Академический Документы
Профессиональный Документы
Культура Документы
1 Sewerage Schedule
SE SCHEDULE 2018
R2-SE-1-3 Transporting surplus materials upto 3 Km. including levelling. cum R2-CS-EW-8
[Note : Prior Specific sanction of Head of Deptt. should be taken if
transportation is to be done at night i.e. between 8.00 pm. to 6 am.and
the rate should be reduced by 10%] {This item will be operated with
the specific sanction of the C.E./Chief Engineer and above}
2 Sewerage Schedule
SE SCHEDULE 2018
3 Sewerage Schedule
SE SCHEDULE 2018
M 15 = 1:2:4
M 20 = 1: 1 1/2 : 3
Providing & laying M 10 c.c. For foundation/bedding including boxing,
R2-SE-2-1 cum 6122
curing etc. complete as specified and as directed.
R2-SE-2-2 -do- -do- for full encasement or cradle -do- -do- cum 6822
R2-SE-2-3 -do- -do- in saddle block -do- -do- cum 7337
-do- -do- M 15 c.c. In foundation including boxing, curing etc.
R2-SE-2-4 cum 7335
complete as specified and as directed.
R2-SE-2-5 -do- -do- M 15 c.c. For full encasement or cradle -do- -do- cum 7354
R2-SE-2-6 -do- -do- in sides and haunches and/or in block coping-do- -do- cum 8067
R2-SE-2-7 do- -do- in saddle block -do- -do- cum 7850
R2-SE-2-8 -do- -do- in arch work -do- -do- cum 8355
R2-SE-2-9 Providing and laying M 20 c.c. In foundations -do- -do- cum 7863
-do- -do- in sides and haunches and /or block coping -do- -do-
R2-SE-2-10 cum 8575
R2-SE-2-11 -do- -do- in arch work -do- -do- cum 8863
REINFORCED CONCRETOR
Note: 1. Wastage in cutting will not be paid for. Only steel actually
fixed in position will be paid by linear measurement including hooks &
bends. No payment will be made for binding wires, pins be made for
binding wires, pins, chairs and laps and / or welding and this should be
noted while quoting the rates.
2. In working out the rates for .R.C.C. Items and steel reinforcement,
the basic rates for steel bars per tonne are taken as mentioned in
Basic Material Master, If steel is controlled in future the necessary
adjustment between the controlled rate and the rates stated above will
have to be made.
3. Note of concretor: (b) is applicable here(controlled concrete).
Providing M 15 R.C.C. Work in dhapas, beams and slabs etc. with
standard reinforcement of 1% including centering etc. and finished
R2-SE-2-12 cum 12407
smooth the exposed surface with cement sand plaster 12 mm thick in
the proportion 1:2 as directed.
R2-SE-2-13 -do- without reinforcement -do- do- cum 9110
R2-SE-2-14 -do- M20 RCC work-do- as per item no SE-2-12 cum 12915
R2-SE-2-15 -do- without reinforcement -do- do- cum 9618
4 Sewerage Schedule
SE SCHEDULE 2018
Supplying blue trap stones of approved quality and providing the same
in rubble packing 250 mm thick to the required level & camber filling in
R2-SE-3-9 voids with chips and 60 mm metal etc. including spreading over the sq.m R2-RW 2.01
rubble 60 mm metal 75mm thick compacting to a thickness of 50 mm
by any means.
R2-SE-3-10 Uncourse rubble masonry in cement mortar (1:6) first sort. cum R2-CS-MW-18
R2-SE-3-11 -do- -do- (1:5) first sort. cum 6678
R2-SE-3-12 -do- -do- (1:4) -do- -do- cum 6695
R2-SE-3-13 -do- -do- (1:3) -do- -do- cum 6740
Uncourse rubble masonry in cement mortar (1:6) first sort using
R2-SE-3-14 cum 5780
municipal rubble
R2-SE-3-15 -do- -do- in cement mortar (1:5) -do- -do- cum 5805
Providing and Laying 230mm thick Rubble Stone for Pitching on
sloping ground or wherever directed, properly arranging and placing
the rubble stones to achieve a plane top surface, set in regular line &
slope, including breaking, laying gravel, quarry spells underneath and
R2-SE-3-16 sq.m R2-CS-EW-24
manually packing the voids with rubble chips, flush pointing with
cement mortar 1:4 up to 25mm deep, etc. complete as specified & as
directed.
(Note: The rate includes the royalty and other taxes if any)
Providing and Laying 230mm thick Rubble Stone for Pitching on
sloping ground or wherever directed, properly arranging and placing
the rubble stones to achieve a plane top surface, set in regular line &
slope, including breaking, laying gravel, quarry spells underneath and
R2-SE-3-17 sq.m R2-CS-EW-25
manually packing the voids with rubble chips, tuck pointing with
cement mortar 1:2 up to 25mm deep, etc. complete as specified & as
directed.
(Note: The rate includes the royalty and other taxes if any)
5 Sewerage Schedule
SE SCHEDULE 2018
6 Sewerage Schedule
SE SCHEDULE 2018
7 Sewerage Schedule
SE SCHEDULE 2018
8 Sewerage Schedule
SE SCHEDULE 2018
9 Sewerage Schedule
SE SCHEDULE 2018
10 Sewerage Schedule
SE SCHEDULE 2018
R2-SE-6-4-a Extra for above manhole above 1.2M and upto 2.3M depth -do- m.depth 20912
Constructing on sewer brick masonary trapezoidal manhole 1.5M x
1.2M at bottom and 0.9M x 0.6M at top, including C.I. EHD airtight
R2-SE-6-5 rectangular frame and cover weighing minimum 270 kg . complete as No 72618
per description in Item No.SE-6-1 depth upto 1.2M
R2-SE-6-5-a Extra for above manhole above 1.2M and upto 2.3M depth -do- m.depth 22899
11 Sewerage Schedule
SE SCHEDULE 2018
Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-6-a including safety chain and extra C.I steps on other side of benching-do- m.depth 44019
do-
R2-SE-6-6-b Do- -do- above 5 M depth and upto 9 M depth -do- -do- m.depth 63597
R2-SE-6-6-c Do- -do- above 9M and upto 11M depth -do- -do- m.depth 89292
R2-SE-6-6-d Do- -do- above 11 M and upto 12 M depth -do -do- m.depth 122826
R2-SE-6-6-e Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 161111
Constructing brick masonary trapezoidal manhole on sewer 2.4M x
1.5M at bottom and 0.9M x 0.6M at top built in brick masonary in C.M.
1:3 plastered both inside and outside with 20 mm thick cement
plaster in C.M. 1:2 and neat cement rendering so as to give a smooth
surface 300 mm thick M 20 cement concrete in foundation and in
haunches and channels finished smooth with 20 mm cement plaster
in C.M. 1:1 and providing C.I. steps (approximately weighing 5.4 kg
each)staggered at 300mm c/c. including 75 mm wide vata all round
the external portion of the manhole and the foundation concrete in
cement mortar 1:1 and supporting the incoming pipes with brick
R2-SE-6-7 masonary wherever necessary including 0.9m x 0.6M C.I. EHD No 239650
airtight rectangular frame and cover weighing minimum 270 kg
resting on 300mm high cement concrete M20 cap with necessary
centering including cement plaster (1:2) on both sides neat cement
rendering so as to give a smooth surface in line and level including
safety chain and extra C.I steps on other side benching complete as
per standard specifications & directions and as per drawing in
Dy.Ch.E. (SP) P&D's office without excavation depth upto
4.5M
Extra per metre depth of the above manhole -do- -do- as per above
R2-SE-6-7-a m.depth 71930
item -do- -do- from 4.5 to 9M depth.
R2-SE-6-7-b Do- -do- above from 9M and upto 11M depth -do- -do- m.depth 100672
R2-SE-6-7-c Do- -do- above from 11 M and upto 12 M depth -do -do- m.depth 137910
R2-SE-6-7-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 179593
Constructing on sewer brick masonry scraper manhole 1.5M x 1.5 M
at bottom and 1.2 M x 0.9M at top, including C.I. EHD airtight
R2-SE-6-8 No 226634
rectangular frame and cover weighing minimum 900 kg . complete as
per description in Item No.SE-6-1 depth 2.9 M
Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-8-a including safety chain and extra C.I steps on other side of benching-do- m.depth 40863
do-
R2-SE-6-8-b Do- -do- above 5 M depth and upto 9 M depth -do- -do- m.depth 59228
R2-SE-6-8-c Do- -do- above 9M and upto 11M depth -do- -do- m.depth 83497
R2-SE-6-8-d Do- -do- above 11 M and upto 12 M depth -do -do- m.depth 115356
R2-SE-6-8-e Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 151870
Constructing on sewer brick masonry scraper manhole 1.8M x 1.5M
at bottom and 1.2M x 0.9M at top , including C.I. EHD airtight
R2-SE-6-9 rectangular frame and cover weighing minimum 900 kg etc. complete No 236136
as per description in item No. SE-6-1 depth upto 2.9M
12 Sewerage Schedule
SE SCHEDULE 2018
Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-10-a including safety chain and extra C.I steps on other side of benching-do- m.depth 47050
do-
R2-SE-6-10-b Do- -do- above 5 M and upto 9 M depth - do- -do- m.depth 67830
R2-SE-6-10-c Do- -do- above 9 M and upto 11M depth -do- -do- m.depth 94947
R2-SE-6-10-d Do- -do- above 11 M and upto 12 M depth -do -do- m.depth 130149
R2-SE-6-10-e Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 170352
Constructing brick masonary scraper type manhole on sewer 2.4M x
1.5M at bottom and 1.2M x 0.9M at top built in brick masonary in C.M.
1:3 -do- -do- as per item No. SE-6-8 including C.I. Rectangular EHD
R2-SE-6-11 No 335566
air tight frame and cover ( weighing minimum 900 kg ), safety
chain and extra C.I. steps, depth upto 4.5M
Extra for above manhole per metre depth above 4.5M and upto 9M
R2-SE-6-11-a m.depth 71930
depth.
R2-SE-6-11-b do- -do- 9 M to 11M depth m.depth 100672
R2-SE-6-11-c do- -do- 11 M to 12M depth m.depth 137910
R2-SE-6-11-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 179593
Constructing brick masonary scraper type manhole on sewer 2.4M x
2.4M at bottom and 1.2M x 0.9M at top built in brick masonary in C.M.
1:3 -do- -do- as per item no. SE-6-8 including C.I. Rectangular EHD
R2-SE-6-12 No 386962
airtight frame and cover weighing minimum 900 kg, safety chain and
extra C.I. steps, depth upto 4.5 M.
R2-SE-6-12-a Extra for above manhole above 4.5M to 9M depth m.depth 84820
R2-SE-6-12-b -do- -do- 9 M to 11 M depth m.depth 117848
R2-SE-6-12-c -do- -do- 11 M to 12 M depth m.depth 159733
R2-SE-6-12-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 207317
Constructing brick masonary scraper type manhole on sewer 3M x 2M
at bottom and 1.2M x 0.9M at top built in brick masonary in C.M. 1:3 -
do- -do- as per item no. SE-6-8 including C.I. Rectangular EHD aritight
R2-SE-6-13 No 373794
frame and cover weighing minimum 900 kg safety chain and extra C.I
steps, depth upto 4.5 M.
R2-SE-6-13-a Extra for above manhole above 4.5M to 9M depth m.depth 85452
R2-SE-6-13-b -do- -do- 9 M to 11 M depth m.depth 121679
R2-SE-6-13-c -do- -do- 11 M to 12 M depth m.depth 164664
R2-SE-6-13-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 213494
13 Sewerage Schedule
SE SCHEDULE 2018
R2-SE-6-14-a Extra for above manhole above 4.5M to 9M depth m.depth 99556
R2-SE-6-14-b -do- -do- 9 M to 11 M depth m.depth 140884
R2-SE-6-14-c -do- -do- 11 M to 12 M depth m.depth 189438
R2-SE-6-14-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 244432
Constructing on sewer brick masonry conical manholes 1.2M dia. at
bottom 0.56 M. dia. at top, built in brick masonry in cement mortar 1:3,
plastered both inside and outside with 20 mm thick cement mortar 1:2
and neat cement rendering so as to give a smooth surface, including
300 mm thick M.15 cement concrete in foundation and in haunches
and channels finished smooth with 20mm thick cement plaster in
cement mortar 1:1 and providing copolymer steps staggered at 300
mm. c/c including 75mm wide vata all round the external portion of
the manhole and the foundation concrete in cement mortar 1:1 and
R2-SE-6-15 supporting the incoming pipes with brick masonry wherever No 35173
necessary including Steel Fibre Reinforced Concrete (SFRC) EHD
circular frame and cover resting on 30 cm high cement concrete M.20
cap with necessary centering etc. all complete as per standard
specifications and directions including finishing the cap with cement
plaster on both sides 1:2 and neat cement rendering so as to give a
smooth surface in line and level with the brick masonry surface and
as per drawing in DyCh.E. (Sewerage) P&D's office without
excavation depth upto 1.5 M.(Depth of Manhole measured from top of
manhole cover to Invert level of manhole)
Extra over above per metre depth above 1.5 M. and upto 2.3 M. depth
R2-SE-6-15-a m.depth 18654
-do- -do-
Constructing on sewer brick masonry conical manhole 1.5 M. dia. at
bottom and 0.56 M dia. at top including SFRC. EHD circular frame
R2-SE-6-15-b No 62533
and cover and copolymer steps etc. complete as per description in
item No.SE-6-15 depth upto 2.3 M.
Extra for above manhole per metre depth above 2.3M and upto 5 M
R2-SE-6-15-c including safety chain and extra copolymer steps on other side of m.depth 34099
benching-do-do-
R2-SE-6-15-d Do- -do- above 5 M & upto 9 M -do- -do- m.depth 48097
R2-SE-6-15-e Do- -do- above 9.M & upto 11 M -do- -do- m.depth 67802
R2-SE-6-15-f Do- -do- above 11M & upto 12 M -do- -do- m.depth 93521
R2-SE-6-15-g Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 122713
Constructing on sewer brick masonary conical manhole 1.8M dia. at
bottom 0.56M dia at top, including SFRC EHD circular frame and
R2-SE-6-16 No 90002
cover and copolymer steps etc. complete as per description in Item
No.SE-6-15 depth upto 2.9 M
Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-16-a including safety chain and extra copolymer steps on other side of m.depth 39365
benching-do-do-
R2-SE-6-16-b Do- -do- above 5 M. and upto 9M -do- -do- m.depth 54724
R2-SE-6-16-c Do- -do- above 9 M. and upto 11M -do- -do- m.depth 77319
R2-SE-6-16-d Do- -do- above 11M and upto 12M -do- -do- m.depth 105651
R2-SE-6-16-e Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 137556
14 Sewerage Schedule
SE SCHEDULE 2018
R2-SE-6-17-a Extra for above manhole above 1.2M and upto 2.3M depth -do- m.depth 20912
Constructing on sewer brick masonary trapezoidal manhole 1.5M x
1.2M at bottom and 0.9M x 0.6M at top, including SFRC. EHD
R2-SE-6-18 No 43047
rectangular frame and cover and copolymer steps complete as per
description in Item No.SE-6-15 depth upto 1.2M
R2-SE-6-18-a Extra for above manhole above 1.2M and upto 2.3M depth -do- m.depth 22899
Constructing on sewer brick masonry trapezoidal manhole 1.8M x
1.5 M at bottom and 1.2 M x 0.9M at top, including SFRC EHD
R2-SE-6-19 No 102027
rectangular frame and cover . complete as per description in Item
No.SE-6-15 depth 2.9 M
Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-19-a including safety chain and extra copolymer steps on other side of m.depth 44019
benching-do-do-
R2-SE-6-19-b Do- -do- above 5 M depth and upto 9 M depth -do- -do- m.depth 63597
R2-SE-6-19-c Do- -do- above 9M and upto 11M depth -do- -do- m.depth 89292
R2-SE-6-19-d Do- -do- above 11 M and upto 12 M depth -do -do- m.depth 122826
R2-SE-6-19-e Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 161111
Constructing brick masonary trapezoidal manhole on sewer 2.4M x
1.5M at bottom and 0.9M x 0.6M at top built in brick masonary in C.M.
1:3 plastered both inside and outside with 20 mm thick cement
plaster in C.M. 1:2 and neat cement rendering so as to give a smooth
surface 300 mm thick M 15 cement concrete in foundation and in
haunches and channels finished smooth with 20 mm cement plaster
in C.M. 1:1 and providing SFRC steps (approximately weighing 5.4 kg
each)staggered at 300mm c/c. including 75 mm wide vata all round
the external portion of the manhole and the foundation concrete in
R2-SE-6-20 cement mortar 1:1 and supporting the incoming pipes with brick No 205745
masonary wherever necessary including 0.9m x 0.6M SFRC EHD
rectangular frame and cover resting on 300mm high cement concrete
M15 cap with necessary centering including cement plaster (1:2) on
both sides neat cement rendering so as to give a smooth surface in
line and level including safety chain and extra copolymer steps on
other side benching complete as per standard specifications &
directions and as per drawing in Dy.Ch.E. (SP) P&D's office without
excavation depth upto 4.5M
Extra per metre depth of the above manhole -do- -do- as per above
R2-SE-6-20-a m.depth 71930
item -do- -do- from 4.5 to 9Mdepth.
R2-SE-6-20-b Do- -do- above from 9M and upto 11M depth -do- -do- m.depth 100672
R2-SE-6-20-c Do- -do- above from 11 M and upto 12 M depth -do -do- m.depth 137910
R2-SE-6-20-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 179593
Constructing on sewer brick masonry scraper manhole 1.5M x 1.5 M
at bottom and 1.2 M x 0.9M at top, including SFRC EHD rectangular
R2-SE-6-21 No 116759
frame and cover and copolymer steps. complete as per description in
Item No.SE-6-15 depth 2.9 M
Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-21-1 including safety chain and extra copolymer steps on other side of m.depth 40863
benching-do-do-
R2-SE-6-21-2 Do- -do- above 5 M depth and upto 9 M depth -do- -do- m.depth 59228
R2-SE-6-21-3 Do- -do- above 9M and upto 11M depth -do- -do- m.depth 83497
R2-SE-6-21-4 Do- -do- above 11 M and upto 12 M depth -do -do- m.depth 115356
15 Sewerage Schedule
SE SCHEDULE 2018
Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-22-a including safety chain and extra co-polymer steps on other side of m.depth 44019
benching-do-do-
R2-SE-6-22-b Do- -do- above 5 M and upto 9 M depth - do- -do- m.depth 63597
R2-SE-6-22-c Do- -do- above 9 M and upto 11M depth -do- -do- m.depth 89292
R2-SE-6-22-d Do- -do- above 11 M and upto 12 M depth -do -do- m.depth 122826
R2-SE-6-22-e Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 161111
Constructing on sewer brick masonry scraper manhole 1.8M x 1.8M
at bottom and 1.2M x 0.9M at top , including SFRC. Rectangular EHD
R2-SE-6-23 frame and cover and copolymer steps complete as per description in No 134943
item No. SE-6-15 depth upto 2.9M
Extra for above manhole per metre depth above 2.9M and upto 5 M
R2-SE-6-23-a including safety chain and extra copolymer steps on other side of m.depth 47050
benching-do-do-
R2-SE-6-23-b Do- -do- above 5 M and upto 9 M depth - do- -do- m.depth 67830
R2-SE-6-23-c Do- -do- above 9 M and upto 11M depth -do- -do- m.depth 94947
R2-SE-6-23-d Do- -do- above 11 M and upto 12 M depth -do -do- m.depth 130149
R2-SE-6-23-e Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 170352
Constructing brick masonary scraper type manhole on sewer 2.4M x
1.5M at bottom 1.2M x 0.9M at top built in brick masonary in C.M. 1:3
R2-SE-6-24 -do- -do- as per item No. SE-6-8 including SFRC. Rectangular EHD No 225119
frame and cover and copolymer steps, safety chain and extra steps,
depth upto 4.5M
Extra for above manhole per metre depth above 4.5M and upto 9M
R2-SE-6-24-a m.depth 71930
depth.
R2-SE-6-24-b -do- -do- 9 M to 11M depth m.depth 100672
R2-SE-6-24-c -do- -do- 11 M to 12M depth m.depth 137910
R2-SE-6-24-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 179593
Constructing brick masonary scraper type manhole on sewer 2.4M x
2.4M at bottom and 1.2M x 0.9M at top built in brick masonary in C.M.
1:3 -do- -do- as per item no. SE-6-17 including SFRC Rectangular
R2-SE-6-25 No 274749
EHD frame and cover with copolymer steps, safety chain and extra
steps, depth upto 4.5M.
R2-SE-6-25-a Extra for above manhole above 4.5M to 9M depth m.depth 84820
R2-SE-6-25-b -do- -do- 9 M to 11 M depth m.depth 117848
R2-SE-6-25-c -do- -do- 11 M to 12 M depth m.depth 159733
R2-SE-6-25-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 207317
Constructing brick masonary scraper type manhole on sewer 3M x 2M
at bottom and 1.2M x 0.9M at top built in brick masonary in C.M. 1:3 -
do- -do- as per item no. SE-6-25 including SFRC Rectangular EHD
R2-SE-6-26 No 263600
frame and cover with copolymer steps, safety chain and extra steps,
depth upto 4.5 M.
R2-SE-6-26-a Extra for above manhole above 4.5M to 9M depth m.depth 85452
R2-SE-6-26-b -do- -do- 9 M to 11 M depth m.depth 121679
R2-SE-6-26-c -do- -do- 11 M to 12 M depth m.depth 164664
R2-SE-6-26-d Do- -do- above 12 M and upto 14 M depth -do- -do- m.depth 213494
16 Sewerage Schedule
SE SCHEDULE 2018
17 Sewerage Schedule
SE SCHEDULE 2018
Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-1-a m.depth 3234
item.
Do- -do- 230 mm dia stone ware pipe of SP2 class in vertical drop
R2-SE-7-2 No 7818
upto 0.6M -do- -do- as per item SE-7-1
Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-2-a m.depth 4992
item.
Do- -do- 300 mm dia stone ware pipe of SP2 class in vertical drop of
R2-SE-7-3 No 18198
0-6m -do- -do- as per item SE-7-1
Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-3-a m.depth 6211
item.
Providing 160 mm dia HDPE pipes of PE-80 grade and PN-6 class in
vertical drop of 0.6m including 160mm dia HDPE pipes fixed in brick
masonary of the manhole at required level and providing 160mm dia
HDPE right angled bend, 160mmx160mmx160mm HDPE double tee
junction including cutting and jointing as per detailed
specifications,encased in half brick thick masonary in cement mortar
(1:3) all round the pipes,double tee,bend and extra brickwork below
R2-SE-7-4 No 5862
bend upto the foundation of the manhole and tapering portion of the
manhole plastering,plastering the exposed surfaces after raking out
the joints of the masonary to a depth of 20mm in CM(1:2) 20mm thick
and neat cement rendering so as to give smooth surface,including
plugging the openings etc complete as directed and asper drawing in
Dy CE(SP)P&D's office
Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-4-a m.depth 3409
item
Do- -do- 200 mm dia HDPE pipes of PE-80 grade and PN-6 class in
R2-SE-7-5 No 9509
vertical drop of 0.6M -do- -do- as in item No.SE-7-4
Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-5-a m.depth 5178
item
Do- -do- 250 mm dia HDPE pipes of PE-80 grade and PN-6 class in
R2-SE-7-6 No 14022
vertical drop of 0.6M -do- -do- as in item No.SE-7-4
Extra over above per additional metre depth -do- -do- as per above
R2-SE-7-6-a m.depth 6643
item
Do- -do- 280 mm dia HDPE pipes of PE-80 grade and PN-6 class in
R2-SE-7-7 No 18809
vertical drop of 0.6M -do- -do- as in item No.SE-7-4
Extra over above per additional meter depth 7167
R2-SE-7-7-a m.depth
Do-do -as per above item
Do- -do- 315 mm dia HDPE pipes of PE-80 grade and PN-6 class in
R2-SE-7-8 No 33371
vertical drop of 0.6M -do- -do- as in item No.SE-7-4
18 Sewerage Schedule
SE SCHEDULE 2018
19 Sewerage Schedule
SE SCHEDULE 2018
Extra over above for every additional metre depth upto 2.5M -do- -do-
R2-SE-8-1-a m.depth 13531
etc. complete as specified and directed.
Constructing brick masonary inspection chamber rectangular 0.9M x
0.6M and 0.6M deep -do- including M 20, 30 cm thick cap c.c.
Bedding & including C.I. extra heavy duty air tight frame and cover
R2-SE-8-2 No 49457
weighing minimum 270kg complete as per description in item No. SE-
8-1 with necessary centering etc. all complete as per plan and
directed.
Extra over above for every additional metre depth upto 2.5M -do- -do-
R2-SE-8-2-a m.depth 15442
etc. complete as specified and directed.
Constructing brick masonary inspection chamber rectangular 0.75M x
0.75M and 0.6M deep -do- -do- as per description in item no SE-8-1
R2-SE-8-3 including CI extra heavy duty air tight frame and cover weighing No 46928
minimum 275 kg complete as per plan and directed
Extra over above for every additional metre depth upto 2.M -do- -do-
R2-SE-8-3-a m.depth 15412
with necessary centering etc. all complete as per direction.
Constructing brick masonary inspection chamber rectangular 0.6M x
0.6M and 0.6M deep -do- -do- etc. complete as per description in item
R2-SE-8-4 no SE-8-1 including CI extra heavy duty air tight frame and cover No 39418
weighing minimum 200 kg complete as per plan and directed.
Extra over above for every additional metre depth upto 2.M -do- -do-
R2-SE-8-4-a m depth 13456
with necessary centering etc. all complete as per direction.
Constructing brick masonary inspection chamber rectangular 0.9M x
0.45M and0.6M deep on sewer with 230mm brick walls in cement
mortar 1:3 plastered both inside & outside with 20 mm thick cement
mortar 1:2 and neat cement rendering so as to give a smooth surface
including 230mm cement concrete bedding (M 15) and cement
concrete (M 15) in haunches and channels finished smooth with 20
mm thick cement mortar( 1:1) and fixing SFRC extra heavy
R2-SE-8-5 No 16604
dutyrectangular frame & cover of size 0.9M x 0.45M. resting on 300
mm high c.c. cap M 20 with (1:1) cement plaster on both the sides &
necessary co-polymer. steps staggered at 300mm c/c. including 75
mm wide vata all round the external portion of the chamber and the
foundation concrete in C.M. 1:1 etc. complete as per plan in
Dy.Ch.E.(SP)P&D's office( without excavation ) .
Extra over above for every additional metre depth upto 2.5M -do- -do-
R2-SE-8-5-a m.depth 12482
etc. complete as specified and directed.
20 Sewerage Schedule
SE SCHEDULE 2018
21 Sewerage Schedule
SE SCHEDULE 2018
C.I. Shoe bend 150 mm dia fixed complete including cutting through
R2-SE-9-2 masonary, cornices etc. and making good the same including painting No 1670
as directed.
R2-SE-9-3 Collar for C.I.pipes 150mm.dia.fixed complete including painting. No 4885
Removing zinc galvanised sheet /cast iron vent shafts including all
fittings and appliances and making good the masonary work including
R2-SE-9-4 m 309
cornices painting and stacking the material wherever directed
etc.complete.
Removing and refixing -do-do-on the same site (for galvanised
R2-SE-9-5 m 682
sheet/cast iron vent shaft).
R2-SE-9-5-a -do- -do- on different site in the same locality -do- -do- m 904
Brick masonary flue chamber for vent shaft 0.375M x 0.375M x 0.6M
deep of 230 mm brick wall in C.M.1:3 and 20 mm cement and sand
plaster on both sides in C.M. 1:2 finished smooth including 150 mm
R2-SE-9-6 No 7273
M15 cement concrete bedding and 150 mm thick reinforcement
concrete dhapas built complete including excavation etc. as specified
and directed
Removing & refixing of C.I. Vent shaft complete as directed including
R2-SE-9-7 transporting to municipal stores anywhere in City/suburbs. No 4440
22 Sewerage Schedule
SE SCHEDULE 2018
23 Sewerage Schedule
SE SCHEDULE 2018
-do- -do- 1400 mm dia to 1800 mm dia -do- -do- as per item no SE-
R2-SE-11-5 m 453
11-2
-do- -do- 2000 mm dia to 2400 mm dia -do- -do- as per item no SE-
R2-SE-11-6 m 708
11-2
24 Sewerage Schedule
SE SCHEDULE 2018
25 Sewerage Schedule
SE SCHEDULE 2018
26 Sewerage Schedule
SE SCHEDULE 2018
27 Sewerage Schedule
SE SCHEDULE 2018
28 Sewerage Schedule
SE SCHEDULE 2018
29 Sewerage Schedule