Site Preparation Works


1.0 Site Clearing
2.0 Demolition of works

Dismantling & Chipping works of Existing Floor Tiles


Roofing Extention @ Proposal Counter
Sub-Total of Site Preparation
ARCHITECTURAL WORKS
1.0 Floor Finishes
Supply and Installation of "White Ceramic Floor Tiles (400mm x 400mm)
a. Selling Area
b. Storage Room (If Applicable)
Peeble washout finish @ porch area (if applicable)
Supply and Installation of Homogenous Granite Floor Tiles (600mm x 600mm)
2.0 Doors, Windows and Glazing
a. 10mm thk Tempered Fixed Glass Panels on Analok Frame Finish
b. Single panel 10mm thk. Tempered Glass Door on Analok Frame Finish
3.0 Painting Works
a.Wall
CARPENTRY/MISCELLANEOUS WORKS
a. Supply and Installation of wall gondolas
b. Supply and Installation of Island gondolas/ End Cap
c. Supply and Installation of nCashier Counter/ Food Cabinet
d. Supply and Installation of grain center
ELECTRICAL
1.0 Roughing-In (Supply and Install conduits, boxes & fitting)
2.0 Supply and Install Wires and Cables is with insulation
3.0 Supply and Install Wiring devices (outlet & switches)
4.0 Supply and Install Lighting panel boards and circuit breaker
5.0 Supply and Installation of Lighting Fixtures & Emergency Lights
6.0 Cutting & Termination of Lighting, Power, Emergency and Auxilliary provisions
7.0 Supply of Power for CCTV
8.0 Supply of Power for Signage
Testing and Commissioning
Miscelaneous
Others