JHBDPL PROJECT (PHASE - II, Section - 2A)

COMBINED DAILY PROGRESS REPORT (LAYING WORKS OF MAIN LINE & SPUR LINES)
CLIENT : GAIL (INDIA) LIMITED REPORT NO : 198
CONSULTANT : MECON LIMITED REPORT DATE : 30/08/2018
PROGRESS DATE : 29/08/2018
COMPLETION DT. : FOA DT. 05.12.2017 (DAPL Main Line) & FOA DT. 26.10.2017 (Both Spur Lines)
WEATHER :

BHUBANESWAR & CUTTACK SPUR LINES


PARADEEP SPUR LINES
DAPL MAIN LINE [36'' x 206.595 KM] [12'' X 109.405 + 10.0 (total 119.405) KM]
Cumulative All Sections [12'' X 75.290 KM] CONTRACTOR
CONTRACTOR : PUNJ LLOYD LTD. CONTRACTOR : CORRTECH
Unit Of : JAIHIND PROJECTS LTD.
Sl. No. Activity Description
Meas. INTERNATIONAL PVT. LTD. Remarks

Scope of Scope of Scope of


Work
Previous Today's Cumulative
Work
Previous Today's Cumulative
Work
Previous Today's Cummulative Scope of work Previous Today's Cumulative

1 Pre Construction Survey Mtr 401285 212011.03 922.14 212933.17 206595 86872 0 86872 119400 99975 0 99975 75290 25164.03 922.14 26086.17
2 3 (1) Notification Mtr 401285 401285 0 401285 206595 206595 0 206595 119400 119400 0 119400 75290 75290 0 75290
- 18.2 Km Proposals with Ministry
- 4.9 Km Proposals shall be Sent in
the last week of Jun'18 (after
completion of objections hearing)
- 9.0 Km Proposals shall be Sent in
Jul'18 (after completion of
objections hearing)
- 2.1 Km Proposals shall be Sent in
Aug'18 (Survey Data Recd.
Recently)
3 6 (1) Notification Mtr 401285 386700 0 386700 206595 194100 0 194100 119400 119400 0 119400 75290 73200 0 73200 -3.4 Km Proposals shall be
Sent after receipt of revised 3(1)
Notification.

4 PANCHNAMA Mtr 401285 136745 470 137215 206595 65715 120 65835 119400 45970 200 46170 75290 25060 150 25210
5 ROU handover Mtr 401285 136745.00 470 137215.00 206595 65715 120 65835 119400 45970 200 46170 75290 25060 150 25210
6 ROU Clearing & Grading Mtr 401285 56912.92 200.00 57112.92 206595 29020.00 0.00 29020.00 119400 24192.92 200.00 24392.92 75290 3700.00 0.000 3700.00
7 Line Pipe Received Mtr 401285 64116.743 0.000 64116.743 206595 26203.200 0.000 26203.200 119400 34596.596 0.000 34596.596 75290 3316.947 0.000 3316.947
8 Stringing Mtr 401285 35765.000 221.650 35986.650 206595 14556.750 36.810 14593.560 119400 18877.110 184.840 19061.950 75290 2331.140 0.000 2331.140
9 Bends Fabrication Nos. 620 23 0 23 0 0
Nos. 26530 2313 17 2330 17147 1155 2 1157 9383 1158 14 1172 0 1 1
10 Mainline Welding
Mtr 319187 28694.990 233.770 28928.760 206595 14040.470 24.540 14065.010 112592 14654.520 184.840 14839.360 0.000 24.390 24.390

Free Tie /Tie-in Free Tie / Tie-in Nos. 534 480 0 480 3 0 3 534 316 0 316 161 0 161
11
Welding
Length Mtr 6407 6118.174 0.000 6118.174 0.000 0.000 0.000 6407 3992.630 0.000 3992.630 2125.544 0.000 2125.544

Nos. 33313 2793 17 2810 17147 1158 2 1160 9917 1474 14 1488 6249 161 1 162
12 Total Welding
Mtr 325594 34813.164 233.770 35046.934 206595 14040.470 24.540 14065.010 118999 18647.150 184.840 18831.990 75290 2125.544 24.390 2149.934

13 Radiography Nos. 17147 0 0.00 0.000 17147 0.00 0


a Taken Nos. 2714 21 2735 17147 1093 7 1100 1460 14 1474 161 0 161
b Reviewed Nos. 2690 0 2690 17147 1069 0 1069 1460 0 1460 161 0 161
c Accepted Nos. 2426 0 2426 17147 819 0 819 1458 0 1458 149 0 149
d Repair Nos. 304 0 304 85 0 85 215 0 215 4 0 4
e Others(RT,RS,CS,GRS etc.)Joints Nos. 83 0 83 0 0 0 75 0 75 8 0 8
f Repair % % 11.301 #DIV/0! 11.301 7.951 #DIV/0! 7.951 14.726 #DIV/0! 14.726 2.484 #DIV/0! 2.484
14 Joint Coating Nos. 27064 1918 0 1918 17147 554 0 554 9917 1364 0.00 1364 0
15 Trenching Mtr 227376 17046.000 0.000 17046.000 206595 350.000 0.000 350.000 119400 16696.000 0.000 16696.000 0

Lowering & Holiday Testing


16 Mtr 325995 16598.86 0.000 16598.86 206595 0.000 0.000 0.000 119400 16598.860 0.000 16598.860 0
(Including HDD & Cased Crossing Length)

17 HDPE Duct Laying Mtr 227376 16598.86 0.000 16598.86 206595 0.000 0.000 0.000 119400 16598.860 0.000 16598.860 0
18 OFC Blowing Mtr 325995 0 0 0 206595 0 0.00 0 119400 0 0 0 0
Nos. 0 0 0 0 0 0 0 0 0 0 0
19 Cased Crossings
Mtr. 0 0 0 0 0 0 0 0 0 0 0
20 Asphalted Roads / Cart Track Nos. 0 0 0 0 0 0 0 0 0 0 0
21 Canal / Nala / Drain Crossing Nos. 0 0 0 0 0 0 0 0 0 0 0
Nos. 0 2 0 2 0 0 0 2 0 2 0
22 HDD Crossing
Mtr. 0 232.385 0 232.385 0 0.00 0 232.385 0 232.385 0
23 Pipeline Crossing Nos. 0 0 0 0 0 0 0 0 0 0 0
24 Backfilling Mtr 325995 15414.281 0 15414.281 206595 0.000 0.000 0.000 119400 15414.281 0.000 15414.281 0
25 Cleaning & Gauging Mtr 325995 0 0 0 206595 0 0.00 0 119400 0 0 0 0
26 Hydrotesting Mtr 325995 0 0 0 206595 0 0.00 0 119400 0 0 0 0
27 CP Work 0 0 0 0 0.00 0 0 0 0 0
a Mg. Anode-3 Kg Installation Nos. 0 5 0 5 0 0.00 0 5 0 5 0
b Mg. Anode-5 Kg Installation Nos. 0 0 0 0 0 0.00 0 0 0 0 0
c Zn. Anode-20 Kg Installation Nos. 0 0 0 0 0 0.00 0 0 0 0 0
d Thermit Welding Nos. 0 5 0 5 0 0.00 0 5 0 5 0
e TLP Installation Nos. 0 0 0 0 0 0.00 0 0 0 0 0
f TCP Commissioning Mtrs. 0 0 0 0 0 0.00 0 0 0 0 0
28 Marker Installation 1715 0 0 0 0 0.00 0 1715 0 0 0 0
a Direction Marker Nos. 350 0 0 0 0 0.00 0 350 0 0 0 0
b Pipeline Warning Signs Nos. 260 0 0 0 0 0.00 0 260 0 0 0 0
c Kilo Meter Posts Nos. 120 0 0 0 0 0.00 0 120 0 0 0 0
d Aerial Marker Nos. 25 0 0 0 0 0.00 0 25 0 0 0 0
e Navigable Waterway Marker Nos. 0 0 0 0 0 0.00 0 0 0 0 0
f ROU Boundary Marker Nos. 960 0 0 0 0 0.00 0 960 0 0 0 0
29 Cleap up & Restoration Mtr 0 0 0 0 0 0.00 0 0 0 0 0