Академический Документы
Профессиональный Документы
Культура Документы
Johnny Choi
38
Curtain Wall Technologies & Systems
First Generation
PERMASTEELISA GROUP “Stick Wall System” z Curtain Wall members are
fixed piece by piece
Curtain Wall Presentation z Vertical members are usual
For installed 1st, which span from
slab to slab
Hong Kong Institute
z Horizontal transom members
of in turn are fixed to mullions
The Principle is simple & efficient: z Units are assembled & glazed in factory
z Usually all components are included within the units
z Panels are packed on metal or timber pallets
z Transported to site by semi trailers
z Hoisted to required floor level by tower crane
z Eliminate Pressure difference at level of Joint
z Site installation teams shall install individual panels to
z Ensures Internal Joint is never in contact with water
designated areas (using a monorail or mobile floor
z Therefore small gaps in sealant / gaskets will not
crane)
produce water leaks but only small air losses when
windy.
2 sides structural glazing ~ vertical bead 2 sides structural glazing ~ horizontal bead
One unit
one unit
Structural Sealants & Application
Water Pattern under Static Pressure Water Pattern under Dynamic Pressure