Footing
FOUNDATION FILL
Footing
Height of Embankment = m
Length to be Embankment = m
Width to be Embankment = m
Volume of Embankment = 0 cu.m
A B
1
= 3 5.55
4 5.4 2
= 3 5.4
3 5.4
= 21.75
3
= 1 3.85
1 3.85
= 3 6.1
3 6.1
= 19.9
C
Ground Floor Slab Second (2nd) Floor Slab
Beams
Column
2.85
5.75
5.75
5.25
5.25
10.5
14.35
CHB 5" (150mm X 400) Wall PLASTERING for CHB WALL
Length Height
Area of Wall = 6.1 4.2 29.52
0.3 6.5 29.52
No. of CHB needed = 369 pieces 1/2"mm thick Class A mortar mi
Mortar Cell Filler 29.52
29.52 1.018 = 30.05136 Bags of Cement 29.52
29.52 0.0844 = 2.491488 cu.m Sand
sq.m
0
0
CHB 6" (150mm X 400) Wall
Perimeter Height
Area of Wall = 16.55 3.2 52.96
WALL TILES
Length of Wall = 0
Width of Wall =
Length of Door = 0
Height of Wall =
Total Lateral Area = 0
Total
Area of Drs &Win = 0 sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
PARTICULARS
One Span Beam Continous Beam
No. of beams to be constructed = pcs. pcs.
Overall length of each beams = m. m.
No. and size of longitudinal bars = dia. mm dia. mm
Length of bars to be ordered = m. 6 m.
Formula:
Straight length of each Overall Length of each beams +
longitudinal bar = Diameter of Longitudinal bars
*SABI SA LIBRO, ANG STIRRUPS DAW AY BILANGIN ANG ACTUAL SA ACTUAL PLAN
Part 2
PARTICULARS
One Span Beam Continous Beam
No. of beams to be constructed = pcs. pcs.
Overall length of each beams = m. m.
No. and size of longitudinal bars = dia. mm 16 dia. mm
Length of bars to be ordered = m. 6 m.
Formula:
Straight length of each Overall Length of each beams +
longitudinal bar = Diameter of Longitudinal bars
Part 3
PARTICULARS
One Span Beam Continous Beam
No. of beams to be constructed = pcs. pcs.
Overall length of each beams = m. m.
No. and size of longitudinal bars = dia. mm dia. mm
Length of bars to be ordered = m. m.
Formula:
Straight length of each Overall Length of each beams +
=
longitudinal bar Diameter of Longitudinal bars
COLUMS
Column Diameter of
No. of colums to be constructed = pcs. Longitudinal bars
Overall length of each column = m. 12mm (1/2") 0.30
No. and size of longitudinal bars = 16 dia. mm 16mm(5/8") 0.35
Length of bars to be ordered = m. 20mm(3/4") 0.45
25mm (1") 0.55
Formula:
Straight length of each Overall Length of each beams +
=
longitudinal bar Diameter of Longitudinal bars
Columns
Straight length of each No. of Full Length bars reqd.= #DIV/0!
= 0.35
longitudinal bar say =
at __ dia. By __ m.
FOOTING
GO TO PAGE D.14
IF THE FOOTING IS 1m X 1m
No. of F/L bars reqd. = 0.00 pcs at 16mm dia. By 6m.
O.C = 0.20 mm
Total Height of Column = m
No. of Same Columns = pcs
Length of Stirrups = 1.20 m
SLAB
Diameter of Short Bars over For Short Bars Only
Longitudinal bars the End Supports
12mm (1/2") 0.30 0.15 Column Width =
16mm(5/8") 0.35 0.20 One Span Beam & Girders =
20mm(3/4") 0.45 0.25
25mm (1") 0.55 0.30 Length of =
Continous Span Beams =
Formula: and Girders
Short Bar Length Column Width +
= L/4 + Dia. Of Short Bar
Part 2
REINFORCING STEEL BARS FOR CHB
m
m
0.50
0.00
0.50 m
0.50
0.00
0.90
0.00
0.50
0.00 m
0.00 pcs
0.3 m
m
m
m
m
0.50
0.00
0.50 m
0.50
0.00
0.30
0.00
0.30
0.00
0.50
0.00 m
0.00 pcs
0.35 m
m
m
m
m
m
0.55
0.00
0.55 m
0.55
0.00
0.35
0.00
0.35
0.00
0.35
0.00
0.55
0.00 m
0.00 pcs
pcs
X2 yung final
answer dahil
magkabilaan
15 pcs
pcs
pcs
X2 yung final
answer dahil
magkabilaan
8 pcs
pcs
Reinforcing Bars for CHB Wall
Length Height
Area of Wall = 16.55 3.2 61.16
COLUMN FOOTING
Length = 0.6 m
Width = 0.6 m
Total Number of Footings = 9.00 pcs
L of cut bar = 0.45 m
Total Number of cut bars = 54 pcs
16mm Steel bars at 6m long = 13.5 pcs
say = 14 pcs
= 132.58 kg
Tie Wires = 5.09434 kg
Width Length
2.85 1.75
Column Beam and Girde
Area = 0 sq.m.
2" x 2" Lumber = 0 bd.ft. Horizontal Support
2" x 2" Lumber = 0 bd.ft. Diagonal Braces
2" x 3" Lumber = 0 bd.ft. Vertical Support
Area = 30 sq.m.
2" x 2" Lumber = 630 bd.ft. Horizontal Support
2" x 2" Lumber = 351 bd.ft. Diagonal Braces
2" x 3" Lumber = 210 bd.ft. Vertical Support
Beam and Girders
Total Length = m
Total Width = m
Area = 0 sq.m.
Number of 1/2"Plywood = 0.00 pcs
say = pcs
2" x 3" Lumber = 0 bd.ft.
Area = 51 sq.m.
2" x 2" Lumber = 239.7 bd.ft. Horizontal Support
2" x 3" Lumber = 306 bd.ft. Vertical Support
CEILING AND PARTITION BOARDS
WALL STUDS
Length of Wall A = m
Length of Wall B = m
Length of Wall C = m
Spacing of Vertical Studs = 0.60 m Height of Wall
CEILING JOISTS
Length of Ceiling = 0m
Width of Ceiling = 0m
WALL STUDS = 0
CEILING JOIST = 0
QTY of 10d CW Nail = 0 say: kilos
CEILING JOISTS
Length of Ceiling = 0m
Width of Ceiling = 0m
Area = 0 sq.m.
WALL PARTITION
Length of Wall = m
Width of Wall = m
Area = 0 sq.m.
Area = 0 sq.m
No. Part. Brd. Reqd. = 0 pcs
say = pcs
Height of Wall = 0m
sq.m
sq.m
0 sq.m
0 liters
0 liters
0 liters
0 liters
Name of Project: CONSTRUCTION / COMPLETION OF SCHOOL
BUILDING @ SAN MARCOS E/S TWO ( 2 ) STOREY
Back - up Computations 1 0f 2
NOTE : Construction/Completion of School Building @ San Marcos E/S, Two (2) Storey,
complete as per plan and specification minus the following :
802 Excavation
F1: 1.40m X 1.40m X 1.50m =
F2: 2.30m x 2.30m x 1.50m =
F3: 2.10m x 2.10m x 1.50m =
TB 105.50 m x 0.40 x 0.80m =
WF 170.78m x 0.30m x 0.60m =
SPT 4.70m X 2.80m X 2.50m =
0.00 6.51
804 Embankment
22.50m x 9.50m x 0.225m = 0.00
Unit cleats
cu.m.
kg.
sq.m.
cu.m.
cu.m.
Concrete Proportion
Cement in Bag Sand Gravel
mixture class Proportion 40 Kg. 50 Kg. cu.m. cu.m.
AA 1:3/2:3 12 9.5 0.5 1
A 1:02:04 9 7 0.5 1
B 1:5/2:5 7.5 6 0.5 1
C 1:03:06 6 5 0.5 1
Cement in Bags
Thickness of Plaster
Mixture
Class 8 mm 12 mm 16 mm 20 mm 25 mm
A 0.144 0.216 0.288 0.36 0.45
B 0.096 0.144 0.192 0.24 0.3
C 0.072 0.108 0.144 0.18 0.225
D 0.06 0.09 0.12 0.15 0.188
Sand 0.008 0.012 0.016 0.02 0.025
QUANTITY OF CEMENT, SAND AND GRAVEL FOR SLAB
AND WALLS PER SQUAE METER
NOMINAL DIMENSIONS
BAR SIZE AREA MASS DIA.
DESIGNATION SQ. MM. KG/M MM
#8 50.3 0.394 8
#10 78.5 0.616 10
#12 113.1 0.888 12
#16 201.1 1.578 16
#20 314.2 2.466 20
#25 490.9 3.853 25
#28 615.8 4.834 28
#32 804.3 6.313 32
#36 1017.9 7.99 36
#40 1256.6 9.865 40
#50 1963.5 15.413 50
GraveL
cu.m.
0.050
0.075
0.100
0.125
0.150
0.175
0.200
0.225
0.250
0.275
0.300
Name of Project:
Back - up Computations
Wall Footing
17.50m x 0.20m x 0.40m = 1.400
Columns
18 ( 0.35m x 0.35m x 8.34m ) = 18.389
Beams and Girders 14.580
Suspended Slab
22.50m x 9.50m x 0.10m - 2.305 = 19.070
Roof Beams
RG1: 82.50m x 0.20m x 0.40m = 6.60
RG 2: 42.00m x 0.20m x 0.50m = 4.20
10.80 10.800
Stairs 4.860
Slab on Grade
22.50m x 9.50m x 0.10m = 21.375
Ramp on Fill
1.00m x 10.00m x 0.10m = 1.000
Media Agua 1.500
129.791 say 129.80
Portland Cement (40 Kg.): 129.80 cu.m. x 9.05bags/cu.m. = 1,174.69 bags
Washed Sand: 129.80 cu.m x 0.50 x 1.05 = 68.14 cu.m.
Washed Gravel 3/4": 129.80cu.m. x 1.00 x 1.05 = 136.29 cu.m.
RSB
Column Footing 1,189.74
Tie Beams 2,061.45
Wall Footing 59.14
Columns 5,737.22
Beams and Girders 2,930.46
Suspended Slab 1,495.11
Roof Beams 1,448.18
Stairs 276.64
Slab on Grade 820.30
Ramp on Fill 42.09
Media Agua 110.90
Total Wt. of RSB ( Grade 40 ) 16,171.23 kgs.
G.I. Tie Wire 324 kgs.
Unit
cu.m.
l.s.
sq.m.
sq.m.
sq.m.
sq.m.
sq.m.
sq.m.
l.s
l.s
l.s