PLAN:

STRUCTURAL PLAN:
FOOTING PLAN:

FOOTING SCHEDULE:
SLAB LAYOUT:

STAAD.Pro Report
To: From:

Copy to: Date: Ref:


21/06/201 ca/ Document2
8 14:23:00

Job Information

Engineer Checked Approved


Name:
Date: 20-Jun-18

Structure Type SPACE FRAME

Number of Nodes 48 Highest Node 48


Number of Elements 87 Highest Beam 87
Number of Basic Load Cases 2
Number of Combination Load Cases 0

Included in this printout are data for:


All The Whole Structure

Included in this printout are results for load cases:


Type L/C Name
Primary 1 LOAD CASE 1
Primary 2 LOAD CASE 2

Primary Load Cases

Number Name Type


1 LOAD CASE 1 Dead
2 LOAD CASE 2 Live

Beam End Force Summary


The signs of the forces at end B of each beam have been reversed. For example: this means that the Min Fx entry gives the
largest tension value for an beam.
Axial Shear Torsion Bending
Fx Fy Fz Mx My Mz
Beam Node L/C
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max Fx 24 7 2:LOAD CASE 161.916 -0.339 1.374 -0.001 -1.317 -0.326
Min Fx 45 25 2
1:LOAD CASE -0.375 5.106 0.000 0.000 -0.000 3.026
Max Fy 51 31 1
2:LOAD CASE 0.529 18.356 -0.003 -0.007 0.006 16.696
Min Fy 46 30 2
2:LOAD CASE 0.668 -20.596 0.004 -0.007 0.008 19.045
Max Fz 28 11 2
2:LOAD CASE 71.255 -0.190 5.644 0.000 -5.698 -0.183
Min Fz 19 2 2
2:LOAD CASE 77.413 0.185 -7.079 0.003 7.328 0.178
Max Mx 44 27 2
2:LOAD CASE 0.211 7.576 0.006 0.427 -0.012 5.986
Min Mx 42 25 2
2:LOAD CASE 0.211 6.864 -0.006 -0.427 0.012 4.634
Max My 19 2 2
2:LOAD CASE 77.413 0.185 -7.079 0.003 7.328 0.178
Min My 31 2 2
2:LOAD CASE 44.699 0.080 3.872 0.001 -5.915 0.119
Max Mz 46 30 2
2:LOAD CASE 0.668 -20.596 0.004 -0.007 0.008 19.045
Min Mz 22 5 2
2:LOAD CASE 79.121 -4.854 0.771 0.001 -0.717 -5.060
2

Whole Structure
Mz(kNm)
6 4.28 6
4 3.03 4
2 2
2.21
26 30
2 1 2 3 4 4.42 2
4 -2.3 4
6 6

Beam 46, Mz, 1 LOAD CASE 1

Fy(kN)
6 5.11 6
4 4
2 2
26 30
2 1 2 3 4 4.42 2
4 4
6 6
-5.67

Beam 46, Fy, 1 LOAD CASE 1

Fx(kN)
0.40 0.40
0.20 0.20
26 30
0.20 1 2 3 4 4.42 0.20
0.40 0.40
-0.375 -0.375

Beam 46, Fx, 1 LOAD CASE 1

REINFORCEMENT DETAILS FOR THE CRITICAL SECTION

CONCRETE DESIGN OF BEAM


CONCRETE DESIGN OF COLUMN