Item
Description Unit Qty Unit Mat'l Unit Labor
No.
A. GENERAL REQUIREMENTS
1.10 Mobilization & Demobilization lot 1.00 120,000.00
1.20 Temporary Facilities/Barracks lot 1.00 60,000.00
1.30 Cleaning & Disposal lot 1.00 20,000.00
1.30 Security lot 1.00 10,000.00
1.40 Electrical and Water Consumption lot 1.00 18,000.00
B. ARCHITECTURAL WORKS
I. Econo Room 205
1.00 Ante & Main Room
Ceiling Finishes
1.0 Ceiling Repainting sq.m 7.43 132.00 108.00
Drop Ceiling - Paint Finish w/ 2" x 2"
2.0 Good Lumber for Ceiling Design w/ set 1.00 3,500.00 3,000.00
strip lights
Lighting Fixture - Drop light, 7W
3.0 set/s 1.00 3,000.00 150.00
(Dresser)
Pinlights 3 Watts (Main Room),w/
4.0 set/s 2.00 550.00 150.00
Frosted Glass Diffuser
Pinlights 5 Watts (Foyer),w/ Frosted
5.0 set/s 1.00 650.00 150.00
Glass Diffuser
Pinlight ( T&B-1pc.) - 7watts, with
6.0 set/s 1.00 750.00 150.00
Clear Glass diffuser
Wall Finishes
1.0 Repainting of Walls (Non Accent) sq.m 27.90 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Painting works
1.0 Cornice lm. 11.63 88.00 68.00
2.0 Baseboards lm. 6.99 88.00 68.00
3.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 7.43 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
4.0 Headboard - see details set/s 1.00 4,500.00 3,500.00
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 11.02 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.93 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.12 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 Ceiling Repainting m² 1.93 132.00 108.00
Wall Replacement - Ficem Board@
8.0 m²
T&B
8.0 6mm thk Mirror @ T & B sets 1.00 1,550.00 120.00
Replacement of Water Closet incl
9.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
11.0 sets 1.00 150.00
Only)
Page 2
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Replacement of Shower Head, Mixer
12.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
13.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
14.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
15.0 sets 1.00 250.00
Only)
Wall Finishes
1.0 Repainting of Walls (Non Accent) sq.m 30.72 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Painting works
1.0 Cornice lm. 12.80 88.00 68.00
2.0 Baseboards lm. 7.17 88.00 68.00
Page 3
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
3.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 7.93 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
4.0 Headboard - see details set/s 1.00 4,500.00 3,500.00
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 11.02 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.85 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 2.99 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 Ceiling Repainting m² 1.85 132.00 108.00
Wall Replacement - Ficem Board@
8.0 m²
T&B
8.0 6mm thk Mirror @ T & B sets 1.00 1,550.00 120.00
Replacement of Water Closet incl
9.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
11.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
12.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
13.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
14.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
15.0 sets 1.00 250.00
Only)
Page 4
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
3.00 Dismantling Works
1.0 T & B Floor / Wall Tiles m² 16.11 150.00
2.0 T & B Fixtures set/s 1.00 500.00
3.0 Door and Jamb (T&B) set/s 1.00 250.00
4.0 Floor Tiles (Main Room) m² 7.93 150.00
5.0 Headboard (Main room) set/s 1.00 250.00
Wall Finishes
1.0 Repainting of Walls (Non Accent) sq.m 31.13 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Painting works
1.0 Cornice lm. 12.97 88.00 68.00
2.0 Baseboards lm. 8.11 88.00 68.00
3.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 8.35 750.00 200.00
400cmx400cm)
Amenities
Page 5
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
4.0 Headboard - see details set/s 1.00 4,500.00 3,500.00
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 11.02 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.86 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.00 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 Ceiling Repainting m² 1.86 132.00 108.00
Wall Replacement - Ficem Board@
8.0 m²
T&B
8.0 6mm thk Mirror @ T & B sets 1.00 1,550.00 120.00
Replacement of Water Closet incl
9.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
11.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
12.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
13.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
14.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
15.0 sets 1.00 250.00
Only)
Page 6
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
5.0 Headboard (Main room) set/s 1.00 250.00
Wall Finishes
1.0 Repainting of Walls (Non Accent) sq.m 30.91 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Painting works
1.0 Cornice lm. 12.88 88.00 68.00
2.0 Baseboards lm. 8.00 88.00 68.00
3.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 8.03 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
Page 7
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
4.0 Headboard - see details set/s 1.00 4,500.00 3,500.00
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 10.43 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.86 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.00 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 Ceiling Repainting m² 1.86 132.00 108.00
Wall Replacement - Ficem Board@
8.0 m²
T&B
8.0 6mm thk Mirror @ T & B sets 1.00 1,550.00 120.00
Replacement of Water Closet incl
9.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
11.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
12.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
13.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
14.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
15.0 sets 1.00 250.00
Only)
Page 8
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Dropped Ceiling in Ribbon Grain
2.0 Laminate or Wood Stain w/ LED Strip set 1.00 3,500.00 3,000.00
Light
Lighting Fixture - Drop light, 7W
3.0 set/s 1.00 3,000.00 150.00
(Dresser)
Pinlights 3 Watts (Main Room),w/
4.0 set/s 2.00 550.00 150.00
Frosted Glass Diffuser
Pinlights 5 Watts (Foyer),w/ Frosted
5.0 set/s 1.00 650.00 150.00
Glass Diffuser
Pinlight ( T&B-1pc.) - 7watts, with
6.0 set/s 1.00 750.00 150.00
Clear Glass diffuser
Wall Finishes
1.0 Repainting of Walls (Non Accent) sq.m 29.80 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Painting works
1.0 Cornice lm. 12.42 88.00 68.00
2.0 Baseboards lm. 7.53 88.00 68.00
3.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 7.55 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
4.0 Headboard - see details set/s 1.00 4,500.00 3,500.00
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Page 9
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Replacement wall tiles to
2.0 m² 10.42 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.85 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 2.99 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 Ceiling Repainting m² 1.85 132.00 108.00
Wall Replacement - Ficem Board@
8.0 m²
T&B
8.0 6mm thk Mirror @ T & B sets 1.00 1,550.00 120.00
Replacement of Water Closet incl
9.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
11.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
12.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
13.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
14.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
15.0 sets 1.00 250.00
Only)
Page 10
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Pinlights 3 Watts (Main Room),w/
4.0 set/s 2.00 550.00 150.00
Frosted Glass Diffuser
Pinlights 5 Watts (Foyer),w/ Frosted
5.0 set/s 1.00 650.00 150.00
Glass Diffuser
Pinlight ( T&B-1pc.) - 7watts, with
6.0 set/s 1.00 750.00 150.00
Clear Glass diffuser
Wall Finishes
1.0 Repainting of Walls (Non Accent) sq.m 30.50 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Painting works
1.0 Cornice lm. 12.71 88.00 68.00
2.0 Baseboards lm. 7.89 88.00 68.00
3.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 7.87 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
4.0 Headboard - see details set/s 1.00 4,500.00 3,500.00
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 10.20 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Page 11
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Replacement floor tiles to
4.0 m² 1.81 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 2.93 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 Ceiling Repainting m² 1.81 132.00 108.00
Wall Replacement - Ficem Board@
8.0 m²
T&B
8.0 6mm thk Mirror @ T & B sets 1.00 1,550.00 120.00
Replacement of Water Closet incl
9.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
11.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
12.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
13.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
14.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
15.0 sets 1.00 250.00
Only)
Page 12
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Pinlight ( T&B-1pc.) - 7watts, with
6.0 set/s 1.00 750.00 150.00
Clear Glass diffuser
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 32.99 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Painting works
1.0 Cornice lm. 13.75 88.00 68.00
2.0 Baseboards lm. 8.67 88.00 68.00
3.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 8.61 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard w/ fabric (Using Uratex
4.0 set/s 1.00 20,000.00 5,000.00
Foam & German Leatherette)
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 10.42 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.86 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.00 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
Page 13
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
7.0 Ceiling Repainting m² 1.86 132.00 108.00
Wall Replacement - Ficem Board@
8.0 m²
T&B
9.0 6mm thk Mirror @ T & B sets 1.00 1,550.00 120.00
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 34.40 140.00 132.00
Page 14
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Painting works
1.0 Cornice lm. 14.34 88.00 68.00
2.0 Baseboards lm. 9.26 88.00 68.00
3.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 9.07 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard w/ fabric (Using Uratex
4.0 set/s 1.00 20,000.00 5,000.00
Foam & German Leatherette)
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 10.27 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.82 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 2.95 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 Ceiling Repainting m² 1.82 132.00 108.00
Wall Replacement - Ficem Board@
8.0 m²
T&B
9.0 6mm thk Mirror @ T & B sets 1.00 1,550.00 120.00
Page 15
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 31.47 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Page 16
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
1.0 Door & Jamb Repainting pc/s 1.00 750.00 750.00
Stainless Butterfly Hinges - 3pcs per
2.0 200.00 55.00
door pc/s 3.00
Painting works
1.0 Cornice lm. 13.11 88.00 68.00
2.0 Baseboards lm. 8.03 88.00 68.00
3.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 8.17 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard w/ fabric (Using Uratex
4.0 set/s 1.00 20,000.00 5,000.00
Foam & German Leatherette)
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 10.42 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.86 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.00 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 Ceiling Repainting m² 1.86 132.00 108.00
Wall Replacement - Ficem Board@
8.0 m²
T&B
9.0 6mm thk Mirror @ T & B sets 1.00 1,550.00 120.00
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Page 17
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 31.68 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Page 18
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Painting works
1.0 Cornice lm. 13.20 88.00 68.00
2.0 Baseboards lm. 8.12 88.00 68.00
3.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 8.29 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard w/ fabric (Using Uratex
4.0 set/s 1.00 20,000.00 5,000.00
Foam & German Leatherette)
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 10.42 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.86 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.00 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 Ceiling Repainting m² 1.86 132.00 108.00
Wall Replacement - Ficem Board@
8.0 m²
T&B
9.0 6mm thk Mirror @ T & B sets 1.00 1,550.00 120.00
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Page 19
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 31.62 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Painting works
1.0 Cornice lm. 13.17 88.00 68.00
2.0 Baseboards lm. 8.09 88.00 68.00
3.0 ACU Mouldings lm. 1.00 88.00 68.00
Page 20
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 8.25 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard w/ fabric (Using Uratex
4.0 set/s 1.00 20,000.00 5,000.00
Foam & German Leatherette)
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 10.43 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.86 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.00 350.00 150.00
6.0 Tissue Holder (OSM - labor Only) pc/s 1.00 120.00
7.0 Ceiling Repainting m² 1.86 132.00 108.00
Wall Replacement - Ficem Board@
8.0 m²
T&B
9.0 6mm thk Mirror @ T & B sets 1.00 1,550.00 120.00
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Page 21
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 31.13 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Painting works
1.0 Cornice lm. 12.97 88.00 68.00
2.0 Baseboards lm. 7.86 88.00 68.00
3.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 7.95 750.00 200.00
400cmx400cm)
Page 22
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard w/ fabric (Using Uratex
4.0 set/s 1.00 20,000.00 5,000.00
Foam & German Leatherette)
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 10.41 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.86 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 2.99 350.00 150.00
6.0 Tissue Holder (OSM - labor Only) pc/s 1.00 120.00
7.0 Ceiling Repainting m² 1.86 132.00 108.00
Wall Replacement - Ficem Board@
8.0 m²
T&B
9.0 6mm thk Mirror @ T & B sets 1.00 1,550.00 120.00
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Page 23
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
2.0 T & B Fixtures set/s 1.00 500.00
3.0 Door and Jamb (T&B) set/s 1.00 250.00
4.0 Floor Tiles (Main Room) m² 7.95 150.00
5.0 Headboard set/s 1.00 250.00
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 30.98 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Painting works
1.0 Cornice lm. 12.91 88.00 68.00
2.0 Baseboards lm. 7.84 88.00 68.00
3.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 8.46 750.00 200.00
400cmx400cm)
Amenities
Page 24
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard w/ fabric (Using Uratex
4.0 set/s 1.00 20,000.00 5,000.00
Foam & German Leatherette)
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 10.39 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.85 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 2.99 350.00 150.00
6.0 Tissue Holder (OSM - labor Only) pc/s 1.00 120.00
7.0 Ceiling Repainting m² 1.85 132.00 108.00
Wall Replacement - Ficem Board@
8.0 m²
T&B
9.0 6mm thk Mirror @ T & B sets 1.00 1,550.00 120.00
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Page 25
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
4.0 Floor Tiles (Main Room) m² 8.46 150.00
5.0 Headboard set/s 1.00 250.00
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 32.94 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Painting works
1.0 Cornice lm. 13.72 88.00 68.00
2.0 Baseboards lm. 8.63 88.00 68.00
3.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 9.39 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
Page 26
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
2.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard w/ fabric (Using Uratex
4.0 set/s 1.00 20,000.00 5,000.00
Foam & German Leatherette)
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 10.42 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.86 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.00 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 Ceiling Repainting m² 1.86 132.00 108.00
Wall Replacement - Ficem Board@
8.0 m²
T&B
9.0 6mm thk Mirror @ T & B sets 1.00 1,550.00 120.00
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Page 27
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
1.00 Ante & Main Room
Ceiling Finishes
1.0 Ceiling Repainting sq.m 9.39 132.00 108.00
Dropped Ceiling in Paint Finish w/ 2"
2.0 x 2" Good Lumber for Ceiling set 1.00 5,000.00 4,000.00
Design,w/ LED Strip Light
Lighting Fixture - Drop light, 7W
3.0 set/s 1.00 3,000.00 150.00
(Dresser)
Pinlights 3 Watts (Main Room),w/
4.0 set/s 2.00 550.00 150.00
Frosted Glass Diffuser
Pinlights 5 Watts (Ante Room) w/
5.0 set/s 1.00 650.00 150.00
Frosted Glass Diffuser
Pinlight ( T&B-1pc.) - 7watts, with
6.0 set/s 1.00 750.00 150.00
Clear Glass diffuser
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 32.94 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Painting works
1.0 Cornice lm. 13.72 88.00 68.00
2.0 Baseboards lm. 8.63 88.00 68.00
3.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 9.39 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard w/ fabric (Using Uratex
4.0 set/s 1.00 20,000.00 5,000.00
Foam & German Leatherette)
Page 28
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 10.42 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.86 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.00 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 Ceiling Repainting m² 1.86 132.00 108.00
Wall Replacement - Ficem Board@
8.0 m²
T&B
9.0 6mm thk Mirror @ T & B sets 1.00 1,550.00 120.00
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Page 29
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Dropped Ceiling in Paint Finish w/ 2"
2.0 x 2" Good Lumber for Ceiling set 1.00 5,000.00 4,000.00
Design,w/ LED Strip Light
Lighting Fixture - Drop light, 7W
3.0 set/s 1.00 3,000.00 150.00
(Dresser)
Pinlights 3 Watts (Main Room),w/
4.0 set/s 2.00 550.00 150.00
Frosted Glass Diffuser
Pinlights 5 Watts (Ante Room) w/
5.0 set/s 1.00 650.00 150.00
Frosted Glass Diffuser
Pinlight ( T&B-1pc.) - 7watts, with
6.0 set/s 1.00 750.00 150.00
Clear Glass diffuser
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 32.94 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Painting works
1.0 Cornice lm. 13.72 88.00 68.00
2.0 Baseboards lm. 8.63 88.00 68.00
3.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 9.39 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard w/ fabric (Using Uratex
4.0 set/s 1.00 20,000.00 5,000.00
Foam & German Leatherette)
2.00 T & B
Page 30
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 10.42 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.86 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.00 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 Ceiling Repainting m² 1.86 132.00 108.00
Wall Replacement - Ficem Board@
8.0 m²
T&B
9.0 6mm thk Mirror @ T & B sets 1.00 1,550.00 120.00
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Page 31
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Lighting Fixture - Drop light, 7W
3.0 set/s 1.00 3,000.00 150.00
(Dresser)
Pinlights 3 Watts (Main Room),w/
4.0 set/s 2.00 550.00 150.00
Frosted Glass Diffuser
Pinlights 5 Watts (Ante Room) w/
5.0 set/s 1.00 650.00 150.00
Frosted Glass Diffuser
Pinlight ( T&B-1pc.) - 7watts, with
6.0 set/s 1.00 750.00 150.00
Clear Glass diffuser
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 33.32 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Painting works
1.0 Cornice lm. 13.89 88.00 68.00
2.0 Baseboards lm. 8.68 88.00 68.00
3.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 9.50 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard w/ fabric (Using Uratex
4.0 set/s 1.00 20,000.00 5,000.00
Foam & German Leatherette)
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 10.40 880.00 200.00
300mmx600mm
Page 32
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.85 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 2.99 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 Ceiling Repainting m² 1.85 132.00 108.00
Wall Replacement - Ficem Board@
8.0 m²
T&B
9.0 6mm thk Mirror @ T & B sets 1.00 1,550.00 120.00
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Page 33
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Pinlights 5 Watts (Ante Room) w/
5.0 set/s 1.00 650.00 150.00
Frosted Glass Diffuser
Pinlight ( T&B-1pc.) - 7watts, with
6.0 set/s 1.00 750.00 150.00
Clear Glass diffuser
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 33.32 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Painting works
1.0 Cornice lm. 13.89 88.00 68.00
2.0 Baseboards lm. 8.68 88.00 68.00
3.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 9.50 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard w/ fabric (Using Uratex
4.0 set/s 1.00 20,000.00 5,000.00
Foam & German Leatherette)
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 10.40 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.85 580.00 200.00
300mmx300mm
Page 34
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
5.0 Waterproofing works m² 2.99 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 Ceiling Repainting m² 1.85 132.00 108.00
Wall Replacement - Ficem Board@
8.0 m²
T&B
9.0 6mm thk Mirror @ T & B sets 1.00 1,550.00 120.00
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Page 35
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 33.32 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Painting works
1.0 Cornice lm. 13.89 88.00 68.00
2.0 Baseboards lm. 8.68 88.00 68.00
3.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 9.50 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard w/ fabric (Using Uratex
4.0 set/s 1.00 20,000.00 5,000.00
Foam & German Leatherette)
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 10.40 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.85 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 2.99 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 Ceiling Repainting m² 1.85 132.00 108.00
Wall Replacement - Ficem Board@
8.0 m²
T&B
Page 36
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
9.0 6mm thk Mirror @ T & B sets 1.00 1,550.00 120.00
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 33.32 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Page 37
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Doors and Hardwares
2.0 Door & Jamb Repainting pc/s 1.00 750.00 750.00
Stainless Butterfly Hinges - 3pcs per
3.0 200.00 55.00
door pc/s 3.00
Painting works
1.0 Cornice lm. 13.89 88.00 68.00
2.0 Baseboards lm. 8.68 88.00 68.00
3.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 9.50 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard w/ fabric (Using Uratex
4.0 set/s 1.00 20,000.00 5,000.00
Foam & German Leatherette)
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 10.40 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.85 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 2.99 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 Ceiling Repainting m² 1.85 132.00 108.00
Wall Replacement - Ficem Board@
8.0 m²
T&B
9.0 6mm thk Mirror @ T & B sets 1.00 1,550.00 120.00
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Page 38
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 33.32 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Page 39
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Painting works
1.0 Cornice lm. 13.89 88.00 68.00
2.0 Baseboards lm. 8.68 88.00 68.00
3.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 9.50 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard w/ fabric (Using Uratex
4.0 set/s 1.00 20,000.00 5,000.00
Foam & German Leatherette)
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 10.40 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.85 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 2.99 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 Ceiling Repainting m² 1.85 132.00 108.00
Wall Replacement - Ficem Board@
8.0 m²
T&B
9.0 6mm thk Mirror @ T & B sets 1.00 1,550.00 120.00
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Page 40
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 32.37 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Painting works
1.0 Cornice lm. 13.49 88.00 68.00
2.0 Baseboards lm. 8.38 88.00 68.00
3.0 ACU Mouldings lm. 1.00 88.00 68.00
Page 41
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 9.12 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard w/ fabric (Using Uratex
4.0 set/s 1.00 20,000.00 5,000.00
Foam & German Leatherette)
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 10.42 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.86 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.00 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 Ceiling Repainting m² 1.86 132.00 108.00
Wall Replacement - Ficem Board@
8.0 m²
T&B
9.0 6mm thk Mirror @ T & B sets 1.00 1,550.00 120.00
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Page 42
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 33.32 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Painting works
1.0 Cornice lm. 13.89 88.00 68.00
2.0 Baseboards lm. 8.68 88.00 68.00
3.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 9.50 750.00 200.00
400cmx400cm)
Page 43
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard w/ fabric (Using Uratex
4.0 set/s 1.00 20,000.00 5,000.00
Foam & German Leatherette)
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 10.40 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.85 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 2.99 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 Ceiling Repainting m² 1.85 132.00 108.00
Wall Replacement - Ficem Board@
8.0 m²
T&B
9.0 6mm thk Mirror @ T & B sets 1.00 1,550.00 120.00
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Page 44
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
2.0 T & B Fixtures set/s 1.00 500.00
3.0 Door and Jamb (T&B) set/s 1.00 250.00
4.0 Floor Tiles (Main Room) m² 9.50 150.00
5.0 Headboard set/s 1.00 250.00
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 38.78 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Shelves in paint finish in 3/4 thk
plywood w/ 2 x 2 solid wood w/
3.0 set/s 1.00 4,500.00 2,500.00
image canvass sticker and backing 1/2
thk plywood
3/4" thk plywood for Accent Framing
4.0 of Mirror in Paint Finish w/ 4mm thk set/s 1.00 3,000.00 1,500.00
Mirror
Painting works
1.0 Repainting of Baseboards lm. 13.03 88.00 68.00
2.0 ACU Mouldings lm. 1.00 88.00 68.00
Page 45
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 11.20 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
Refurbishing of Cabinet, Including
2.0 set/s 1.00 1,500.00 1,500.00
repainting
3.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
4.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard,incl canvass image wall &
5.0 set/s 1.00 15,000.00 5,000.00
Ceiling,LED strip light
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 11.38 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 2.23 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.45 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 6mm thk Mirror @ T & B pcs 1.00 1,550.00 120.00
8.0 Ceiling Repainting m² 2.23 132.00 108.00
Wall Replacement - Ficem Board@
9.0 m²
T&B
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Page 46
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 38.78 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Shelves in paint finish in 3/4 thk
plywood w/ 2 x 2 solid wood w/
3.0 set/s 1.00 4,500.00 2,500.00
image canvass sticker and backing 1/2
thk plywood
3/4" thk plywood for Accent Framing
4.0 of Mirror in Paint Finish w/ 4mm thk set/s 1.00 3,000.00 1,500.00
Mirror
Page 47
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Repainting of Door & jamb (Main
2.0 750.00 750.00
door) pc/s 1.00
Stainless Butterfly Hinges - 3pcs per
2.0 200.00 55.00
door pc/s 6.00
Painting works
1.0 Repainting of Baseboards lm. 13.03 88.00 68.00
2.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 11.20 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
Refurbishing of Cabinet, Including
2.0 set/s 1.00 1,500.00 1,500.00
repainting
3.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
4.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard,incl canvass image wall &
5.0 set/s 1.00 15,000.00 5,000.00
Ceiling,LED strip light
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 11.38 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 2.23 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.45 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 6mm thk Mirror @ T & B pcs 1.00 1,550.00 120.00
8.0 Ceiling Repainting m² 2.23 132.00 108.00
Wall Replacement - Ficem Board@
9.0 m²
T&B
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Page 48
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 38.78 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Page 49
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Shelves in paint finish in 3/4 thk
plywood w/ 2 x 2 solid wood w/
3.0 set/s 1.00 4,500.00 2,500.00
image canvass sticker and backing 1/2
thk plywood
3/4" thk plywood for Accent Framing
4.0 of Mirror in Paint Finish w/ 4mm thk set/s 1.00 3,000.00 1,500.00
Mirror
Painting works
1.0 Repainting of Baseboards lm. 13.03 88.00 68.00
2.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 11.20 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
Refurbishing of Cabinet, Including
2.0 set/s 1.00 1,500.00 1,500.00
repainting
3.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
4.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard,incl canvass image wall &
5.0 set/s 1.00 15,000.00 5,000.00
Ceiling,LED strip light
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 11.38 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Page 50
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Replacement floor tiles to
4.0 m² 2.23 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.45 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 6mm thk Mirror @ T & B pcs 1.00 1,550.00 120.00
8.0 Ceiling Repainting m² 2.23 132.00 108.00
Wall Replacement - Ficem Board@
9.0 m²
T&B
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Page 51
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Pinlights 5 Watts (Ante Room) w/
5.0 set/s 1.00 650.00 150.00
Frosted Glass Diffuser
Pinlight ( T&B-1pc.) - 7watts, with
6.0 set/s 1.00 750.00 150.00
Clear Glass diffuser
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 41.06 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Shelves in paint finish in 3/4 thk
plywood w/ 2 x 2 solid wood w/
3.0 set/s 1.00 4,500.00 2,500.00
image canvass sticker and backing 1/2
thk plywood
3/4" thk plywood for Accent Framing
4.0 of Mirror in Paint Finish w/ 4mm thk set/s 1.00 3,000.00 1,500.00
Mirror
Painting works
1.0 Repainting of Baseboards lm. 13.15 88.00 68.00
2.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 11.57 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
Refurbishing of Cabinet, Including
2.0 set/s 1.00 1,500.00 1,500.00
repainting
3.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
4.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Page 52
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Headboard,incl canvass image wall &
5.0 set/s 1.00 15,000.00 5,000.00
Ceiling,LED strip light
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 11.35 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 2.22 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.43 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 6mm thk Mirror @ T & B pcs 1.00 1,550.00 120.00
8.0 Ceiling Repainting m² 2.22 132.00 108.00
Wall Replacement - Ficem Board@
9.0 m²
T&B
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Page 53
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
1.00 Ante & Main Room
Ceiling Finishes
1.0 Ceiling Repainting sq.m 11.20 132.00 108.00
Drop Ceiling -Paint Finish w/ 2" x 2"
2.0 set/s 1.00 5,000.00 4,000.00
Good Lumber for Ceiling Design
Lighting Fixture - Drop light, 7W
3.0 set/s 1.00 3,000.00 150.00
(Dresser)
Pinlights 3 Watts (Main Room),w/
4.0 set/s 2.00 550.00 150.00
Frosted Glass Diffuser
Pinlights 5 Watts (Ante Room) w/
5.0 set/s 1.00 650.00 150.00
Frosted Glass Diffuser
Pinlight ( T&B-1pc.) - 7watts, with
6.0 set/s 1.00 750.00 150.00
Clear Glass diffuser
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 38.78 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Shelves in paint finish in 3/4 thk
plywood w/ 2 x 2 solid wood w/
3.0 set/s 1.00 4,500.00 2,500.00
image canvass sticker and backing 1/2
thk plywood
3/4" thk plywood for Accent Framing
4.0 of Mirror in Paint Finish w/ 4mm thk set/s 1.00 3,000.00 1,500.00
Mirror
Painting works
1.0 Repainting of Baseboards lm. 13.03 88.00 68.00
2.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 11.20 750.00 200.00
400cmx400cm)
Amenities
Page 54
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
Refurbishing of Cabinet, Including
2.0 set/s 1.00 1,500.00 1,500.00
repainting
3.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
4.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard,incl canvass image wall &
5.0 set/s 1.00 15,000.00 5,000.00
Ceiling,LED strip light
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 11.38 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 2.23 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.45 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 6mm thk Mirror @ T & B pcs 1.00 1,550.00 120.00
8.0 Ceiling Repainting m² 2.23 132.00 108.00
Wall Replacement - Ficem Board@
9.0 m²
T&B
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Page 55
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
2.0 T & B Fixtures set/s 1.00 500.00
3.0 Door and Jamb (T&B) set/s 1.00 250.00
4.0 Center Mouldings lm 13.78 5.00
5.0 Cornice lm 16.16 5.00
6.0 Headboard set/s 1.00 250.00
7.0 Floor Tiles (Main Room) m² 11.20 150.00
8.0 Wall Mirror w/ Frame set/s 1.00 50.00
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 41.06 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Shelves in paint finish in 3/4 thk
plywood w/ 2 x 2 solid wood w/
3.0 set/s 1.00 4,500.00 2,500.00
image canvass sticker and backing 1/2
thk plywood
3/4" thk plywood for Accent Framing
4.0 of Mirror in Paint Finish w/ 4mm thk set/s 1.00 3,000.00 1,500.00
Mirror
Painting works
Page 56
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
1.0 Repainting of Baseboards lm. 13.15 88.00 68.00
2.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 11.57 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
Refurbishing of Cabinet, Including
2.0 set/s 1.00 1,500.00 1,500.00
repainting
3.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
4.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard,incl canvass image wall &
5.0 set/s 1.00 15,000.00 5,000.00
Ceiling,LED strip light
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 11.35 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 2.22 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.43 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 6mm thk Mirror @ T & B pcs 1.00 1,550.00 120.00
8.0 Ceiling Repainting m² 2.22 132.00 108.00
Wall Replacement - Ficem Board@
9.0 m²
T&B
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Page 57
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 38.78 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Shelves in paint finish in 3/4 thk
plywood w/ 2 x 2 solid wood w/
3.0 set/s 1.00 4,500.00 2,500.00
image canvass sticker and backing 1/2
thk plywood
3/4" thk plywood for Accent Framing
4.0 of Mirror in Paint Finish w/ 4mm thk set/s 1.00 3,000.00 1,500.00
Mirror
Page 58
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Doors and Hardwares
Replacement of Door & Lockset (ante
1.0 2,350.00 750.00
room) pc/s 1.00
Repainting of Door & jamb (Main
2.0 750.00 750.00
door) pc/s 1.00
Stainless Butterfly Hinges - 3pcs per
2.0 200.00 55.00
door pc/s 6.00
Painting works
1.0 Repainting of Baseboards lm. 13.03 88.00 68.00
2.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 11.20 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
Refurbishing of Cabinet, Including
2.0 set/s 1.00 1,500.00 1,500.00
repainting
3.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
4.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard,incl canvass image wall &
5.0 set/s 1.00 15,000.00 5,000.00
Ceiling,LED strip light
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 11.38 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 2.23 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.45 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 6mm thk Mirror @ T & B pcs 1.00 1,550.00 120.00
8.0 Ceiling Repainting m² 2.23 132.00 108.00
Wall Replacement - Ficem Board@
9.0 m²
T&B
Page 59
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 38.78 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Page 60
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Shelves in paint finish in 3/4 thk
plywood w/ 2 x 2 solid wood w/
3.0 set/s 1.00 4,500.00 2,500.00
image canvass sticker and backing 1/2
thk plywood
3/4" thk plywood for Accent Framing
4.0 of Mirror in Paint Finish w/ 4mm thk set/s 1.00 3,000.00 1,500.00
Mirror
Painting works
1.0 Repainting of Baseboards lm. 13.03 88.00 68.00
2.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 11.20 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
Refurbishing of Cabinet, Including
2.0 set/s 1.00 1,500.00 1,500.00
repainting
3.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
4.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard,incl canvass image wall &
5.0 set/s 1.00 15,000.00 5,000.00
Ceiling,LED strip light
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 11.38 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Page 61
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Replacement floor tiles to
4.0 m² 2.23 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.45 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 6mm thk Mirror @ T & B pcs 1.00 1,550.00 120.00
8.0 Ceiling Repainting m² 2.23 132.00 108.00
Wall Replacement - Ficem Board@
9.0 m²
T&B
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Page 62
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Pinlights 5 Watts (Ante Room) w/
5.0 set/s 1.00 650.00 150.00
Frosted Glass Diffuser
Pinlight ( T&B-1pc.) - 7watts, with
6.0 set/s 1.00 750.00 150.00
Clear Glass diffuser
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 38.78 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Shelves in paint finish in 3/4 thk
plywood w/ 2 x 2 solid wood w/
3.0 set/s 1.00 4,500.00 2,500.00
image canvass sticker and backing 1/2
thk plywood
3/4" thk plywood for Accent Framing
4.0 of Mirror in Paint Finish w/ 4mm thk set/s 1.00 3,000.00 1,500.00
Mirror
Painting works
1.0 Repainting of Baseboards lm. 13.03 88.00 68.00
2.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 11.20 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
Refurbishing of Cabinet, Including
2.0 set/s 1.00 1,500.00 1,500.00
repainting
3.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
4.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Page 63
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Headboard,incl canvass image wall &
5.0 set/s 1.00 15,000.00 5,000.00
Ceiling,LED strip light
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 11.38 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 2.23 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.45 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 6mm thk Mirror @ T & B pcs 1.00 1,550.00 120.00
8.0 Ceiling Repainting m² 2.23 132.00 108.00
Wall Replacement - Ficem Board@
9.0 m²
T&B
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Page 64
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
1.00 Ante & Main Room
Ceiling Finishes
1.0 Ceiling Repainting sq.m 11.20 132.00 108.00
Drop Ceiling -Paint Finish w/ 2" x 2"
2.0 set/s 1.00 5,000.00 4,000.00
Good Lumber for Ceiling Design
Lighting Fixture - Drop light, 7W
3.0 set/s 1.00 3,000.00 150.00
(Dresser)
Pinlights 3 Watts (Main Room),w/
4.0 set/s 2.00 550.00 150.00
Frosted Glass Diffuser
Pinlights 5 Watts (Ante Room) w/
5.0 set/s 1.00 650.00 150.00
Frosted Glass Diffuser
Pinlight ( T&B-1pc.) - 7watts, with
6.0 set/s 1.00 750.00 150.00
Clear Glass diffuser
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 38.78 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Shelves in paint finish in 3/4 thk
plywood w/ 2 x 2 solid wood w/
3.0 set/s 1.00 4,500.00 2,500.00
image canvass sticker and backing 1/2
thk plywood
3/4" thk plywood for Accent Framing
4.0 of Mirror in Paint Finish w/ 4mm thk set/s 1.00 3,000.00 1,500.00
Mirror
Painting works
1.0 Repainting of Baseboards lm. 13.03 88.00 68.00
2.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 11.20 750.00 200.00
400cmx400cm)
Amenities
Page 65
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
Refurbishing of Cabinet, Including
2.0 set/s 1.00 1,500.00 1,500.00
repainting
3.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
4.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard,incl canvass image wall &
5.0 set/s 1.00 15,000.00 5,000.00
Ceiling,LED strip light
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 11.38 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 2.23 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.45 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 6mm thk Mirror @ T & B pcs 1.00 1,550.00 120.00
8.0 Ceiling Repainting m² 2.23 132.00 108.00
Wall Replacement - Ficem Board@
9.0 m²
T&B
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Page 66
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
2.0 T & B Fixtures set/s 1.00 500.00
3.0 Door and Jamb (T&B) set/s 1.00 250.00
4.0 Center Mouldings lm 13.78 5.00
5.0 Cornice lm 16.16 5.00
6.0 Headboard set/s 1.00 250.00
7.0 Floor Tiles (Main Room) m² 11.20 150.00
8.0 Wall Mirror w/ Frame set/s 1.00 50.00
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 38.78 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Shelves in paint finish in 3/4 thk
plywood w/ 2 x 2 solid wood w/
3.0 set/s 1.00 4,500.00 2,500.00
image canvass sticker and backing 1/2
thk plywood
3/4" thk plywood for Accent Framing
4.0 of Mirror in Paint Finish w/ 4mm thk set/s 1.00 3,000.00 1,500.00
Mirror
Painting works
Page 67
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
1.0 Repainting of Baseboards lm. 13.03 88.00 68.00
2.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 11.20 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
Refurbishing of Cabinet, Including
2.0 set/s 1.00 1,500.00 1,500.00
repainting
3.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
4.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard,incl canvass image wall &
5.0 set/s 1.00 15,000.00 5,000.00
Ceiling,LED strip light
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 11.38 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 2.23 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.45 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 6mm thk Mirror @ T & B pcs 1.00 1,550.00 120.00
8.0 Ceiling Repainting m² 2.23 132.00 108.00
Wall Replacement - Ficem Board@
9.0 m²
T&B
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Page 68
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 38.78 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Shelves in paint finish in 3/4 thk
plywood w/ 2 x 2 solid wood w/
3.0 set/s 1.00 4,500.00 2,500.00
image canvass sticker and backing 1/2
thk plywood
3/4" thk plywood for Accent Framing
4.0 of Mirror in Paint Finish w/ 4mm thk set/s 1.00 3,000.00 1,500.00
Mirror
Page 69
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Doors and Hardwares
Replacement of Door & Lockset (ante
1.0 2,350.00 750.00
room) pc/s 1.00
Repainting of Door & jamb (Main
2.0 750.00 750.00
door) pc/s 1.00
Stainless Butterfly Hinges - 3pcs per
2.0 200.00 55.00
door pc/s 6.00
Painting works
1.0 Repainting of Baseboards lm. 13.03 88.00 68.00
2.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 11.20 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
Refurbishing of Cabinet, Including
2.0 set/s 1.00 1,500.00 1,500.00
repainting
3.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
4.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard,incl canvass image wall &
5.0 set/s 1.00 15,000.00 5,000.00
Ceiling,LED strip light
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 11.38 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 2.23 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.45 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 6mm thk Mirror @ T & B pcs 1.00 1,550.00 120.00
8.0 Ceiling Repainting m² 2.23 132.00 108.00
Wall Replacement - Ficem Board@
9.0 m²
T&B
Page 70
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 38.78 140.00 132.00
Corner Ledge in paint finish in 3/4 thk
2.0 set/s 1.00 1,000.00 500.00
plywood
Page 71
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Shelves in paint finish in 3/4 thk
plywood w/ 2 x 2 solid wood w/
3.0 set/s 1.00 4,500.00 2,500.00
image canvass sticker and backing 1/2
thk plywood
3/4" thk plywood for Accent Framing
4.0 of Mirror in Paint Finish w/ 4mm thk set/s 1.00 3,000.00 1,500.00
Mirror
Painting works
1.0 Repainting of Baseboards lm. 13.03 88.00 68.00
2.0 ACU Mouldings lm. 1.00 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 11.20 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,000.00 2,500.00
-Incl Repainting;Installation of
Angular Support
Refurbishing of Cabinet, Including
2.0 set/s 1.00 1,500.00 1,500.00
repainting
3.0 Dresser mirror & frame replacement set/s 1.00 1,800.00 1,050.00
4.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
Headboard,incl canvass image wall &
5.0 set/s 1.00 15,000.00 5,000.00
Ceiling,LED strip light
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 11.38 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Page 72
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Replacement floor tiles to
4.0 m² 2.23 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.45 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 6mm thk Mirror @ T & B pcs 1.00 1,550.00 120.00
8.0 Ceiling Repainting m² 2.23 132.00 108.00
Wall Replacement - Ficem Board@
9.0 m²
T&B
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 1.00 250.00
Only)
Page 73
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Pinlights 5 Watts (Foyer) w/ Frosted
5.0 set/s 1.00 650.00 150.00
Glass Diffuser
Pinlight ( T&B-1pc.) - 7watts, with
6.0 set/s 1.00 750.00 150.00
Clear Glass diffuser
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 45.51 140.00 132.00
3/4" thk plywood for Accent Framing
2.0 of Mirror in Paint Finish w/ 4mm thk set/s 1.00 3,000.00 1,500.00
Mirror
Shelves in paint finish in 3/4 thk
plywood w/ 2 x 2 solid wood w/
3.0 set/s 1.00 4,500.00 2,500.00
image canvass sticker and backing 1/2
thk plywood
Display Painting in PTEX Material in
4.0 set/s 1.00 4,500.00 2,500.00
Latex Paint
Painting works
1.0 ACU Mouldings lm. 1.00 88.00 68.00
2.0 Baseboards lm. 14.89 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 18.81 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,500.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,880.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
4.0 Dinnete Chair (OSM) set/s 4.00
5.0 Dinnete Counter in New Design set/s 1.00 3,000.00 1,200.00
Page 74
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Refurbishing of Cabinet/Closet, Incl.
6.0 Replacement of Laminates and set/s 1.00 5,000.00 2,500.00
Repainting
Headboard,incl canvass image wall &
7.0 set/s 1.00 25,000.00 5,000.00
Ceiling,LED strip light
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 13.69 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.83 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 4.46 350.00 150.00
6.0 Tissue Holder (OSM - labor Only) pc/s 1.00 120.00
7.0 6mm thk Mirror @ T & B pcs 1.00 1,550.00 120.00
8.0 Ceiling Repainting m² 3.05 132.00 108.00
Wall Replacement - Ficem Board@
9.0 m²
T&B
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 2.00 250.00
Only)
17.0 Bathub - Contour Buffing sets 1.00 4,500.00 3,000.00
18.0 Rechrome Towel Rack sets 1.00 500.00
Page 75
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
6.0 Wall Mirror set/s 1.00 100.00
7.0 Ceiling Mirror set/s 1.00 100.00
8.0 Cornice lm 18.96 5.00
9.0 Bathub set/s 1.00 1,000.00
10.0 Floor Tiles (Main Room) m² 18.81 150.00
11.0 Towel Rack sets 1.00 50.00
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 47.88 140.00 132.00
3/4" thk plywood for Accent Framing
2.0 of Mirror in Paint Finish w/ 4mm thk set/s 1.00 3,000.00 1,500.00
Mirror
Display Painting in PTEX Material in
3.0 set/s 1.00 4,500.00 2,500.00
Latex Paint
Painting works
1.0 ACU Mouldings lm. 1.00 88.00 68.00
2.0 Baseboards lm. 15.88 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 18.83 750.00 200.00
400cmx400cm)
Page 76
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,500.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,880.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
4.0 Dinnete Chair (OSM) set/s 4.00
5.0 Dinnete Counter in New Design set/s 1.00 3,000.00 1,200.00
Refurbishing of Cabinet/Closet, Incl.
6.0 Replacement of Laminates and set/s 1.00 5,000.00 2,500.00
Repainting
Headboard,incl canvass image wall &
7.0 set/s 1.00 25,000.00 5,000.00
Ceiling,LED strip light
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 13.72 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.84 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.20 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 6mm thk Mirror @ T & B pcs 1.00 1,550.00 120.00
8.0 Ceiling Repainting m² 3.06 132.00 108.00
Wall Replacement - Ficem Board@
9.0 m²
T&B
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Page 77
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Installation of Grab Bar(OSM-Labor
16.0 sets 2.00 250.00
Only)
17.0 Bathub - Contour Buffing sets 1.00 4,500.00 3,000.00
18.0 Rechrome Towel Rack sets 1.00 500.00
Wall Finishes
1.0 Painting Walls (Non Accent) sq.m 47.88 140.00 132.00
3/4" thk plywood for Accent Framing
2.0 of Mirror in Paint Finish w/ 4mm thk set/s 1.00 3,000.00 1,500.00
Mirror
Display Painting in PTEX Material in
3.0 set/s 1.00 4,500.00 2,500.00
Latex Paint
Page 78
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Stainless Butterfly Hinges - 3pcs per
2.0 200.00 55.00
door pc/s 3.00
repalcement of Door stopper (Main &
3.0 120.00 55.00
T&B) pc/s 2.00
Painting works
1.0 ACU Mouldings lm. 1.00 88.00 68.00
2.0 Baseboards lm. 15.88 88.00 68.00
Floor Finishes
Ceramic Floor Tiles (Granito Bone-
1.0 sq.m 18.83 750.00 200.00
400cmx400cm)
Amenities
Refurbishing of Bedbox w/ side table
(Replacement of Laminate & Edging)
1.0 set/s 1.00 4,500.00 2,500.00
-Incl Repainting;Installation of
Angular Support
2.0 Dresser mirror & frame replacement set/s 1.00 1,880.00 1,050.00
3.0 Dresser Table New Design set/s 1.00 2,500.00 1,050.00
4.0 Dinnete Chair (OSM) set/s 4.00
5.0 Dinnete Counter in New Design set/s 1.00 3,000.00 1,200.00
Refurbishing of Cabinet/Closet, Incl.
6.0 Replacement of Laminates and set/s 1.00 5,000.00 2,500.00
Repainting
Headboard,incl canvass image wall &
7.0 set/s 1.00 25,000.00 5,000.00
Ceiling,LED strip light
2.00 T & B
PVC Door with louver white including
1.0 pc/s 1.00 2,150.00 750.00
hardwares
Replacement wall tiles to
2.0 m² 13.72 880.00 200.00
300mmx600mm
Accent wall tiles mariwasa brand
3.0 m² 3.24 680.00 200.00
30x30 ( 36pcs ) per T&B
Replacement floor tiles to
4.0 m² 1.84 580.00 200.00
300mmx300mm
5.0 Waterproofing works m² 3.20 350.00 150.00
6.0 Tissue Holder (OSM-Labor Only) pc/s 1.00 120.00
7.0 6mm thk Mirror @ T & B pcs 1.00 1,550.00 120.00
8.0 Ceiling Repainting m² 3.06 132.00 108.00
Wall Replacement - Ficem Board@
9.0 m²
T&B
Page 79
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Replacement of Water Closet incl
10.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Lavatory incl
11.0 set/s 1.00 650.00
Accessories (OSM-Labor Only)
Replacement of Bidet (OSM-Labor
12.0 sets 1.00 150.00
Only)
Replacement of Shower Head, Mixer
13.0 sets 1.00 650.00
& Spout (OSM-Labor Only)
Replacement of Lavatory Faucet
14.0 sets 1.00 150.00
(OSM-Labor Only)
Replacement of Floor Drain(OSM-
15.0 sets 1.00 150.00
Labor Only)
Installation of Grab Bar(OSM-Labor
16.0 sets 2.00 250.00
Only)
17.0 Bathub - Contour Buffing sets 1.00 4,500.00 3,000.00
18.0 Rechrome Towel Rack sets 1.00 500.00
C. Others
Page 80
Item
Description Unit Qty Unit Mat'l Unit Labor
No.
Page 81
Total Material Total Labor Total Amount
- 228,000.00 228,000.00
120,000.00 120,000.00
60,000.00 60,000.00
20,000.00 20,000.00
10,000.00 10,000.00
18,000.00 18,000.00
.
3,030,056.21 1,578,238.39 4,608,294.60
54,397.40 32,665.54 87,062.95
- - -
5,572.50 1,486.00 7,058.50
- - -
- - -
- 650.00 650.00
- 150.00 150.00
Page 83
Total Material Total Labor Total Amount
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- - -
- - -
- 2,427.90 2,427.90
- 500.00 500.00
- 250.00 250.00
- 1,114.50 1,114.50
- 250.00 250.00
- - -
5,947.50 1,586.00 7,533.50
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- - -
Page 85
Total Material Total Labor Total Amount
- - -
- 2,415.90 2,415.90
- 500.00 500.00
- 250.00 250.00
- 1,189.50 1,189.50
- 250.00 250.00
- - -
6,262.50 1,670.00 7,932.50
- - -
- - -
Page 86
Total Material Total Labor Total Amount
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- - -
- - -
- 2,417.85 2,417.85
- 500.00 500.00
- 250.00 250.00
- 1,252.50 1,252.50
Page 87
Total Material Total Labor Total Amount
- 250.00 250.00
- - -
6,022.50 1,606.00 7,628.50
- - -
- - -
Page 88
Total Material Total Labor Total Amount
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- - -
- - -
- 2,329.56 2,329.56
- 500.00 500.00
- 250.00 250.00
- 1,204.50 1,204.50
- 250.00 250.00
Page 89
Total Material Total Labor Total Amount
- - -
5,662.50 1,510.00 7,172.50
- - -
- - -
Page 90
Total Material Total Labor Total Amount
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- - -
- - -
- 2,325.90 2,325.90
- 500.00 500.00
- 250.00 250.00
- 1,132.50 1,132.50
- 250.00 250.00
Page 91
Total Material Total Labor Total Amount
- - -
5,901.75 1,573.80 7,475.55
- - -
- - -
Page 92
Total Material Total Labor Total Amount
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- - -
- - -
- 2,286.99 2,286.99
- 500.00 500.00
- 250.00 250.00
- 1,180.35 1,180.35
- 250.00 250.00
Page 93
Total Material Total Labor Total Amount
- - -
6,457.50 1,722.00 8,179.50
- - -
- - -
Page 94
Total Material Total Labor Total Amount
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- - -
- - -
- 2,328.12 2,328.12
- 500.00 500.00
- 250.00 250.00
- 1,291.50 1,291.50
- 250.00 250.00
Page 95
Total Material Total Labor Total Amount
- - -
6,802.50 1,814.00 8,616.50
- - -
- - -
Page 96
Total Material Total Labor Total Amount
- 650.00 650.00
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- - -
- - -
- 2,300.16 2,300.16
- 500.00 500.00
- 250.00 250.00
- 1,360.50 1,360.50
- 250.00 250.00
Page 97
Total Material Total Labor Total Amount
- - -
6,127.50 1,634.00 7,761.50
- - -
- - -
- 650.00 650.00
Page 98
Total Material Total Labor Total Amount
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- - -
- - -
- 2,327.40 2,327.40
- 500.00 500.00
- 250.00 250.00
- 1,225.50 1,225.50
- 250.00 250.00
Page 99
Total Material Total Labor Total Amount
- - -
6,216.00 1,657.60 7,873.60
- - -
- - -
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
Page 100
Total Material Total Labor Total Amount
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- - -
- - -
- 2,327.40 2,327.40
- 500.00 500.00
- 250.00 250.00
- 1,243.20 1,243.20
- 250.00 250.00
Page 101
Total Material Total Labor Total Amount
- - -
6,187.50 1,650.00 7,837.50
- - -
- - -
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
Page 102
Total Material Total Labor Total Amount
- 250.00 250.00
- - -
- - -
- 2,329.20 2,329.20
- 500.00 500.00
- 250.00 250.00
- 1,237.50 1,237.50
- 250.00 250.00
- - -
5,962.50 1,590.00 7,552.50
Page 103
Total Material Total Labor Total Amount
- - -
- - -
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- - -
- - -
- 2,325.57 2,325.57
Page 104
Total Material Total Labor Total Amount
- 500.00 500.00
- 250.00 250.00
- 1,192.50 1,192.50
- 250.00 250.00
- - -
6,348.00 1,692.80 8,040.80
- - -
- - -
Page 105
Total Material Total Labor Total Amount
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- - -
- - -
- 2,321.58 2,321.58
- 500.00 500.00
- 250.00 250.00
Page 106
Total Material Total Labor Total Amount
- 1,269.60 1,269.60
- 250.00 250.00
-
73,550.22 36,726.40 110,276.62
- - -
7,045.50 1,878.80 8,924.30
- - -
- - -
Page 107
Total Material Total Labor Total Amount
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- - -
- - -
- 2,328.33 2,328.33
- 500.00 500.00
- 250.00 250.00
- 1,409.10 1,409.10
- 250.00 250.00
Page 108
Total Material Total Labor Total Amount
- - -
7,045.50 1,878.80 8,924.30
- - -
- - -
Page 109
Total Material Total Labor Total Amount
- - -
- - -
2,150.00 750.00 2,900.00
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- - -
- - -
- 2,328.33 2,328.33
- 500.00 500.00
- 250.00 250.00
- 1,409.10 1,409.10
- 250.00 250.00
Page 110
Total Material Total Labor Total Amount
- - -
7,045.50 1,878.80 8,924.30
- - -
- - -
Page 111
Total Material Total Labor Total Amount
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- - -
- - -
- 2,328.33 2,328.33
- 500.00 500.00
- 250.00 250.00
- 1,409.10 1,409.10
- 250.00 250.00
Page 112
Total Material Total Labor Total Amount
- - -
7,125.00 1,900.00 9,025.00
- - -
- - -
Page 113
Total Material Total Labor Total Amount
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- - -
- - -
- 2,324.19 2,324.19
- 500.00 500.00
- 250.00 250.00
- 1,425.00 1,425.00
- 250.00 250.00
Page 114
Total Material Total Labor Total Amount
- - -
7,125.00 1,900.00 9,025.00
- - -
- - -
Page 115
Total Material Total Labor Total Amount
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- - -
- - -
- 2,324.19 2,324.19
- 500.00 500.00
- 250.00 250.00
- 1,425.00 1,425.00
- 250.00 250.00
Page 116
Total Material Total Labor Total Amount
- - -
4,665.36 4,398.77 9,064.13
1,000.00 500.00 1,500.00
- - -
- - -
750.00 750.00 1,500.00
600.00 165.00 765.00
- - -
- - -
7,125.00 1,900.00 9,025.00
- - -
- - -
Page 117
Total Material Total Labor Total Amount
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- - -
- - -
- 2,324.19 2,324.19
- 500.00 500.00
- 250.00 250.00
- 1,425.00 1,425.00
- 250.00 250.00
- - -
4,665.36 4,398.77 9,064.13
1,000.00 500.00 1,500.00
- - -
Page 118
Total Material Total Labor Total Amount
- - -
750.00 750.00 1,500.00
600.00 165.00 765.00
- - -
- - -
7,125.00 1,900.00 9,025.00
- - -
- - -
- 650.00 650.00
Page 119
Total Material Total Labor Total Amount
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- - -
- - -
- 2,324.19 2,324.19
- 500.00 500.00
- 250.00 250.00
- 1,425.00 1,425.00
- 250.00 250.00
Page 120
Total Material Total Labor Total Amount
- - -
7,125.00 1,900.00 9,025.00
- - -
- - -
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
Page 121
Total Material Total Labor Total Amount
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- - -
- - -
- 2,324.19 2,324.19
- 500.00 500.00
- 250.00 250.00
- 1,425.00 1,425.00
- 250.00 250.00
Page 122
Total Material Total Labor Total Amount
- - -
6,838.50 1,823.60 8,662.10
- - -
- - -
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
Page 123
Total Material Total Labor Total Amount
- 250.00 250.00
- - -
- - -
- 2,328.48 2,328.48
- 500.00 500.00
- 250.00 250.00
- 1,367.70 1,367.70
- 250.00 250.00
- - -
7,125.00 1,900.00 9,025.00
Page 124
Total Material Total Labor Total Amount
- - -
- - -
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- - -
- - -
- 2,324.19 2,324.19
Page 125
Total Material Total Labor Total Amount
- 500.00 500.00
- 250.00 250.00
- 1,425.00 1,425.00
- 250.00 250.00
- - -
- - -
2,350.00 750.00 3,100.00
Page 126
Total Material Total Labor Total Amount
- - -
8,400.75 2,240.20 10,640.95
- - -
- - -
- 650.00 650.00
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
Page 127
Total Material Total Labor Total Amount
- 250.00 250.00
- 2,527.68 2,527.68
- 500.00 500.00
- 250.00 250.00
- 68.90 68.90
80.80 80.80
- 250.00 250.00
- 1,680.15 1,680.15
- 50.00 50.00
- - -
- - -
2,350.00 750.00 3,100.00
Page 128
Total Material Total Labor Total Amount
- 650.00 650.00
Page 129
Total Material Total Labor Total Amount
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- 2,527.68 2,527.68
- 500.00 500.00
- 250.00 250.00
- 68.90 68.90
80.80 80.80
- 250.00 250.00
- 1,680.15 1,680.15
- 50.00 50.00
Page 130
Total Material Total Labor Total Amount
- - -
- - -
2,350.00 750.00 3,100.00
Page 131
Total Material Total Labor Total Amount
- 650.00 650.00
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- 2,527.68 2,527.68
- 500.00 500.00
- 250.00 250.00
- 68.90 68.90
80.80 80.80
- 250.00 250.00
- 1,680.15 1,680.15
- 50.00 50.00
Page 132
Total Material Total Labor Total Amount
- - -
- - -
2,350.00 750.00 3,100.00
Page 133
Total Material Total Labor Total Amount
- 650.00 650.00
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- 2,521.86 2,521.86
- 500.00 500.00
- 250.00 250.00
- 45.96 45.96
85.54 85.54
- 250.00 250.00
- 1,735.80 1,735.80
- 50.00 50.00
Page 134
Total Material Total Labor Total Amount
- - -
- - -
2,350.00 750.00 3,100.00
Page 135
Total Material Total Labor Total Amount
- 650.00 650.00
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- 2,527.68 2,527.68
Page 136
Total Material Total Labor Total Amount
- 500.00 500.00
- 250.00 250.00
- 68.90 68.90
80.80 80.80
- 250.00 250.00
- 1,680.15 1,680.15
- 50.00 50.00
- - -
- - -
2,350.00 750.00 3,100.00
Page 137
Total Material Total Labor Total Amount
- 650.00 650.00
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
Page 138
Total Material Total Labor Total Amount
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- 2,521.86 2,521.86
- 500.00 500.00
- 250.00 250.00
- 45.96 45.96
85.54 85.54
- 250.00 250.00
- 1,735.80 1,735.80
- 50.00 50.00
- - -
Page 139
Total Material Total Labor Total Amount
- - -
2,350.00 750.00 3,100.00
Page 140
Total Material Total Labor Total Amount
- 650.00 650.00
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- 2,527.68 2,527.68
- 500.00 500.00
- 250.00 250.00
- 68.90 68.90
80.80 80.80
- 250.00 250.00
- 1,680.15 1,680.15
- 50.00 50.00
Page 141
Total Material Total Labor Total Amount
- - -
- - -
2,350.00 750.00 3,100.00
Page 142
Total Material Total Labor Total Amount
- 650.00 650.00
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- 2,527.68 2,527.68
- 500.00 500.00
- 250.00 250.00
- 68.90 68.90
80.80 80.80
- 250.00 250.00
- 1,680.15 1,680.15
- 50.00 50.00
Page 143
Total Material Total Labor Total Amount
- - -
- - -
2,350.00 750.00 3,100.00
Page 144
Total Material Total Labor Total Amount
- 650.00 650.00
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- 2,527.68 2,527.68
- 500.00 500.00
- 250.00 250.00
- 68.90 68.90
80.80 80.80
- 250.00 250.00
- 1,680.15 1,680.15
- 50.00 50.00
Page 145
Total Material Total Labor Total Amount
- - -
- - -
2,350.00 750.00 3,100.00
Page 146
Total Material Total Labor Total Amount
- 650.00 650.00
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- 2,527.68 2,527.68
Page 147
Total Material Total Labor Total Amount
- 500.00 500.00
- 250.00 250.00
- 68.90 68.90
80.80 80.80
- 250.00 250.00
- 1,680.15 1,680.15
- 50.00 50.00
- - -
- - -
2,350.00 750.00 3,100.00
Page 148
Total Material Total Labor Total Amount
- 650.00 650.00
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
Page 149
Total Material Total Labor Total Amount
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- 2,527.68 2,527.68
- 500.00 500.00
- 250.00 250.00
- 68.90 68.90
80.80 80.80
- 250.00 250.00
- 1,680.15 1,680.15
- 50.00 50.00
- - -
Page 150
Total Material Total Labor Total Amount
- - -
2,350.00 750.00 3,100.00
Page 151
Total Material Total Labor Total Amount
- 650.00 650.00
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- 2,527.68 2,527.68
- 500.00 500.00
- 250.00 250.00
- 68.90 68.90
80.80 80.80
- 250.00 250.00
- 1,680.15 1,680.15
- 50.00 50.00
Page 152
Total Material Total Labor Total Amount
- - -
- - -
2,350.00 750.00 3,100.00
Page 153
Total Material Total Labor Total Amount
- 650.00 650.00
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 250.00 250.00
- 2,527.68 2,527.68
- 500.00 500.00
- 250.00 250.00
- 68.90 68.90
80.80 80.80
- 250.00 250.00
- 1,680.15 1,680.15
- 50.00 50.00
Page 154
Total Material Total Labor Total Amount
Page 155
Total Material Total Labor Total Amount
- 650.00 650.00
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 500.00 500.00
4,500.00 3,000.00 7,500.00
- 500.00 500.00
- - -
- - -
- 2,814.54 2,814.54
- 500.00 500.00
- 250.00 250.00
- 87.16 87.16
- 5.00 5.00
Page 156
Total Material Total Labor Total Amount
- 100.00 100.00
- 100.00 100.00
94.81 94.81
1,000.00 1,000.00
- 2,821.05 2,821.05
50.00 50.00
Page 157
Total Material Total Labor Total Amount
- - -
- - -
- 650.00 650.00
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
Page 158
Total Material Total Labor Total Amount
- 500.00 500.00
4,500.00 3,000.00 7,500.00
- 500.00 500.00
- - -
- - -
- 2,820.36 2,820.36
- 500.00 500.00
- 250.00 250.00
- 92.11 92.11
- 5.00 5.00
- 100.00 100.00
- 100.00 100.00
99.76 99.76
1,000.00 1,000.00
- 2,824.20 2,824.20
50.00 50.00
Page 159
Total Material Total Labor Total Amount
Page 160
Total Material Total Labor Total Amount
- 650.00 650.00
- 650.00 650.00
- 150.00 150.00
- 650.00 650.00
- 150.00 150.00
- 150.00 150.00
- 500.00 500.00
4,500.00 3,000.00 7,500.00
- 500.00 500.00
- - -
- - -
- 2,820.36 2,820.36
- 500.00 500.00
- 250.00 250.00
- 92.11 92.11
- 5.00 5.00
- 100.00 100.00
- 100.00 100.00
99.76 99.76
1,000.00 1,000.00
- 2,824.20 2,824.20
50.00 50.00
Page 161
Total Material Total Labor Total Amount
7,080,000.00
181,538.46
August 1, 2018
Page 162
XXIX. Deluxe - Room 221 ###
1.00 Ante & Main Room
Ceiling Finishes
1.0 Ceiling Repainting sq.m 11.57
###
2.0 Drop Ceiling -Paint Finish w/ 2" x 2" Good Lumber for Ceiling Design set/s 1.00
###
3.0 Lighting Fixture - Drop light, 7W (Dresser) set/s 1.00
###
4.0 Pinlights 3 Watts (Main Room),w/ Frosted Glass Diffuser set/s 2.00
###
5.0 Pinlights 5 Watts (Ante Room) w/ Frosted Glass Diffuser set/s 1.00
###
6.0 Pinlight ( T&B-1pc.) - 7watts, with Clear Glass diffuser set/s 1.00
###
###
Wall Finishes ###
1.0 Painting Walls (Non Accent) sq.m 41.06
###
2.0 Corner Ledge in paint finish in 3/4 thk plywood set/s 1.00
###
Shelves in paint finish in 3/4 thk plywood w/ 2 x 2 solid wood w/ image
3.0 set/s 1.00
###
canvass sticker and backing 1/2 thk plywood
3/4" thk plywood for Accent Framing of Mirror in Paint Finish w/ 4mm
4.0 set/s 1.00
###
thk Mirror
###
Doors and Hardwares ###
1.0 Replacement of Door & Lockset (ante room) pc/s ###
1.00
2.0 Repainting of Door & jamb (Main door) pc/s ###
1.00
2.0 Stainless Butterfly Hinges - 3pcs per door pc/s ###
6.00
###
Painting works ###
1.0 Repainting of Baseboards lm. 13.15
###
2.0 ACU Mouldings lm. 1.00
###
###
Floor Finishes ###
1.0 Ceramic Floor Tiles (Granito Bone-400cmx400cm) sq.m 11.57
###
###
Amenities ###
Refurbishing of Bedbox w/ side table (Replacement of Laminate &
1.0 set/s 1.00
###
Edging) -Incl Repainting;Installation of Angular Support
2.0 Refurbishing of Cabinet, Including repainting set/s 1.00
###
3.0 Dresser mirror & frame replacement set/s 1.00
###
4.0 Dresser Table New Design set/s 1.00
###
5.0 Headboard,incl canvass image wall & Ceiling,LED strip light set/s 1.00
###
###
2.00 T & B ###
1.0 PVC Door with louver white including hardwares pc/s 1.00
###
2.0 Replacement wall tiles to 300mmx600mm m² 11.35
###
3.0 Accent wall tiles mariwasa brand 30x30 ( 36pcs ) per T&B m² 3.24
###
4.0 Replacement floor tiles to 300mmx300mm m² 2.22
###
5.0 Waterproofing works m² 3.43
###
6.0 Tissue Holder (OSM-Labor Only) pc/s ###
1.00
7.0 6mm thk Mirror @ T & B pcs 1.00
###
8.0 Ceiling Repainting m² 2.22
###
9.0 Wall Replacement - Ficem Board@ T&B m² ###
10.0 Replacement of Water Closet incl Accessories (OSM-Labor Only) set/s 1.00
###
11.0 Replacement of Lavatory incl Accessories (OSM-Labor Only) set/s 1.00
###
12.0 Replacement of Bidet (OSM-Labor Only) sets 1.00
###
13.0 Replacement of Shower Head, Mixer & Spout (OSM-Labor Only) sets 1.00
###
14.0 Replacement of Lavatory Faucet (OSM-Labor Only) sets 1.00
###
15.0 Replacement of Floor Drain(OSM-Labor Only) sets 1.00
###
16.0 Installation of Grab Bar(OSM-Labor Only) sets 1.00
###