June 2017
Building Research Institute,
Japan
Matsutaro SEKI
3. Conclusions
Compressive Compressive
force force
Strong !
Tensile Tensile
force force
Weak !
Property of concrete
Reinforced concrete
Concrete Beam
Beam
Seki M., UTCB Lecture note, June 2017, BRI, Japan
What is the PC structure?
Concept
http://kenken-pc.com/intro/
Stress Stress
2. Casting
concrete and
curing
Concrete
PC steel wire
1. Construction
of rebar, sheath
pipe and form
Bed
Member after casting
of concrete Sheath pipe
2. Casting of
concrete and
cure
PC wire
Grouting
Jack
PC steel wire
http://www.geocities.jp/ars_ksj/kanri/kanri1.html
Seki M., UTCB Lecture note, June 2017, BRI, Japan
What is the PCa structure?
Pca concrete Pca concrete Pca concrete roof panel Non welding
floor panel Wall panel joint
Wall tile
prefabricated
Rebar for Vertical joint (sleeve joint)
at factory
vertical joint
PC RC
Seki M., UTCB Lecture note, June 2017, BRI, Japan
How to make the PCa member?
Construction of PCa panel at factory
By.
MASAYOSHI IMAMURA
INTERNATIONAL UNIVERSITY OF
HEALTH AND WELFARE
NARITA CAMPUS
Building Summary
PLAN Y4
PC4
PG2
PC1
PG1
PC1
PG1
PC1
PG1
PC1
PG1
PC1
PG1
PC2
PG1
PC2
PG1
PC2
PG1
PC1
PG1
PC1
PG1
PC1
PG1
PC1
PG1
PC1
PG2
PC4
12000
PG13A
PG11
PG13
PG13
PG13
PG13
PG13
PG13
PG13
PG13
PG13
PG13
PG13
PG11
PG13
PC5 PC3 PC3 PC3 PC3 PC3 PC3 PC3 PC3 PC3 PC3 PC3 PC3 PC3 PC5
PG4 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG4
Y3
37000
13000
[PG14]
•G14•
[PG14A]
n
PG14A
[PG14]
[PG14]
[PG14]
[PG12]
PG12
PG14
PG15
PG14
PG14
PG14
PS3 PS3
[PG15A]
m
P
PC5 PC3 PC3 PC3 PC3 PC3 PC3 PC3 PC3 PC3A PC3A PC3 PC3 PC3 PC5
PG4 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG4
Y2
12000
PG13A
PG13
PG11
PG13
PG13
PG13
PG13
PG13
PG13
PG13
PG13
PG13
PG13
PG13
PG11
PC4 PC1 PC1 PC1 PC1 PC1 PC2 PC2 PC2 PC1A PC1A PC1 PC1 PC1 PC4
PG2 PG1 PG1 PG1 PG1 PG1 PG1 PG1 PG1 PG1 PG1 PG1 PG1 PG2
Y1
6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000
PG3 PG3
4030
9FL PC5
PG4
PC3
PG3
PC3
PG3
PC3
PG3
PC3
PG3
PC3
PG3 PG3 PG3 PG3
PC3
PG3
PC3
PG3
PC3
PG3
PC3
PG3
PC3
PG4
PC5
4130
8FL PG4 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG4
4030
7FL PG4 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG4
4030
6FL PG4 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG4
36870
36770
4030
5FL PG4 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG4
4130
4FL PG4 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG4
4130
3FL PG4 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG4
4130
2FL PG4 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG3 PG4
4130
100
GL 1FL
Column
X
Tie Hoop X
Main Reinforcement
18-D38 (390MPa) S13@100 (785MPa)
757.5 ▽2FL
975
Main Reinforcement
1305
18-D38 (390MPa)
Y
217.5
487.5 487.5
975
Top Cross Section Tie Hoop
S13@100 (785MPa)
4630
4130
Splice Sleeve Tie Hoop
Splice sleeve for(12U-X)
joint S13@100 (785MPa)
3325
757.5
975
Y Splice Sleeve
217.5
(12U-X)
487.5 487.5
▽1FL
220
975
487.5 487.5
Bottom Cross Section 975
130
Duct for PC Tendon of
757.5
Longitudinal Direction Beam
975
Stirrup
995
865
D13@100
Y
217.5
Anchorage for
720 30 PC Tendon 487.5 487.5
Main Reinforcement
4-D35 (390MPa) 750 975
X
Stirrup
D13@100
130
▽2FL
Duct for PC Tendon of
Transverese Direction Beam
1000
870 Main Reinforcement
350 350
10-15.2φ PC Tendons 4-D22(345MPa)
(Pre-Tensioning, 1570MPa) 700
Slab Element
84000
Prestressing Prestressing
84000
NICHIA SUWA
TECHNOLOGY CENTER
Building Summary
3200
PLAN
CPG1A PG1A CPG2A SG4A CPG2A PG1B CPG1B
E
8800
CPB1 PB1 CPB2 SG1 CPB2A CPB4A CPB3 CPB1
EV
G3
G3
G3
G3
CPG1 PG1 CPG2 SG3 CPG2 CPG1
D PG1
32800
8800
CPB1 PB1 CPB2 SG2 CPB2 PB1 CPB1
G2
G2
G2
G2
EV
8800
CPB1 CPB3 CPB4 CPB2A SG1 CPB2 PB1 CPB1
G1
G1
G1
G1
CPG1A PG1A CPG2A SG4 CPG2A PG1A CPG1A
B
3200
SECTION 1 2 3 4 5
73600
6 7 8 9 10
PHFL Steel Frame Large Steel Beam Precast Prestressed Concrete Beam PHFL
3800 2600
3800 2600
RFL sb58M
RFL
2FL 2FL
14095
15400
CPG1B PG1B CPG2A SG4A CPG2A PG1B CPG1B
1800
1695 6000
6000
C2 C2
100
PG1A
GL 1FL FG6
1FL
3000
Precast Concrete F3 F2a
C1
FG1
C1 B1FL
aveGL Column
F1 F2 Hanging Slab
6400 6400 9600 9600 9600 9600 9600 6400 6400
73600
1 2 3 4 5 6 7 8 9 10
Excavation
Grout-injection
Grout-injection
Post-tensioning
Grout-injection
Grout-injection
Grout-injection Grout-injection
Post-tensioning, and
Grout injection into connections between beam units
Support removal
Building Summary
3900 4450 4150 4150 4200 4150 4150 4150 4350 4150 4150 4350 4150 4150 3650 4875 8100
GK52GK52
Fc42
PGK3 GK11 GK11 GK11 GK11GK11GK11 GK11 GK11 GK11
30FL
3500 4850 4150 4150 4150 4350 4150 4150 4200 4150 4150 4200 4150 4150 5700 3925
PGK3
29FL
GK11 GK11 GK11 GK11GK11GK11 GK11 GK11 GK11
PGK3
GK11
GK11
GK11GK11GK11
WGK11
GK11GK11GK11
GK11
WGK11
GK11 PGK3
27FL
Precast Concrete Column WGK11 WGK11
26FL
Precast Prestressed PGK3 GK11
WGK11
GK11GK11GK11
WGK11
GK11 PGK3
( 560mm x 900mm : Fc60~Fc80 ) WGK11 WGK11
25FL
Concrete Beam PGK3 GK11
WGK11
GK11GK11GK11
WGK11
GK11 PGK3
WGK11 WGK11
( 500mm x 800mm Multistory Bearing Wall PGK3 GK11
WGK11
GK11GK11GK11
WGK11
GK11 PGK3
24FL
: Fc60 ) WGK11 WGK11
Fc60
( t•
•
=200mm~1000mm ) WGK11 WGK11 23FL
PGK3 GK11 GK11GK11GK11 GK11 PGK3
WGK11 WGK11
PGK3 GK11
WGK11
GK11GK11GK11
WGK11
GK11 PGK3
22FL
WGK11 WGK11
GK4 GK4 GK4 GK4 GK4 GK4 GK4 GK4 GK4 GK4 GK4 PGK2 PCGK1
Y18 WGK11 WGK11 21FL
PGK2 PCGK1
PGK3 GK11 GK11GK11GK11 GK11 PGK3
WGK11 WGK11
PGK6 PGK6 WGK11 WGK11 20FL
16675
PGK3 GK11 GK11GK11GK11 GK11 PGK3
PGK7 WGK11 WGK11
PGK7
GK4
PGK3
PGK8
PGK8
PGK3
PGK1
PGK1
PGK1
PGK1
PGK1
PGK7
PGK7
PGK3 GK11
WGK11
GK11GK11GK11
WGK11
GK11 PGK3
19FL
PGK3 GK11
WGK11
GK11GK11GK11
WGK11
GK11 PGK3
18FL
GK4 GK4 GK4 GK4 GK4 GK4 GK4 GK4 GK4 GK4 GK4 GK4
GK4 GK4 GK4 GK4 GK4 GK4 GK4 GK4 GK4 GK4 GK4 GK4
PGK6 WGK1 WGK1 PGK6
137000
PGK3 GK1 GK1 GK1 GK1 GK1 GK1 PGK3 WGK11 WGK11
Y14 17FL
WGK12
WGK12
WGK11 WGK11
GK11
GK11
PGK3 GK11 GK11GK11GK11 GK11 PGK3
PGK1 PGK1 WGK11 WGK11
WGK11
WGK11
16FL
GK12 GK12
GK12 GK12
WGK11
GK3
WGK11 WGK11 15FL
WGK12
PGK1 WGK12 PGK1 PGK3 GK11 GK11GK11GK11 GK11 PGK3
PBK1 WGK11 WGK11
GK11 GK11 GK11
GK11GK11 GK11
14FL
65300
PBK1
31950
GK12 GK12 GK12 GK12
WGK12
PBK1 WGK11 WGK11
PGK1 PGK1
12FL
WGK11
WGK11
PBK1 WGK11 WGK11
PGK3 GK11 GK11GK11GK11 GK11 PGK3
PGK8 GK2 GK3 GK2 PGK8 WGK11 WGK11
11FL
WGK11
WGK11
WGK11 WGK11
GK12
10FL
WGK12
GK11
GK11
WGK11 WGK11
PGK3 PGK3 PGK3 GK11 GK11GK11GK11 GK11 PGK3
Y05 WGK11 WGK11
PGK6
GK1
WGK1
GK1 GK1 GK1 GK1
WGK1
GK1
PGK6
WGK11 WGK11 9FL
PGK3 GK11 GK11GK11GK11 GK11 PGK3
WGK11 WGK11
16675
WGK11 WGK11 8FL
PGK7
PGK7
PGK1
PGK1
PGK1
PGK1
PGK1
PGK3
PGK8
PGK8
PGK3
PGK7
PGK7
Fc80
PGK3 GK11 GK11GK11GK11 GK11 PGK3
WGK11 WGK11
WGK11 WGK11 7FL
PGK6 PGK6 PGK3 GK11 GK11GK11GK11 GK11 PGK3
WGK11 WGK11
GK4 GK4 GK4 GK4 GK4 GK4 GK4 GK4 GK4 GK4 GK4 GK4 PGK3 GK11
WGK11
GK11GK11GK11
WGK11
GK11 PGK3
6FL
Y01 WGK11 WGK11
PGK3 GK11
WGK11
GK11GK11GK11
WGK11
GK11 PGK3
5FL
16350 28400 16350 WGK11 WGK11
WGK11 WGK11 4FL
( Center Core Span ) PGK9 GK11
GK11 GK11
GK11GK11GK11
GK11 GK11
GK11 PGK9
3FL
61100 GK11 GK11 GK11 GK11 GK11
EXP.J
GK11a
GK11
GK11a
GK11
WGK11
GK11
GK11a
GK11
GK11a PGK9
2FL
X01 X05 X13 X17 GK11a WGK11 GK11a GK11a
1FL
Seismic Isolator PCK2a CK3 CK1 KCK1 CK1 CK1 CK1 CK1 KCK1 CK1 CK3 PCK2a GL
B1FL
B2FL
18200
11900
Y01 Y05 Y14 Y18
Precast RC Column
of Circumference Y07
Y06
Y05
X17
2004.5.19 Ymanaka
Total coordination
/Entire architectural design
/Urban planning, environmental assessment
+
Complex facility
Multi-purpose
and cultural
buildings with Annex building with
organic shape triangular shape
Super mega
frame
Damper
various
boomerang
plan
study
Seki M., UTCB Lecture note, June 2017, BRI, Japan
Typical floor model:1/200
High density
low density
low density
High density
low density
Span 7,200 mm
Seki M., UTCB Lecture note, June 2017, BRI, Japan
Mock up for checking the gradation
Selenic printed glass
Gray⇒White NCS5500、5000,4000,3500,
3000,2500,2000, 1500, 1000, 500 (10 grades)
7
Seki M., UTCB Lecture note, June 2017, BRI, Japan
Drawing of
façade concept
design partner;
Jean Nouvel
(France)
H/D=1.5 H/D=5
H ↓
シ
ア
↓
ー
Flexural
ズ
Shear 曲げ変形
タ ペ
せん断変形 deflection
ワ
ー
ト
ロ
is
deflection is
卓越
predominant 卓越 ナ
predominant
ス
タ
ワ
ー
東
京
都
庁
D
Natural period Natural period
T1=4.6sec T1=5.4sec
建物1次固有周期(SEC)
period (sec)
5.00
4.00
y = 0.0224x + 0.1347
3.00
R2 = 0.7081
Natural
2.00
1.00
0.00
0 50 100 150 200 250 300
建物高さ(M)
Height (m)
Elastic response
spectrum
SA(gal)
500
Response acceleration
→ Input earthquake force
0
0 1 2 3 4 5 6
固有周期T(sec)
1ELCN40NS h=0.00
Natural period
変位応答スペクトル
4.6 s 5.4 s
80 1ELCN40NS h=0.01
1ELCN40NS h=0.02
1ELCN40NS h=0.03
1ELCN40NS h=0.04
1ELCN40NS
1ELCN40NS
h=0.05
h=0.10
Disp. Response spectrum
1ELCN40NS h=0.15
60 1ELCN40NS h=0.20
Response displacement
SD(cm)
→ Vibration displacement
40
20
0
0 1 2 3 4 5 6
Natural period
固有周期T(sec)
4.6 s 5.4 s
・Dead load
・EQ load Damping factor h=0.04
・Wind load
・Damping force
Design direction
PYO PYOダンパー
damper
Shear Kv 4K z
層の
stiffnessせん 断剛 性 θ K=∞
Kc C KL
Shear
せん 断変 形
sKi
of story deflection
Super
structure sK= ∞ 層の回転 剛性
Flexural
曲げ変形
3K z
θKi
deflection
2K z
Vertical spring
around the shuttle EV
Basement
1K z
Foundation
Three dimensional model Lamped mass model for
for nonlinear static analysis nonlinear response analysis
Seki M., UTCB Lecture note, June 2017, BRI, Japan
Design concept and procedure
Design criteria
10000
Co=0.0605 Co=0.0605
Co=0.0440 Co=0.0440
5000
Co=0.0400 Co=0.0400
0
-15000 -10000 -5000 0 5000 10000 15000
X方向基部
-5000
剪断力(t)
Y
-10000 設計用剪断力
設計用地震荷重
X
設計用風荷重 L2
-15000 設計用風荷重 L1
35 35
30 30
25
層
25
層
20 20
15 15
10
10
5
5
0
0
0 50 100 150 200
0 50 100 150 200
Qi(×103 kN ) Qi(×103 kN )
35 35
30 30
層
25
層
25
20 20
15 15
10
10
5
5
0
0
0.0E+0
0 2.0E-3 1/250
1/500 4.0E-3 1/167
6.0E-3 8.0E-3
1/125 1.0E-2
1/100
0.0E+0
0 2.0E-3 1/250
1/500 4.0E-3 1/167
6.0E-3 8.0E-3
1/125 1.0E-2
1/100
Maximum response story drift angle Maximum response story drift angle
Wing beam
CFT column
Contribution as the
elastic stiffness (steel damper) Energy absorption (Steel damper)
Flexural
deflection
of beam
Oil damper
1600kN~2000kN
Mega frame
Flexural damper
Rigid truss
Earthquake
force
Mega
frame
&
Flexural
damper
Oil damper
Oil damper
Mega frame
Passive control
Active control
動力
盤 制御部
(No.
1)
動力
制振装置本体 No.2<N> 盤
(RF) (No.
2)
AC100V
電源 AC400V
盤
制御
盤
建物センサー(RF) 2方向
×2
観測 NTT電話回
盤 線
建物 セ ンサ ー(44F,26F)1
方向×4
建物センサー(1F) 2方向
×1 風向風速
計
防災センター
建物センサー(B5F) 3方 (1F)
向×1
AC100V
監 視
盤 監視部
センサー
部
Vibration
制振システム系統図control system
Seki M., UTCB Lecture note, June 2017, BRI, Japan
Over all view of ACICS-II
Composition of AVIC-II
0 0
非制振 制 振
-10 -10
0 100 200 300 0 100 200 300
(sec) (sec)
0 0
0 100 200 300 0 100 200 300
(sec) (sec)
Wind force(Velocity)
Seki M., UTCB Lecture note, June 2017, BRI, Japan
Vibration control effect against Typhoon No.10 (2003.10.1)
Without With
control control
Transverse
direction
Longitudinal
direction
Transverse direction
Habitability evaluation
Transverse
Without
direction
control
With
Longitudinal
control
direction
Horizontal haunch
Conventional beam column joint Wing beam
Location of
plastic hinges
Horizontal haunch
Column ⑦
Fc=50N/mm2 Fc=50 Mpa
充填範囲
⑥
▽110m ⑤ コンクリート配管
④
Concrete flow test
③ ポンプ圧送
Fc=80N/mm2
充填範囲
②
Fc=50 Mpa 生コン車
定置式ポンプ車
①
▽0m
Fc=80N/mm2
(落込) Fc=80 Mpa
▽-20m
Used zone by
fireproof steel
(FR steel) at the
atrium
station lobby
(6,14,25,36F)
Seki M., UTCB Lecture note, June 2017, BRI, Japan
Tokyo Skytree
OCAJI
The world’s tallest free –standing broad casting tower with a
height of 634m
Berlin tower
(Berlin)
Obayashi HP
■Opening: May.2012
by SEKI
Seki M., UTCB Lecture note, June 2017, BRI, Japan
Photo: M.Seki
OCAJI
Seki M., UTCB Lecture note, June 2017, BRI, Japan
1. High strength circular steel
pipe of large cross section
were used.
OCAJI
Seki M., UTCB Lecture note, June 2017, BRI, Japan
1. The vibration should be avoided because
of the digital terrestrial broadcasting
antenna.
Location of
TMD Weight
Weight frame
Stopper
Antenna gain tower
Oil damper
Fender
Spring
Frame
Universal joint
http://www.obayashi.co.jp/news/skytreedetail10_20101125_1
Movement of
antenna gain tower
http://www.obayashi.co.jp/news/skytreedetail10_20101125_1
Seki M., UTCB Lecture note, June 2017, BRI, Japan
1. The central concrete cylindrical
center pillar was installed at
the center of the tower.
Tower wall
tower
Shimbashira
(Diameter: 8 m,
inside; evacuation
Shimbashira
stair)
Oil damper
http://www.nikken.jp/ja/archives/history/12_03.html
http://musen.de-
blog.jp/jbfblog/2012/08/post_8ebc.html
Unit: m
Bottom portion of
shimbashira
Seki M., UTCB Lecture note, June 2017, BRI, Japan
Skytree Construction work (Video)