Project: RENOVATION OF OFFICE


Cost Estimates

DRYWALL PARTITION ELIMINATION


Materials Cost 3,500.00
Labor Cost 15,000.00
Total 18,500.00

RELOCATING ELECTRICAL WIRE


Materials Cost 6,000.00
Labor Cost 3,500.00
Total 9,500.00

PAINTING WORKS
Materials Cost 67,000.00
Labor Cost 42,000.00
Total 109,000.00

KITCHEN COUNTER TOP


Materials Cost 32,000.00
Labor Cost 15,000.00
Total 47,000.00

Total Cost: 184,000.00

Prepared by:

Francis T. Lumantad
Cost Estimator