P& D Deptt.
Name of the implementing Department : - PWD
Name of the Administrative Department : - P&D
5. Amount proposed for sanction in the 2010-11 current year:- 3.54 Lakh
8.Brief nature of the work of the scheme/project and the time period ::Earthwork and GWC,
required for implementation /execution 3(Three) months
9. Aims, objectives and benefit expected from the scheme / project. ::To facilitate better road communication
c) Year wise receipt and rental share and state share from 2007-08
NA
onwards and the status of submission of utilization certificate:
d) The quantum of Central share allocated/released for the year 2010-
NA
11 along with supporting document:
e) The criteria of proposing the amount of state share: NA
Road
Amount Name of Habits Total
S1. Name of Code Length Populatio SC/ST
Name of Road (Rs. In Block habitation tion Populati
No Division in (KM) n Population
L) benefited Code on
CN
1 2 3 4 5 6 7 8 9 10 11 12
Guwahati
I Road 1.3 22.42 Boko Raipara 98 1253 1253 622
Division
#REF!
#REF!
ABSTRACT OF COST
Checked physically by
SI.NO Amount
Item
(Rs.) EE SE CE
Initials of the Officer
Construction of
1 0,000,142.00
embankment
2 Construction of Subgrade
& Shoulder 00,294.00
3 GWC 353,106.00
Rs. 353,542.00
Say Rs. 3.54 Lakh
1 2 3 4 5 6 7 8 9 10
As per Qty.
Cum 1.00 142.00 142.00
Statement
As per Qty.
2.00 147.00 294.00
Statement Cum
353542.00
Say Rs. 3.54
joynul.AE 396653559.xlsfile:///conversion/tmp/scratch/396653559.xls
NON-DUPLICATE CERTIFICATE
SL. No-
Certified that the above project / scheme or any other part there of are neither proposed
nor taken up under any scheme / programmed like NLCPR/NEC / State plan / MLAAES /
PMGSY / Economic and important etc. or this shall be proposed for such scheme in future.
Item of Work : Construction of Granular Sub-base/surface course using locally available material
(Table 400.13) by mix in place method normal construction of Granular Sub-base by providing
local material spreading in uniform layers with motor grader in prepared surface mixing by mix
in place method with rotavator at OMC and compacting with smooth wheel roller to achieve the
desired density complete as per Clause 401.4 as per Technical specification clause 406.
Clause 401.4 as per Technical specification clause 406.
II) Using Gavel mixed Soil
SI. Item of Cost Quantity Quantity Rate Amount
(Compacte
No Analysis Lead(Km) Unit (Loose) (Rs.) Rs.
d
Cost of GWC
A Cum 1.00 555.00 555.00
excluding lead
#REF! #REF!
QUARRY INDEX MAP OF ROAD (NOT TO SCALE)
3 BORROW
PIT
Tarabari PROPOSED ROAD L #REF!
TO CHAMARIA
N
TO HEKRA
SUKINIAPARA NAGARBERA
PWD ROAD.
PWD
SUKINIAPARA OFFICE BOKO
81 KMP Singra 91.00 KMp
LEAD
1. quarry Road(kutcha) = 1.00 km BOKO HAHIM ROAD
2. Boko Hahim Road(Surface) = 14.00 Km L=14.00 km
3.NH.37 (Surface) = 1.00 Km
4.Boko towards work site = 7.00 Km
5.Proposed gravel Road(apprx.)= 1.00 Km
Total surface 23.00 Km
Unsurace 1.00
24.00
HAHIM QUARRY ROAD(L=1.00KM)
RIVER
QUARRY
#REF! #REF!