Item Unit Rate (Tk.

)
1 Brick works (As shutter) Cum 5,471
2 Brick works (Permanent) - 250mm/375mm/etc. Cum 8,960
3 125mm brick works (Permanent) Sqm 1,245
4 Supply, Fitting &Laying of 150mm PVC Pipe Rm 2,407
5 Supply, Fitting &Laying of 200mm PVC Pipe Rm 3,160
6 Supply, Fitting &Laying of 200mm PVC Bend Pcs 3,510
7 Supply, Fitting &Laying of 100mm PVC Pipe Rm 942
8 Supply, Fitting &Laying of 100m PVC Bend Pcs 765
9 Supply, Fitting &Laying of 50mm PVC Pipe Rm 345
10 Supply, Fitting &Laying of GI Reducer (80x50) Pcs 614
11 Epoxy Anchoring (16mm Dia rebar) nos 160
12 Epoxy Anchoring (10mm Dia rebar) nos 120
13 Supplying & laying of polythene sheet Sqm 40
14 Supplying & laying of Cock Sheet Sqm 210
15 S\F of steel shutter engine foundation (inside) set 81,394
16 S\F of steel shutter (per set engine foundation steel shutter cost/surface area) Sqm 4,111
17 Supply and Fitting of Angle Kg 145
18 Epoxy Anchoring (16mm Dia rebar) nos 160
19 Epoxy Anchoring (10mm Dia rebar) nos 120
20 50mm Bitunim Layer Sqm 1,920
21 Making & Access road: Brick Khoa consolidation up to 200mm thick Sqm 1,354
22 Supplying of Embedded Plates kg 130
23 Supplying of Rails (for Transformers) Rm 6,000
24 Plastering Work Sqm 312
25 Neat Cement Finishing Sqm 88
26 Grouting of Leg supports Cum 9,880
27 Red Oxyde Painting Sqm 270
28 Supply and Fitting Floor Tiles Sqm 2,602
29 Supplying of 100x100x59 MS rails Rm 6,780
30 Expansion joints Rm 1,104
31 Supplying and Laying of River Shingle layer of 100mm Thick Sqm 1,626