Beban Pondasi
Tebal Tinggi Panjang Berat Jenis Beban perluasan Luas Beban ke kolom
Beban Mati 3 2 2
(m) (m) (m) (kN/m ) (kN/m ) (m ) (kN)
Beban pelat lantai 0.1 24 2.4 18.0625 43.35
Beban Pasir 0.01 16 0.16 18.0625 2.89
Beban spesi 0.03 22 0.66 18.0625 11.92125
Beban Keramik 0.01 22 0.22 18.0625 3.97375
Beban Plafon 0.2 18.0625 3.6125
Beban instalasi ME 0.25 18.0625 4.515625
Beban Balok Arah a 4.25 24 0.12 12.24
Beban Balok Arah b 4.25 24 0.12 12.24
Beban Kolom 4 24 0.16 15.36
Pasangan 1/2 bata 4 8.5 2.5 85
Σ Beban Mati 124.84
Σ Beban Hidup 2.5 18.0625 45.15625
N-SPT average = 24
Pile Data :
where :
Nb = N-SPT value at bottompile
Ab = area of pile tip ( m2)
N ave = N-SPT value average as long pile
As = are of pile shaft ( m2)
SF = safety factor ( this case is taken 3 )
Q all = allowable capacity of pile
Q ult = ultimate pile capacity
A = 2*(bo+ho)*d
= 2*(900+900)*460 = 1656000 mm2
Data-data
fc' (beton) 30.00 Mpa Ht 500 mm
fy' (baja) 410.00 Mpa b 1000 mm
d'
(1) 40 mm
L1 = 0.25 m 2P = 222860 kg
L= 0.50 m
1.2 x ( 2P.L1 -
Mu = 1/2.Q.L^2)
= 1.2 x (222859.93061651x0.25-1/2x1200x0.5^2)
= 66677.98 kgm
pmin = = 0.0025
pmaks = 0,75 x (0,85 x 30)/410 x 0,85 x [600/(600+410)]
= 0.0236
mm2 dipakai
As 4826.50 D25 - 100 ( 4,909 mm2 )
PERHITUNGAN GROUND BEAM
GB 1
Data Bahan :
fc' = 30 Mpa
fy = 410 Mpa
Ukuran Penampang :
B = 20 cm
H = 35 cm
d = 33 cm
min = 1.4/fy
= 0.003415
Rn = 2.860973
m = 16.07843
1/m(1-V(1-2mRn/fy)
= 0.007421
pakai = 0.007421
As pakai---> dia = 16 mm
jumlah = 3 mm
As ada
= 6.0288 cm2
PERHITUNGAN TULANGAN GESER BALOK
Mutu Bahan :
fc' = 30 Mpa
fy = 410 Mpa
Tulangan Balok :
tulangan utama = 16 mm
sengkang = 10 mm
cover = 30 mm
Dimensi Balok :
bw = 300 mm
H= 500 mm
d= 452 mm
Hasil Analisa :
Vu = 72.97 kN
Vs = 59.73 kN
Vs = Av x fy x d
S
S perlu = Av x fy x d = 487.13 mm
Vs
Kontrol S max
S max1 = d/4 = 113 mm
S max2 = 8.db tul = 128 mm
S max3 =24 db hoop = 240 mm
S max 4 = 300 mm