Академический Документы
Профессиональный Документы
Культура Документы
DOI: 10.5923/j.mining.20120104.01
Abstract The paper contains the review of issues of completeness and quality of mineral mining at the opencast mines and
creation of geomechanical justification of systems with internal p iling. Current mining production is characterized by the
increase of share of open mining of mineral resources, the ratio of which in the world mineral mining is nearly 70%. Capacit ies of
mining co mpanies keep on g rowing, production processes are being intensified; depth and periods of operation of open mines
are being increased. In these cond it ions , issues of increase o f econo mic efficiency and env iron mental safety o f min ing
operat ions beco me of mo re impo rtance; on e o f the most rad ical ways o f solut ion o f th is p rob lem is the maxi mu m use
fo r locat ion o f ov erbu rden ro ck and p roduct ion waste fro m the waste qu arry area as a vo lu me man -caused resource.
The work contains the analytical rev iew o f the current state of open mining of mineral resources of Kazakhstan, sequence of
mining operations with internal piling, sequence of format ion and development of internal dump, optimal parameters of
dumps (volu me, height, stratification, angles of d ips) as well as the stability of inactive pit edge before and after its loading
with embankment.
Keywords Open Method of Mineral Field Development, Metallurgy, Technology of Development
7. Developmentsystem Sinking
Cyclic and
8. Technology of development Cyclic Cyclic
flow
Vehicle,
Vehicle and
9. Kind of transport complex Vehicle and railway Vehicle railway, Vehicle
railway
conveyor
10. Gradient of railway, ppm 36 - 40 - 40 36 - 40 -
Nearly 35 %of copper ores are mined at the open mines of mining is directed at the solution of various environ mental
Northern Jezkazgan ore pit, open mines “Nikolaevskiy” and aspects, at the same time the issues of development of
“Shemonaih inskiy” of Eastern Kazakhstan copper plant and resource saving technologies of piling require further
“Konyrat” of Balkhash mining and metallurg ical plant. Since research.
2003 new powerful open mine “Nurkazgan” started to Wastes of mineral mining represented by the overburden
operate at Samara copper field near Temirtau city. The are mainly placed on the surface of the open mine or in its
designed depth of the open mine is 600 m[2]. open area. External waste dumps alienate significant land
The main characteristics of some open mines of resources deforming the relief and negatively affecting the
Kazakhstan are shown in table 1. environment.
Along with the increase of the depth of open mines, In Kazakhstan more than 26 b illion tones of production
mining and geological conditions become co mplicated that wastes have been accumulated at the dumps, which are
leads to various kinds of deformat ions and landslides of pit increased by 1 billion tones every year. Out of these waste,
walls. This in its turn significantly damages the mining the most part (58%) includes the wastes of ferrous and
company to the point of its shutdown. Therefore the issues of non-ferrous metallurgy. Non-ferrous metallurgy of
effective and safe development of open mines, justification Kazakhstan is represented by 24 companies of three main
of borders of open excavations, provision of stability of p it segments of industries: copper and aluminum, lead and zinc,
walls, optimizat ion of mining volu me with due account to gold and rare metals.
the market relations, quality management of the mined Develop ment of open mines is accompanied with constant
mineral resources, reclamation of dumps and disturbed lands increase of distances of transportation of the overburden to
etc are still essential.[3]. the external dumps and therefore the costs for piling. In
particular, this is typical for railway du mps which, in view of
low values of gradients passed by this transport, are made at
2. Discussion significant distances from open mines by low layers and on
large areas. In other words, technical characteristics of the
Recently the basic research on the issues of open pit railway transport predetermine the two-d imensional
Khaini-Kamal Kassymkanova et al.: Current Conditions of Open M ining of M ineral Fields of Kazakhstan 122
construction of dumps for the overburden and large areas of The classification of dumps developed by the member of
disturbed lands several times exceeding the land allotment of Academy N.V. Melnikovа contributes to the selection of
open mines. rational process charts of piling for steeply inclined fields of
To smaller degree th is is referred to the most popular at certain mining and technical conditions and correct
present time vehicle and bulldozer du mps, however in this organization of du mp ing operations in open mines[5].
case also the distance of rock transportation to the dumps Further solution of the problem requires the development
along the surface is often much more than at the open mine of scientific grounds of technologies of open pit mineral
itself, and land areas allocated for du mps are co mpared to the mining with maximu m possible internal piling in wide range
area of the open mine over the surface or exceeds it several of mining and geological and min ing and technical
times. By construction, external vehicle and bulldozer du mps conditions.
can be called height-two-dimensional ones. They are formed Sequence of mining operations with internal piling
in one layer or several layers the total height of the dump determines the progressive advance of the dump along with
(layer) is 100-120 m and more. the progress of field develop ment.
Along the deepening and enlargement of open mine, the However the fo rmation of internal dumps requires the
cost for format ion of t wo-dimensional (railway) and thorough study of issues related to the proper stability of
height-two-dimensional (vehicle and bulldozer) dumps, internal p it walls loaded with embankments of internal
besides, land areas under them will be increased, in view of dumps. At that, geomechanical justification of the piling
which the issue of improvement of piling technology will be place, sequence of piling, its parameters (volu me, height,
crucial. layers, angles of dips) is needed. Since the disturbance of
At present time in v iew of ever increasing requirements of stability of the system can lead to emergencies (collapse of
economic efficiency and environ mental safety of mining pit wall, landslides) and to temporary shutdowns or
operations, one of the most radical ways of location of the reductions of min ing in the period of emergency liquidation.
overburden and production wastes is the maximu m use of
internal piling o f the open mine. Potential opportunities of
the resource under question are proved for instance by the 3. Results
fact that the share of internal p iling at the operating coal
mines does not exceed 30-35%, i.e. the main volu me of the Thus, analysis of experience of mineral field develop ment
overburden is located at external du mps along with the proves that the rational use of open area, ensuring the
withdrawal of land lots. One of the main reasons of the optimal location of the overburden at the least costs for their
limited internal p iling at the open mines, in particular at large transportation and storage as well as the search for reduction
depth and small sizes in the plane, is insufficient knowledge of adverse environmental impact of mining production, is
of issues of formation and rational use of the open area of one of the main reserves of increase of econo mic efficiency
open mines. The issues of the use of the open area of open and mining safety.
mines for the storage of the overburden and production Another factor, that is worthy of consideration, is the
wastes have been already considered by the mining scientists technology of mining operations in the Kazakh oil fields,
and specialists[4]. At that, traditionally the area of worked by open method, yielding counterparts overseas in
application of technologies with the use of the open area in terms of mine technical and environ mental efficiency and
both domestic and foreign practice is mainly refers to safety. At present, due to the ever increasing demands for
horizontal and flat (up to 10-120 ) fields. The ways of increase greater economic efficiency and environmental safety of
of volu me of internal piling must be searched by means of mining operations, it is important and urgent to find solution
creating the mining methods ensuring stability of internal to maximize space for the waste of mining fields.
dumps on more inclined grounds. Search fo r solutions to mentioned problems is main ly in the
At that geological characteristics of rocks, mining and direction of creat ing a method of mining to ensure the
technical conditions, technology of operations at the working sustainability of internal piles on more sloping grounds, as
place, safety requirements and time of operation are well as increasing the use of the mou ldboard in min ing fields.
determined by the basic parameters of internal du mps such To address the problem, a series of scientific work is,
as quantity and height of layers, min imal sizes in the plane. currently, underway. One of them is the development of a
Besides, the applied parameters of the du mp should ensure scientific basis for the further exp loration of resource-saving
the opportunity of its setting out in case of temporary storage technologies and open min ing with maximu m internal
of the rock. stacking. It is important to consider such tasks as:
At the development of flat and steeply inclined fields • Geo-mechanical study of min ing development;
much experience was gained in the field of piling in various • Optimization of the parameters of the min ing field’s
mining and technical conditions (stable and unstable ground, spacer;
plain, undulating land and high land relief, layering), at • Analytical calculat ions of volumes of overburden;
various location relat ive to contours (external and internal) • Justification quarry transport and all processes;
and various methods of safety provision (conservation of • Sustainability-p it dumps and sides;
stability and controlled shifting). • Calculat ion of the environ mental risks.
123 International Journal of M ining Engineering and M ineral Processing 2012, 1(4): 120-123
One of the main parameters in the security of these from the Grasberg open pit to the Grasberg block cave mine,
conditions is the stability of pit walls, which provides Proceedings of Rock M echanics Conference, Taylor&Francis
Group, London, 2007.
optimu m angle side. The Kazakh mines, such as asbestos
‘Zhitikara’, sections of JSC "Shubarkol", " Bogatyr Coal", [7] Chebakov A. Stability of open pit edges (статья)// Challenges
LLP "Karazh ira Ltd» and others can skip the internal and Solutions in M ineral Industry. Freiberger
stacking. Positive aspect in this case is the fact that such a Forschungsforum 60. 2009. - P. 155-158.
resource-mining system reduces the cost of transportation of [8] M eagher, S. A. Abdel Sabour, and R. Dimitrakopoulos.
overburden, reduces the cost of land reclamation fro m Pushback design of open pit mines under geological and
external piles, wh ich consequently leads to lower production market uncertainties, The Australasian Institute of M ining
and M etallurgy, Spectrum Series No. 17, 2010.
costs. This raises the issue of geo-mechanical character that
is the sustainability of pit slopes and internal du mps. For [9] Castendyk D.N., M auk J.L., Webster J.G. A mineral
each particular field it is necessary to study sustainable quantification method for wall rocks at open pit mines, and
geo-mechanical parameters of boards and benches. application to the M arpha Au-Ag mine, Waihi, New Zeland //
Applied Geochem. 2005. V. 20. P. 135–156.