Академический Документы
Профессиональный Документы
Культура Документы
Rosettanet PIP3A4
Purpose
The Process involves execution of Rosettanet PIP3A4(Request Purchse Order Business
Process) between the Buyer and Seller. The RosettaNet PIP3A4 scenario was chosen because
it is a well defined and understood business process that is in use in production today.
Because more and better information is available through Rosettanet PIP3A4(Request
Purchase Order process), Customers should use this process to make faster and more accurate
business decisions. Orders can be placed and receive order confirmations directly into the ERP
Systems of both companies. Using order fulfillment status speeds the decision process and
order response can be near real-time.
One of the key benefits of using this process is the reduction of implementation time and cost
for Rosettanet Partners to build and expand their trading partner networks based on Rosettanet
specifications.
The Benefits also include
¡ Help reduce TCO while connecting with Trading Partners
¡ End-to-end visibility and control
¡ Reduced cycle times
¡ Create new opportunities to adopt collaborative business practices
¡ Develop closer relationship with key partners and customers
¡ Leverage SAP expertise in Industry specific business processes
Prerequisites
RosettaNet STK Installation & Configuration
1. Install the RosettaNet Self-Test Kit which can be downloaded from
http://www.rosettanet.org.
2. For the purpose of the Demo, the Rosettanet Self-Test Kit (STK) is installed on the Server
iwdflv11vm01 and can be accessed via URL
http://iwdflv11vm01.wdf.sap.corp:8080/rosettanet/RnsttHome.jsp
3. Configure the settings for the Trading Partner for User ID Customer.
SAP XI (DC8 System) Configuration:
1. Configure the RFC Destination T90CLNT090 using Transaction SM59
2. Configure the Port SAPDL3_800 using Transaction IDX1.
3. Configure the communication parties SAP & Customer in IR-Configuration. Enter the
DUNS number as the alternative identifier for the Party.
4. Configure the Broker Process.
5. Configure the Communication Channels for handling messages during Inbound and
Outbound processing:
Channel containing configuration for RNIF Adapter to communicate with
RosettaNet STK
System Landscape
System Landscape, this Process is built in
SAP XI for Rosettanet Business Package
Users
Predefined User (Role) Password Component
DEMO WELCOME R/3
Process Flow
Exchange Infrastructure
Business Partner’s
RosettaNet Compliant
SAP Application System
IDOC RNIF
Adapter Adapter
The following diagram shows how the Request Purchase Order PIP3A4 works. In this Two-Action
(Request-confirm) Partners exchange two messages and two receipts. The two messages are
Purchase Order Request and Purchase Order Confirmation with receipt acknowledgement signals in
between two to acknowledge the receipt of messages.
1 Request (PurchaseOrderAction)
Signal (ReceiptAcknowledgement) 2
3 Response (PurchaseOrderConfirmationAction)
Signal (ReceiptAcknowledgement) 4
Figure 1
The Request Purchase Order Scenario above enables a Buyer to issue a Purchase Order (Step 1),
and a Seller to Acknowledge (Step 3).
Step 1 and Step 3 are Business Action messages and are part of PIP. They contain the purchase
Order data. Step 2 and Step 4 are Business Signal messages and are acknowledgements that are
sent in response to Business Actions.
The RNIF Adapter executes the transport, packaging and routing of all PIP messages and business
signals based on the relevant information retrieved from the Integration Repository and Integration
Directory at runtime.
The following table details the roles that individual parties will play within the demo for the Rosettanet
PIP3A4 Request Purchase Order Scenario.
Party Role
Customer Buyer
SAP Seller
Figure 2
The following actions take place for each Party in the above Scenario:
Buyer:
The following diagram shows the component view of the Business Scenario in SAP XI. Business
Scenarios describe the communication between application components on a higher level.
PurchaseOrderRequestAction
PurchaseOrderConfirmationAction
Business Data
The successful implementation of the demo is nearly independent of the information contained in the
message payloads. However, certain business data is required in order to populate the message
Procedure
Open the Web Browser and open the Rosettanet Self-Test Kit using the URL
http://iwdflv11vm01.wdf.sap.corp:8080 .
Perform the following steps on this screen as shown in the figure below:
1. In the Enter a User ID field, enter Customer.
2. Click on RosettaNet Test Configuration link.
Enter User ID
Click Rosettanet
Test Configurationtion
Figure 4
PIP
Test Scenario
Figure 5
Figure 6
Test Reports can be viewed in:
Summary
Detailed
Pure XML
Summary Report show high level test results. Results are shown for each interaction within a PIP.
Detailed Reports show complete error details for Delivery Header. Details include XML message
content, Error component, Expected value and Description.
Summary Report
Figure 7
Monitoring on XI
The Interactions on the Seller side can be viewed using the following:
SAP XI Monitoring Tool on DC8 using Tr. Code SXMB_MONI.
Monitoring PIP messages in the Integration Engine Runtime Workbench.
SAP XI Monitoring
1. Log on to the DC8 System/ Client 800 with user DEMO and password WELCOME.
4. In the Status Group drop down menu, select Processed Successfully. Click on icon.
6. The Status icon means the message was processed successfully. Highlight each message
and double-click to see the status of each message,
3. On the next screen, click the Message-Monitoring and in the Status menu, select ALL option.
4. Choose the PIP message to see the status of the message.
1. Log on to the DL3 System/ Client 800 with user DEMO and password WELCOME.
2. Choose the Transaction WE05. In the Basic type field, enter ORDERS05
3. In the Partner Number field, enter IDESCUST.
4. Click Execute button.
5. On the next screen, highlight the ORDERS/ORDERS05 IDoc and double-click on it.
9. On the next screen, view the details of Sales order that was created by the IDOC sent by
SAP XI via IDOC Adapter.
12. Click on the button Processing Log to view the IDOC number that was created by the
Process.
14. Open the Status record of the IDOC to see the IDOC is successfully transmitted to SAP
XI.