 Basement Epoxy work 15 13-May-18 29-May-18 Basement Epoxy work
A10480 Ground floor rooms Final coat paint 15 02-Jun-18 18-Jun-18 Ground floor rooms Final coat paint
A10670 Ground floor room Final coat epoxy 10 12-Jun-18 23-Jun-18 Ground floor room Final coat epoxy
A10880 Ground floor room Cheqquered plate fixing 8 19-Jun-18 28-Jun-18 Ground floor room Cheqquered plate fixing
A10890 Ground floor room door Ironmongries fixing 8 19-Jun-18 28-Jun-18 Ground floor room door Ironmongries fixing
A10980 Pedestrain gate fixing 5 26-Jun-18 01-Jul-18 Pedestrain gate fixing
A11040 Transformer Cheqquered Plate fixing 6 30-Jun-18 05-Jul-18 Transformer Cheqquered Plate fixing
A11210 Manholes and catch pits internal finishing work 15 28-Jun-18 15-Jul-18 Manholes and catch pits internal finishing work
A11240 Earthing Cable Excavation and Backfilling 20 23-Jun-18 16-Jul-18 Earthing Cable Excavation and Backfilling
A11260 Water Supply Line work 20 23-Jun-18 16-Jul-18 Water Supply Line work
A11230 Transformer Gravel filling 10 07-Jul-18 17-Jul-18 Transformer Gravel filling
A11250 Soakaways internal finishing work 12 04-Jul-18 17-Jul-18 Soakaways internal finishing work
A11300 Flame Trap internal finishing work 15 02-Jul-18 18-Jul-18 Flame Trap internal finis hing work
A11330 Roof area aluminium flashing work 8 11-Jul-18 19-Jul-18 Roof area aluminium flashing work
A11480 Pump room Grating and Epoxy work and Ramp 6 16-Jul-18 22-Jul-18 Pump room Grating and Epoxy work and Ramp
A11410 Precast cover slab placing work 20 05-Jul-18 28-Jul-18 Precast cover slab placing work
A11420 Bollards fixing 10 17-Jul-18 28-Jul-18 Bollards fixing
A11430 Staircase hand rail fixing 15 14-Jul-18 30-Jul-18 Staircase hand rail fixing
A11440 Loading platform Hand rail fixing 10 19-Jul-18 30-Jul-18 Loading platform Hand rail fixing
A11450 Deluge trench cover precasting and fixing work 20 08-Jul-18 30-Jul-18 Deluge trench cover precasting and fixing work
A11460 OCT internal finishing work 12 19-Jul-18 01-Aug-18 OCT internal finishing work
A11470 Gravel filling around the building 12 19-Jul-18 01-Aug-18 Gravel filling around the building
A11510 Demobilization 21 16-Jul-18 08-Aug-18 Demobilization
ELETRCIAL WORK BY SIEMENS 154 27-Jan-18 26-Jul-18 ELETRCIAL WORK BY SIEMEN S
A9480 40 MVA TX erection w ork 30 01-Apr-18 05-May-18 40 MVA TX erection w ork
A9610 Basement Eletrical work 90 27-Jan-18 12-May-18 Basement Eletrical work
A10020 All ground floor room equipment erection work 60 24-Mar-18 31-May-18 All ground floor room equipment erection work
A10130 Auxiliary TX erection work 30 01-May-18 04-Jun-18 Auxiliary TX erection work
A10900 315MVA / 60 MVA TX erection work 50 01-May-18 28-Jun-18 315MVA / 60 MVA TX erection work
A11140 Roof HVAC Equipment Erection work 60 01-May-18 10-Jul-18 Roof HVAC Equipment Erection work
A11390 Pump Erection 25 16-Jun-18 15-Jul-18 Pump Erection
A11400 SAT Procedure 7 19-Jul-18 26-Jul-18 SAT Procedure

GATE & BOUNDARY WALL WORKS 100 25-Mar-18 19-Jul-18 GATE & BOUNDARY WALL WORKS
BOUNDARY WALL 100 25-Mar-18 19-Jul-18 BOUNDARY WALL
A8850 Excavation 20 25-Mar-18 16-Apr-18 Excavation
A9440 Blinding/WP/Screed 20 08-Apr-18 30-Apr-18 Blinding/WP/Screed
A9590 Footing erection work 7 01-May-18 08-May-18 Footing erection work
A9700 Columns erection work 7 06-May-18 13-May-18 Columns erection work

Data Date : 23-Aug-17 AL SHAHHANIYAH SUPER SUBSTATION


220/132/11KV AL SHAHANIYAH SUPER SUBSTATION Actual Work
Date Revision Checked Approved
Remaining Work
(Page21 of 22) 16-Sep-17 Baseline Contract Programme_Rev.00 SKS SKM
Critical Remaining Work
05-Nov-17 Baseline Contract Programme_Rev.01 SKS SKM
Milestone
Summary
Ac vity ID Ac vity Name Original BL Project Start BL Project Finish
Dura on 2018 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
A9810 Columns grouting work 7 10-May-18 17-May-18 Columns grouting work
A9820 Footing WP Work 10 07-May-18 17-May-18 Footing WP Work
A10010 Backfilling upto plinth beam bottom / Blinding & waterproofing 10 19-May-18 29-May-18 Backfilling upto plinth beam bottom / Blinding & waterproofing
A10180 Plinth beam erection 6 30-May-18 05-Jun-18 Plinth beam erection
A10270 Wall panel erection 8 02-Jun-18 10-Jun-18 Wall panel erection
A10590 Scaffolding for painting work 12 06-Jun-18 19-Jun-18 Scaffolding for painting work
A11050 Internal Painting work 15 17-Jun-18 04-Jul-18 Internal Painting work
A11280 External painting work 15 30-Jun-18 16-Jul-18 External painting work
A11350 Substation Name Board fixing 3 17-Jul-18 19-Jul-18 Substation Name Board fixing
GATE WORK 57 05-May-18 10-Jul-18 GATE WORK
A9650 Excavation for Foundation 7 05-May-18 12-May-18 Excavation for Foundation
A9800 Blinding/WP/Screed 5 13-May-18 17-May-18 Blinding/WP/Screed
A9950 Foundation rebar/shutter/concrete 8 19-May-18 27-May-18 Foundation rebar/shutter/concrete
A10170 WP and backfilling work 7 28-May-18 04-Jun-18 WP and backfilling work
A10410 Gate post fixing 7 05-Jun-18 12-Jun-18 Gate post fixing
A11000 Gate fixing work 7 23-Jun-18 01-Jul-18 Gate fixing work
A11170 Gate painting work 8 02-Jul-18 10-Jul-18 Gate painting work

ROAD WORKS 46 10-Jun-18 02-Aug-18 ROAD WORKS


A11130 Backfilling upto formation level 25 10-Jun-18 09-Jul-18 Backfilling upto formation level
A11190 Subgrade preparation 15 24-Jun-18 11-Jul-18 Subgrade preparation
A11320 Sub Base 4 15-Jul-18 18-Jul-18 Sub Base
A11340 MC-1 1 19-Jul-18 19-Jul-18 MC-1
A11370 Base Course 3 21-Jul-18 23-Jul-18 Base Course
A11380 Wearing Course 2 24-Jul-18 25-Jul-18 Wearing Course
A11490 Road marking work 5 29-Jul-18 02-Aug-18 Road marking work

Data Date : 23-Aug-17 AL SHAHHANIYAH SUPER SUBSTATION


220/132/11KV AL SHAHANIYAH SUPER SUBSTATION Actual Work
Date Revision Checked Approved
Remaining Work
(Page22 of 22) 16-Sep-17 Baseline Contract Programme_Rev.00 SKS SKM
Critical Remaining Work
05-Nov-17 Baseline Contract Programme_Rev.01 SKS SKM
Milestone
Summary