DG – DONEGALL
H – HANNAHSTOWN BALLYLUMFORD POWERSTATION
TO BALLYMENA LARNE
F – FINAGHY LETTERKENNY
KELLS
B
BC – BELFAST CENTRAL CREAGH MOYLE INTERCONECTOR
CE – CREGAGH STRABANE
R – ROSEBANK MAGHERAFELT E
NORFIL KILROOT POWER STATION
K – KNOCK CR
ANTRIM
G
PSW RATHGAEL
BC R K
DG
H CE NEWTOWNARDS
CASTLEREAGH
F
OMAGH
TYRONE LISBURN
DUNGANNON
WARRINGSTOWN
DRUMNAKELLY
BALLYNAHINCH
TANDRAGEE
ENNISKILLEN BANBRIDGE
110KV SUBSTATION
POWER FLOW
CONTROLLER
MECH SWITCHED
CAPACITANCE
257 MW Connected 38 MW
COLERAINE
COOLKEERAGH
POWER
STATION
LIMAVADY
LISAGHMORE 26 MW
KELLS
STRABANE
MAGHERAFELT
104 MW
OMAGH
76 MW TYRONE
DUNGANNON
TANDRAGEE
ENNISKILLEN
POWERSTATION
LOUTH
275KV SUBSTATION
110KV SUBSTATION
POWER FLOW
CONTROLLER
MECH SWITCHED
CAPACITANCE
53 MW (+39%)
225 MW Contracted
(% increase on connected capacity)
COLERAINE
COOLKEERAGH
POWER 93 MW (+291%)
STATION
LIMAVADY
LISAGHMORE
KELLS
STRABANE
MAGHERAFELT
247 MW(+138%)
OMAGH
76 MW(0%) TYRONE
DUNGANNON
TANDRAGEE
ENNISKILLEN
POWERSTATION
LOUTH
275KV SUBSTATION
110KV SUBSTATION
POWER FLOW
CONTROLLER
MECH SWITCHED
CAPACITANCE
270 MW
483 MW Connected+ contracted
53 MW
1200 MW Capacity in Planning
143 MW
COLERAINE
COOLKEERAGH
POWER
STATION 93 MW
LIMAVADY
LISAGHMORE
610 MW
STRABANE
MAGHERAFELT
247 MW
114 MW
OMAGH
TYRONE
DUNGANNON
76 MW
TANDRAGEE
ENNISKILLEN
POWERSTATION
LOUTH
275KV SUBSTATION
110KV SUBSTATION
POWER FLOW
CONTROLLER
MECH SWITCHED
CAPACITANCE
Network Development
• Critical that strategies are brought
forward into detailed plans
• Developers keen to understand how
constraints will be reduced
• Financially firm delivery dates for
major projects
– Incentivise owners and operators to
achieve target timelines
Other Issues
• Clear rules for curtailment particularly
for non firm windfarms
• Constraint reports suitable for banking
due diligence
• Transparency around connection offer
process
– Publish list of all accepted offers
• Significant concern around proposed
Supplementary Planning Guidelines
Summary
• NI has excellent potential to develop a
significant wind industry
• Investors require certainty around roll
out of key infrastructure
• Planning guidelines should enable
responsible development