Вы находитесь на странице: 1из 4

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

DOORS

WINDOWS
DOORS

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

WINDOWS

SCHEDULE OF DOORS AND WINDOWS


SCALE 1 : 50 M

Prepared by: Checked by: Approved by: PROJECT NAME : Sheet Content: DRAWN BY: ADD Revisions: Sheet No.:
REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF TRANSPORTATION AND TAY TAY AIRPORT DEVELOPMENT PROJECT 2015 CHECKED BY: -

COMMUNICATIONS 5 5
AS SHOWN DATE DRAWN: --/--/--
PROJECT DEVELOPMENT SERVICE PROJECT SCOPE:

- JULIUS C. CARLOS DEO LEO N. MANALO Proposed Passenger Terminal Building and Vehicular Parking Area DATE PRINTED: --/--/-- Total Sheet No.:
UNIT 83, THE COLUMBIA TOWER, BRGY. WACK WACK, - Engineer IV Director, Project Development Service
ORTIGAS AVENUE, MANDALUYONG CITY 1555
LOCATION : Brgy. Sandoval, Taytay , Palawan SCALE : AS SHOWN DATE APPROVED: --/--/-- 5 - 13
The copyright of this drawing remains the property of the Department of Transportation and Communications whose permission must be obtained before any use of it can be made.

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

2cm +/- 3mm


ASPHALT SEALANT

1 cm SPACED @ 76cm on center

0.1T

T/2

0.2T
T
THIS SIDE POURED
FIRST

CROSS SECTION
HINGED CONSTRUCTION (J-4)
SCALE 1 : 30M

ASPHALT SEALANT

T/4 to T/6
1 cm
SPACED @ 30.5cm on center

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

T/2
T
DOWELED BUTT CONSTRUCTION (J-8)

NOTE:
1. Dowels shall be supported and held in
place by an approved assembly.
2. All formed joints shall be finished with
radius 6mm or 13mm.
3. All grooves of contraction joints shall
be sawed within 24 hours. As an
alternative, a 10mm x 100mm x 3.0m
flat bar may be placed between joints
during paving operations to isolate the
joint during contraction.
4. Where paving operations are delayed
or stopped, provide dowel butt
construction joint (J-8).
5. Concrete blocking shall be 3.0
meters x 3.0 meters, unless
otherwise governed by an abutting
edge.
SITE DEVELOPMENT PLAN 6. Provide Expansion Joint (J-1A) @
1 : 200 M
SCALE
every sixty (60) meter interval.

Prepared by: Checked by: Approved by: PROJECT NAME : Sheet Content: DRAWN BY: ADD Revisions: Sheet No.:
REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF TRANSPORTATION AND TAY TAY AIRPORT DEVELOPMENT PROJECT 2015 CHECKED BY: -

COMMUNICATIONS 1 1
AS SHOWN DATE DRAWN: --/--/--
PROJECT DEVELOPMENT SERVICE PROJECT SCOPE:

- JULIUS C. CARLOS DEO LEO N. MANALO Proposed Passenger Terminal Building and Vehicular Parking Area DATE PRINTED: --/--/-- Total Sheet No.:
UNIT 83, THE COLUMBIA TOWER, BRGY. WACK WACK, - Engineer IV Director, Project Development Service
ORTIGAS AVENUE, MANDALUYONG CITY 1555
LOCATION : Brgy. Sandoval, Taytay , Palawan SCALE : AS SHOWN DATE APPROVED: --/--/-- 13 - 13
The copyright of this drawing remains the property of the Department of Transportation and Communications whose permission must be obtained before any use of it can be made.

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

A B C D A B C D

4 4

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


3 3
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

2 2

1 1

FOUNDATION PLAN ROOF BEAM LAYOUT


SCALE 1 : 100 M SCALE 1 : 100 M

Prepared by: Checked by: Approved by: PROJECT NAME : Sheet Content: DRAWN BY: ADD Revisions: Sheet No.:
REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF TRANSPORTATION AND TAY TAY AIRPORT DEVELOPMENT PROJECT 2015 CHECKED BY: -

COMMUNICATIONS 1 3
AS SHOWN DATE DRAWN: --/--/--
PROJECT DEVELOPMENT SERVICE PROJECT SCOPE:

- JULIUS C. CARLOS DEO LEO N. MANALO Proposed Passenger Terminal Building and Vehicular Parking Area DATE PRINTED: --/--/-- Total Sheet No.:
UNIT 83, THE COLUMBIA TOWER, BRGY. WACK WACK, - Engineer IV Director, Project Development Service
ORTIGAS AVENUE, MANDALUYONG CITY 1555
LOCATION : Brgy. Sandoval, Taytay , Palawan SCALE : AS SHOWN DATE APPROVED: --/--/-- 6 - 13
The copyright of this drawing remains the property of the Department of Transportation and Communications whose permission must be obtained before any use of it can be made.

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

NOTE:
REINFORCING BAR FOR SLAB OPENING

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

OPENING SIZE VERTICAL & HORIZONTAL

UNDER 600

UNDER 800

Prepared by: Checked by: Approved by: PROJECT NAME : Sheet Content: DRAWN BY: ADD Revisions: Sheet No.:
REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF TRANSPORTATION AND TAY TAY AIRPORT DEVELOPMENT PROJECT 2015 CHECKED BY: -

COMMUNICATIONS 2 3
AS SHOWN DATE DRAWN: --/--/--
PROJECT DEVELOPMENT SERVICE PROJECT SCOPE:

- JULIUS C. CARLOS DEO LEO N. MANALO Proposed Passenger Terminal Building and Vehicular Parking Area DATE PRINTED: --/--/-- Total Sheet No.:
UNIT 83, THE COLUMBIA TOWER, BRGY. WACK WACK, - Engineer IV Director, Project Development Service
ORTIGAS AVENUE, MANDALUYONG CITY 1555
LOCATION : Brgy. Sandoval, Taytay , Palawan SCALE : AS SHOWN DATE APPROVED: --/--/-- 7 - 13
The copyright of this drawing remains the property of the Department of Transportation and Communications whose permission must be obtained before any use of it can be made.

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Вам также может понравиться