Вы находитесь на странице: 1из 1

NO.

DIKIRIM TANGGAL PARAF

MATCH LINE

FIGURED DIMENSIONS ONLY ARE TO BE TAKEN


FROM THIS DRAWING. ALL DIMENSIONS ARE TO BE
CHECKED ON SITE, BEFORE ANY WORK IS PUT IN
ou HAND. IF IN DOUBT, ASK.
t
rl
+4
.0
0

C Copyright Portal Engginering Perkasa, PT


in

CATATAN :
rl
+4
.0
0

rl
+4
.0
0

rl
+4
.0
0

in

KEY PLAN

sh
elt
e r

rl
+4
.0
0

PONDASI SUMURAN
63184.4161 m2

ke
be
ra
ng
ka
ta
n
MATCH LINE

MATCH LINE
dr NO. REVISI TANGGAL PARAF
op bl
wl
+1
of +0 .50
f .5
0
c
13 arp NAMA PROYEK :
9 ark
ca
rl
+4
.0
rs
0
PENGEMBANGAN
BANDAR UDARA AHMAD YANI
SEMARANG - JAWA TENGAH

PEMBERI TUGAS :

rl
+4
.0
te 0
rm
ina
fl + l
4.5
0 DISETUJUI : DEPUTI DIREKTUR TEKNIK PERENCANAAN
DAN SPESIFIKASI TEKNIS

rl
+4
IR. YUDI MAISA MM. AMP.
.0
0
DIKETAHUI : DIREKTUR OPERASI DAN TEKNIK

DIREKTUR OPERASI DAN TEKNIK

RE
FL

JAYA CM
E CT KONSULTAN MENAJEMEN KONSTRUKSI :
IN
G
PO
wl
OL
+4
.2
0
bl
+3
.8
0

d
26 ana
41 u
wl m ERMAN PATTIPEILUHU
bl +1
+ .50
2
0.5
0
KONSULTAN ARSITEKTUR, STRUKTUR, SIPIL DAN ME :

RE
TE IR. MAKARIOS RUDYO MURSANTO
N
42 TIO
KEPALA PERWAKILAN

14 N
wl
bl +2.0
m PO
+1
.0 0
2 ND
0 KONSULTAN ARSITEKTUR DAN INTERIOR

BENYAMIN ARIS NUGROHO, S.Sn


DIREKTUR UTAMA

rl
+4
.0
0 JUDUL GAMBAR SKALA

GE
D
AN . PE
G RK
KA A
SA NT DENAH SITUASI H: 1:100
PU OR
RA AN PONDASI SUMURAN V: 1:100

DI GAMBAR : CHAIRUL UMAM


ca
18 rpa DI PERIKSA : BHAGUS MERIDIAN, ST
ca rk
rl
+4
rs
.0
0
DI SETUJUI : Ir. HARY SAMUDRA, MT

STATUS GAMBAR TANGGAL UNTUK LEMBAR


GS
E
ca
13 rpa FOR CONSTRUCTION JULI 2012 AO
ca rk
rs
MATCH LINE rl
+4
.0
0
NO. PROYEK KODE GAMBAR NO. GAMBAR

S-06F

CAD INFO :

D:\
4.situasi rev.dwg

Вам также может понравиться